EM 38 2TR-FE ENGINE MECHANICAL CAMSHAFT REMOVAL

Similar documents
REPLACEMENT. 1. REMOVE CYLINDER HEAD COVER NO.2 (a) Remove the 4 nuts and cylinder head cover No. 2.

REPLACEMENT 1. REMOVE ENGINE UNDER COVER RH. 2. REMOVE CYLINDER HEAD COVER NO.2 (a) Remove the 2 screw, 3 clips and engine under cover.

OVERHAUL. 1. REMOVE OIL FILLER CAP SUB ASSY (a) Remove the oil filler cap from the cylinder head cover.

1ZZ-FE ENGINE MECHANICAL ENGINE UNIT DISASSEMBLY. If you paid for the content in this manual you were screwed!

25. REMOVE OIL PIPE NO.1 (a) Remove the 2 oil pipe unions, and oil pipe No.1. (b) Remove the oil control valve filter LH and gaskets.

VALVE CLEARANCE (1NZ-FXE)

REMOVAL EM SEPARATE COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) (a) Remove the bolt shown in the illustration.

VALVE CLEARANCE (K3-VE)

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE OIL FILLER CAP GASKET (a) Using a screwdriver, remove the gasket from the oil filter cap.


INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

CAMSHAFT (LH BANK) (2GR FE) ENGINE MECHANICAL 1424N 01 REPLACEMENT

TIMING CHAIN COMPONENTS

VALVE CLEARANCE ADJUSTMENT EM 7

Page 1 of 25. Service and Repair REMOVAL SIZED FOR PRINT. Related Components

VALVE CLEARANCE (1ZZ FE)

Technical Service BULLETIN

TIMING CHAIN COMPONENTS

VALVE CLEARANCE ADJUSTMENT EM 8

6/6/2018 2ZR-FXE Engine Mechanical: Camshaft: Removal 2012 Toyota Prius V MotoLogic

2012 Honda Crosstour EX ENGINE Cylinder Head - (4-CYL)

EM 92 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY REMOVAL

2001 Chevrolet Metro LSi ENGINES 1.3L 4-Cylinder - Metro & Firefly (Canadian) Fig. 3: Exploded View Of Timing Belt & Components (Typical)

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

REASSEMBLY MT 27. Remove the shift arm pivot and shift arm.

OIL PUMP (for 4WD and Pre-Runner)

TIMING BELT COMPONENTS

REMOVAL AC 67. Using a clip remover, disengage the 6 clips and remove the front fender apron seal upper. (2WD)

EM 97 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSTALLATION

26/01/2017 3GR-FSE ENGINE MECHANICAL: ENGINE UNIT: DISASSEMBLY; 2006 MY GS300 [01/ ]

REMOVAL EM SEPARATE COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) (a) Remove the bolt shown in the illustration.

PS 60. POWER STEERING POWER STEERING LINK (for 4WD and Pre-Runner) INSPECTION

2004 Toyota CAMRY. Submodel: Engine Type: L4 Liters: 2.4 Fuel Delivery: FI Fuel: GAS

REMOVAL AT REMOVE NO.2 MANIFOLD STAY (a) Remove the 3 bolts and manifold stay No. 2.

11. REMOVE OIL PAN SUB ASSY NO.2 (a) Remove the 18 bolts and 2 nuts.

COMPONENTS ILLUSTRATION

INSTALLATION AT 182. Using calipers and a straight edge, measure

Mazda3 - Workshop Manual - Engine

3/13/ :32 AM. NOTICE: Do not disconnect the hose.

RADIATOR COMPONENTS CO 29 1NZ-FXE COOLING RADIATOR. x 6. Clip RADIATOR SUPPORT OPENING COVER COOLER BRACKET INVERTER BRACKET. x 5.

EM 27 2UZ-FE ENGINE MECHANICAL CAMSHAFT REMOVAL

REPLACEMENT HINT: 11. REMOVE V RIBBED BELT TENSIONER ASSY (a) Remove the 5 bolts and V ribbed belt tensioner.

