User Guide. BreezePro TPW-400DT 12/24V 400W Wind Turbine A. NOTICE. B. SAFETY PRECAUTIONS (Important) C. About BreezePro

Similar documents
400 Watt WIND TURBINE

Contents INTRODUCTION... 2 CHECK YOU HAVE RECEIVED... 4 WHAT YOU WILL NEED...4 TECHNICAL CHARACTERISTICS...5 WIRING DIAGRAMES...6 CABLES...

Wind Generator. FSH400 Instruction Manual. Serial number:

3. WIRING AND INSTALLATION PROCEDURES 3.1 System wiring diagrams 4.LOCATION SELECTION 5. TOWER 6.1 SINGLE WIND GENERATOR 6.2CONTROLLER WIRING 6.

UPSPro Backup Power System

Recommended Tools: Phillips Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver, Flat Blade Screwdriver

UPS-ST12xx UPSPro Backup Power System

Recommended Tools: Phillips Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver, Flat Blade Screwdriver

Recommended Tools: Phillips Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver, Flat Blade Screwdriver

Some admonitions you must know before using DS600

Recommended Tools: Phillips Screwdriver, 7mm Open End Wrench, Soldering Iron & Solder (for solar panel)

Recommended Tools: Phillips Screwdriver, 7mm Open End Wrench, Soldering Iron & Solder (for solar panel)

Chinook 200 Micro-Turbine Installation & Operation Guide

The New 400 watt turbine!

400 WATT WIND TURBINE

GENERAL SAFETY PRECAUTIONS

OBE, OBEXU, ON BOARD Battery Chargers

User Guide IGD Series

Race Sport Lighting RSUKIT LED UNDERBODY KIT INSTALLATION GUIDE

600 WATT WIND TURBINE

Recommended Tools: Phillips Screwdriver, Flat Blade Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver,

OBAE, OBAEXU, ON BOARD Battery Chargers

Recommended Tools: Phillips & Flat Screwdriver, 17/13/10mm wrench, 8mm nut driver

SOLAR BOLT CHARGING SYSTEM INSTALLATION GUIDE

QPET, QPETXU Battery Chargers

W650. Beawindhog Rev01 ALASKA'S LOW COST ENERGY SOURCE. Wind, Solar, Bio, and Other alternative energy custom manufacturing

QSSE, QSSEX INDUSTRIAL Battery Chargers

Embedded Rack Slide-out System

Windtura 750 Owner s Manual. (No slip ring version)

Model E600 Tarping System

Operating & Installation Manual

600 Watt MARINE WIND TURBINE

Chinook 200 Marine. Assembly and Use Instructions

Installation and Operation Guide. Tundra HD 2500 Power Inverter. for the. Webasto BlueCool Truck System

HM WIND TURBINE. Operation Manual. **Please read the manual carefully before using **

MODEL 6010A 6 12 VOLT BATTERY CHARGER ASSOCIATE

Universal Super Shield & Ultimate Aluminum w/electric Drive Conversion Kits , , Installation Instructions

Recommended Tools: Phillips & Flat Screwdriver, 17/13/10mm wrench, 8mm nut driver

Automatic Battery Charger Switching mode with Micro-controlled Input: Vac / Output: 12Volt DC

ENFORCER TM 6201-IQ ELECTRONIC SIREN

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

Automatic Battery Charger Switching mode with Micro-controlled Input: Vac / Output: 12Volt DC

Your Legal Fuel Tank Source.

This sheet must be read completely to:

ASSEMBLY INSTRUCTIONS

Chinook 200. Assembly and Use Instructions

Read this entire manual before operation begins.

Installation and Set Up Instructions

Single Leg AM/CM 20, 24 and 30

OPT7 LED AURA UNDERBODY KIT GENERAL INSTALLATION GUIDE

VTC610 Series Voltage Converter. Installation & Operation Manual

OPERATING MANUAL. aeration fans. models: sa sa sa SAFETY PRACTICES

TP-BC AC to DC24V UNINTERRUPTED POWER SUPPLY User Manual. DC power output 8A Charge current 7.5A

Single Leg AM / CM 20, 24 and 30. Installation

AUTO CHARGE 12 DV AUTOMATIC BATTERY CHARGER

IMPORTANT: Before you install the automatic gate lock be sure your gate is level, moves freely on hinges, and is free from binding and/or dragging.

24/3000H-3PH 24/4500H-3PH 24/6000H-3PH

VTC1000 Series Voltage Converter. Installation & Operation Manual

Read this entire manual before operation begins.

