Oconee Nuclear Station ALLOY 600 REPAIRS 1EOC23

Similar documents
(3) 2-Loop B&W PWR s Unit 1- Commissioned 7/5/1973 Unit 2- Commissioned 9/9/1974 Unit 3- Commissioned 12/16/ MW per unit for a total of 2880 MW

EXAMINATION OF NOZZLE INNER RADIUS AND PIPING FROM THE OUTER SURFACE

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS

Component Asset Management with Ultra-High Pressure Cavitation Peening

Visual Inspection of Reactor Vessel Head Penetration Nozzles

Current Status of Ultrasonic Examination Performance Demonstration in Korea

Robotics and Manipulators for Reactor Pressure Vessel Head Inspection

SUBMARINE NOZZLE PIPE MANIPULATOR. R. Zeilinger, G. Hünies, F. Mohr AREVA NDE-Solutions/ intelligendt Systems & Services GmbH

AP1000 Nuclear Power Plant Squib Valve Design Challenges & Regulatory Interface. September 2017

National Robotic Arc Welding Conference Joy Global Welding Automation June, 2013

Nuclear L.L. C. 10 CFR 50.55a

INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD

Specialty Maintenance Solutions

Chemical decontamination in nuclear systems radiation protection issues during planning and realization

DEVELOPMENT OF NEW MANIPULATORS FOR PWR AND VVER VESSEL INSPECTION. Authors: Mats Wendel and Torbjörn Sjö, DEKRA Industrial, Sweden

Startup and Operation of SEE-THRU Nuclear Power Plant for Student Performance MP-SEE-THRU-01 Rev. 018

Aoý. 0Constellation Nuclear. Calvert Cliffs Nuclear Power Plant. February 27, U. S. Nuclear Regulatory Commission Washington, DC 20555

Broetje-Automation Company Standard Structural component specification for welded parts

ADVANCED INSPECTION TECHNIQUE FROM INSIDE SURFACE FOR DISSIMILAR METAL WELD OF STEAM GENERATOR NOZZLE

ALARA Program and RP Activities for the Reactor Vessel Head Replacement in Vandellòs II NPP

NRC Non-Destructive Examination Research

Current Status of the Melcor Nodalization for Atucha I Nuclear Power Plant. Zárate. S.M. and Valle Cepero, R.

S. Y. Park (*), K. I. Ahn

Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure

Advanced Outage Compression Methods for Steam Turbines. Nicholas Marsh 13 th February 2012

Class 1E LOCA Cabled Connectors

TSC INSPECTION SYSTEMS

Current Status of Fukushima Daiichi Nuclear Power Station & Lessons Learned from Experiences of the Great East Japan

HIGH LEVEL WASTE TANK CLOSURE PROJECT AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY

SECTION XI. Subject Interpretation File No.

Feedwater Reg Valve Internal Erosion OR17 Fall 2015

Smart Grid Automation and Centralized FISR

IMPLEMENTATION OF THE RCP SHIELD MECHANICAL SEAL MODEL IN THE COMANCHE PEAK PRA

Assembled Chemical Weapons Alternatives Program Use Of Explosive Destruction Technologies. 5-6 June 2014

Robotic Inspection of Unpiggable Piping at Pump Station

Safe operation of the rotating anode x-ray generator in room 1128 ERB. Emergency power disconnect

Dynamic Balancing. Need a high-speed balance? No problem.

THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES

QUARTER SCALE ROBOTICS POSITOING SYSTEM

SUB-CHAPTER E.4 DESIGN OF COMPONENTS AND SUB-SYSTEMS

*TATSUYA KUNISHI, HITOSHI MUTA, KEN MURAMATSU AND YUKI KAMEKO TOKYO CITY UNIVERSITY GRADUATE SCHOOL

Radiation Safety Requirements for the Use of Non-Medical X- Ray.

Alvin Upgrade Project

CHALLENGES AHEAD KEEPING PACE WITH RAPID ADVANCES IN COLLISION REPAIR BY JASON BARTANEN

PRODUCT OVERVIEW. Our BDB (Bolted Body) and BW3 (Fully Welded Body) trunnion-mounted ball valves are designed and manufactured

Algeria, November 2016

Fuel Reliability: Achieving Zero Failures and Minimizing Operational Impacts Rob Schneider, Senior Engineer/Technologist, Global Nuclear Fuel

Scientech Stresswave SRV Leak Detection Scientech Symposium 2015

Overview of the ITER In-Vessel coil (IVC)

LESSONS LEARNED FORSMARK EVENT Presented To IEEEE

PM/ECCM Course Description and Outline

PROCESS INTEGRITY Engineering Solutions and On-Site Services

FRM II Converter Facility

OPAL Engineering Early Modifications Relating to AOC: Loss of Offsite Power (LOOP)

SECTION H3 TRAYMASTER SERIES DEAERATORS

Seismic Damage Information (the 120th Release) (As of 15:00 April 29, 2011)