2008 Toyota RAV ELECTRICAL Charging (2AZ-FE) - RAV4

PS 23. POWER STEERING POWER STEERING LINK (for 2WD)

3/15/2015 1:10 PM TIMING CHAIN REMOVAL/INSTALLATION [L3 WITH TC]

EM 112 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSPECTION. Intake Air Surge Tank Side

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

VALVE CLEARANCE (3ZZ FE/4ZZ FE)

FUEL SYSTEM PRECAUTION FU 1

FRONT DRIVE SHAFT COMPONENTS DS 1 DRIVE SHAFT FRONT DRIVE SHAFT FRONT DRIVE SHAFT HOLE SNAP RING. w/o ABS: AUTOMATIC TRANSMISSION CASE PROTECTOR

CHARGING SYSTEM PRECAUTION CH 1

TECHNICAL INSTRUCTIONS FOR SAFETY RECALL ALE VALVE SPRING AND LASH ADJUSTER REPLACEMENT GS 350: IS 350:

OVERHAUL 3. REMOVE EXHAUST VALVE

POWER STEERING PUMP (3VZ FE) POWER STEERING PUMP REMOVAL AND INSTALLATION Remove and install the parts as shown.

PS 37. POWER STEERING POWER STEERING LINK (for 4WD) REMOVAL

file://c:\program Files\tsocache\OFFICE_5416\SY1~us~en~file=SY131B46.htm~gen~ref...

Power Steering Pump REMOVAL AND INSTALLATION OF POWER STEERING PUMP

IN-VEHICLE SERVICE. Engine Components

a. Turn the crankshaft pulley, and align its groove with the timing mark "0" of the timing chain cover.

15.Timing Chain Assembly

1GR-FE ENGINE MECHANICAL: TIMING CHAIN: INSTALLATION (2007 4Runner) Model Year: 2007 Model: 4Runner Doc ID: RM WS002X

CYLINDER HEAD (for Bank 2 4WD and Pre-Runner)

REMOVAL FU 11 2TR-FE FUEL FUEL INJECTOR. Pinch. Checker. Detaching Switch Pull Out. Retainer. Fuel Hose Connector. Pipe. O-ring. Pinch.

CAUTION: Do not compress the ratchet assembly. This will damage the ratchet assembly.

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

Engine. Special Tool(s) Compressor, Valve Spring (T97P-6565-AH) Compressor Spacer, Valve Spring (T91P-6565-AH)

INSTALLATION NOTICE: EM 25. Align. Align. Align. Pin. (c) (a) (b) ENGINE MECHANICAL (2RZ FE, 3RZ FE) 2003 TOYOTA TACOMA (RM1002U) P15100 P15081 Z15266

ENGINE MECHANICAL (4A FE)

Cylinder Head Installation...

Testing and Inspection. Diagnostic Procedure Step 1-2

Power Steering Rack Leak from Right Side: Overhaul Procedure

COBB CAMSHAFTS INSTALLATION Impreza RS/TS

DISASSEMBLY. Engine. CAUTION: Remove the cylinder heads before removing the crankshaft. Failure to do so can result in engine damage.

Zoom and Print Options

Timing Belt: Service and Repair Timing Belt Replace. Timing Belt Removal

PR 3. PROPELLER SHAFT FRONT PROPELLER SHAFT ASSEMBLY (for 4WD) DISASSEMBLY

8/14/2016 8:12 PM. Bolt: Part No for Type B

2007 Ford Freestyle SEL

Toothed belt, removing and installing

Mazda North American Operations Irvine, CA

TIMING BELT REPLACEMENT. Tools Required. J A (KM-421-A) Timing Belt Adjuster J Angle Meter KM-470-B Angular Torque Gage

2003 Toyota Truck Highlander 2WD V6-3.0L (1MZ-FE) Copyright 2013, ALLDATA Page 1

2001 Toyota MR ENGINES' '1.8L 4-Cylinder

OIL AND FILTER INSPECTION

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

GENERATOR CH-9 COMPONENTS FOR REMOVAL AND INSTALLATION

WARNING: ALWAYS relieve fuel pressure before disconnecting any fuel related component. DO NOT allow fuel to contact engine or electrical components.

AXLE SYSTEM PROBLEM SYMPTOMS TABLE AH 1

REMOVAL 1. DRAIN ENGINE COOLANT 2. REMOVE THROTTLE BODY COVER 3. DISCONNECT TIMING BELT FROM CAMSHAFT TIM- ING PULLEYS (See page EM 14)

IN-VEHICLE REPAIR. Timing Drive Components. Removal. 3. Disconnect the eight ignition coil electrical connectors.

