T r0(1 Jn11 ttull ~O,

Similar documents
Riverside County Transportation Department Summary of Bids

STREET IMPROVEMENTS PROPOSAL BID ITEMS

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY

Riverside County Transportation Department Summary of Bids

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

BUTTE COUNTY DEPARTMENT OF PUBLIC WORKS

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD,

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

CITY OF STANDARD SPECIFICATIONS

Riverside County Flood Control & Water Conservation District 1995 Market St. Riverside, CA Phone: Fax:

* AS IN DID NOT INCLUDE ADDENDUM NOS. 1 AND 2

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

Items Unit Quantity Unit Price Total Unit Price Total

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Public Works. Capital Projects FY

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

Dredging 101 Dredging and Disposal Workshop

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

SUBJECT: CONTRACT C080S, HOIST REPLACEMENT AT BUS MAINTENANCE DIVISIONS 3, 5, 9, 10, AND 18, PETERSON HYDRAULICS AND ROTARY LIFT, A JOINT VENTURE

County of Santa Cruz 0579

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

DELETE first sentence of first paragraph that reads: REPLACE with the following:

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

METRO Magnolia Transit Center - Bid Tab

365, , , A Total of Schedule I and II 530, , A 702, A

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

San Antonio Water System Standard Specifications for Construction ITEM NO. 836 GREY-IRON AND DUCTILE-IRON FITTINGS

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

DESCRIPTION QUANTITY PRICE TOTAL

Form A STORM WATER POLLUTION PREVENTION PLAN ANNUAL UPDATE QUESTIONNAIRE

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

2011 STORM WATER POLLUTION PREVENTION PLAN ANNUAL UPDATE QUESTIONNAIRE

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

City of Grand Island Tuesday, February 13, 2018 Council Session

DOCUMENTATION WORKBOOK FY 2017

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

San Antonio Water System Standard Specifications for Construction ITEM NO. 836 GREY-IRON AND DUCTILE-IRON FITTINGS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

TORONTO TRANSIT COMMISSION REPORT NO.

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

Steese Rd - Curb & Sidewalk Improvement

B2. Fueling Operations

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT

WHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON

Wentzville Parkway South Phase 2 & 2A

SOUTHEAST LIVESTOCK ELECTRICAL AND POLE BARN EXPLANATION AND COST BREAKDOWN

COUNTY OF ROCKLAND Department of General Services Purchasing Division

T.A.T Minimum Wage Scale

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Federal Project No.: STP-5128(388)

Federal Project No.: NHFP-081-1(346)

HYDRAULIC CUTTING ATTACHMENTS

Alternative Delivery as a Form of Risk Mitigation

CRRMA BOARD PRESENTATION

COASTAL MARSHLANDS PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS. August 11, 2017

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

Mayor and Assembly Briefings

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

CT Consultants, Inc.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

PART A TENDER SUBMISSION

Appendix C Capital Improvement Program Project Descriptions and Details

Removal of Underground Storage Tanks (UST) Encountered during Construction

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Report Number: COD Resolution: GG

PROCEDURE FOR THE HANDLING OF FUEL ON CONSTRUCTION SITES. Civil Engineering Sector Labour-Management Health and Safety Committee

Installing or Rebuilding Your Electric Service

Metro REVISED SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE OCTOBER 16, 2014 SUBJECT: ALTERNATORS AWARD CONTRACT FOR ALTERNATORS RECOMMENDATION

A summary of the vehicle to be purchased: Department Type of Vehicle Quantity Stormwater Department One Ton Dual Rear Wheel Dump Truck w/ Bed 1

2, total unit $ total unit $ total unit $ total $

Otsego County Road Commission

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014

NAME OF BIDDER MERCER GROUP INTERNATIONAL OF NJ, INC CALHOUN STREET CITY, STATE, ZIP TRENTON, NJ 08638

P2000 RAIL CAR AUXILIARY INVERTERS

PRODUCT NEWS AND DEVELOPMENTS 2016

ADDRESS PO BOX MAIN STREET 175 DRIFT ROAD 100 BILBY ROAD

ADDENDUM No. 1 Prospective Bidders

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

Transcription:

CONSTRUCTION DIVISION : 134,107,514.00 ADVERTISED DATE: FEBRUARY 19, 2008 BID OPENING DATE: AUGUST 14, 2008 ITEM 1 CONSTRUCTION ITEM 2 TIMBER PILE REMOVAL 35,500,000.00 Each Approx. Qty. = /ea 650.00 520,000.00 800 1) MANSON CONSTRUCTION CO. 29,600,000.00 900.00 720,000.00 2) DUTRA CONSTRUCTION CO., INC. 34,863,472.00 765.00 612,000.00 3) TRAYLOR PACIFIC 40,024,000.00 650.00 520,000.00 4) GENERAL CONSTRUCTION CO. 45,877,000.00 700.00 560,000.00 5) FCI CONSTRUCTORS, INC. 51,400,000.00 1,000.00 800,000.00 1) AVERAGE BID 40,352,894.40 803.00 642,400.00 2) STANDARD DEVIATION 8,637,432.38 144.64 115,709.98 3) ENG. EST. - LOW BIDDER 5,900,000.00 (250.00) s (200,000.00) T r0(1 Jn11 ttull ~O, I

2 Each Approx. Qty. = ITEM 3 CONCRETE PILE REMOVAL /ea 2,500.00 1,125,000.00 ITEM 4 DREDGING-DISPOSAL OF DREDGE MATERIAL AT LA-2 OCEAN DISPOSAL SITE 450 Cu. Yds. Otv, = 159800 /cu yds 12.00 1,917,600.00 1) MANSON CONSTRUCTION CO. 1,300.00 585,000.00 11.00 1,757,800.00 2) DUTRA CONSTRUCTION CO., INC. 651.00 292,950.00 13.55 2,165,290.00 3) TRAYLOR PACIFIC 2,000.00 900,000.00 19.00 3,036,200.00 4) GENERAL CONSTRUCTION CO. 1,800.00 810,000.00 15.00 2,397,000.00 5) FCI CONSTRUCTORS, INC., 2,000.00 900,000.00 21.00 3,355,800.00 1) AVERAGE BID 1,550.20 697,590.00 2) STANDARD DEVIATION 578.40 260,281.42 3) ENG. EST. - LOW BIDDER 1,200.00 540,000.00 15.91 4.06 1.00 2,542,418.00 648,923.78 159,800.00

3 PROJ. CaNST. MGR.: DONNA ENFIAJIAN DREDGING-DISPOSAL OF DREDGE MATERIAL AT ANCHORAGE ROAD UPLAND SOIL STORAGE SITE CU. Yds. Approx. oty. = /cu yds 22.00 2,215,400.00 ITEMS ITEM 6 100700 INDICATOR PILE TESTING: FURNISH 24 INCH OCTAGONAL CONCRETE INDICATOR PILES Lin. Ft.Approx. Oty. = 1212 /Iin ft 95.00 115,140.00 1) MANSON CONSTRUCTION CO. 30.00 3,021,000.00 95.00 115,140.00 2) DUTRA CONSTRUCTION CO., INC. 26.95 2,713,865.00 77.60 94,051.20 3) TRAYLOR PACIFIC 25.00 2,517,500.00 80.00 96,960.00 4) GENERAL CONSTRUCTION CO. 37.00 3,725,900.00 120.00 145,440.00 5) FCI CONSTRUCTORS, INC. 37.00 3,725,900.00 150.00 181,800.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 31.19 3,140,833.00 104.52 126,678.24 5.60 563,429.77 30.51 36,983.92 (8.00) (805,600.00) - -

4 ITEM 7 INDICATOR PILE TESTING: INSTALL 24 INCH OCTAGONAL CONCRETE INDICATOR PILE Each Approx. Otv, /ea 8,500.00 85,000.00 ITEM 8 INDICATOR PILE TESTING: DRIVE EXISTING 24 INCH OCTAGONAL CONCRETE INDICATOR PILE 10 Each Approx. No. = /ea 2,500.00 7,500.00 3 1) MANSON CONSTRUCTION CO. 25,000.00 250,000.00 7,000.00 21,000.00 2) DUTRA CONSTRUCTION CO., INC. 7,200.00 72,000.00 3,400.00 10,200.00 3) TRAYLOR PACIFIC 10,000.00 100,000.00 7,500.00 22,500.00 4) GENERAL CONSTRUCTION CO. 52,000.00 520,000.00 8,000.00 24,000.00 5) FCI CONSTRUCTORS, INC. 15,000.00 150,000.00 14,000.00 42,000.00 1) 2) 3) AVERAGE BID STANDARD DEVIATION ENG. EST. - LOW BIDDER 21,840.00 18,172.18 (16,500.00) 218,400.00 181,721.77 (165,000.00) 7,980.00 3,821.26 (4,500.00) 23,940.00 11,463.77 (13,500.00)