DEKRA Industrial. Torbjörn Sjö, Mats Wendel and Jorge Benitez, Business Area Nuclear

AP1000 Plant Overview

ULTRASONIC EXAMINATION

PPTS OPERATOR ADVISORY: FACILITIES PIPING AND EQUIPMENT: FOCUS ON ITEMS INVOLVED AND CAUSES OF INCIDENTS

TEPCO NUCLEAR SAFETY REFORM PLAN PROGRESS REPORT 1 ST QUARTER FY 2014 EXECUTIVE SUMMARY

YARWAY NARVIK MODEL 88 SPID SMALL PIPE INLINE DESUPERHEATER

MCF BALL VALVES OVERVIEW

Turbine & Generator Rotor Welding to Solve Reliability and Performance Issues. Tom Smith President T and A Consultants April 16-17, 2013

Streamlined RI-ISI. Patrick O Regan EPRI

YARWAY HANCOCK Y-PATTERN FORGED STEEL GLOBE STOP VALVES SERIES 4000

Advanced Digital Valve Controller

ULTRASONIC TESTING OF RAILWAY AXLES WITH PHASED ARRAY TECHNIQUE EXPERIENCES DURING OPERATION

SchuF FETTEROLF SchuF / Fetterolf standard Type 32 sampling valves custom-built solutions

WELD CRAWLER TM HIGHLY FLEXIBLE & ADAPTABLE SCANNER FOR WELD INSPECTIONS TRANSFORMING WELD INSPECTIONS.

Life Extension Testing of Electrical Penetration Assemblies

5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS

Seismic Damage Information (the 144th Release) (As of 15:00 May 20, 2011)

Low and medium voltage service. Power Care Customer Support Agreements

Hot Gas Stand durability tests for Turbine Housing design validation

Impacts of Hurricane Sandy to NYCDEP WWTPs and Pump Stations. December 12, 2012

Client Success Story Sheri Baucom Senior Advisor II

The B&W mpower TM Small Modular Reactor I&C Design, Architecture and Challenges

DL Shah Quality Award

Deploying Power Flow Control to Improve the Flexibility of Utilities Subject to Rate Freezes and Other Regulatory Restrictions

EDI K_Instructions.qxd 28/07/ :34 Page 1 ORDER CODE: EDI K MODEL IRT537. Infrared Thermometer OPERATING MANUAL CLASS 2 LASER

SPRAY EQUIPMENT (NOZZLES, PUMPS, SYSTEMS)

p h a s e d - a r r a y t e c h n o l o g i e s w w w. m 2 m - n d t. c o m

AP Plant Operational Transient Analysis

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

IFE Engineering Test Facility (ETF) - Opportunities for Reducing Fusion Development Costs

Contents. Dimensions and weights

NLCTA Accelerator Safety Envelope

SECTION XI. Subject Interpretation File No. Cases N and N-729-2, -3141(c)...XI

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.

Body Repair News Fit: New Model Body Repair Information. June Applies To: Fit ALL

ASME B31.3 Process Piping

TREAT Startup Update

TM SERIES Engineered Valves For Pipeline Service Application

30 Years of Innovation

LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK

MODEL/YEAR MODÈLE /ANNÉE TL: Body Repair Information

Inline Inspection Technology Overview

Blade Testing. In production

Prevention vs. Reaction The Importance of Asset Integrity

Transcription:

Oconee Nuclear Station ALLOY 600 REPAIRS 1EOC23

We re requiring more inspections due to susceptibility of material to cracking Some utilities have implemented mitigative actions Stress improvement Weld overlays Some utilities have found indications requiring repairs Replacement Overlays Stress improvement Many utilities planning near-term mitigative actions Focusing on pressurizer welds first, mostly because of configuration

Alloy 600 Locations in B&W Plants

Butt Weld Locations B&W Design Plants 5 6 9 3 4 10 2 8 13 1 7 11 12

Butt Weld Locations B&W Design Plants Application Pressurizer - Surge Line Nozzle - Spray Nozzle - PORV Nozzle - Safety Relief Nozzles Identification Number 1 2 3 4 Typical Temperature ( F) 650 Typical ID (inches) 10 4 2.5 2.5-3 Typical Number Reactor Vessel 2 - Core Flood Nozzle 5 577 14 2 RCS Hot Leg Pipe - Surge Line Nozzle - Decay Heat Nozzle RCS Cold Leg Pipe - RCP Inlet Nozzles - RCP Outlet Nozzles - High Pressure Injection Nozzles - Letdown/Drain Nozzles Core Flood Tanks - Outlet Nozzle - Pressure Relief 6 7 8 9 10 11 601-605 10 12 557 28 28 2.5 1.5-2.5 12 13 RT 14 2 2 2 1. Figures only show locations in pipes greater than 1" NPS and operating at temperatures greater than about 550 F. 2. As of July 2004, there are two remaining B&W plants that have reactor vessel closure heads with Alloy 600 CRDM nozzles and Alloy 82 nozzle-to-flange butt welds (69 4" welds at temperature < 605 F). 1 1 1 2 1 1 4 4 4 4

