Roller Removal Instructions

Similar documents
CRESTLINE DAMPENING SYSTEM INSTALLATION INSTRUCTIONS. Ryobi 3302M Itek 3985 A.B. Dick 9985 X /99

Crestline Dampening System. Installation Instructions. Hamada RS34 & VS34 Satellite Unit. For Presses Originally Equipped With. Integrated Dampeners

Crestline Altra Series TM Dampener. Installation Instructions. Heidelberg GTO. X /98 Rev-A

Crestline Dampening System Installation Instructions

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A

Crestline Altra TM Series Dampener. Installation Instructions. Didde MCP/Conserver. X /2001 Rev-A

Altra Series Dampener

Crestline Dampening System

Crestline Dampening System. Installation Instructions. Ryobi 500N X /98

ASTRO AMC-2000 SERIES ENVELOPE FEEDER

ASTRO AMC-2000 SERIES ENVELOPE FEEDER

PowderPro Spray System

70001 and Clutch Rebuild Instructions

Lifecycle Upright Bikes LC95, LC91, LC85, C9, C7, 95Ce, 95Ci, 93Ci, and 90C How To... Replace the Intermediate Pulley Shaft and Bearings

Firehawk Second Stage Regulator Fire Service

TCU Static Mixer Installation

Aligning the TH-28/480 Series Lower Drive System

CU-30, CS-40, CTS-45. Operation & Setup Guide

PARTS CATALOGUE / TECHNICAL GUIDE

PARTS CATALOGUE / TECHNICAL GUIDE

INSTRUCTION BULLETIN

Recommended Maintenance Procedures for the Cutters Edge MULTI-CUT 2100 Series Fire Rescue Saw

CorkSport Rear Camber Arms Mazda 3, Mazda 6, & CX-5

GXS14 - Civic Natural Gas Fuel Tank Solenoid Valve Replacement

Repair Manual VW 02T gearbox. INA GearBOX

JARVIS. Model 50G Hydraulic Dehorner

# : Engine Bearing Knock Noise (Resuppport Crankshaft, Select-fit Rod Bearings) - (Mar 29, 1999)

Steering Intermediate Shaft Noise

OPERATING INSTRUCTIONS SET UP: CW10: The CW10 is shipped partially assembled. The following items should be received:

Installation Instructions February 2009

Training Documentation

Torqueflite Trans-Scat Kit

Installation Instructions 1812 Folder Disk Clutch Retrofit Kit Martin Yale #WRA

"Engineered to Ride, Built to Last "

Installation Instructions

Front Differential Growl/Howl/Rumble Noise at MPH

FRONT FORK 2.16 GENERAL REMOVAL HOME. 4. See Figure Loosen upper and lower fork clamp pinch fasteners (1, 4).

INSTALLATION INSTRUCTIONS 97 FORD EXPEDITION

2.2L 4-CYL - VIN [S]

ALL PRODUCTS PATENT PENDING

Front Upper Control Arm-to-Frame Mounting Bracket Attachment

Transmission Overhaul Procedures-Bench Service

Disassembly and Reassembly for CBB (Double Acting) Series Pneumatic Actuators

PROCEDURE. Required tools. Drive Pulley Sliding Sheave Removal. No Subject:REV-XP, REV-XR & REV-XU Engine Alignment

Auger Belt Tension Adjustment DB7659

Patriot. Aluminum and Steel 5spring. Step #1 Tarp Spool with Gear Motor (Includes Instructions for Optional Wind Deflector)

STERNDRIVE UNIT 3 A DRIVE SHAFT HOUSING

Disassembly and Reassembly for CBB-SR (Spring Return) Series Pneumatic Actuators

CLUTCH CONTENTS SERVICE DIAGNOSIS. (a) Worn or damaged disc assembly. (b) Grease or oil on disc facings. (c) Improperly adjusted cover assembly.