5 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 9 FURNISH 24 INCH OCTAGONAL LONG CONCETE PILES ITEM 10 INSTALL 24 INCH OCTAGONAL LONG CONCRETE PILES Lin. Ft. Approx. Oty. = 77000 Each Approx. Oty. = 636 /Iin ft /ea 95.00 7,315,000.00 3,850.00 2,448,600.00 1) MANSON CONSTRUCTION CO. 86.00 6,622,000.00 3,700.00 2,353,200.00 2) DUTRA CONSTRUCTION CO., INC. 77.00 5,929,000.00 1,525.00 969,900.00 3) TRAYLOR PACIFIC 77.00 5,929,000.00 5,000.00 3,180,000.00 4) GENERAL CONSTRUCTION CO. 85.00 6,545,000.00 6,000.00 3,816,000.00 5) FCI CONSTRUCTORS, INC. 100.00 7,700,000.00 3,300.00 2,098,800.00 1} AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 85.00 6,545,000.00 3,905.00 2,483,580.00 9.41 724,373.18 1,707.37 1,085,889.68 9.00 693,000.00 150.00 95,400.00

6 ITEM 11 ITEM 12 FURNISH 24 INCH OCTAGONAL SHORT CONCRETE PILES INSTALL 24 INCH OCTAGONAL SHORT CONCRETE PILES Lin. Ft. Approx. Qty. = 1631 liin ft 84.00 137,004.00 Each Approx. Qty. = 35 /ea 3,850.00 134,750.00 1) MANSON CONSTRUCTION CO. 92.00 150,052.00 3,400.00 119,000.00 2) DUTRA CONSTRUCTION CO., INC. 79.00 128,849.00 1,866.00 65,310.00 3) TRAYLOR PACIFIC 81.00 132,111.00 3,900.00 136,500.00 4) GENERAL CONSTRUCTION CO. 125.00 203,875.00 2,350.00 82,250.00 5) FCI CONSTRUCTORS, INC. 142.00 231,602.00 3,500.00 122,500.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 103.80 169,297.80 3,003.20 105,112.00 28.21 46,007.50 855.63 29,947.02 (8.00) (13,048.00) 450.00 15,750.00

7 ITEM 13 FURNISH & INSTALL LONGITUDINAL STEEL SHEET PILES W/KING PILES & INDICATOR KING PILE CONFIGURATION Tons Approx. No. = /tons 6,250.00 5,312,500.00 ITEM 14 FURNISH AND INSTALL TRANSVERSE STEEL SHEET PILES 850 Tons Approx. Qty. = /tons 6,250.00 437,500.00 70 1) MANSON CONSTRUCTION CO. 3,700.00 3,145,000.00 s 3,800.00 266,000.00 2) DUTRA CONSTRUCTION CO., INC. 4,053.00 3,445,050.00 4,500.00 315,000.00 3) TRAYLOR PACIFIC 3,600.00 3,060,000.00 3,600.00 252,000.00 4) GENERAL CONSTRUCTION CO. 3,700.00 3,145,000.00 3,700.00 259,000.00 5) FCI CONSTRUCTORS, INC. 3,500.00 2,975,000.00 3,500.00 245,000.00 1) AVERAGE BID 3,710.60 2) STANDARD DEVIATION 208.59 3) ENG. EST. - LOW BIDDER 2,550.00 3,154,010.00 177,305.60 2,167,500.00 3,820.00 396.23 2,450.00 267,400.00 27,736.26 171,500.00

8 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 15 ITEM 16 FURNISH ANDPLACE QUARRY RUN FURNISH ANDPLACE RIPRAP Tons Approx. Qty. = /ton5 45.00 14,589,000.00 324200 Tons Approx. Qty. = 30850 s/tons 65.00 2,005,250.00 1) MANSON CONSTRUCTION CO. 24.00 7,780,800.00 42.00 1,295,700.00 2) DUTRA CONSTRUCTION CO., INC. 27.00 8,753,400.00 47.00 1,449,950.00 3) TRAYLOR PACIFIC 25.00 8,105,000.00 43.50 1,341,975.00 4) GENERALCONSTRUCTION CO. 27.00 8,753,400.00 40.00 1,234,000.00 5) FCI CONSTRUCTORS, INC. 25.00 8,105,000.00 43.00 1,326,550.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 25.60 8,299,520.00 43.10 1,329,635.00 1.34 434,959.94 2.56 78,954.31 21.00 6,808,200.00 23.00 709,550.00

