SOR-I: FOR SUPPLY PORTION S. No. Description Unit Qty. Unit Cost including Packing and Forwardi ng + TPIA charges Excise Duty (in % and amount) 2 3 4 5 6 Supply of 650 KVA, 415 Volts Gas Genset comprising of Gas Engine, Alternator (rated at (A) 650KVA, 415 Volts), Controller and required all acessories, mounted on a common base frame, housed in sound proof enclosure as per CPCB Norms. A-1 Batteries & Leads. A-2 Residential Silencer (with spark arrester) A-3 AMF Panel A-4 Safety system (GD,FD,ALARM) (B) ELECTRICAL SYSTEM B-1 B-2 B-3 Supply of MCC auxillary panel for oil,wter etc circuit as per OEM design/ Technical specification. Terminal Box including double compression type cable gland Supply and burring of safe earthing electrode T-19 Cu-Copper coated, length 3000 mm., outer pipe 48.4 mm. x 3.2 mm., inner pipe 26.9mm.x2.6 mm., terminal dia. 12 mm., coating 80-100 micron filled with crystallinc conductive mixture (CCM) having anti corrosive & conductive properly with 50 kgs. activated soil (BFC) capable of reducing the soil resistivity with good mixture of retaining capacity along with 30 cm square C.I. frame with hinged cover & masonry housing. Supply and laying of 32 mm x 6 mm G.I. strip B-4 from earth electrode directly in the ground as required complete in all respect. (SOR 2009) (C ) BALANCE ITEMS OF PLANT C-1 EXHAUST SYSTEM Nos. 4 Mtr. 50 C-1.1 C-1.2 Supply and installation on site of Exhaust piping 8" MS ERW 4.85 mm thick including M.S "C" Class long bend,short bend and flanges( table "F") including nut / bolts gasket.rate shall be including all required material to install the exhaust line.igl will pay charges for installed line in RM.. Supply and installation of MS Support structure complete with paint as per site requirement. RM 25 Kg 2500
Supply and installation of aluminium cladding for exhaust pipes on site-supply of 75 mm thick, Density-150 Kg/M3 Rock wool, aluminium C-1.3 cladding,hardware,net,etc.( all material required) for thermal insulation as per requirement and industrial standards.igl will pay charges for installed line in RM. Supply and installation of material ( aluminium C-1.4 cladding,rockwool, hardware,net, etc.) for thermal insulation of Silencer of GAS GENSET. C-2 COOLING SYSTEM Supply of Coil Cooler suitable for offered 650KVA Gas Genset including ( 1 WTISB) cooling &Raw C-2.1 water pumpsets, expansion tank and makeup tanks.all items required for cooling system as per OEM design / specification. Genset to coil cooler coolent line piping - Supply and installation of 1" pipe line including 1"Class "B" MS ERW Pipe,ball valves, flanges, temperature gauges, pressure C-2.2 gauges,gasket,hardware, fixtures etc.vendor shall supply all material required for installation of this pipeline as per standered.igl will pay charges for installed line in RM. C-2.3 C-2.4 C-2.5 Genset to coil cooler coolent line piping- Supply and installation of 3" or 4" dia MS ERW pipe Class B, ball valves, flanges, temperature gauges, pressure gauges,gasket,hardware, fixtures etc.vendor shall supply all material required for installation of this pipeline as per standered and OEM design/specification.igl will pay charges for installed line in RM. Flexible bellow 3"/4" dia, required in coolent line as per GAS GENSET OEM specification Supply of Butterfly valve of 3" / 4"dia as per technical specification/ approved make RM 25 Sets 1 RM 70 RM 40 Nos. 8 Nos. 16
VAT/CST (without Form C @ %)) Freight & Insurance + Unloadin g at site Total Unit Price (FOT IGL Store Total price FOT (FOT IGL Store 7 8 9 10
SOR-II: FOR SERVICE PORTION S. No. Description Unit Qty. Unit Rate SOR-II PART-1 (D) ENGINEERING, INSTALLATION & COMMISSIONING D-1 Engineering Charges- Design and providing the layout, drawing, manual etc. of Gas GENSET and BOP. set 1 D-2 Installation and commissioning charges of all supplied items for startup the GAS GENSET and auxialuries on site. set 1 (F) LOAD TESTING AND STATUTORY/ ELECTRICAL APPROVALS F-1 Charges of arrangement and providing electrical load bank ( 750 KVA ) on site for testing the GENSET on load conditions. Sets 1 F-2 Charges for obtaining sanction and approval from local electrical / statuatory authorities i.e, electrical inspector etc. for operation/ Sets 1 startup of 650 KVA GAS GENSET at IGL Bhawan. (G) Freight & Insurance Charges Up to Site Unit 1 TOTAL OF PART-1 SOR-II PART-2 S. No. Description Unit Qty. Unit Rate (H) H-1 H-2 H-3 ANNUAL MAINTENANCE CHARGES (AMC) Annual maintenance contract(amc) for 1st year (during Warranty Period) Comprehensive annual maintenance contract(camc) for 2nd year (After warranty period) Comprehensive annual maintenance contract(camc) for 3rd year (After warranty period) TOTAL OF PART-2 Unit 12 Unit 12 Unit 12 TOTAL OF SOR-II (PART-1 + PART-2)
Service Tax @15% Total Unit Price (FOT IGL Store Total price FOT (FOT IGL Store Service Tax Component of WCT @10.5% Total Unit Price (FOT IGL Store Total price FOT (FOT IGL Store
SOR-III FOR BUY-BACK PORTION S. No. Description Unit Qty. 1 2 3 4 (A) Buyback of brand new diesel gen-set, 180 KVA (Engine make- Greaves) with all accessories (B) Buyback of used diesel gen-set, 380 KVA (Engine make- Cummins), model no.nta-14-g3, coupled with Stamford alternator, with all basic accessories and complete AMF panel TOTAL OF SOR-III
Unit Cost including Packing and Forwardi ng + TPIA charges Excise Duty (in % and amount) VAT/CST (without Form C @ %)) Freight & Total Unit Insurance Price + (FOT Unloadin IGL Site g at site Total price FOT (FOT IGL Site 5 6 7 8 9 10
TOTAL OF SOR-II TOTAL OF SOR-II TOTAL OF SOR-III GRAND TOTAL OF ALL ITEMS = (SOR-I) + (SOR-II) - (SOR-III)