Sub Regional RTEP Committee Mid-Atlantic

Similar documents
Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic

Reliability Analysis Update

Sub Regional RTEP Committee South

Reliability Analysis Update

Sub Regional RTEP Committee South

Sub Regional RTEP Committee Mid-Atlantic

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Western Region ATSI

Reliability Analysis Update

Sub Regional RTEP Committee Mid-Atlantic

Reliability Analysis Update

PJM Regional Transmission Expansion Planning (RTEP) Process

Transmission Expansion Advisory Committee

Sub Regional RTEP Committee - Southern. August 19, 2011

Supplemental Report on the NCTPC Collaborative Transmission Plan

New Jersey State Report

Market Efficiency Update

Market Efficiency RTEP Proposal Window

Transmission Expansion Advisory Committee. Reliability Analysis Update

Transmission Expansion Advisory Committee

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

Sub-Regional RTEP Committee PJM South

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Generation Deactivation Notification Update

Market Efficiency RTEP Proposal Window

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Feasibility Study Report

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Designated Entity Pre-Qualification Materials. Exelon Corporation

Falcon-Midway 115 kv Line Uprate Project Report

Market Efficiency Update

Market Efficiency Update

Illinois State Report

Transmission Expansion Advisory Committee Meeting. April 23, 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Solution Meeting

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Reliability Analysis Update

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

South Dakota 890 Study

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

BC Hydro System 2017 Annual Progress Report

BC Hydro System 2016 Annual Progress Report

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -

Sub Regional RTEP Committee PJM West

DFO STATEMENT OF NEED REPORT

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

Sub Regional RTEP Committee - Southern

Black Hills Project Summary

Reliability Analysis Update

Transmission Planning Attachment K Public Input Meeting

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

MOBILIZATION REPORT OBEY THE SIGNS OR PAY THE FINES 2007 NORTH REGION SPEED CRACKDOWN 2007 OBEY THE SIGNS OR PAY THE FINES CAMPAIGN THE RESULTS

PG&E s 2012 Request Window Proposals

15 Nelson-Marlborough Regional Plan

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

15 Nelson-Marlborough Regional Plan

Q0044 interconnection at

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Status of PNM s Completed Transmission Construction Projects 11/30/2017

SECTION 9: ELECTRICAL POWER DISTRIBUTION. ESE 470 Energy Distribution Systems

Gateway South Transmission Project

Appendix B. Summary of Changes to the Year Assessment

2013 ANNUAL PROGRESS REPORT

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

New Mexico Transmission Expansion Concepts For Wind Resources

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Expansion Advisory Committee

Appendix D Black Hills Project Summary

Pacific Gas and Electric Company s Revised 2015 Annual Progress

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018

Subregional RTEP Committee Mid-Atlantic Area. September 9, 2008

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Feasibility Study Report

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

ATTACHMENT - DFO STATEMENT OF NEED

CHAPTER 8 - GAS AND ELECTRICITY TRANSMISSION COMPARATIVE CASE STUDY

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

APPENDIX E: Project Need and Description

4.7: New Jersey RTEP Overview

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Merger of the generator interconnection processes of Valley Electric and the ISO;

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

North Oregon Coast Area Study. Adam Lint

Merchant Transmission Interconnection PJM Impact Study Report. PJM Merchant Transmission Request Queue Position X3-028.

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

Pacific Gas and Electric Company s Revised 2016 Annual Progress

NYCA LOLE Violations (Methods D and E )

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Transcription:

Sub Regional RTEP Committee Mid-Atlantic December 19, 2017

First Preliminary Review Baseline Reliability and Supplemental Projects 2

The slide was previously presented at 8/31/2017 and is replaced by the slide on next page. Load Deliverability DPL South (Summer): Problem Statement: Low voltage violation at the Five Point 69 kv plus the Robinson and Rehoboth 138 kv stations during the Delmarva South LDA load deliverability analysis. (FG# LD-SVL1, LD-SVL,2 and LD-SVL3) Potential Solution: Install additional 30 MVAR capacitor bank at DPL s Rehoboth 138 kv Substation. o The capacitor bank would be installed in two separate 15 MVAR stages allowing DPL operational flexibility. At this stage, there are ongoing discussions with Substation Engineering to assess the viability of this option from a constructability standpoint, and the estimate is being created accordingly. This solution will resolve all of the voltage issues identified above. Alternative Solution: Replace existing 30 MVAR capacitor bank at DPL s Rehoboth 138 kv Substation with a +50/-25 MVAR Static VAR Compensator (SVC). o At this stage, there are ongoing discussions with Substation Engineering to assess the viability of this option from a constructability standpoint, and the estimate is being created accordingly. This solution will resolve all of the voltage issues identified above Required IS date: 6/1/2022 Project Status: Conceptual DPL Transmission Zone Baseline Reliability Project 3