9 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 17 ITEM 18 INSTALL DEPARTMENT-FURNISHED ASPHALT CONCRETE PAVEMENT CRUSHED MISCELLANEOUS BASE Cu. Yds..Approx. Qty. = 35000 Tons Approx. Qty. = 38000 /cu yds 22.00 770,000.00 /tons 95.00 3,610,000.00 1) MANSON CONSTRUCTION CO. 13.00 455,000.00 96.00 3,648,000.00 2) DUTRA CONSTRUCTION CO., INC. 21.65 757,750.00 98.00 3,724,000.00 3) TRAYLOR PACIFIC 10.50 367,500.00 97.00 3,686,000.00 4) GENERAL CONSTRUCTION CO. 11.00 385,000.00 96.00 3,648,000.00 5) FCI CONSTRUCTORS, INC. 12.00 420,000.00 100.00 3,800,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 13.63 477,050.00 97.40 3,701,200.00 4.58 160,474.14 1.67 63,586.16 9.00 315,000.00 (1.00) (38,000.00)

10 ITEM 19 ITEM 20 ALTERNATIVE MARITIME POWER SEALCOAT 16,385,000.00 Sq. Yd. Approx. Qty. = 79500 /sq yd 2.50 198,750.00 1) MANSON CONSTRUCTION CO. 11,775,000.00 1.00 79,500.00 2) DUTRA CONSTRUCTION CO., INC. 805,000.00 1.60 127,200.00 3) TRAYLOR PACIFIC 13,000,000.00 0.90 71,550.00 4) GENERAL CONSTRUCTION CO. 10,100,000.00 0.90 71,550.00 5) FCI CONSTRUCTORS, INC. 10,500,000.00 1.00 79,500.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 9,236,000.00 1.08 85,860.00 4,848,715.55 0.29 23,449.13 4,610,000.00 1.50 119,250.00

ITEM 21 BERTHS 143-144 DAMAGED PILE REMOVAL AND REPLACEMENT AND PILE REPAIR 420,000.00 ITEM 22 CONSTRUCT NEW LONGSHORE TOILET BUILDING 250,000.00 1) MANSON CONSTRUCTION CO. 600,000.00 500,000.00 2) DUTRA CONSTRUCTION CO., INC. 455,000.00 800,000.00 3) TRAYLOR PACIFIC 400,000.00 400,000.00 4) GENERAL CONSTRUCTION CO. 850,000.00 400,000.00 5) FCI CONSTRUCTORS, INC. 250,000.00 290,000.00 1) AVERAGE BID 511,000.00 478,000.00 2) STANDARD DEVIATION 227,167.34 194,730.58 3) ENG. EST. - LOW BIDDER (180,000.00) (250,000.00)

12 ITEM 23 ITEM 24 EXCAVATE AND DISPOSE OFSOIL EXCAVATE ANDREUSE SOILAS FILL Cu. Yds. Approx. Qty. = 37500 Cu. Yds. Approx. Otv, = /cu yds /cu yds 25.00 937,500.00 18.00 262,800.00 14600 1) MANSON CONSTRUCTION CO. 20.00 750,000.00 13.00 189,800.00 2) DUTRA CONSTRUCTION CO., INC. 29.00 1,087,500.00 8.00 116,800.00 3) TRAYLOR PACIFIC 20.50 768,750.00 6.00 87,600.00 4) GENERAL CONSTRUCTION CO. 23.00 862,500.00 10.00 146,000.00 5) FCI CONSTRUCTORS, INC. 23.00 862,500.00 15.00 219,000.00 1) AVERAGE BID 23.10 866,250.00 10.40 151,840.00 2) STANDARD DEVIATION 3.58 134,164.08 3.65 53,244.98 3) ENG. EST. - LOW BIDDER 5.00 187,500.00 5.00 73,000.00

13 ITEM 25 IMPORT AND PLACE FILL SOIL ITEM 26 SEWER CU. Yds. Approx. Otv, = /cu yds 35.00 511,000.00 14600 850,000.00 1) MANSON CONSTRUCTION CO. 10.00 146,000.00 500,000.00 2) DUTRA CONSTRUCTION CO., INC. 41.00 598,600.00 510,000.00 3) TRAYLOR PACIFIC 13.50 197,100.00 450,000.00 4) GENERAL CONSTRUCTION CO. 10.00 146,000.00 950,000.00 5) FCI CONSTRUCTORS, INC. 13.00 189,800.00 1,300,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 17.50 255,500.00 742,000.00 13.24 193,277.75 371,577.72 25.00 365,000.00 350,000.00

14 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 27 ITEM 28 ITEM 29 WATER STORM DRAIN STRIPING 2,753,720.00 1,883,150.00 1,575,000.00 1) MANSON CONSTRUCTION CO. 250,000.00 4,450,000.00 65,000.00 2) DUTRA CONSTRUCTION CO., INC. 1,100,000.00 1,940,000.00 72,000.00 3) TRAYLOR PACIFIC 578,000.00 2,474,000.00 60,000.00 4) GENERAL CONSTRUCTION CO. 925,000.00 3,750,000.00 32,000.00 5) FCI CONSTRUCTORS, INC. 1,100,000.00 1,700,000.00 40,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 790,600.00 2,862,800.00 53,800.00 369,786.15 1,189,659.28 17,035.26 2,503,720.00 (2,566,850.00) 1,510,000.00

