CONSTRUCTION DIVISION : 134,107,514.00 ADVERTISED DATE: FEBRUARY 19, 2008 BID OPENING DATE: AUGUST 14, 2008 ITEM 1 CONSTRUCTION ITEM 2 TIMBER PILE REMOVAL 35,500,000.00 Each Approx. Qty. = /ea 650.00 520,000.00 800 1) MANSON CONSTRUCTION CO. 29,600,000.00 900.00 720,000.00 2) DUTRA CONSTRUCTION CO., INC. 34,863,472.00 765.00 612,000.00 3) TRAYLOR PACIFIC 40,024,000.00 650.00 520,000.00 4) GENERAL CONSTRUCTION CO. 45,877,000.00 700.00 560,000.00 5) FCI CONSTRUCTORS, INC. 51,400,000.00 1,000.00 800,000.00 1) AVERAGE BID 40,352,894.40 803.00 642,400.00 2) STANDARD DEVIATION 8,637,432.38 144.64 115,709.98 3) ENG. EST. - LOW BIDDER 5,900,000.00 (250.00) s (200,000.00) T r0(1 Jn11 ttull ~O, I
2 Each Approx. Qty. = ITEM 3 CONCRETE PILE REMOVAL /ea 2,500.00 1,125,000.00 ITEM 4 DREDGING-DISPOSAL OF DREDGE MATERIAL AT LA-2 OCEAN DISPOSAL SITE 450 Cu. Yds. Otv, = 159800 /cu yds 12.00 1,917,600.00 1) MANSON CONSTRUCTION CO. 1,300.00 585,000.00 11.00 1,757,800.00 2) DUTRA CONSTRUCTION CO., INC. 651.00 292,950.00 13.55 2,165,290.00 3) TRAYLOR PACIFIC 2,000.00 900,000.00 19.00 3,036,200.00 4) GENERAL CONSTRUCTION CO. 1,800.00 810,000.00 15.00 2,397,000.00 5) FCI CONSTRUCTORS, INC., 2,000.00 900,000.00 21.00 3,355,800.00 1) AVERAGE BID 1,550.20 697,590.00 2) STANDARD DEVIATION 578.40 260,281.42 3) ENG. EST. - LOW BIDDER 1,200.00 540,000.00 15.91 4.06 1.00 2,542,418.00 648,923.78 159,800.00
3 PROJ. CaNST. MGR.: DONNA ENFIAJIAN DREDGING-DISPOSAL OF DREDGE MATERIAL AT ANCHORAGE ROAD UPLAND SOIL STORAGE SITE CU. Yds. Approx. oty. = /cu yds 22.00 2,215,400.00 ITEMS ITEM 6 100700 INDICATOR PILE TESTING: FURNISH 24 INCH OCTAGONAL CONCRETE INDICATOR PILES Lin. Ft.Approx. Oty. = 1212 /Iin ft 95.00 115,140.00 1) MANSON CONSTRUCTION CO. 30.00 3,021,000.00 95.00 115,140.00 2) DUTRA CONSTRUCTION CO., INC. 26.95 2,713,865.00 77.60 94,051.20 3) TRAYLOR PACIFIC 25.00 2,517,500.00 80.00 96,960.00 4) GENERAL CONSTRUCTION CO. 37.00 3,725,900.00 120.00 145,440.00 5) FCI CONSTRUCTORS, INC. 37.00 3,725,900.00 150.00 181,800.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 31.19 3,140,833.00 104.52 126,678.24 5.60 563,429.77 30.51 36,983.92 (8.00) (805,600.00) - -
4 ITEM 7 INDICATOR PILE TESTING: INSTALL 24 INCH OCTAGONAL CONCRETE INDICATOR PILE Each Approx. Otv, /ea 8,500.00 85,000.00 ITEM 8 INDICATOR PILE TESTING: DRIVE EXISTING 24 INCH OCTAGONAL CONCRETE INDICATOR PILE 10 Each Approx. No. = /ea 2,500.00 7,500.00 3 1) MANSON CONSTRUCTION CO. 25,000.00 250,000.00 7,000.00 21,000.00 2) DUTRA CONSTRUCTION CO., INC. 7,200.00 72,000.00 3,400.00 10,200.00 3) TRAYLOR PACIFIC 10,000.00 100,000.00 7,500.00 22,500.00 4) GENERAL CONSTRUCTION CO. 52,000.00 520,000.00 8,000.00 24,000.00 5) FCI CONSTRUCTORS, INC. 15,000.00 150,000.00 14,000.00 42,000.00 1) 2) 3) AVERAGE BID STANDARD DEVIATION ENG. EST. - LOW BIDDER 21,840.00 18,172.18 (16,500.00) 218,400.00 181,721.77 (165,000.00) 7,980.00 3,821.26 (4,500.00) 23,940.00 11,463.77 (13,500.00)