DC to DC Step Up Converter Model: VTC305

Missouri Wind and Solar Wind Turbine Installation Instructions

HIGH RISE POWER ANGLE KIT

VW/AUDI MK7 VEHICLES

INSTALLATION & OPERATION MANUAL

RollSeal 1733 County Road 68 Bremen, Alabama Part No Rev Owner s Manual RS-Divider Curtain

Important Information

INSTALLATION & OPERATION MANUAL

Air x. Owner s Manual Installation Operation Maintenance

MODEL A97 SERIES. Switchmode Utility Rectifier/Battery Charger ECN/DATE

Installation Instructions **THIS RAIL MOUNTING KIT USES 11 BOLTS**

CLEAN POWER TM CPS Series Operator s Manual

On all settings above 100 horsepower the following precautions should be observed:

INSTALLATION INSTRUCTIONS

This Manual Provides Installation and Operation Instructions for the following models:

HOG SLAT. Pit Scraper System. Installation Instructions. Take special note of any warnings or safety decals on the equipment and in this manual.

Overload Warning System DS 50

Installation and Operating Instructions (for chargers shown below)

MOTORIZED FOLDING CAMPER WINCH

RUTLAND HRDi CHARGE REGULATOR INSTALLATION AND OPERATION

A48 / A48B (base plate) BATTERY CHARGER

Tumo-Int 600W 5 Blades. Samll Wind Turbine. User Manual

AQUA4GEN OWNERS MANUAL

INSTALLATION INSTRUCTIONS

ELECTRONIC MARINE CONVERTER/CHARGER Owners Manual Models PD2020, PD2030, PD2040, PD2050, PD2060, PD2080

Battery Control Center - Diesel

AUTO CHARGE 12 AUTOMATIC BATTERY CHARGER

Installation Manual for VMAC Throttle Commander Throttle Control T500111

CAPACITOR ACTUATED PORTABLE STARTER CAPS USER GUIDE. INST048 Doc 3.01

Owner s Manual Installation Operation Maintenance

Model Numbers SAVI-NOTE75, SAVI-NOTE150

Stevens Type A/F Encoder. For Stand-Alone Encoder Part # AND Encoder Attachment Part # INSTRUCTION 90044

G500REC Manual Covering System for Containers

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Page 1 of 4 Model: BTL4E-004 V2.0 Pulsar Electronic LED Turn Signal Flasher Unit Installation & Operation Instructions:

OPERATING MANUAL. centrifugal fan SAFETY PRACTICES

Operators Guide: RoboSign Stop/Go Traffic Control System

NOVALYNX CORPORATION MODEL 200-WS-02F WIND SPEED & DIRECTION SENSOR INSTRUCTION MANUAL

Southwest Windpower, Inc.

MODEL ELC-12/60-D BATTERY CHARGER

Transcription:

A. NOTICE User Guide BreezePro TPW-400DT 12/24V 400W Wind Turbine 1. This information is believed to be reliable; however, We assume no responsibility for inaccuracies or omissions. The user of this information and product assumes full responsibility and risk. 2. All specifications are subject to change without notice. 3. Wind turbines must be installed following the guidelines of local regulations. B. SAFETY PRECAUTIONS (Important) 1. Safety must be the primary concern as you plan the location, installation and operation. Please be aware of electrical, mechanical and blade hazards. 2. DO NOT install the turbine where anyone could approach the blades. 3. Use common sense and be careful. 4. Select the correct wire size, and the correct fuse size. 5. When installing, please make sure that the wind turbine is disconnected from the batteries. 6. Do not let the blades spin freely until the turbine is mounted on the pole. 7. Never approach the turbine during operation. 8. The edges of the blades are very sharp, please be careful. C. About BreezePro 1. This wind turbine has an embedded PWM charge controller with dump load. It controls battery charging and protects the wind turbine in high winds. 2. This wind turbine is designed to charge 12V or 24V Lead-Acid battery, specifically AGM or GEL sealed lead acid batteries. It is 12V/24V auto select. It can only work with 12V or 24V battery. Please DO NOT connect it to other battery voltages. 3. When connecting to the battery, please make sure that: the RED wire (+) of the wind turbine connects to battery V+ (positive); the BLUE wire (-) of the wind turbine connects to battery V- (negative). 4. Never allow a short between red and blue wires when the turbine is rotating. 5. Incorrect battery voltage or incorrect wire connection may damage the wind Page 1

turbine internal controller, and these are not covered by the warranty. D. Package content and specification D.1 Package Contents Figure 1: Package list BreezePro is shipped partially disassembled. Please compare the parts shown above to ensure that all necessary parts are included. 1 Mainbody 1 Fastener Pcs 2 Hub 1 M14 Nut 1 for Hub 3 Nose Cone 1 Φ2.5 Cotter Pin 1 for Hub 4 Blade 6 Φ6*25 Screw 12 for Blades 5 Tail Vane 1 Φ6*20 Screw 3 for Tail Vane 6 Manual 1 M6 Gasket 3 for Tail Vane M6 Nut (Nyloc) 15 + 2(spare) for Blades & Tail 7 Fastener & Tools 5mm Hex Key 1 D.2 Specification Rotor Diameter 1.2M Net Weight 7.8Kg Cut-in Wind Speed 2.1M/S Rated Power 250W Max Power 400W Pole Dimensions Inner Diameter 41mm Package Weight 9.5Kg Figure 2: Specification Page 2