15 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 30 ITEM 31 ELECTRICAL BERTHS 136-139 AMP 16,850,000.00 6,500,000.00 1) MANSON CONSTRUCTION CO. 2,000,000.00 9,675,000.00 2) DUTRA CONSTRUCTION CO., INC. 28,000,000.00 900,000.00 3) TRAYLOR PACIFIC 2,500,000.00 10,000,000.00 4) GENERAL CONSTRUCTION CO. 1,200,000.00 9,000,000.00 5) FCI CONSTRUCTORS, INC. 1,100,000.00 7,500,000.00 1) AVERAGE BID 6,960,000.00 7,415,000.00 2) STANDARD DEVIATION 11,775,950.07 3,766,779.13 3) ENG. EST. - LOW BIDDER 14,850,000.00 (3,175,000.00)

16 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 32 ITEM 33 INDICATORPILE TESTING: RESTRIKING 24 RESTRIKING 24 INCH OCTAGONAL CONCRETE INCH OCTAGONALCONCRETEINDICATOR PRODUCTION PILES PILES (CONTINGENCYITEM) (CONTINGENCYITEM) Each Approx. Oty. = 7 Each Approx. Oty. = 32 /ea /ea 1,650.00 11,550.00 1,650.00 52,800.00 1) MANSON CONSTRUCTION CO. 2,700.00 18,900.00 1,700.00 54,400.00 2) DUTRA CONSTRUCTION CO., INC. 4,900.00 34,300.00 1,174.00 37,568.00 3) TRAYLOR PACIFIC 1,800.00 12,600.00 2,100.00 67,200.00 4) GENERAL CONSTRUCTION CO. 6,300.00 44,100.00 5,650.00 180,800.00 5) FCI CONSTRUCTORS, INC. 8,500.00 59,500.00 7,800.00 249,600.00 1) AVERAGE BID 4,840.00 2) STANDARD DEVIATION 2,708.87 3) ENG. EST. - LOW BIDDER (1,050.00) 33,880.00 3,684.80 117,913.60 18,962.12 2,896.21 92,678.57 (7,350.00) (50.00) (1,600.00)

17 ITEM 34 CONCRETE PILE BUILD-UPS BETWEEN 6 INCHES AND4 FEET IN HEIGHT (CONTINGENCY ITEM) Each Approx. Qty. = /ea 1,750.00 110,250.00 ITEM 35 CONCRETE PILE BUILD-UPS BETWEEN 4 FEETAND 7 FEETIN HEIGHT (CONTINGENCY ITEM) 63 Each Approx. Qty. = /ea 2,500.00 157,500.00 63 1) MANSON CONSTRUCTION CO. 700.00 44,100.00 1,200.00 75,600.00 2) DUTRA CONSTRUCTION CO., INC. 965.00 60,795.00 1,922.00 121,086.00 3) TRAYLOR PACIFIC 500.00 31,500.00 600.00 37,800.00 4) GENERAL CONSTRUCTION CO. 380.00 23,940.00 1,200.00 75,600.00 5) FCI CONSTRUCTORS, INC. 890.00 56,070.00 1,100.00 69,300.00 1) AVERAGE BID 687.00 2) STANDARD DEVIATION 248.94 3) ENG. EST. - LOW BIDDER 1,050.00 43,281.00 15,683.08 66,150.00 1,204.40 472.01 1,300.00 75,877.20 29,736.85 81,900.00

18 ITEM 36 BREAK OFFAND DISPOSE OF24-INCH OCTAGONAL CONCRETE PILES (CONTINGENCY ITEM) Each Approx. Oty. = 33 ITEM 37 SPUDDING OF OBSTRUCTIONS (CONTINGENCY ITEM) Each Approx. Oty. = 60 /ea 2,500.00 82,500.00 /ea 3,150.00 189,000.00 1) MANSON CONSTRUCTION CO. 1,300.00 42,900.00 1,300.00 78,000.00 2) DUTRA CONSTRUCTION CO., INC. 1,125.00 37,125.00 1,175.00 70,500.00 3) TRAYLOR PACIFIC 1,800.00 59,400.00 900.00 54,000.00 4) GENERAL CONSTRUCTION CO. 3,200.00 105,600.00 1,800.00 108,000.00 5) FCI CONSTRUCTORS, INC. 5,100.00 168,300.00 2,500.00 150,000.00 1) AVERAGE BID 2,505.00 2) STANDARD DEVIATION 1,663.62 3) ENG. EST. - LOW BIDDER 1,200.00 82,665.00 54,899.40 39,600.00 1,535.00 630.38 1,850.00 92,100.00 37,822.61 111,000.00

