Compatibility Between Electric Trains and Electrification Systems

Similar documents
Controlling the Speed of Tilting Trains Through Curves

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Mechanical Trainstop Systems

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Interface between Rail Vehicle Weights and Underline Bridges

Risk Management of Rail Vehicle Axle Bearings

Guidance for Low Voltage Electrical Installations

Branding of Wheels,Tyres and Axles

Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure

Signing of Permissible Speeds and Speed Restrictions

Track Circuit Assister Configuration for Rail Vehicles

Permissible Track Forces for Railway Vehicles

Structural Requirements For Drawgear And Buffers On Railway Vehicles

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Road-Rail Plant

Low Voltage Power Supplies in Electrified Areas

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

Lineside Signal Spacing and Speed Signage

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Rail Safety and Standards Board

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7)

Operation of Trams and Light Rail or Metro Vehicles Over Railtrack Controlled Infrastructure

TOPAS 2130A (Draft v3)

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem

ENE Standards Committee Chairman s presentation. Presented by David Knights 25 th January 2018

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

(Non-legislative acts) DECISIONS

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130

Rail Industry Standard for the Design of On- Track Machines in Travelling and Working Modes

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

Council of the European Union Brussels, 18 July 2014 (OR. en)

Lloyd s Register Type Approval System Test Specification Number GT04

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

Requirements for the Application of Standard Vehicle Gauges

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

SOUTH AFRICAN NATIONAL STANDARD

Deviation from a Railway Group Standard

SUBSTATION INTERLOCKING SCHEMES

Lineside Operational Safety Signs

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION. -Module Number Session

POSITION PAPER Version 3.0

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

Research Brief. Simulation and verification of results from 125mph current collection modelling for two pantographs. T841 - January 2011.

Track System Requirements

Rail Industry Standard for 750 V and 1500 V DC Overhead Lines and corresponding Rolling Stock requirements

Guidance on the Energy TSI

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Service and operate an electric main line locomotive

Land Transport Rule Traction Engines [2008]

RIS RIS-1701-PLT. Rail Industry Standard for Portable and Transportable Plant Used for. Infrastructure Work Issue 1 October 2008

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

Certificate of Acceptance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

LIFT TRUCK POLICY AND PROGRAM

Requirements for the Application of Standard Vehicle Gauges

COMMISSION REGULATION (EU) No /.. of XXX

Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31. Rockhampton Office Brisbane Office Tarong Site

Vehicle Management Policy and Procedure Document No: VMPol 001

Guide for the application of the CR ENE TSI

Resistance of Railway Vehicles to Overturning in Gales

Research Brief. Feasibility study into raising and lowering pantographs while trains are in motion. T778 - July Overview. Aims.

New EU Regulation on General Safety. Implementation of Tyre Aspects

Mallory Park Circuit Kirkby Mallory Leicestershire LE9 7QE. Noise Management Plan Thursday, 5 March 2015 all rights reserved Page

Revised proposal to amend UN Global Technical Regulation No. 3 (Motorcycle brake systems) I. Statement of technical rationale and justification

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS

SOUTH AFRICAN NATIONAL STANDARD. Plug and socket-outlet systems for household and similar purposes for use in South Africa

ST. VINCENT AND THE GRENADINES

Service and operate a diesel-electric main line locomotive

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Microgeneration Installation Standard: MCS

The Project North West Electrification Programme

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Vehicle Systems Engineering and Integration Activities - Phase 3

(Non-legislative acts) DECISIONS

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Compatibility Requirements for Braking Systems of Rail Vehicles

Status of the review of the General Safety and Pedestrian Safety Regulations

WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR)

Permit Holder. Permitted Equipment

NZQA Expiring unit standard 893 version 5 Page 1 of 5. Diagnose and rectify vehicle emission control system faults

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society

Minimum Operating Standards for. Rolling Stock WOS 01

Microgeneration Installation Standard: MCS 023

NZQA unit standard version 8 Page 1 of 5. Apply and remove earths from conductors on electricity supply networks

Substation Lightning Protection. Document Number: 1-11-FR-11

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

AS/NZS 3112:2004 AS/NZS

Transcription:

Compatibility Between Electric Trains and Electrification Systems Synopsis Process for managing change that affects the compatibility between electric trains and electrification systems Submitted by Signatures removed from electronic version Anne Blakeney Standards Project Manager Authorised by Signatures removed from electronic version Brian Alston Controller, s This document is the property of Railtrack PLC. It shall not be reproduced in whole or in part without the written permission of the Controller, s, Railtrack PLC. Published by Safety & Standards Directorate, Railtrack PLC, Railtrack House DP01, Euston Square London NW1 2EE Copyright 2000 Railtrack PLC

This page has been left blank intentionally

Page 1 of 7 Contents Section Description Page Part A Issue Record 2 Responsibilities 2 Compliance 2 Health and Safety Responsibilities 2 Supply 2 Part B 1 Purpose 3 2 Scope 3 3 Definitions 3 4 Evaluation process 3 5 Implementation 4 6 Verification 5 Appendix A Compatibilty Issues 6 References 7 R A I L T R A C K 1

Page 2 of 7 Issue Record Part A This document will be updated when necessary by distribution of a complete replacement. Revisions in the reissued document will be marked by a vertical black line in the right hand margin adjacent to the revision. Issue Date Comments One October 2000 This document supersedes GM/RT1000 Responsibilities s are mandatory on all members of the Railway Group * and apply to all relevant activities that fall into the scope of each individual s Railway Safety Case. If any of those activities are performed by a contractor, the contractor s obligation in respect of s is determined by the terms of the contract between the respective parties. Where a contractor is a duty holder of a Railway Safety Case then s apply directly to the activities described in the Safety Case. * The Railway Group comprises Railtrack and the duty holders of the Railway Safety Cases accepted by Railtrack. Compliance The provisions in this are to be complied with from 2 December 2000. Health and Safety Responsibilities In issuing this document, Railtrack PLC makes no warranties, express or implied, that compliance with all or any s is sufficient on its own to ensure safe systems of work or operation. Each user is reminded of its own responsibilities to ensure health and safety at work and its individual duties under health and safety legislation. Supply Controlled and uncontrolled copies of this document may be obtained from the Industry Safety Liaison Dept, Safety and Standards Directorate, Railtrack PLC, Railtrack House, DP01, Euston Square, London, NW1 2EE. 2 R A I L T R A C K

Page 3 of 7 Part B 1 Purpose The purpose of this document is to mandate the management process to ensure the compatibility between electric trains and electrification systems. The document mandates controls to minimise the risk of physical injury and electric shock resulting from unacceptable mechanical or electrical interactions. 2 Scope The overall scope of s is as specified in Appendix A of GA/RT6001. Specifically the content of this document applies to the Infrastructure Controller s electrification systems and to electric trains that draw current from them. This document contains requirements which are applicable to the duty holders of the following categories of Railway Safety Case: Infrastructure Controller Train Operator The requirements for accepting rail vehicles to operate on Railtrack Controlled Infrastructure are set out in GO/RT3270. 3 Definitions Electric trains Electric locomotives or electric multiple units that draw current from an electrification system. Electrification system A system providing electrical energy to electric trains comprising the Electricity Supply Industry (ESI) generation, distribution and traction supply point equipment and the Infrastructure Controller s electrical distribution system, contact system and return current system. Electrification statement A documented record maintained by the Infrastructure Controller detailing the electric train services that the electrification system on a particular route can support. 4 Evaluation process 4.1 Any of the changes listed below, whether proposed by the Infrastructure Controller or by a train operator, shall have their significance for compatibility issues (see Appendix A) considered by the proposer and the conclusions recorded: introduction onto an electrified route of new or modified electric trains which are equipped with, or have been modified to incorporate, equipment not previously used on that route; modification of the working timetable or the speed, consist or formation of electric trains; modification of an existing electrification system, or the provision of a new electrification system. For each route the Infrastructure Controller and the relevant train operators shall agree what level of changes are significant. 4.2 When the change proposed is significant an evaluation of the effect of the proposed change shall take place. R A I L T R A C K 3