5 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 9 FURNISH 24 INCH OCTAGONAL LONG CONCETE PILES ITEM 10 INSTALL 24 INCH OCTAGONAL LONG CONCRETE PILES Lin. Ft. Approx. Oty. = 77000 Each Approx. Oty. = 636 /Iin ft /ea 95.00 7,315,000.00 3,850.00 2,448,600.00 1) MANSON CONSTRUCTION CO. 86.00 6,622,000.00 3,700.00 2,353,200.00 2) DUTRA CONSTRUCTION CO., INC. 77.00 5,929,000.00 1,525.00 969,900.00 3) TRAYLOR PACIFIC 77.00 5,929,000.00 5,000.00 3,180,000.00 4) GENERAL CONSTRUCTION CO. 85.00 6,545,000.00 6,000.00 3,816,000.00 5) FCI CONSTRUCTORS, INC. 100.00 7,700,000.00 3,300.00 2,098,800.00 1} AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 85.00 6,545,000.00 3,905.00 2,483,580.00 9.41 724,373.18 1,707.37 1,085,889.68 9.00 693,000.00 150.00 95,400.00
6 ITEM 11 ITEM 12 FURNISH 24 INCH OCTAGONAL SHORT CONCRETE PILES INSTALL 24 INCH OCTAGONAL SHORT CONCRETE PILES Lin. Ft. Approx. Qty. = 1631 liin ft 84.00 137,004.00 Each Approx. Qty. = 35 /ea 3,850.00 134,750.00 1) MANSON CONSTRUCTION CO. 92.00 150,052.00 3,400.00 119,000.00 2) DUTRA CONSTRUCTION CO., INC. 79.00 128,849.00 1,866.00 65,310.00 3) TRAYLOR PACIFIC 81.00 132,111.00 3,900.00 136,500.00 4) GENERAL CONSTRUCTION CO. 125.00 203,875.00 2,350.00 82,250.00 5) FCI CONSTRUCTORS, INC. 142.00 231,602.00 3,500.00 122,500.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 103.80 169,297.80 3,003.20 105,112.00 28.21 46,007.50 855.63 29,947.02 (8.00) (13,048.00) 450.00 15,750.00
7 ITEM 13 FURNISH & INSTALL LONGITUDINAL STEEL SHEET PILES W/KING PILES & INDICATOR KING PILE CONFIGURATION Tons Approx. No. = /tons 6,250.00 5,312,500.00 ITEM 14 FURNISH AND INSTALL TRANSVERSE STEEL SHEET PILES 850 Tons Approx. Qty. = /tons 6,250.00 437,500.00 70 1) MANSON CONSTRUCTION CO. 3,700.00 3,145,000.00 s 3,800.00 266,000.00 2) DUTRA CONSTRUCTION CO., INC. 4,053.00 3,445,050.00 4,500.00 315,000.00 3) TRAYLOR PACIFIC 3,600.00 3,060,000.00 3,600.00 252,000.00 4) GENERAL CONSTRUCTION CO. 3,700.00 3,145,000.00 3,700.00 259,000.00 5) FCI CONSTRUCTORS, INC. 3,500.00 2,975,000.00 3,500.00 245,000.00 1) AVERAGE BID 3,710.60 2) STANDARD DEVIATION 208.59 3) ENG. EST. - LOW BIDDER 2,550.00 3,154,010.00 177,305.60 2,167,500.00 3,820.00 396.23 2,450.00 267,400.00 27,736.26 171,500.00