E.Prepare for install E.1 The following general tools may be required for installing: Multi-meter Wrench or spanner, Soldering iron, Screw driver, Heat shrink or electrical tape E.2 Pole or Mast 1. BreezePro is designed to mount to an aluminum or steel tube with an inside diameter of 41mm. An inside diameter 41mm (1.6" or 15/8") steel pole is readily available (water pipe or scaffold tube). Please do not use plastic pipe. 2. A suitable mounting pole can be erected using a 6 meter galvanized pipe supported by 3 or 4 guy wires (Refer to Figure 5). 3. Make sure a minimum 50mm clearance is provided between the blade tips and any obstructions (Refer to Figure 3). 4. Mark and centre-punch two positions diametrically opposite, at 90 to the pipe seam, 20mm from top of the pipe (Refer to Figure 4). Then drill two 12mm diameter holes. Figure 3: The clearance between the blade and pole Figure 4: Mounting holes in pipe Figure 5: Mounting using guy wires E.3 Wire If the cross section area of the wires is NOT sufficient, the wires will heat up and could create a fire hazard. Please choose the right size of wire. Minimum Wire Size (X-Section Area): Distance From Batteries to Turbine 0-10M 10-20M 20-30M 30-50M Wire X-Section Area for 12V Battery 12AWG 10AWG 9AWG 8AWG Wire X-Section Area for 24V battery 14AWG 12AWG 10AWG 9AWG Page 3

F. Installation F.1 Please follow these precautions during the installation: 1. THINK SAFETY! Have someone available to help when installing. 2. Disconnect batteries from turbine. 3. Be careful not to pinch the wires when attaching the turbine to pole. F.2 Step-By-Step Instructions F.2.1 Connect the wires and mount the turbine 1. Run the 2 wires from the battery location, through the pole to the top of it. DO NOT connect the wires to the battery until everything has been completed. Strip the insulation back from each side of wires. Mark both ends of the wires with tape to identify the polarity: Red = Positive (+); Blue = Negative (-). CAUTION: If you are uncertain of the polarity of the wires, simply spin the rotor shaft clockwise and measure the voltage direction with a volt meter. 2. Connect the Red (+) and Blue (-) wires from the wind turbine to the wires from the battery location. Insulate the connections using either heat shrink tubing or a quality electrical tape or wire nuts. 3. Once the wires are attached to the BreezePro, gently pull the wires down through the mount pole sliding the yaw shaft into the pipe. Slide the yaw shaft down inside the end of the pole carefully, so as not to pinch the wires. Leave enough slack in the wires so that, if necessary, the BreezePro can be removed from the pole. Strain relieve the wires so the weight of the long wires isn't pulling on the red and blue turbine wires. 4. Once the yaw shaft is mounted in the pole, a. First, firmly tighten the two 10mm screws with a wrench. b. Then, firmly tighten the two 10mm nuts. Figure 6 CAUTION: Make sure that your BreezePro is securely attached to the pole. Remember that this attachment will have to hold in high winds. Figure 7.1: Blades & Hub Figure 7.2: Cotter Pin Figure 7.3: Fix the Tail Vane Page 4

F.2.2 Fix the blades, the Hub and the tail CAUTION: The edges of the blades are very sharp, please be careful. 1. Hold the shaft with a screw driver, turn the Hub counter-clockwise to remove the Hub from the shaft if necessary. 2. Attach the blades to the Hub. Securely tighten all the screws and nuts (Figure 7.1). Make sure every bolt on the blade is fully contact the nylon locker in the nut. Make sure the front face of the blade is toward the wind. 3. Put the M14 nut into the middle of the Hub, then put the Hub on the top of the rotor shaft. Hold the rotor shaft with a screw driver and turn the Hub clockwise to tighten the hub on the shaft (Figure 7.1). 4. Insert the cotter pin. Spread cotter pin (Figure 7.2). 5. Assemble the nose cone to the head of the shaft by snapping into place. 6. Attach the tail vane to the tail bracket, install the screws and nuts, tighten them firmly (Figure 7.3). F.2.3 Connect the wires 1. Run the wires from the BreezePro to the battery. 2. Attach wires to the battery. Wind Turbine Red wire = Battery Positive (+); Wind Turbine Blue wire = Battery Negative (-). CAUTION: The BreezePro may be damaged if the battery is wrong connected. CAUTION: Never allow a short between red and blue wires. CAUTION: DO NOT connect or disconnect the BreezePro when the wind turbine blades are moving very fast. Wait for rotation to slow. F.3 System wiring Please refer to Figure 8 when wiring. Voltmeter (50V rated) and ammeter (20A rated) can be used to test the turbine and the charging. The fuse is 20A. Figure 8: Connect the hybrid system Page 5