DPL Transmission Zone Baseline Reliability Project DPL recently provided a new load profile in the Robinsonville area and PJM reevaluated the load deliverability analysis based on the modified load. Load Deliverability DPL South (Summer): Problem Statement: Low voltage violation at Lank 69 kv station during the Delmarva South LDA load deliverability analysis. Potential Solution: Install a 30 MVAR capacitor bank at DPL s Cool Springs 69 kv Substation. The capacitor bank would be installed in two separate 15 MVAR stages allowing DPL operational flexibility. Estimated cost: $1.7 M Alternative Solution: Install an additional 30 MVAR capacitor bank at DPL s Rehoboth 69 kv Substation. The capacitor bank would be installed in two separate 15 MVAR stages allowing DPL operational flexibility. This solution would resolve all of the voltage issues identified above, but due to lack of space in the Rehoboth Substation and surrounding areas, there are major constructability concerns. Required IS date: 6/1/2022 Project Status: Conceptual 4

PSE&G Transmission Zone: Supplemental Project Harvey Switching Station Problem Statement: Equipment Material Condition, Performance and Risk: As discussed during the 8/31/2017 SRRTEP Mid Atlantic meeting, there are several 26kV and 13kV substations in the Clifton area with equipment in poor condition. The majority of equipment at Allwood, Nutley, and Van Houten Substations is over 60 years of age and must be addressed. Alternatives: 1. Construct a new 230/69kV station in the Clifton area on the existing ROW and a new 69/13kV station within the existing ROW. Construct a new 230/69kV station in the Clifton area to provide a third source to Kuller Road. Install 230kV ring bus with two (2) 230/69kV transformer and 69kV ring bus at Harvey Switching Station. Loop in overhead 230kV line to Harvey Switching Station. Install two (2) 69/13kV transformers fed from 69kV ring bus. Provides a source for a third supply to Kuller Rd Estimated Project Cost: $195 M 2. Construct a new 230/13kV station in the Clifton area and a new 230/69kV station at a new site Purchase property and construct a new 230/69kV station to provide a third source to Kuller Road and outlets for Allwood, Nutley, and Van Houten. Install 230kV ring bus with one (1) 230/69kV transformer and 69kV ring bus at a new site. Construct 230kV ring bus on the existing ROW to avoid derating the line and extend 230kV circuit using XLPE cable to Harvey Switching Station. Install two (2) 230/13kV transformers fed from 230kV ring bus. Provides a source for a third supply to Kuller Rd Estimated Project Cost: $379M 3. Rebuild Allwood, Nutley, and Van Houten as 69/4kV stations and connect to East Rutherford 69kV and Belleville 69kV Switching Stations. Purchase additional property to accommodate new construction at all three locations. Install 69kV ring bus and three (3) 69/4kV transformers at each location. Construct a 69kV network between Allwood, Nutley, Van Houten, Belleville, Branch Brook, East Rutherford, and Kuller Road. Estimated Project Cost: $244M 4. Do Nothing Alternative there is a reliability risk created by not acting to address. Project Status: Conceptual 5

Second Review and Recommendations Baseline Reliability and Supplemental Projects 6