MKVI Jetta Fog Light Kit

Power Filter Kit PART# - RS

TURBOCHARGER UPGRADE; N20 INSTALLATION INSTRUCTIONS PART NUMBER D

Rear Spring Harsh Ride

9905/9910/9910D/ 9910XCS/9910XC2 Service Reference Manual

959 PARTS LIST. Item # Description Qty. Part number

AIRAM Press Co. LTD Industrial Court Covington, OH

PARTS CATALOGUE / TECHNICAL GUIDE

Toothed belt, removing and installing

PremAire Cadet Escape Respirator: Second Stage Regulator

Carriage Height Calibration

SE-1200-MP ECO - SERIES

Intake Manifold Flap Linkage Pair, Billet Aluminum, B7 Audi RS4 4.2L FSI

TOYOTA 4-RUNNER TOWING HITCH Preparation

2010 Camaro SS/V Underbody Brace Installation Instructions

MANUAL TRANSMISSION SERVICE

G3 UHT TRANSMISSION. G3 UHT Transmission Replacement. G3 UHT Transmission Removal

AND BASE DISASSEMBLY AND REASSEMBLY ROUTINES CONTENTS DISASSEMBLY AND REASSEMBLY

8 TROUBLESHOOTING

SHOP PRO FXP 95 UPGRADE KIT (REGULATED)

Tank Indicator Installation Model: VSTI AE020, Stainless Reverse Read System

STERNDRIVE UNIT 3 B GEAR HOUSINGS MR/ALPHA ONE/ALPHA ONE SS

PRODUCT USE INFORMATION

Trinity Low Profile Vehicle Restraint System

Revised on : 05. Jun TECHNICAL GUIDE PARTS CATALOGUE. Cal.VJ23B Cal.VJ33B ANALOGUE QUARTZ. SII Products

Installation Guide: Front Brake Pad

CALIFORNIA TRIMMER MOWER MAINTENANCE MANUAL

AmTryke Adult Recumbent Model HP1000 #50-HC-1000

****SERVICE MANUAL****

TOYOTA COROLLA LOWERING SPRINGS Preparation

Headlamp Durability Enhancement

X-Trainer 43mm fork service manual. Beta USA, Inc This work should be performed by a trained motorcycle technician.

IMPORTANT WARRANTY & INSTALLATION INSTRUCTIONS ATTACHED

UNIT MAINTENANCE INSTRUCTIONS PAGE 2-1 DIRECT SUPPORT

KENCOVE PD100 MANUAL TILT POST DRIVER

Gate Valve Maintenance & Adjustment Procedures

Ford Racing GT500 Style Strut Mount Upgrade (05-12 All):

REMOVAL & INSTALLATION

ENG-14, Balance Shaft Oil Seal Replacement

PowerBook G4 Aluminum 17" GHz Clutch Hinges Replacement

Service Kit C

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB-SR-S SEISMIC SPRING RETURN SERIES PNEUMATIC ACTUATORS

GATE VALVE MAINTENANCE AND ADJUSTMENT PROCEDURES

DISASSEMBLY Procedure revision date: 11/22/2001

Special Points. Specifications TRAIN SIDE DIAL SIDE. Scale 2V2:1

Pleasereadandfulyunderstandthisprocedurepriortoperforminganybearingmaintenance.

TOYOTA TUNDRA TVIP V4 REMOTE ENGINE STARTER (RES)

Return to Instruction Sheet index TCI Torqueflite Trans-Scat Kit

ENERGY SMART TROUBLESHOOTING

TABLE OF CONTENTS. 3 Outlet Stainless Steel Body. 3 Outlet Ductile Body. 2 Outlet Ductile Body 2 Outlet Bronze Body

Section X STEERING DATA AND SPECIFICATIONS. 21 degrees 45 minutes -f- or 1 degree (inner wheel when outer wheel is 20 degrees)

Transcription:

Roller Removal Instructions Rollers for the Crestline dampener are broken down into numerical categories as follows: Prefix Roller Position Prefix Roller Position x07-01.. Form Roller x07-04.. Oscillator x07-02.. Metering Roller x07-05.. Intermediate Roller xsa-0702.. xsa-0705.. x07-03.. Pan Roller x07-06.. Bridge Roller Replacement of metering, intermediate, oscillator & bridge rollers can generally be replaced without removal and disassembly of the dampener from the press with the exception of the Altra Series dampeners on page 4. Consequently, most of these are not covered in these instructions. Regardless of which roller is being replaced, all roller pressures should be checked prior to operating the dampener after replacement of a roller. Roller replacement instructions for each model are listed below: A.B. Dick Hamada, Satellite Ryobi 360 2 375 2 8800 2 9800 2 9900 2 9985 (4 roll) 2 9985 (6 roll) 3 9985 (Altra) 4 6020 4 A.M. Multigraphics All Models 5 555 6 661, 661E 6 662, 662E 6 665 6 775 6 E47S 6 RS, VS 34 6 Heidelberg GTO Altra 4 GTO 46/52 (6 roll) 7 2700 2 2800 2 3200 2 3200 MCD 5 3302 (4 roll) 2 3302 (6 roll) 3 3302 (Altra) 4 500N 5 512 4 Sakurai 258, 258 E 4 Didde Imperial Toko Apollo 8.5 5 Hamada, Parent C248 4 500 CDA 5 600 5 611, 611E 5 700 5 E47 5 RS, VS, DU 34 5 Itek 2200 5 3200 5 4200 5 950 2 960 2 975 2 985 5 3985 (4 roll) 2 3985 (6 roll) 3 3985 (Altra) 4 1800 5 4700 5 4750 5 Townsend All Models 8 1

1. Remove dampener from press. Lift out metering & oscillator rollers. 2. Take out springs (, ) and save. 3. Remove tie bar bolts by oscillator slots & above water pan blocks. 4. Pull side frames off. If replacing just the pan roller, proceed to step 6. 5. Take gear and set collars off form & place on new roller in the exact order as they were on the old roller. On A.B. Dick's the gear is pinned to the form and a new 5/32" x 1 pin is provided. If replacing just the form, proceed to step 9. 6. Take gear & collars off pan roller. Remove hanger from one side by taking off acorn nut, washer and clicker plate. 7. Replace the old pan roller with the new one & reassemble bracket assembly. On 360 & 8800 pan rollers one journal is slightly shorter than the other. Check the journal alignment before removing the pan roller. 8. Place form roller on hanger assembly. On A.B. Dick's make sure the hanger falls between the combo gear on the form roller. Diagram B 9. Put side frames on dampener, align on a cutter bed and tighten tie bar bolts. 10. Reposition set collars on form and/or pan roller and tighten. 11. Re-install springs removed in step 2. 12. Place metering & oscillator in dampener. 13. Reinstall in press & align hanger brackets by: A. Placing dampener in "On" position. B. Loosen acorn nuts. C. Put pressure with the palm of your hand on tie bar between thumb screws. D. Tighten acorn nuts. 14. Check metering to pan roller pressure & form to plate pressure. 2

1. Remove dampener from press. Lift out metering, upper & lower intermediates & oscillator. 2. Remove guard () beneath pan roller. 3. Remove tie bar bolts by oscillator slots & beneath pan roller. 4. Pull side frames off. The steps are the same if replacing the form or pan roller. 5. Remove roller from dampener. 6. Take gear and set collars off old roller & place on new roller in the exact same order. 7. Install new roller in frames. 8. Put side frames on dampener, align on a cutter bed and tighten tie bar bolts. 9. Reposition set collars on form and/or pan and tighten. 10. Reinstall in press. 11. Put intermediate rollers in dampener. Make sure the roll pins are to the gear side, facing up. 12. Reinstall oscillator & metering rollers. Diagram B 13. Check the following pressures: A. Metering to pan roller. B. Metering to upper intermediate (an upgrade to a self compensating pressure device is available. Please contact Accel for more information). C. Form to plate pressure. 3