2003 Nissan-Datsun Truck Frontier 4WD V6-3.3L (VG33E)

Engine. Special Tool(s) Compressor, Piston Ring 303-D032 (D81L-6002-C) or equivalent. Compressor, Valve Spring (T93P-6565-AR)

CYLINDER HEAD COMPONENTS FOR REMOVAL AND INSTALLATION

IG 1 1NZ-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM IGNITION COIL NO. 1 CAMSHAFT POSITION SENSOR SPARK PLUG CRANKSHAFT POSITION SENSOR A116185E01

ALLDATA Online Toyota Truck Tacoma 4WD V6-4.0L (1GR-FE) - Service and... Service and Repair 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

2012 Kia Soul L4 2.0L

(g)honda Service Bulletin

ARTICLE BEGINNING COMPONENTS FRONT DOOR Toyota Tacoma

CHARGING SYSTEM PRECAUTION CH 1

INSTALLATION. Using the crankshaft pulley bolt, turn the crankshaft and set the set key on the crankshaft upward.

Transcription:

38 2TR-FE ENGINE MECHNICL CMSHFT ROVL 1. DISCONNECT CLE FROM NEGTIVE TTERY TERMINL 2. ROVE NO. 1 ENGINE UNDER COVER SU- SSLY (for 4WD) (a) Remove the 4 bolts, then remove the No. 1 engine under cover. 3. DRIN ENGINE COOLNT (See page CO-3) 4. ROVE RDITOR SUPPORT TO FRME SEL LH (See page CO-12) 5. ROVE FN SHROUD (See page CO-13) 6. ROVE IR CLENER CP SU-SSLY (See page EC-14) 7. ROVE INTKE IR CONNECTOR (See page ES- 452) 8. ROVE CYLINDER HED COVER SU-SSLY (a) Disconnect the ignition coil connectors. (b) Disconnect the throttle with motor body connector. (c) Disconnect the VSV connector. (d) Disconnect the camshaft position sensor connector. (e) Disconnect the engine wire harness clamps. G038214E01 (f) Remove the bolts, then remove the ignition coils. G038215E01

2TR-FE ENGINE MECHNICL CMSHFT 39 (g) Disconnect the ventilation hose. G038216E01 (h) Remove the 19 bolts and 2 nuts, then remove the cylinder head cover. 088646E03 9. ROVE TIMING CHIN GUIDE (a) Remove the 2 bolts, then remove the timing chain guide. G038217E01 (b) Remove the O-ring. G038218E01

40 2TR-FE ENGINE MECHNICL CMSHFT 13 Timing Marks Timing Marks 10. ROVE CMSHFT (a) Set the No. 1 cylinder to the TDC/compression. (1) Turn the crankshaft pulley clockwise and align its timing mark notch with the timing mark "0". (2) Check that the timing marks of the camshaft timing gear are located as illustrated. If not, turn the crankshaft to align the marks. Timing Marks Groove 097861E07 Paint Marks (b) Place paint marks on the timing chain plates that align with timing marks of the camshaft timing gear. Timing Marks 097862E06 (c) (d) Hold the hexagonal lobe of the No. 2 camshaft with an adjustable wrench. e careful not to damage the camshaft oil delivery pipe. Loosen the bolt. 097863E05 (e) Using 10 mm socket hexagon wrench, remove the head straight screw plug. 086539E01

2TR-FE ENGINE MECHNICL CMSHFT 41 (f) Insert a screwdriver into the service hole of the chain tensioner to hold the stopper plate of the chain tensioner lifted up. Lifting up the stopper plate of the chain tensioner unlocks the plunger. Stopper Plate 097864E03 Turn Plunger 097865E03 (g) (h) (i) (j) While keeping the stopper plate of the chain tensioner lifted up, slightly rotate the hexagonal lobe of the No. 2 camshaft clockwise with an adjustable wrench so the plunger of the chain tensioner is pushed. When the No. 2 camshaft is slightly rotated clockwise, the plunger is pushed. e careful not to damage the camshaft oil delivery pipe. Keeping the adjustable wrench installed, remove the screwdriver with the plunger pushed in. Do not move the adjustable wrench. Removing the screwdriver lifts down the stopper plate and locks the plunger. Insert a 3.0 mm (0.118 in.) diameter bar into the hole of the stopper plate with the stopper plate of the chain tensioner lifted down and locked. If a 3.0 mm (0.118 in.) diameter bar cannot be inserted into the hole of the stopper plate, rotate the No. 2 camshaft slightly to the left and right. Then a 3.0 mm (0.118 in.) diameter bar can be inserted easily. Secure the 3.0 mm (0.118 in.) diameter bar with tape. G038219E01

