Bakken/Three Forks Drilling Economics

Similar documents
January 2018 Monthly Update North Dakota Pipeline Authority Justin J. Kringstad January 16, 2018

Industrial Commission Update. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

American Petroleum Institute Dickinson Chapter. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Bakken Well Economics & Production Forecasting

ND Pipeline Authority Web Presentation

North Dakota Industrial Commission. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Williston Basin Petroleum Conference

UTC Region 5 Meeting. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

North Dakota Department of Mineral Resources. 600 East Boulevard Ave. - Dept 405 Bismarck, ND (701) (701)

Bakken Investor Conference North Dakota Pipeline Authority Justin J. Kringstad April 25, Minot, ND. March 8,

Utilization of Associated Gas to Power Drilling Rigs A Demonstration in the Bakken

2011 Economic Impact Report

Inland Truck Shortage in North America. February 2018

Interior Gas Utility. April 2014

2.2 Deep-dive E-Mobility

Alpine Highway to North County Boulevard Connector Study

4lliedSig nal. Development of a Digital Control Unit to Displace Diesel Fuel With Natural Gas. Federal Manufacturing & Tech nolog ies. A. D.

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Legend. 0 1,000 2,000 Feet

THE ALTERNATIVE FUEL PRICE REPORT

Advance Trading, Inc. Supply/Demand Summary

Trond-Erik Johansen President ConocoPhillips Alaska

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

Estimation of Average Trip Lengths To and From Century City Center Century City, California

Bald Hill on track to start lithium concentrate production this quarter

Small GTL A New Midstream Opportunity

U.S. Crude Exports and Impact on Trade

Fleet Incentives for Clean Vehicles. June 23, 2015

Valvoline Fourth-Quarter Fiscal 2016 Earnings Conference Call. November 9, 2016

Hotel Performance Outlook North Dakota Travel Industry Conference

Brazil: a Historic Opportunity for the Global Oil and Gas Industry

Sales and Use Transportation Tax Implementation Plan

3QFY2018 Financial Results. Quarter Ended 31 December 2017

There is no shortage of attention on the issue of Bakken related natural gas flaring.

VEHICLE FLEET MANAGEMENT AT THE IDAHO NATIONAL ENGINEERING AND ENVl RONMENTAL LABORATORY

Meter Reader: Commodity Price Sticking

Borrego Springs Microgrid Demonstration Overview

Parks and Transportation System Development Charge Methodology

The Realities of Consumer-Owned Wind Power For Rural Electric Co-operatives

1QFY2018 Financial Results. Quarter Ended 30 June 2017

Pão de Açúcar A sweet high-impact discovery! Pão de Açúcar = The Sugar Loaf Mountain

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Applied Materials is accelerating Solar

Volatility Advantage for CRT

Electric Vehicle Cost-Benefit Analyses

Non-ABM Component Status. Presented to project status meeting: 11/27/2017

NGK Insulators, Ltd. Nov. 2009

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

May 1, SUBJECT: Demand Forecasting and the Transportation Sector

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

Economic Development Benefits of Plug-in Electric Vehicles in Massachusetts. Al Morrissey - National Grid REMI Users Conference 2017 October 25, 2017

Vanpool Regional Administration

ABATEMENT TECHNOLOGY, RFO vs DISTILLATE - impact on costs & emissions

The Economic Impact of Franchised New Vehicle Dealers on the Colorado Economy

U.S. Rail Crude Oil Traffic

DRAFT KIRKLAND HIGH QUALITY POZZOLAN MINE SUPPLEMENTAL TRAFFIC ANALYSIS. Bureau of Land Management TABLE OF CONTENTS

Driving to Net Zero. County of Santa Clara Office of Sustainability. Submitted to: Santa Clara County Submitted by: ICF

Sacramento Municipal Utility District s EV Innovators Pilot

Analyst Briefing. FGV Green Energy Sdn Bhd ACQUISITION OF M2 BIODIESEL PLANT IN KUANTAN

NORTH DAKOTA PETROLEUM COUNCIL NORTH DAKOTA S GAME-CHANGING OIL SHALE RESOURCE

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

2018 Load & Capacity Data Report

COMPRESSED NATURAL GAS (CNG) BUS ENGINES

4 th April, 2018 I Industry Research

U.S. Solar Market Post 2016: Deployment and Employment. Justin Baca Senior Director of Research, SEIA

Darquain Oil Field Development Project Phase III In Brief

ON-LINE BLENDING. Optimizing refining margins by minimizing Octane and VP give-away. Dr. Oliver SAUER. Director Marketing & Sales

UPGRADER FOR HEAVY, EXTRA-HEAVY CRUDE/BITUMEN AND RESIDUAL FRACTIONS

Jefferies 2012 Global Energy Conference

NPCC Natural Gas Disruption Risk Assessment Background. Summer 2017

Goals, Objectives, Performance Measurements. Mayor s Transition Team Public Input Session: Finance & Budget/Pensacola Energy 1/22/2019

For personal use only

Licence Application Decision

Los Angeles County One Gateway Plaza q.200n Tpl Metropolitan Transportation Authority Los Angeles, CA metro.4 I

Waco Rapid Transit Corridor (RTC) Feasibility Study

Abstract PEP Review PROCESS ECONOMICS OF COAL-BASED OLEFINS PRODUCTION IN CHINA By R. J. Chang and Jamie Lacson (May 2012)

