Loop 375 Border Highway West Extension Project

Similar documents
This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.

STATE LOOP 195 PUBLIC MEETING. Footer Text

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

IH 35 FEASIBILITY STUDY

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

HSR Vancouver WA to Camas Commuter Des, by R.N.

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.

SOUTH TEXAS COMMISSION MEETING

Wentzville Parkway South Phase 2 & 2A

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

Project: Borgfeld Dr Phase I (ROW )

XI. W-3 TRINITY RAILWAY EXPRESS (WEST) CORRIDOR CONSIDERATIONS

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

Brent Spence Bridge Design Exceptions - Alternative I

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

Port Terminal Railroad Association. Committed to Safety and Service

II. PROJECT DESCRIPTION

GATTIS SCHOOL RD / SH 130 SUBDIVISION

City of Denton On-system Project Status Report Prepared by ITS

SPRINGWATER MISSING GAP Springwater Missing Gap Linking the Springwater on the Willamette Trail to the Springwater Corridor Trail June 2006

EXCEPTION TO STANDARDS REPORT

Houston Region Freight Study. July 23, 2007

Arizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING

Metro Highway Program

Proposed Project I 35 Improvements from SH 195 to I 10

Appendix G Aquilla Lake Pool Rise Recreational Resources

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

I-84 Hartford Project Public Advisory Committee Meeting #19. March 28, 2019

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Community Meeting Station Elements

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Westland No. 1 Mine (Bob Ciminel 2012)

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

Hudson-Bergen Light Rail Transit System Joint Occupancy-Joint Use

Summary of the Alcoa Highway Redevelopment Project

Adams County, Iowa ~ always creative

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

STANDARD DRAWING INDEX

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

Local Public Agency Obligated Projects SFY 2018

PERFORMANCE ACTIVITY 603 SIGNS

City of Denton On-system Project Status Report Prepared by ITS

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030

The Eastern Connector Study November, 2007 planning for the future

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/03/19 to 03/09/19 Contact: Rick Estrada (209)

CITY OF GILROY 2012 SPEED SURVEY

Final. Traffic Impact Study For 1200 Ashby Avenue Mixed-Use Development. In City of Berkeley. November 26, TJKM Transportation Consultants

Denver Metro Association of Realtors

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

I-405 Sepulveda Pass Improvements Project

Station Evaluation Summary

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

SAN RAFAEL CITY COUNCIL AGENDA REPORT

IMPROVEMENT CONCEPTS

30-Day Look Ahead Summary August 2011

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

SC Highway 41 Existing Conditions

CRRMA BOARD PRESENTATION

CTA Blue Line Study Area

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

PUBLIC INFRASTRUCTURE PROJECTS

City of Pittsburg Five Year Capital Improvements Plan. Introduction

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

METRO Light Rail Update

Validation Study. Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad. May 15, 2008.

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

City of Houston Fondren Road Paving and Drainage

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

800 Access Control, R/W Use Permits and Drive Design

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices

Dockless Mobility Transportation and Municipal Infrastructure Committee January 8, 2019

Develop ground transportation improvements to make the Airport a multi-modal regional

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

CONDUCTOR CONDUCTOR. Overhead Electric Distribution Standards INTRODUCTION

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

ODOT District Two Monthly Construction Update

US 67 WIDENING PROJECT

CHAPTER 69 PARKING REGULATIONS

Landtech...a measure of excellence

New York Metropolitan Transportation Council. HUB Bound. Travel Data

2017 Industrial Rail and Transportation Study. Becker, Minnesota

Detailed Definition of Alternatives

Public Works. Capital Projects FY

Transcription:

Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\1_13_05_21_UPRR_Pinch_Pts_South_Asarco.mxd Date Saved: 5/31/13 PAISANO UPRR ExistingTrack 3 Aerial: NAIP, 08/30/12 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from Halff Engineering, 13 85 UPRR Existing Track 1 UPRR Existing Track 2 BHW Right-of-Way Drainage Pond BNSF Existing Track UPRR Existin Track 1:3,600 1 " = 300 ' 0 75 150 300 Loop Border Highway 85 ASARCO Area (PP1) RIIO GRANDE