42 2TR-FE ENGINE MECHNICL CMSHFT (k) Remove the bolt, then remove the camshaft timing gear. G038220E01 (l) Using several steps, uniformly loosen and remove the 21 bearing cap bolts in the sequence shown in the illustration. Place the camshaft on a flat surface and loosen the bolts uniformly. 086543E01 (m) Remove the camshaft oil delivery pipe and O-ring. G037284E05 (n) Remove the camshaft bearing cap No. 1 and 8 camshaft bearing caps No. 2. G037285E02 (o) Remove the camshaft and No. 2 camshaft. Do not pry the camshaft with a tool by applying excessive force to it. Do not damage the cylinder head when removing the camshafts. G038221E01

2TR-FE ENGINE MECHNICL CMSHFT 43 (p) Tie the chain with a piece of string or wire. Prevent foreign objects from getting into the engine compartment with a shop rag. 086545E01 Retard Side Paths Close Open dvance Side Paths Open Close 11. ROVE CMSHFT TIMING GER SSLY (a) Clamp the camshaft in a vise, then check that the camshaft timing gear does not rotate. Do not damage the camshaft by clamping it in a vise too tightly. (b) Cover the 4 oil paths of the cam journal with vinyl tape as shown in the illustration. One of the 2 grooves located on the cam journal is for retarding cam timing (upper) and the other is for advancing cam timing (lower). Each groove has 2 oil paths. Plug one of the 2 oil paths for each groove with a piece of rubber before wrapping the cam journal with the tape. (c) Puncture the tape covering the advance side path and retard side path on the opposite side. Vinyl Tape Rubber Piece G038222E01 Ratard Side Paths dvance Side Paths (d) pply air pressure at approximately 200 kpa (2.0 kgf/cm 2, 29 psi) into the 2 paths (the advance side path and retard side path) from the 2 punctures. When applying air pressure, cover the paths with a shop rag to prevent oil splashes. G038223E02 Retard Side Paths Decompress dvance Side Paths Hold Pressure (e) Confirm that the camshaft timing gear revolves in the advance direction when reducing the air pressure on the retard side path. The lock pin is released and the camshaft timing gear revolves in the advance direction. G038224E02

44 2TR-FE ENGINE MECHNICL CMSHFT (f) When the camshaft timing gear reaches the most advanced position, release the air pressure on the retard side path, then release the air pressure on the advance side path. If the air pressure on the advance side path is released first, the camshaft timing gear assembly occasionally shifts in the retard direction abruptly. This may damage the lock pin. e sure to release the air pressure on the retard side path first. Do Not Remove Straight Pin (g) Remove the fringe bolt of the camshaft timing gear. e sure not to remove the other 3 bolts. Fringe olt Straight Pin Key Groove 097871E05 G037326E01 INSTLLTION 1. INSTLL CMSHFT TIMING GER SSLY (a) Put the camshaft timing gear and camshaft together by aligning the key groove and straight pin. (b) Gently press the gear against the camshaft, and turn the gear. Push further at the position where the pin fits into the groove. CUTION: e sure not to turn the camshaft timing gear to the retard angle side (to the right angle). (c) Check that there is no clearance between the gear's fringe and the camshaft. (d) Tighten the fringe bolt with the camshaft timing gear fixed. Torque: 78 N*m (795 kgf*cm, 58 ft.*lbf) (e) Check that the camshaft timing gear can move to the retard angle side (the right angle), and is locked in the extreme retard position.