Page 4 of 7 4.3 The evaluation shall address, but not be limited to, the relevant compatibility issues from the list in Appendix A. In certain cases detailed requirements are given in appropriate s. The evaluation shall be undertaken by a competent body appointed by the Railway Group member. 4.4 Where appropriate to the compatibility issue being considered, both the individual and collective effects of the proposed change shall be taken into account in the evaluation. The evaluation shall allow for both normal and credible fault conditions of operation (eg failure of pantograph anti-tilt device). 4.5 The proposer of the change shall ensure that an exchange of relevant information takes place between the Infrastructure Controller and train operators of electric trains that will be affected by the change. This exchange of information shall take place in a formal way and to timescales that allow an evaluation to take place. The information to be exchanged shall include a schedule of the compatibility issues to be addressed by each party. Where they exist, the results of previous evaluations and electrification statements shall be made available. 4.6 Taking into account the significance of the proposed change, the method, scope, acceptance criteria and verification requirements of the evaluation shall be agreed, prior to the evaluation taking place, between the Infrastructure Controller and relevant train operators. 4.7 Any mathematical model used to assess the effect of any change and to test any solutions proposed to address incompatibilities between trains and electrification systems resulting from the proposed change shall be acceptable to both the Infrastructure Controller and the relevant train operators. 4.8 The results of the evaluation shall be recorded with a concise summary and recommendations. The recommendations shall address whether the change can be implemented without any further action, or that it can be implemented with certain operational restrictions or limitations, or that the change cannot be implemented without appropriate remedial or mitigating measures being applied to either the infrastructure, the trains, or both. The record of the evaluation results shall define the infrastructure and electric trains combination that have been found to be acceptable, and shall form the basis of an electrification statement for the route(s) concerned. 5 Implementation 5.1 The implementation of the proposed change shall not commence until the results of the evaluation have been accepted by both the Infrastructure Controller and the relevant train operators. 5.2 The implementation of the proposed change shall not commence until any recommendations identified in the evaluation have been undertaken to the satisfaction of all parties. 4 R A I L T R A C K

Page 5 of 7 6 Verification 6.1 On completion of the proposed change: the proposer of the change shall submit evidence to the other parties that the effect of the change is consistent with that predicted in the evaluation; the relevant train operators shall submit evidence to the Infrastructure Controller that the information provided by them relating to electric trains for the purpose of the evaluation was consistent with that submitted to the vehicle acceptance process. 6.2 If there are any inconsistencies found during verification which are unacceptable to either party, the Infrastructure Controller and the relevant train operators shall agree what, if any, limitations shall be imposed until a satisfactory solution can be found. R A I L T R A C K 5

Page 6 of 7 Appendix A Compatibility Issues a) Maximum and minimum electrification system voltages and their durations b) Continuous and short term electrification equipment ratings c) ESI supply point criteria d) Contact system ratings e) Accessible and touch voltages in traction return circuits and other lineside circuits and conductors f) Thermal rating of contact system/current collector interface g) System resonance and harmonic interference h) Protection co-ordination i) Electric train equipment s ability to withstand electrification system fault levels j) Electrification system s ability to tolerate electric train regenerative braking k) Ability of both electrification systems and electric trains to withstand the discharge of stored electrical energy from the other l) Physical and electrical clearances between electric trains and infrastructure m) Contact system to current collector geometry n) Compatibility of contact surface materials of current collector and contact system o) Co-ordination of resilience to damage of current collector and contact system components p) Maximum and minimum contact forces and contact system dynamic displacement q) Avoidance of electric trains being stationary with current collectors at prohibited locations, such as neutral sections or conductor rail gaps r) Co-ordination of the positions of automatic power control magnets and receivers s) Compatibility between neutral sections and on board current collection and power control equipment 6 R A I L T R A C K

Page 7 of 7 References GA/RT6001 GO/RT3270 s - Change Procedures Route Acceptance of Rail Vehicles The Catalogue of s and the s CD-ROM give the current issue number and status of documents published by the Safety & Standards Directorate. R A I L T R A C K 7