19 ITEM 38 DISPOSE OF SURPLUS 24-INCH OCTAGONAL CONCRETE PILES (CONTINGENCY ITEM) Each Apprx. Qty. = /ea 7,600.00 152,000.00 20 Each Approx. Qty. = ITEM 39 PERFORM PILE CUT-OFFS OVER6 FEET LONG (CONTINGENCY ITEM) /ea 850.00 85,000.00 100 1) MANSON CONSTRUCTION CO. 100.00 2,000.00 300.00 30,000.00 2) DUTRA CONSTRUCTION CO., INC. 1,811.00 36,220.00 484.00 48,400.00 3) TRAYLOR PACIFIC 600.00 12,000.00 50.00 5,000.00 4) GENERAL CONSTRUCTION CO. 225.00 4,500.00 420.00 42,000.00 5) FCI CONSTRUCTORS, INC. 4,900.00 98,000.00 3,000.00 300,000.00 1) AVERAGE BID 1,527.20 30,544.00 2) STANDARD DEVIATION 2,003.04 40,060.76 3) ENG. EST. - LOW BIDDER 7,500.00 150,000.00 850.80 85,080.00 1,212.83 121,283.27 550.00 55,000.00

20 PROJ. CON ST. MGR.: DONNA ENFIAJIAN ITEM 40 ITEM 41 REMOVEAND DISPOSEOF REMOVE& DISPOSE OF HAZARDOUS ASBESTOS CEMENT PIPE WASTES WITHIN DREDGE SPOILS (CONTINGENCYITEM) (CONTINGENCYITEM) Lin. Ft. Approx. Otv, = 50 Tons Approx. Otv, = 100 /Iin ft 50.00 2,500.00 160.00 16,000.00 /tons 1) MANSON CONSTRUCTION CO. 100.00 5,000.00 200.00 20,000.00 2) DUTRA CONSTRUCTION CO., INC. 154.00 7,700.00 125.00 12,500.00 3) TRAYLOR PACIFIC 150.00 7,500.00 1,850.00 185,000.00 4) GENERAL CONSTRUCTION CO. 100.00 5,000.00 21-5.00 21,500.00 5) FCI CONSTRUCTORS, INC. 500.00 25,000.00 145.00 14,500.00 1) AVERAGE BID 200.80 10,040.00 507.00 50,700.00 2) STANDARD DEVIATION 169.27 8,463.63 751.69 75,168.64 3) ENG. EST. - LOW BIDDER (50.00) (2,500.00) (40.00) (4,000.00)

21 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 42 REMOVE TIMBERPILESTUBS (CONTINGENCY ITEM) ITEM 43 JETIING DURING PILE REMOVALS (CONTINGENCY ITEM) Each Approx. otv. = /ea 100.00 25,000.00 250 Each Approx. Otv. = /ea 500.00 50,000.00 100 1) MANSON CONSTRUCTION CO. 110.00 27,500.00 600.00 60,000.00 2) DUTRA CONSTRUCTION CO., INC. 745.00 186,250.00 1,127.00 112,700.00 3) TRAYLOR PACIFIC 1,700.00 425,000.00 650.00 65,000.00 4) GENERAL CONSTRUCTION CO. 630.00 157,500.00 250.00 25,000.00 5) FCI CONSTRUCTORS, INC. 400.00 100,000.00 1,260.00 126,000.00 1) AVERAGE BID 717.00 179,250.00 777.40 77,740.00 2) STANDARD DEVIATION 600.75 150,186.34 412.61 41,260.61 3) ENG. EST. - LOW BIDDER (10.00) (2,500.00) (100.00) (10,000.00)

22 ITEM 44 ITEM 45 INSTALLCONTRACTOR-FURNISHED CRUSHED MISCCELLANEOUS BASE (CONTINGENCY ITEM) CU. Yds Approx. Qty. = /cu yds 36.00 1,260,000.00 TRENCHSUBGRADE STABILIZATION (CONTINGENCY ITEM) 35000 Cu. Yds. Approx. Qty. = 75 /cu yds 150.00 11,250.00 1) MANSON CONSTRUCTION CO. 8.00 280,000.00 60.00 4,500.00 2) DUTRA CONSTRUCTION CO., INC. 37.11 1,298,850.00 58.00 4,350.00 3) TRAYLOR PACIFIC 16.00 560,000.00 100.00 7,500.00 4) GENERAL CONSTRUCTION CO. 24.00 840,000.00 135.00 10,125.00 5) FCI CONSTRUCTORS, INC. 11.00 385,000.00 100.00 7,500.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 19.22 672,770.00 90.60 s 6,795.00 11.69 409,187.90 32.20 2,414.95 28.00 980,000.00 s 90.00 6,750.00