8 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 15 ITEM 16 FURNISH ANDPLACE QUARRY RUN FURNISH ANDPLACE RIPRAP Tons Approx. Qty. = /ton5 45.00 14,589,000.00 324200 Tons Approx. Qty. = 30850 s/tons 65.00 2,005,250.00 1) MANSON CONSTRUCTION CO. 24.00 7,780,800.00 42.00 1,295,700.00 2) DUTRA CONSTRUCTION CO., INC. 27.00 8,753,400.00 47.00 1,449,950.00 3) TRAYLOR PACIFIC 25.00 8,105,000.00 43.50 1,341,975.00 4) GENERALCONSTRUCTION CO. 27.00 8,753,400.00 40.00 1,234,000.00 5) FCI CONSTRUCTORS, INC. 25.00 8,105,000.00 43.00 1,326,550.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 25.60 8,299,520.00 43.10 1,329,635.00 1.34 434,959.94 2.56 78,954.31 21.00 6,808,200.00 23.00 709,550.00
9 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 17 ITEM 18 INSTALL DEPARTMENT-FURNISHED ASPHALT CONCRETE PAVEMENT CRUSHED MISCELLANEOUS BASE Cu. Yds..Approx. Qty. = 35000 Tons Approx. Qty. = 38000 /cu yds 22.00 770,000.00 /tons 95.00 3,610,000.00 1) MANSON CONSTRUCTION CO. 13.00 455,000.00 96.00 3,648,000.00 2) DUTRA CONSTRUCTION CO., INC. 21.65 757,750.00 98.00 3,724,000.00 3) TRAYLOR PACIFIC 10.50 367,500.00 97.00 3,686,000.00 4) GENERAL CONSTRUCTION CO. 11.00 385,000.00 96.00 3,648,000.00 5) FCI CONSTRUCTORS, INC. 12.00 420,000.00 100.00 3,800,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 13.63 477,050.00 97.40 3,701,200.00 4.58 160,474.14 1.67 63,586.16 9.00 315,000.00 (1.00) (38,000.00)
10 ITEM 19 ITEM 20 ALTERNATIVE MARITIME POWER SEALCOAT 16,385,000.00 Sq. Yd. Approx. Qty. = 79500 /sq yd 2.50 198,750.00 1) MANSON CONSTRUCTION CO. 11,775,000.00 1.00 79,500.00 2) DUTRA CONSTRUCTION CO., INC. 805,000.00 1.60 127,200.00 3) TRAYLOR PACIFIC 13,000,000.00 0.90 71,550.00 4) GENERAL CONSTRUCTION CO. 10,100,000.00 0.90 71,550.00 5) FCI CONSTRUCTORS, INC. 10,500,000.00 1.00 79,500.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 9,236,000.00 1.08 85,860.00 4,848,715.55 0.29 23,449.13 4,610,000.00 1.50 119,250.00
ITEM 21 BERTHS 143-144 DAMAGED PILE REMOVAL AND REPLACEMENT AND PILE REPAIR 420,000.00 ITEM 22 CONSTRUCT NEW LONGSHORE TOILET BUILDING 250,000.00 1) MANSON CONSTRUCTION CO. 600,000.00 500,000.00 2) DUTRA CONSTRUCTION CO., INC. 455,000.00 800,000.00 3) TRAYLOR PACIFIC 400,000.00 400,000.00 4) GENERAL CONSTRUCTION CO. 850,000.00 400,000.00 5) FCI CONSTRUCTORS, INC. 250,000.00 290,000.00 1) AVERAGE BID 511,000.00 478,000.00 2) STANDARD DEVIATION 227,167.34 194,730.58 3) ENG. EST. - LOW BIDDER (180,000.00) (250,000.00)