2TR-FE ENGINE MECHNICL CMSHFT 45 Stem End Cap Rocker rm Correct Incorrect Lash djuster 2. INSTLL CMSHFT Check that the valve rocker arm is correctly set as shown in the illustration. (a) pply clean engine oil to the camshaft's cam portion and the cylinder head journals. (b) Install the chain onto the camshaft timing gear, with the painted mark of the link aligned with the timing mark of the camshaft timing gear. Timing Mark Paint Mark 115992E01 C (c) Set the 2 camshafts as shown in the illustration. lign the paint mark with the timing mark before setting the camshaft. D C D 097874E01 E2 E3 E4 E5 (d) (e) Provisionally install the No. 1 camshaft bearing cap. Check the proper location of each No. 2 camshaft bearing cap and install each one. I2 I3 I4 I5 G037331E03

46 2TR-FE ENGINE MECHNICL CMSHFT (f) (g) Install a new O-ring onto the No. 1 camshaft bearing cap. Provisionally install the camshaft oil delivery pipe. G037284E05 20 18 21 17 19 E 2 E 3 E 4 E 5 12 11 9 10 4 3 1 2 8 7 5 6 16 15 13 14 (h) Tighten the bolts in the order shown in the illustration. Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf) for bolt 16 N*m (158 kgf*cm, 11 ft.*lbf) for bolts except bolt I 2 I 3 I 4 I 5 olt G038225E02 Timing Mark (i) Check that each timing mark is set in the position shown in the illustration. Timing Mark Straight Pin Timing Mark Groove 097877E03 Paint Mark (j) Install the timing chain onto the camshaft timing gear, with the paint mark aligned with the timing mark on the camshaft timing gear. Timing Mark 097878E04

2TR-FE ENGINE MECHNICL CMSHFT 47 097863E05 (k) lign the No. 2 camshaft straight pin and camshaft timing gear straight pin hole. Then install the camshaft timing gear onto the No. 2 camshaft. If the straight pin and straight pin hole are difficult to align, slightly rotate the No. 2 camshaft to the left and right using the hexagonal lobe of the camshaft. Then attempt to align them again. (l) Hold the hexagonal lobe of the No. 2 camshaft with the adjustable wrench. (m) Tighten the bolt. Torque: 78 N*m (795 kgf*cm, 58 ft.*lbf) (n) Remove the 3.0 mm (0.118 in.) diameter bar from the chain tensioner. (o) pply adhesive to 2 or 3 threads of the timing gear case with head straight screw plug. dhesive: Part No. 08833-00070, THREE OND 1324 or equivalent (p) Using a 10 mm socket hexagon wrench, install the timing gear case with head straight screw plug. Torque: 17 N*m (170 kgf*cm, 12 ft.*lbf) 086539E01 3. INSTLL TIMING CHIN GUIDE (a) Install a new O-ring onto the camshaft bearing cap. G038218E01 (b) Install the timing chain guide with the 2 bolts. Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) G038217E01

48 2TR-FE ENGINE MECHNICL CMSHFT : Seal Packing 097879E03 4. INSTLL CYLINDER HED COVER SU-SSLY (a) pply seal packing to the 2 locations shown in the illustration. Seal packing: Part No. 08826-00080 or equivalent Remove any oil from the contact surface. Install the cylinder head cover within 3 minutes of applying the seal packing. Do not apply engine oil for at least 2 hours of installation. Nut Nut G035202E06 (b) (c) (d) (e) Provisionally install the cylinder head cover with the 19 bolts and 2 nuts. Tighten bolts shown in the illustration. Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) Tighten bolts and nuts shown in the illustration. Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) Tighten bolts again. Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) (f) Connect the ventilation hose. G038216E01 (g) Install the ignition coils with the bolts. Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) G038215E01

2TR-FE ENGINE MECHNICL CMSHFT 49 G038214E01 (h) Install the engine wire harness clamps. (i) Connect the camshaft position sensor connector. (j) Connect the VSV connector. (k) Connect the throttle with motor body connector. (l) Connect the ignition coil connectors. 5. INSTLL INTKE IR CONNECTOR (See page ES- 455) 6. INSTLL IR CLENER CP SU-SSLY (See page EC-17) 7. INSTLL FN SHROUD (See page CO-18) 8. INSTLL RDITOR SUPPORT TO FRME SEL LH (See page CO-19) 9. CONNECT CLE TO NEGTIVE TTERY TERMINL Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf) 10. DD ENGINE COOLNT (See page CO-3) 11. CHECK FOR ENGINE COOLNT LEKGE (See page CO-2) 12. CHECK FOR ENGINE OIL LEKGE 13. INSTLL NO. 1 ENGINE UNDER COVER SU- SSLY (for Pre Runner and 4WD Type) (a) Install the No. 1 engine under cover with the 4 bolts. Torque: 30 N*m (306 kgf*cm, 22 ft.*lbf)