UNIVERSITY ELECTRIC SUN BOWL WIGGINS RIM SCHUSTER Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\2_13_05_21_UPRR_Pinch_Pts_Rescue_Mission.mxd Date Saved: 5/31/13 UPRR Existing Track 1 UPRR Existing Track 2 Aerial: NAIP, 08/30/12 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from Halff Engineering, 13 Project Area Drainage Pond UP-FUTURE-REMOVAL RIO I GRANDE BNSF Track Removal BNSF Existing Track UPRR Existin Track 85 1:3,600 1 " = 300 ' 0 75 150 300 RUHLEN RAMP Northwest of Rescue Mission (PP2) HART Loop Border Highway MAIN

YANDELL FERN PORFIRIO DIAZ MISSOURI LAWTON FEWEL MAIN RANDOLPH FRANKLIN SAN FRANCISCO ANTHONY WESTERN DURANGO SAN ANTONIO RAMP GATEWAY EAST PAISANO OVERLAND Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\3_13_05_21_UPRR_Pinch_Pts_Yandell_Bridge.mxd Date Saved: 5/31/13 Aerial: NAIP, 08/30/12 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from Halff Engineering, 13 BHW Project Area Proposed Side Remove Shift Existing Mainline Foreign Railroad RR Right of Way Former RR Right of Way RR Right of Way to be Acquired Sidewalk Removal Dock Retaining Wall RIIO GRANDE Amtrak Siding UPRR Main Track 1 UPRR Main Track 2 UPRR Main Track 3 1:3,600 1 " = 300 ' 0 75 150 300 Loop Border Highway South of Yandell Bridge (PP3) CANAL

SANTA FE ALLEY E STANTON OREGON EIGHTH CHIHUAHUA NINTH CALLEROS 62 Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\4_13_05_30_UPRR_Pinch_Pts_Intern_Inspection.mxd Date Saved: 5/31/13 WB BHW BHW Median BHW ' Shoulder Aerial: TxDOT, 09 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from HDR Engineering, 13 EB BHW Project Area UP-FUTURE-REMOVAL UPRR Inspection Track Removal BNSF Track Removal BNSF Existing Track UPRR Existin Track SANTA FE BRIDGE RIO I GRANDE UPRR Relocated Inspection Track 1:3,000 1 " = 250 ' 0 62.5 125 250 STANTON BRIDGE Loop Border Highway International Inspection Track (PP4)

ALLEY G KANSAS CAMPBELL FLORENCE OCHOA VIRGINIA SAINT VRAIN HILLS TAYS PARK SIXTH SEVENTH EIGHTH NINTH Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\5_13_05_30_UPRR_Pinch_Pts_Park_St.mxd Date Saved: 5/31/13 62 STANTON BRIDGE Median Shoulder Aerial: TxDOT, 09 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from HDR Engineering, 13 WB BHW EB BHW Proposed Track 0 RR ROW Proposed Track 2 Proposed Track 3 BHW Right-of-Way UPRR Existing Track UPRR Relocated Track Railroad Right-of-Way Concrete Apron Ditch Toe Ditch Top Traffic Rail UPRR Survey Construction Lines Wall RIO I GRANDE 1:3,000 1 " = 250 ' 0 62.5 125 250 Loop Border Highway Park Street (PP5)

CYPRESS NOBLE SAN ANTONIO TORNILLO GREAT BEAR OVERLAND COTTON Path: \\Ausw00\jobs\485 Border Hwy West\Techprod\GIS\MXD\EXHBT\PL_0\UPRR_Pinch_Points\6_13_05_31_UPRR_Pinch_Pts_Coles.mxd Date Saved: 5/31/13 PARK ALLEY P NINO AGUILERA Aerial: TxDOT, 09 BHW Boundary: Halff Engineering, 13 BHW Schematic: Halff Engineering, 13 Rail: Obtained from HDR Engineering, 13 WARD ALLEY Q DELTA THIRD FOURTH UPRR Track Removal Project Area BNSF Track Removal UPRR Future Track BNSF Existing Track UPRR Relocated Track UPRR Existing Track COLES 1:3,000 1 " = 250 ' 0 62.5 125 250 RIIO GRANDE Loop Border Highway Coles Overpass (PP6)