12 ITEM 23 ITEM 24 EXCAVATE AND DISPOSE OFSOIL EXCAVATE ANDREUSE SOILAS FILL Cu. Yds. Approx. Qty. = 37500 Cu. Yds. Approx. Otv, = /cu yds /cu yds 25.00 937,500.00 18.00 262,800.00 14600 1) MANSON CONSTRUCTION CO. 20.00 750,000.00 13.00 189,800.00 2) DUTRA CONSTRUCTION CO., INC. 29.00 1,087,500.00 8.00 116,800.00 3) TRAYLOR PACIFIC 20.50 768,750.00 6.00 87,600.00 4) GENERAL CONSTRUCTION CO. 23.00 862,500.00 10.00 146,000.00 5) FCI CONSTRUCTORS, INC. 23.00 862,500.00 15.00 219,000.00 1) AVERAGE BID 23.10 866,250.00 10.40 151,840.00 2) STANDARD DEVIATION 3.58 134,164.08 3.65 53,244.98 3) ENG. EST. - LOW BIDDER 5.00 187,500.00 5.00 73,000.00
13 ITEM 25 IMPORT AND PLACE FILL SOIL ITEM 26 SEWER CU. Yds. Approx. Otv, = /cu yds 35.00 511,000.00 14600 850,000.00 1) MANSON CONSTRUCTION CO. 10.00 146,000.00 500,000.00 2) DUTRA CONSTRUCTION CO., INC. 41.00 598,600.00 510,000.00 3) TRAYLOR PACIFIC 13.50 197,100.00 450,000.00 4) GENERAL CONSTRUCTION CO. 10.00 146,000.00 950,000.00 5) FCI CONSTRUCTORS, INC. 13.00 189,800.00 1,300,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 17.50 255,500.00 742,000.00 13.24 193,277.75 371,577.72 25.00 365,000.00 350,000.00
14 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 27 ITEM 28 ITEM 29 WATER STORM DRAIN STRIPING 2,753,720.00 1,883,150.00 1,575,000.00 1) MANSON CONSTRUCTION CO. 250,000.00 4,450,000.00 65,000.00 2) DUTRA CONSTRUCTION CO., INC. 1,100,000.00 1,940,000.00 72,000.00 3) TRAYLOR PACIFIC 578,000.00 2,474,000.00 60,000.00 4) GENERAL CONSTRUCTION CO. 925,000.00 3,750,000.00 32,000.00 5) FCI CONSTRUCTORS, INC. 1,100,000.00 1,700,000.00 40,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 790,600.00 2,862,800.00 53,800.00 369,786.15 1,189,659.28 17,035.26 2,503,720.00 (2,566,850.00) 1,510,000.00
15 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 30 ITEM 31 ELECTRICAL BERTHS 136-139 AMP 16,850,000.00 6,500,000.00 1) MANSON CONSTRUCTION CO. 2,000,000.00 9,675,000.00 2) DUTRA CONSTRUCTION CO., INC. 28,000,000.00 900,000.00 3) TRAYLOR PACIFIC 2,500,000.00 10,000,000.00 4) GENERAL CONSTRUCTION CO. 1,200,000.00 9,000,000.00 5) FCI CONSTRUCTORS, INC. 1,100,000.00 7,500,000.00 1) AVERAGE BID 6,960,000.00 7,415,000.00 2) STANDARD DEVIATION 11,775,950.07 3,766,779.13 3) ENG. EST. - LOW BIDDER 14,850,000.00 (3,175,000.00)
16 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 32 ITEM 33 INDICATORPILE TESTING: RESTRIKING 24 RESTRIKING 24 INCH OCTAGONAL CONCRETE INCH OCTAGONALCONCRETEINDICATOR PRODUCTION PILES PILES (CONTINGENCYITEM) (CONTINGENCYITEM) Each Approx. Oty. = 7 Each Approx. Oty. = 32 /ea /ea 1,650.00 11,550.00 1,650.00 52,800.00 1) MANSON CONSTRUCTION CO. 2,700.00 18,900.00 1,700.00 54,400.00 2) DUTRA CONSTRUCTION CO., INC. 4,900.00 34,300.00 1,174.00 37,568.00 3) TRAYLOR PACIFIC 1,800.00 12,600.00 2,100.00 67,200.00 4) GENERAL CONSTRUCTION CO. 6,300.00 44,100.00 5,650.00 180,800.00 5) FCI CONSTRUCTORS, INC. 8,500.00 59,500.00 7,800.00 249,600.00 1) AVERAGE BID 4,840.00 2) STANDARD DEVIATION 2,708.87 3) ENG. EST. - LOW BIDDER (1,050.00) 33,880.00 3,684.80 117,913.60 18,962.12 2,896.21 92,678.57 (7,350.00) (50.00) (1,600.00)