23 Sq. Ft. Approx. Oty. = ITEM 46 ITEM 47 LAY GEOFABRIC (CONTINGENCY ITEM) /sq ft 1.50 15,000.00 10000 EXCAVATE, REMO, & DISP OR RECY CA HAZ WASTE SOIL, RCRA HAl WASTE SOIL & CHEM IMPCT/NON-HAl WASTE SOIL 100,000.00 1) MANSON CONSTRUCTION CO. 1.00 10,000.00 100,000.00 2) DUTRA CONSTRUCTION CO., INC. 0.35 3,500.00 100,000.00 3) TRAYLOR PACIFIC 1.50 15,000.00 100,000.00 4) GENERAL CONSTRUCTION CO. 0.20 2,000.00 100,000.00 5) FCI CONSTRUCTORS, INC. 4.75 47,500.00 100,000.00 1) AVERAGE BID 1.56 15,600.00 100,000.00 2) STANDARD DEVIATION 1.86 18,578.89-3) ENG. EST. - LOW BIDDER 0.50 5,000.00 -

24 ITEM 48 ITEM 49 ITEM 50 EXCAVATE, DISPOSE, & REPL ACE GEOTECH UNSUITABLESOIL WI CRUSHED MISCELLANEOUS BASE EXCAVATE, DISPOSE, & REPLACE GEOTECHNICALLY UNSUITABLE SOIL REMOVE& REALIGN INTERFERING UNDERGROUND UTILITIES & MODIFY UTILITIES 50,000.00 20,000.00 100,000.00 1) MANSON CONSTRUCTION CO. 50,000.00 20,000.00 100,000.00 2) DUTRA CONSTRUCTION CO., INC. 50,000.00 20,000.00 100,000.00 3) TRAYLOR PACIFIC 50,000.00 20,000.00 100,000.00 4) GENERAL CONSTRUCTION CO. 50,000.00 20,000.00 100,000.00 5) FCI CONSTRUCTORS, INC. 50,000.00 20,000.00 100,000.00 1) AVERAGE BID 50,000.00 2) STANDARD DEVIATION - 3) ENG. EST. - LOW BIDDER - 20,000.00 - - 100,000.00 - -

25 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 51 ITEM 52 ITEM 53 ADDITIONAL WHARF DECK MODIFICATIONS TO FORMWORK REINFORCEMENT PERFORM DEPT. OF BUILDING ANDSAFETY CORRECTIONS 50,000.00 200,000.00 100,000.00 1) MANSON CONSTRUCTION CO. 50,000.00 200,000.00. 100,000.00 2) DUTRA CONSTRUCTION CO., INC. 50,000.00 200,000.00 100,000.00 3) TRAYLOR PACIFIC 50,000.00 200,000.00 100,000.00 4) GENERAL CONSTRUCTION CO. 50,000.00 200,000.00 100,000.00 5) FCI CONSTRUCTORS, INC. 50,000.00 200,000.00 100,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 50,000.00 200,000.00 100,000.00 - - - - - -

26 ITEM 54 ITEM 55 ITEM 56 WEDLING STIFFENERS TO SHEET PILE JOINTS CONTAINMENT ANDCLEANUP OF PETROLEUM PRODUCT SPILL ON WATER GUARD SERVICE COMPENSATION 100,000.00 75,000.00 270,000.00 1) MANSON CONSTRUCTION CO. 100,000.00 75,000.00 270,000.00 2) DUTRA CONSTRUCTION CO., INC. 100,000.00 75,000.00 270,000.00 3) TRAYLOR PACIFIC 100,000.00 75,000.00 270,000.00 4) GENERAL CONSTRUCTION CO. 100,000.00 75,000.00 270,000.00 5) FCI CONSTRUCTORS, INC. 100,000.00 75,000.00 270,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 100,000.00 75,000.00 270,000.00 - - - - - -