Additional Transit Bus Life Cycle Cost Scenarios Based on Current and Future Fuel Prices

7/21/2016. Tradition methods. Special studies. Maintenance Division Inter Agency Contract. Summer 2016

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT

Project Title: Contract Number: Milestone Number: Report Date: Contract Contact: Phone: Congressional District: Executive Summary:

Assessment of Smart Grid Applications for the City of Palo Alto. City of Alameda Public Utilities Board September 19, 2011

Power Consumption Reduction: Hot Spare

Engineering - Other Projects

SUMMARY OF REPORT TO ENERGIAVIRASTO SEPTEMBER Study on the amount of peak load capacity for

Belt Conveyors Separating Fact from Fiction Richard Enning Bob Schaefer Steve Timmer

WashTec AG Baader Bank Investment Conference Karoline Kalb WashTec AG

Technical Session: Crude Oil Supply High Quality Competitive Distillate Fuels from Coal-to-Liquids Processing

Europe in focus: Regional Transport without Borders Brussels, 31 May 2017 Herald RUIJTERS, DG MOVE

Abstract Process Economics Program Report 21F NEW GENERATION OXO ALCOHOLS (October 2012)

FISCAL YEAR MARCH 2014 FINANCIAL RESULTS

PLUG-IN ELECTRIC VEHICLE PLAN FOR HIGHWAY 70 CORRIDOR. Stakeholder meeting February 5, 2016

ABCs of GTL. Dr. Ronald Sills Founding Director, XTL & DME Institute SM

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

GEOPARK ANNOUNCES FOURTH QUARTER 2017 OPERATIONAL UPDATE

Transit Access Study

Leak Detection in Large Diameter Mains

Mini refinery feasibility study

Greater Cleveland Regional Transit Authority

GEOPARK ANNOUNCES FIRST QUARTER 2017 OPERATIONAL UPDATE

Transcription:

/ Drilling Economics Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority May 22, 2018

Objective Define where the / system may be economic in the current oil price environment. Method Analyze past well performance across the region and estimate well economics for various production levels. Disclaimer The goal of this work is not to imply individual company actions or intentions. All view expressed are strictly that of Justin J. Kringstad. Neither the State of North Dakota, nor any agency, officer, or employee of the State of North Dakota warrants the accuracy or reliability of this product and shall not be held responsible for any losses related to its use. 2 JJ Kringstad - North Dakota Pipeline Authority 2

Key Economic Assumptions $6-$8 Million Well Costs $63/BBL & $6.00/MCF Wellhead Pricing 1/6 Royalty Zero Flaring Assumed 10-20% IRR to drill (calculated after production taxes and royalties) No Tax Incentives Included Production rate is 30-day average All / wells drilled in 2008+ JJ Kringstad - North Dakota Pipeline Authority 3 3

Peak Month Minimum - 200 BOPD 3,755 Wells 7,062 Wells JJ Kringstad - North Dakota Pipeline Authority 4

Peak Month Minimum - 300 BOPD 3,149 Wells 6,222 Wells JJ Kringstad - North Dakota Pipeline Authority 5

Peak Month Minimum - 400 BOPD 2,508 Wells 5,247 Wells JJ Kringstad - North Dakota Pipeline Authority 6

Peak Month Minimum - 500 BOPD 1,895 Wells 4,153 Wells JJ Kringstad - North Dakota Pipeline Authority 7

Peak Month Minimum - 600 BOPD 1,371 Wells 3,097 Wells JJ Kringstad - North Dakota Pipeline Authority 8

Peak Month Minimum - 700 BOPD 960 Wells 2,171 Wells JJ Kringstad - North Dakota Pipeline Authority 9

Peak Month Minimum - 800 BOPD 666 Wells 1,505 Wells JJ Kringstad - North Dakota Pipeline Authority 10

Peak Month Minimum - 900 BOPD 424 Wells 1,015 Wells JJ Kringstad - North Dakota Pipeline Authority 11

Peak Month Minimum 1,000 BOPD 266 Wells 706 Wells JJ Kringstad - North Dakota Pipeline Authority 12

Peak Month Minimum 1,250 BOPD 107 Wells 266 Wells JJ Kringstad - North Dakota Pipeline Authority 13

Peak Month Minimum 1,500 BOPD 36 Wells 98 Wells JJ Kringstad - North Dakota Pipeline Authority 14

Breakeven Summary JJ Kringstad - North Dakota Pipeline Authority 15 15

Summary of Oil JJ Kringstad - North Dakota Pipeline Authority 16 16

Breakeven Analysis Important Considerations Breakeven areas were determined by neighboring well performance and are expected to expand as new completion technology is applied in areas outside the core. Just because an area is considered economic does not mean that it is the most economic option for the industry participant(s). Competition for capital continues to exist inside and outside the region. JJ Kringstad - North Dakota Pipeline Authority 17 17

Breakeven Price Range (20% IRR) Breakeven Prices $6 - $8 Million Completed Wells Cost Background Map: Esri, HERE, DeLorme, MapmyIndia, OpenStreetMap contributors, and the GIS user community JJ Kringstad - North Dakota Pipeline Authority 18 18

Contact Information Justin J. Kringstad, Director North Dakota Pipeline Authority 600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840 Phone: (701)220-6227 Fax: (701)328-2820 E-mail: jjkringstad@ndpipelines.com Websites: www.pipeline.nd.gov www.northdakotapipelines.com JJ Kringstad - North Dakota Pipeline Authority 19