17 ITEM 34 CONCRETE PILE BUILD-UPS BETWEEN 6 INCHES AND4 FEET IN HEIGHT (CONTINGENCY ITEM) Each Approx. Qty. = /ea 1,750.00 110,250.00 ITEM 35 CONCRETE PILE BUILD-UPS BETWEEN 4 FEETAND 7 FEETIN HEIGHT (CONTINGENCY ITEM) 63 Each Approx. Qty. = /ea 2,500.00 157,500.00 63 1) MANSON CONSTRUCTION CO. 700.00 44,100.00 1,200.00 75,600.00 2) DUTRA CONSTRUCTION CO., INC. 965.00 60,795.00 1,922.00 121,086.00 3) TRAYLOR PACIFIC 500.00 31,500.00 600.00 37,800.00 4) GENERAL CONSTRUCTION CO. 380.00 23,940.00 1,200.00 75,600.00 5) FCI CONSTRUCTORS, INC. 890.00 56,070.00 1,100.00 69,300.00 1) AVERAGE BID 687.00 2) STANDARD DEVIATION 248.94 3) ENG. EST. - LOW BIDDER 1,050.00 43,281.00 15,683.08 66,150.00 1,204.40 472.01 1,300.00 75,877.20 29,736.85 81,900.00
18 ITEM 36 BREAK OFFAND DISPOSE OF24-INCH OCTAGONAL CONCRETE PILES (CONTINGENCY ITEM) Each Approx. Oty. = 33 ITEM 37 SPUDDING OF OBSTRUCTIONS (CONTINGENCY ITEM) Each Approx. Oty. = 60 /ea 2,500.00 82,500.00 /ea 3,150.00 189,000.00 1) MANSON CONSTRUCTION CO. 1,300.00 42,900.00 1,300.00 78,000.00 2) DUTRA CONSTRUCTION CO., INC. 1,125.00 37,125.00 1,175.00 70,500.00 3) TRAYLOR PACIFIC 1,800.00 59,400.00 900.00 54,000.00 4) GENERAL CONSTRUCTION CO. 3,200.00 105,600.00 1,800.00 108,000.00 5) FCI CONSTRUCTORS, INC. 5,100.00 168,300.00 2,500.00 150,000.00 1) AVERAGE BID 2,505.00 2) STANDARD DEVIATION 1,663.62 3) ENG. EST. - LOW BIDDER 1,200.00 82,665.00 54,899.40 39,600.00 1,535.00 630.38 1,850.00 92,100.00 37,822.61 111,000.00
19 ITEM 38 DISPOSE OF SURPLUS 24-INCH OCTAGONAL CONCRETE PILES (CONTINGENCY ITEM) Each Apprx. Qty. = /ea 7,600.00 152,000.00 20 Each Approx. Qty. = ITEM 39 PERFORM PILE CUT-OFFS OVER6 FEET LONG (CONTINGENCY ITEM) /ea 850.00 85,000.00 100 1) MANSON CONSTRUCTION CO. 100.00 2,000.00 300.00 30,000.00 2) DUTRA CONSTRUCTION CO., INC. 1,811.00 36,220.00 484.00 48,400.00 3) TRAYLOR PACIFIC 600.00 12,000.00 50.00 5,000.00 4) GENERAL CONSTRUCTION CO. 225.00 4,500.00 420.00 42,000.00 5) FCI CONSTRUCTORS, INC. 4,900.00 98,000.00 3,000.00 300,000.00 1) AVERAGE BID 1,527.20 30,544.00 2) STANDARD DEVIATION 2,003.04 40,060.76 3) ENG. EST. - LOW BIDDER 7,500.00 150,000.00 850.80 85,080.00 1,212.83 121,283.27 550.00 55,000.00