27 ITEM 57 PARTNERING WORKSHOPS, ITEM 58 MODFICIATIONS TO AMP SYSTEMS ITEM 59 OVERSIZE LOAD PERMITS ON CITYOF LOSANGELES STREETS 100,000.00 2,000,000.00 500,000.00 1) MANSON CONSTRUCTION CO. 100,000.00 2,000,000.00 500,000.00 2) DUTRA CONSTRUCTION CO., INC. 100,000.00 2,000,000.00 500,000.00 3) TRAYLOR PACIFIC 100,000.00 2,000,000.00 500,000.00 4) GENERAL CONSTRUCTION CO. 100,000.00 2,000,000.00 500,000.00 5) FCI CONSTRUCTORS, INC. 100,000.00 2,000,000.00 500,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 100,000.00 2,000,000.00 500,000.00 - - - - - -

28 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 60 ITEM 61 ITEM 62 UNFORESEEN REGULATORY (SWPPP) CAULERPASURVEYAND ERADICATION MATERIALPRICE FLUCTUATION 150,000.00 100,000.00 250,000.00 1) MANSON CONSTRUCTION CO. 150,000.00 100,000.00 250,000.00 2) DUTRA CONSTRUCTION CO., INC. 150,000.00 100,000.00 250,000.00 3) TRAYLOR PACIFIC 150,000.00 100,000.00 250,000.00 4) GENERAL CONSTRUCTION CO. 150,000.00 100,000.00 250,000.00 5) FCI CONSTRUCTORS, INC. 150,000.00 100,000.00 250,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 150,000.00 100,000.00 250,000.00 - - - - - -

29 PROJ. CON ST. MGR.: DONNA ENFIAJIAN ITEM 63 GRAND TOTAL WEBCAM BID ITEMS 1-63 100,000.00 134,107,514.00 1) MANSON CONSTRUCTION CO. 100,000.00 97,902,892.00 2) DUTRA CONSTRUCTION CO., INC. 100,000.00 109,210,981.20 3) TRAYLOR PACIFIC 100,000.00 110,203,746.00 4) GENERAL CONSTRUCTION CO. 100,000.00 116,474,580.00 5) FCI CONSTRUCTORS, INC. 100,000.00 118,832,022.00 1) AVERAGE BID 100,000.00 110,524,844.24 2) STANDARD DEVIATION - 8,147,876.66 3) ENG. EST. - LOW BIDDER - 36,204,622.00 ~ CJc~ ~ Chief Harbor Engineer Construction Division

Project Title: Berths 145-147 Wharf Improvements Spec No.: 2605 Total Bid Amount: 97,902,892.00 Prime Contractor's Name & Address Type of Work SBE ( Yes! No) Amount SBE% MBEIWBE!OBE Manson Construction Co. Prime Contractor No 97,902,892.00 0.00% OBE 777 Tuna St. San Pedro, CA 90731 Subcontractor's Name & Address Type of Work SBE (Yes! No)( Amount SBE% MBEIWBE!OBE Lonerock, Inc. Storm Drain, Water, 4,200,000.00 4.48% OBE 26 Vista Firenze Sewer Laguna Hills, CA 92653 Dynalectric Electrical No 18,500,000.00 0.00% OBE - 4962 Corporate Center Dr. Los Alamitos, CA 90720 W.W. Stevenson Co. Civil 6,953,371.00 7.42% OBE 1305 E. Burnett St. Signal Hill, CA 90755 Platinum Contracting Inc. Earthwork 4,075,145.00 4.35% WBE 3485 Silver Cloud Dr. Norco, CA 92360 All American Asphalt Asphalt Paving No 3,716,370.00 0.00% OBE 400 E. 6th St. Corona, CA 92878 Zaccor Companies, Inc. Demolition 2,107,000.00 2.25% OBE 2900 Main St., Ste. 3100 Alameda, CA 94501 Reeve Trucking Trucking ::PcP;", 800,000.00 0.85% OBE P.O. Box 5126 Stockton, CA 95205 CMC/Fontana Steel Rebar No 5,571,000.00 0.00% OBE 12451 Arrow Route Rancho Cucamonqa, CA Total SBE Total Total Subcontractor Subcontractor Subcontractor Total Amount Amount Total SBE % SBE% Subcontractor % 45,922,886.00 18,135,516.00 19.35% 19.35% 46.9% Page 1 of 1 TRANSMITTAL NO.2

BERTHS 136-139 AMP BERTHS 145-147 WHARF SCALE AS SHOWN DRAWN: CHECKED: DESIGNED: ENGR/ARCH RECOMMENDED FOR APPROVAL CHIEF OF DESIGN ASSISTANT HARBOR CHIEF ENGINEER APPROVED CHIEF HARBOR ENGINEER AERIAL SITE PLAN PORT OF LOS ANGELES CONSTRUCTION DIVISION P.O. BOX 151 SAN PEDRO, CA 90733-0151 SPEC No. 2605 TRANSMITTAL NO. 3