PSE&G Transmission Zone: Baseline Reliability Kuller Road Substation Previously Presented: 10/31/2017 Problem Statement: PSE&G FERC Form 715: Kuller Road Substation is supplied by two underground 138kV lines. Kuller Road supplies more than 18,000 customers with load in excess of 60 MVA. An N-1-1 event would result in a complete loss of electric supply to the station for more than 24 hrs, a violation of PSE&G acceptable load drop levels and durations. Recommended Solution: Convert Kuller Road to a 69/13kV station. (B2983) Install 69kV ring bus and two (2) 69/13kV transformers at Kuller Road. Construct a 69kV network between Kuller Road, Passaic, Paterson, and Harvey (new Clifton area switching station). Estimated Project Cost: $98.25 M Required IS Date: 6/1/2018 Expected IS Date: 6/30/2021 Project Status: Engineering PATERSON TO NORTH PATERSON TO 40 TH STREET SOUTH PATERSON PASSAIC TO VAN WINKLE TO CARLSTADT 138/69KV EAST RUTHERFORD KULLER ROAD FUTURE (TO HARVEY) TO HASBROUCK HEIGHTS Legend: In Service 138 kv In Service 69 kv New 69kV Project 69/13KV 69/13KV 7

PSE&G Transmission Zone: Baseline Reliability Hillsdale Substation Previously Presented: 10/31/2017 Problem Statement: PSE&G FERC Form 715: Hillsdale Substation is supplied by two underground 230kV lines. Hillsdale supplies more than 17,000 customers with load in excess of 80 MVA. An N-1-1 event would result in a complete loss of electric supply to the station for more than 24 hrs, a violation of PSE&G acceptable load drop levels and durations. Recommended Solution: Construct a 230/69kV station at Hillsdale Substation and tie to Paramus and Dumont at 69kV. B2982) Install a 69kV ring bus and one (1) 230/69kV transformer at Hillsdale. Construct a 69kV network between Paramus, Dumont, and Hillsdale Substation using existing 69kV circuits WALDWICK SWITCH HILLSDALE SWITCH 230/13KV 230/13KV NEW MILFORD SWITCH Estimated Project Cost: $115M FAIRLAWN SWITCH UNDERGROUND CABLE UNDERGROUND CABLE 230/69KV TEANECK 69KV Required IS Date: 6/1/2018 Expected IS Date: 6/30/2021 Project Status: Engineering 138/69KV TO HAWTHORNE 69KV TO MCLEAN 69KV TO WARREN POINT 69KV PARAMUS 69KV TO HASBROUCK HEIGHTS 69KV SPRING VALLEY 69KV DUMONT 69KV TO BERGENFIELD 69KV Legend: In Service 230 kv In Service 138 kv In Service 69 kv New 69kV Project 8

PSE&G Transmission Zone: Supplemental Project North Bridge St and Mountain 69 kv stations Previously Presented: 10/31/2017 Problem Statement: During an N-1-1 contingency event, the voltage at North Bridge St 69kV and Mountain Ave 69kV drops to below 0.95 p.u. The loss of the Bridgewater - North Bridge Street 69kV line and the Lake Nelson - Mountain Ave 69kV line would leave North Bridge Street and Mountain Ave fed from a single 69kV line. North Bridge Street serves around 2000 customers and over 40 MVA of load, while Mountain Ave also serves around 2000 customers and over 20 MVA of load. Selected Solution: Construct a new 69kV line from Bridgewater to North Bridge Street. (S1459) Rebuild North Bridge Street 69kV bus as a GIS ring bus. Install new 69kV overhead line from Bridgewater to North Bridge Street using existing line position at Bridgewater. Estimated Project Cost: $60 M Expected IS Date: 10/31/2021 Project Status: Engineering TO CUSTOMER BRIDGEWATER SWITCH TO CUSTOMER 230/69KV TO SOUTH SECOND ST. TO CUSTOMER LAKE NELSON SWITCH NORTH BRIDGE STREET MOUNTAIN AVE TO CUSTOMER Legend: 230/69KV In Service 69 kv New 69kV Project 9

Next Steps 10

Upcoming SRRTEP - Mid-Atlantic Meetings Mid Atlantic Start End 1/26/2018 8:30 12:30 3/23/2018 8:30 12:30 5/25/2018 8:30 12:30 7/20/2018 8:30 12:30 9/21/2018 8:30 12:30 11/28/2018 8:30 12:30 11

Questions? or RTEP@pjm.com 12

Revision History 12/13/2017 V1 Original version posted to PJM.com 12/18/2017 V2 Slide # 5 minor correction to alternative 1 and replaced the map - Slide # 7 changed map 12/18/2017 V3 Slide # 5 minor correction to alternative 1 - Removed Slide # 10 and 11 13