20 PROJ. CON ST. MGR.: DONNA ENFIAJIAN ITEM 40 ITEM 41 REMOVEAND DISPOSEOF REMOVE& DISPOSE OF HAZARDOUS ASBESTOS CEMENT PIPE WASTES WITHIN DREDGE SPOILS (CONTINGENCYITEM) (CONTINGENCYITEM) Lin. Ft. Approx. Otv, = 50 Tons Approx. Otv, = 100 /Iin ft 50.00 2,500.00 160.00 16,000.00 /tons 1) MANSON CONSTRUCTION CO. 100.00 5,000.00 200.00 20,000.00 2) DUTRA CONSTRUCTION CO., INC. 154.00 7,700.00 125.00 12,500.00 3) TRAYLOR PACIFIC 150.00 7,500.00 1,850.00 185,000.00 4) GENERAL CONSTRUCTION CO. 100.00 5,000.00 21-5.00 21,500.00 5) FCI CONSTRUCTORS, INC. 500.00 25,000.00 145.00 14,500.00 1) AVERAGE BID 200.80 10,040.00 507.00 50,700.00 2) STANDARD DEVIATION 169.27 8,463.63 751.69 75,168.64 3) ENG. EST. - LOW BIDDER (50.00) (2,500.00) (40.00) (4,000.00)
21 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 42 REMOVE TIMBERPILESTUBS (CONTINGENCY ITEM) ITEM 43 JETIING DURING PILE REMOVALS (CONTINGENCY ITEM) Each Approx. otv. = /ea 100.00 25,000.00 250 Each Approx. Otv. = /ea 500.00 50,000.00 100 1) MANSON CONSTRUCTION CO. 110.00 27,500.00 600.00 60,000.00 2) DUTRA CONSTRUCTION CO., INC. 745.00 186,250.00 1,127.00 112,700.00 3) TRAYLOR PACIFIC 1,700.00 425,000.00 650.00 65,000.00 4) GENERAL CONSTRUCTION CO. 630.00 157,500.00 250.00 25,000.00 5) FCI CONSTRUCTORS, INC. 400.00 100,000.00 1,260.00 126,000.00 1) AVERAGE BID 717.00 179,250.00 777.40 77,740.00 2) STANDARD DEVIATION 600.75 150,186.34 412.61 41,260.61 3) ENG. EST. - LOW BIDDER (10.00) (2,500.00) (100.00) (10,000.00)
22 ITEM 44 ITEM 45 INSTALLCONTRACTOR-FURNISHED CRUSHED MISCCELLANEOUS BASE (CONTINGENCY ITEM) CU. Yds Approx. Qty. = /cu yds 36.00 1,260,000.00 TRENCHSUBGRADE STABILIZATION (CONTINGENCY ITEM) 35000 Cu. Yds. Approx. Qty. = 75 /cu yds 150.00 11,250.00 1) MANSON CONSTRUCTION CO. 8.00 280,000.00 60.00 4,500.00 2) DUTRA CONSTRUCTION CO., INC. 37.11 1,298,850.00 58.00 4,350.00 3) TRAYLOR PACIFIC 16.00 560,000.00 100.00 7,500.00 4) GENERAL CONSTRUCTION CO. 24.00 840,000.00 135.00 10,125.00 5) FCI CONSTRUCTORS, INC. 11.00 385,000.00 100.00 7,500.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 19.22 672,770.00 90.60 s 6,795.00 11.69 409,187.90 32.20 2,414.95 28.00 980,000.00 s 90.00 6,750.00
23 Sq. Ft. Approx. Oty. = ITEM 46 ITEM 47 LAY GEOFABRIC (CONTINGENCY ITEM) /sq ft 1.50 15,000.00 10000 EXCAVATE, REMO, & DISP OR RECY CA HAZ WASTE SOIL, RCRA HAl WASTE SOIL & CHEM IMPCT/NON-HAl WASTE SOIL 100,000.00 1) MANSON CONSTRUCTION CO. 1.00 10,000.00 100,000.00 2) DUTRA CONSTRUCTION CO., INC. 0.35 3,500.00 100,000.00 3) TRAYLOR PACIFIC 1.50 15,000.00 100,000.00 4) GENERAL CONSTRUCTION CO. 0.20 2,000.00 100,000.00 5) FCI CONSTRUCTORS, INC. 4.75 47,500.00 100,000.00 1) AVERAGE BID 1.56 15,600.00 100,000.00 2) STANDARD DEVIATION 1.86 18,578.89-3) ENG. EST. - LOW BIDDER 0.50 5,000.00 -