1. If replacing the form roller it is not necessary to remove the dampener from the press. The form roller is replaced in the same manner as the ink form rollers. Proceed to step 12. 2. Remove bridge roller (Ryobi 512 & A.B. Dick 6020). 3. Remove dampener from press. Take metering roller out of hanger bracket assembly. 4. If replacing just the intermediate roller remove the bolts holding the intermediate shaft and pull the hanger bracket assembly off each end (, ). 5. Place the hanger bracket assembly on the new roller and re-install in dampener. Proceed to step 9. 6. Remove the tie bar by the pan roller. 7. Take gear and set collars off pan roller, remove side frames and install new roller in frames 8. Put gears & collars back on pan roller, re-install tie bar and intermediate roller assembly. 9. Align dampener on cutter bed and tighten tie bar bolts. 10. Reinstall metering roller in hangers and install dampener in press. 11. Reinstall brige roller (Ryobi 512 & A.B.Dick 6020). 12. Check the following pressures: A. Metering to pan roller. B. Metering to intermediate. C. Intermediate to oscillator. D. Oscillator to form. E. Form to plate pressure. F. Bridge to intermediate (Ryobi 512 & A.B. Dick 6020). 4

1. Remove dampener from press. Lift out metering, intermediate & oscillator. 2. Remove tie bar bolts by oscillator slots & pan roller. 3. Pull side frames off. The steps are the same if replacing the form or pan roller. 4. Remove form or pan roller. Take gear and set collars off old roller & place on new roller in the exact order as they were on the old roller. 5. Re-install roller in frame. 6. Put side frames on dampener, align on a cutter bed and tighten tie bar bolts. 7. Reposition set collars on form and/or pan and tighten. 8. Reinstall in press. 9. Put intermediate roller in dampener. Make sure the roll pin is to the gear side, facing up. 10. Reinstall oscillator & metering rollers. 11. Check the following pressures: A. Metering to pan roller. B. Metering to intermediate. C. Form to plate pressure. 5

1. Form rollers on newer Hamada satellite units (Diagram B) are replaced like the ink forms. If this is the only roller being replaced, proceed to step 9. 2. Remove dampener from press. Lift out metering & oscillator rollers. 3. Remove tie bar bolts. On newer model Hamada satellite units the tie bar containing the thumb screws must come off entirely but does not need to be disassembled. 4. Pull side frames off. Replacement of the pan and form roller is the same. 5. Check the journal alignment before removing the pan or form roller. They may not be symmetrical depending upon the unit. 6. Take gear and set collars off form or pan & place on new roller in the exact same order. 7. Put side frames on dampener, align on a cutter bed and tighten tie bar bolts. On newer style Hamada satellite units make sure the lift bearings spin freely (Diagram B, ) and the thumb screws for the metering roller (Diagram B, #2) don't bind. Diagram B 8. Place metering & oscillator in dampener. 9. Check the following pressures: A. Metering to pan. B. Metering to form. B. Form to plate. #2 6

1. Lift out metering, intermediate & oscillator rollers. 2. Remove dampener from press. 3. It is not necessary to disassemble the dampener to replace the form or pan rollers. The procedure is the same. 4. Remove the bolts holding the roller plates (, ) and pull the roller assembly out. 5. Take gear and set collars off rollers and remove the plates. 6. Place the plates on the new rollers. 7. The gearing on the form rollers have been changed. The clutch gear has been replaced with a gear and keyway at both OPS & NOPS. These new parts are provided with the form roller. Do not use the old clutch gears on the form roller. Discard to avoid confusion! 8. Reinstall gears & collars. 9. Reinstall roller plate assembly in dampener, align the rollers and gears and tighten set collars. 10. Install dampener in press. 11. Replace intermediate rollers with roll pins to the NOPS, facing up. An upgrade, self compensating hanger assembly is available. Please contact Accel for more information. 12. Install metering and oscillator rollers. 13. Check the following pressures: A. Form to plate. B. Metering to pan. 7

Replacing rollers in the Crestline on Townsend T-51 color heads does not require the removal of the dampener from the press. Rollers are replaced as follows: Form: Pull out form roller shaft and replace roller. Large Intermediate: Unhook from spring loaded arms and put new roller in place. Small Intermediate: Loosen set screws holding roller in place and put in new roller. Oscillator: Pull out old oscillator and drop new roller in slots. Metering: Pull out old metering and drop new roller in slots. Pan: Pull out shaft (Diagram B) and install new roller. Diagram B 8 production\forms\roller removal instructions