SRV s Vent Line Spray Line Steam Space nozzles(3) Alloy 600 Project H/L Surge Thermo Well Water Space nozzles(3) Overview Sample Line PZR Surge

Scope of Work 6 Overlays

3 Relief Valve Nozzles

Spray Line Nozzle

Surge Line to Hot Leg

Surge Line to PZR

9 Replacements

6 Level Tap Nozzles

1 Vent Nozzle

ThermoWell

1 Sample Nozzle

Assumptions

Lower PZR insulation and support structure would remain in place Assumptions

Assumptions Unit 1 should be similar to Units 2 & 3 Unit 3 PZR Surge nozzle

Preparation ALARA planner attended process validation and vendor crew training

Preparation A comprehensive shielding plan was compiled using planning photos from June forced outage

OCONEE Unit 1 Alloy 600 Shielding Plan ONS Radiation Protection/ALARA

Target Dose *40 +12 Spray line will be shielded with 6 of 1.5 Radishield TM

Target Dose *60 +10 *120 +25 Shielded with 1.5 X 12 Radishield TM Spray Line Above 2 nd Grating

Custom Shielding Material Temperature Resistant / non-hazardous material was ordered Radishield 40lb/ft Pipe Wrap for Small-bore piping

ALARA Initiatives Area walkdowns to identify low dose areas, camera angles, and shielding opportunities Extensive digital photography to assist planners, brief crews, and reduce # of entries

Early removal & decon of significant dose contributors scheduled Bar Code scans created to track dose by task & area

Weld head attendants staged on the 4th Floor or in a shielded booth on the 2nd Grating level to allow rapid access to work areas. Equipment operators situated in the Basement and on the 4th Floor; Extensive use of remote tooling for welding and abrasive operations to minimize personnel exposure.

Use of 3-D drawings to provide orientation Camera coverage of work areas to reduce entries for oversight or informational purposes while allowing more flexible and efficient use of RP resources.

Shielded hut was constructed adjacent to work areas Enclosures were constructed to contain grinding dust

Detailed estimates created for each area/task

Detailed estimates created for each area/task

ALARA Challenges Unanticipated dose rates on PZR Surge nozzle Insulation restricted access to top of nozzle

ALARA Challenges 4500 lb. LOCA restraint impacting work area

ALARA Challenges Initial plan did not call for automation of pre weld surface prep process. Remote tooling was not vigorously pursued during planning and validation phases. Higher than anticipated dose rates required implementation of remote process.

ALARA Challenges First time deployment of tooling increased reliance on vendor provided occupancy times. This resulted in inflated dose estimates as tasks were completed in a fraction of time projected. ALARA bonus may lead vendors to inflate estimates.

ALARA Challenges Work on PZR Surge nozzle was initially planned for inside the Wagon Wheel opening, forcing workers into close proximity to source. We eventually removed insulation panels which changed the access and allowed work from an increased distance.

ALARA Challenges PZR Spray block valve remained open during induced crudburst, allowing higher activity RCS to enter the PZR and increase dose rates on lower components Instrument valves went from 35-50 mr/hr to 400-600 mr/hr Sample line increased from 10-20 mr/hr to 300 mr/hr

ALARA Challenges Shifting scope & changing conditions challenged estimate process

ALARA Successes Rapid development & deployment of remote tooling by WSI

Lower Layout Marking Tool Weld Overlay Lower Weld

Upper Layout Marking Tool

Base Metal Surface Prep

Contour Measuring Weld System Weld Head Tractor Scanning Laser Video Front-End Laser Path

ALARA Successes Newly developed phased array ultrasonic techniques reduced exposure to NDE technicians. The beam direction is electronically swept through multiple angles, eliminating the need for a variety of probes.

ALARA Successes Modification of access to PZR Surge nozzle saved substantial dose Lower PZR insulation panels were removed to allow better access

ALARA Successes Use of Gamma imagery for crew briefing

1st UT - Standard PJB - 2.5 hrs 122 mr 2 nd UT - Enhanced PJB - 2.9 hrs 68 mr due to different body position

AREA INSP-RP THER SRV SAMPLE VENT SPRAY WATER SPACE STEAM SPACE HL SRG Pzr SRG TOTAL DOSE 764 659 933 895 511 1177 2618 2159 3069 6822 19,607 EXPOSURE 7114 RWP Hours

Pzr Surge Nozzle Inspect/ RP Grinding (Hand) Support Activities NDE 218 1265 2373 640 Surface Prep (Machine) Tool Setup 506 694 Welding 1126

Highest 10 Individual Exposures Exposure Distribution 411 407 407 349 343 338 328 326 319 311 # of Workers by Exposure 158 59 28 13 8 3 0-50 50-100 100-200 200-300 300-400 400+ mr

Still ahead

Core Flood Nozzles Hot Leg Nozzles 4-48 RCP Nozzles LetDown Line Nozzle Decay Heat Nozzle