24 ITEM 48 ITEM 49 ITEM 50 EXCAVATE, DISPOSE, & REPL ACE GEOTECH UNSUITABLESOIL WI CRUSHED MISCELLANEOUS BASE EXCAVATE, DISPOSE, & REPLACE GEOTECHNICALLY UNSUITABLE SOIL REMOVE& REALIGN INTERFERING UNDERGROUND UTILITIES & MODIFY UTILITIES 50,000.00 20,000.00 100,000.00 1) MANSON CONSTRUCTION CO. 50,000.00 20,000.00 100,000.00 2) DUTRA CONSTRUCTION CO., INC. 50,000.00 20,000.00 100,000.00 3) TRAYLOR PACIFIC 50,000.00 20,000.00 100,000.00 4) GENERAL CONSTRUCTION CO. 50,000.00 20,000.00 100,000.00 5) FCI CONSTRUCTORS, INC. 50,000.00 20,000.00 100,000.00 1) AVERAGE BID 50,000.00 2) STANDARD DEVIATION - 3) ENG. EST. - LOW BIDDER - 20,000.00 - - 100,000.00 - -
25 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 51 ITEM 52 ITEM 53 ADDITIONAL WHARF DECK MODIFICATIONS TO FORMWORK REINFORCEMENT PERFORM DEPT. OF BUILDING ANDSAFETY CORRECTIONS 50,000.00 200,000.00 100,000.00 1) MANSON CONSTRUCTION CO. 50,000.00 200,000.00. 100,000.00 2) DUTRA CONSTRUCTION CO., INC. 50,000.00 200,000.00 100,000.00 3) TRAYLOR PACIFIC 50,000.00 200,000.00 100,000.00 4) GENERAL CONSTRUCTION CO. 50,000.00 200,000.00 100,000.00 5) FCI CONSTRUCTORS, INC. 50,000.00 200,000.00 100,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 50,000.00 200,000.00 100,000.00 - - - - - -
26 ITEM 54 ITEM 55 ITEM 56 WEDLING STIFFENERS TO SHEET PILE JOINTS CONTAINMENT ANDCLEANUP OF PETROLEUM PRODUCT SPILL ON WATER GUARD SERVICE COMPENSATION 100,000.00 75,000.00 270,000.00 1) MANSON CONSTRUCTION CO. 100,000.00 75,000.00 270,000.00 2) DUTRA CONSTRUCTION CO., INC. 100,000.00 75,000.00 270,000.00 3) TRAYLOR PACIFIC 100,000.00 75,000.00 270,000.00 4) GENERAL CONSTRUCTION CO. 100,000.00 75,000.00 270,000.00 5) FCI CONSTRUCTORS, INC. 100,000.00 75,000.00 270,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 100,000.00 75,000.00 270,000.00 - - - - - -
27 ITEM 57 PARTNERING WORKSHOPS, ITEM 58 MODFICIATIONS TO AMP SYSTEMS ITEM 59 OVERSIZE LOAD PERMITS ON CITYOF LOSANGELES STREETS 100,000.00 2,000,000.00 500,000.00 1) MANSON CONSTRUCTION CO. 100,000.00 2,000,000.00 500,000.00 2) DUTRA CONSTRUCTION CO., INC. 100,000.00 2,000,000.00 500,000.00 3) TRAYLOR PACIFIC 100,000.00 2,000,000.00 500,000.00 4) GENERAL CONSTRUCTION CO. 100,000.00 2,000,000.00 500,000.00 5) FCI CONSTRUCTORS, INC. 100,000.00 2,000,000.00 500,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 100,000.00 2,000,000.00 500,000.00 - - - - - -
28 PROJ. CaNST. MGR.: DONNA ENFIAJIAN ITEM 60 ITEM 61 ITEM 62 UNFORESEEN REGULATORY (SWPPP) CAULERPASURVEYAND ERADICATION MATERIALPRICE FLUCTUATION 150,000.00 100,000.00 250,000.00 1) MANSON CONSTRUCTION CO. 150,000.00 100,000.00 250,000.00 2) DUTRA CONSTRUCTION CO., INC. 150,000.00 100,000.00 250,000.00 3) TRAYLOR PACIFIC 150,000.00 100,000.00 250,000.00 4) GENERAL CONSTRUCTION CO. 150,000.00 100,000.00 250,000.00 5) FCI CONSTRUCTORS, INC. 150,000.00 100,000.00 250,000.00 1) AVERAGE BID 2) STANDARD DEVIATION 3) ENG. EST. - LOW BIDDER 150,000.00 100,000.00 250,000.00 - - - - - -
29 PROJ. CON ST. MGR.: DONNA ENFIAJIAN ITEM 63 GRAND TOTAL WEBCAM BID ITEMS 1-63 100,000.00 134,107,514.00 1) MANSON CONSTRUCTION CO. 100,000.00 97,902,892.00 2) DUTRA CONSTRUCTION CO., INC. 100,000.00 109,210,981.20 3) TRAYLOR PACIFIC 100,000.00 110,203,746.00 4) GENERAL CONSTRUCTION CO. 100,000.00 116,474,580.00 5) FCI CONSTRUCTORS, INC. 100,000.00 118,832,022.00 1) AVERAGE BID 100,000.00 110,524,844.24 2) STANDARD DEVIATION - 8,147,876.66 3) ENG. EST. - LOW BIDDER - 36,204,622.00 ~ CJc~ ~ Chief Harbor Engineer Construction Division
Project Title: Berths 145-147 Wharf Improvements Spec No.: 2605 Total Bid Amount: 97,902,892.00 Prime Contractor's Name & Address Type of Work SBE ( Yes! No) Amount SBE% MBEIWBE!OBE Manson Construction Co. Prime Contractor No 97,902,892.00 0.00% OBE 777 Tuna St. San Pedro, CA 90731 Subcontractor's Name & Address Type of Work SBE (Yes! No)( Amount SBE% MBEIWBE!OBE Lonerock, Inc. Storm Drain, Water, 4,200,000.00 4.48% OBE 26 Vista Firenze Sewer Laguna Hills, CA 92653 Dynalectric Electrical No 18,500,000.00 0.00% OBE - 4962 Corporate Center Dr. Los Alamitos, CA 90720 W.W. Stevenson Co. Civil 6,953,371.00 7.42% OBE 1305 E. Burnett St. Signal Hill, CA 90755 Platinum Contracting Inc. Earthwork 4,075,145.00 4.35% WBE 3485 Silver Cloud Dr. Norco, CA 92360 All American Asphalt Asphalt Paving No 3,716,370.00 0.00% OBE 400 E. 6th St. Corona, CA 92878 Zaccor Companies, Inc. Demolition 2,107,000.00 2.25% OBE 2900 Main St., Ste. 3100 Alameda, CA 94501 Reeve Trucking Trucking ::PcP;", 800,000.00 0.85% OBE P.O. Box 5126 Stockton, CA 95205 CMC/Fontana Steel Rebar No 5,571,000.00 0.00% OBE 12451 Arrow Route Rancho Cucamonqa, CA Total SBE Total Total Subcontractor Subcontractor Subcontractor Total Amount Amount Total SBE % SBE% Subcontractor % 45,922,886.00 18,135,516.00 19.35% 19.35% 46.9% Page 1 of 1 TRANSMITTAL NO.2
BERTHS 136-139 AMP BERTHS 145-147 WHARF SCALE AS SHOWN DRAWN: CHECKED: DESIGNED: ENGR/ARCH RECOMMENDED FOR APPROVAL CHIEF OF DESIGN ASSISTANT HARBOR CHIEF ENGINEER APPROVED CHIEF HARBOR ENGINEER AERIAL SITE PLAN PORT OF LOS ANGELES CONSTRUCTION DIVISION P.O. BOX 151 SAN PEDRO, CA 90733-0151 SPEC No. 2605 TRANSMITTAL NO. 3