F.4 BreezePro operation Check support structures, blades, and electrical systems. 1. Do not let the rotor blades come in contact with a solid object. Use common sense about safety when locating the turbine. 2. Before you inspect the wind turbine or approach the path of the blades, disconnect the power leads from the battery. The wind turbine should slow down or stop spinning. Be very careful when working near a spinning turbine. Wait till the turbine stops spinning then tie one of the blades to the mounting pole using a rope or bungee. 3. NEVER allow a short between Red and Blue wires. If you want to stop charging, just disconnect the turbine from the battery. Use electrical tape to insulate the two output wires if necessary. 4. If no battery connection, the dump load on the wind turbine will be engaged and the turbine will be protected from over speed. 5. Note: The bearings in the turbine may require about 100 hours of operation in normal wind before they are running at peak efficiency. It is called break-in period. 6. When expecting high winds such as from a Hurricane, it s best to remove the hub/blade assembly before the storm and then re-install after the storm passes. Removal is simple and involves only one cotter pin and one nut. G. Additional Information G.1 A larger system Figure 9: Connect a larger system Multiple BreezePro s can be run in a parallel fashion in order to increase the total power. This is an economical and reliable way to generate increased power if required. Hybrid solar/wind systems can also be created by adding a solar panel and solar controller. G.2 How the embedded controller works: 1. The embedded PWM controller is mounted inside the turbine body. It continuously monitors and controls the output of the wind turbine to optimize battery charging and protect the wind turbine from over-speed. Page 6

2. The controller continually feeds any excess current to the embedded dump load located in the tail section of the turbine in order to control the wind turbine output and rotational speed. CAUTION: If the wind is strong, the dump load may get extremely hot. In order to avoid serious burns, never touch the dump load. G.3 Testing your BreezePro - Manual Method a. When the BreezePro is disconnected from a battery the controller switches in the dump load. This is a safety feature but makes the wind turbine harder to turn by hand. b. Disconnect the turbine from the battery and connect a voltmeter to the Red (+) and Blue (-) wires (Refer to Figure 8). Spin the turbine blades by hand and you should immediately see a voltage up to 20V on the voltmeter. Voltage will depend on rotation speed and will not be stable. This is normal. Voltage will only be seen when you first start to spin the blades. Very quickly, the controller will dump the power to the dump load and voltage output on the wires will fall to near zero. c. Connect the turbine to a 12V battery with an amp meter in line. Spin the turbine and measure the amps. You should see up to about 4-10A depending on the rotational speed and the battery charge condition. G.4 Trouble shooting your BreezePro An AMP meter, such as the TP-BATTMETER-24, is recommended to be connected in your system, to monitor wind turbine performance. Check all wiring and tighten all fasteners. If you can t determine cause of the problems, such as: big vibration; no output; very small output in large wind. Please: 1. Uninstall the wind turbine immediately and check if there is obvious damage on the shell, blades or yaw part. 2. Disconnect the wind turbine from the battery, spin the wind turbine and test the output voltage. This open-circuit voltage can easily exceed 12V but will only be seen for an instant before the controller routes the power output to the dump load. 3. Connect the turbine to the battery with an ampere meter, spin the turbine by hand or by tools, to see the charge current is OK. Figure 10: Typical Charge Current Vs Wind Speed Page 7

Limited Warranty Tycon Solar BreezePro wind turbines are supplied with a limited 24-month warranty which covers material and workmanship defects. This warranty does not cover the following: Parts requiring replacement due to improper installation, misuse, poor site conditions, faulty power, etc. Lightning damage. Physical damage to the external & internal parts. Products that have been opened, altered, or defaced. Units that were not properly grounded. Usage other than in accordance with instructions and the normal intended use. Do not return any products until you receive a Return Material Authorization (RMA) number. Products received without a valid RMA number will be rejected and returned to sender. Warranty Repairs All returns must have a valid RMA number written clearly on the outside of the box. Without an RMA number the shipment will be refused. For customers located in United States and Canada, customer pays all shipping charges incurred to ship the product to Tycon Systems. Tycon Systems pays shipping charges to return the product to the original purchaser. For all other countries, the original purchaser shall pay all shipping, broker fees, duties and taxes incurred in shipping products to and from Tycon Systems. Provided the goods have not been modified or repair attempted by someone other than Tycon Systems, at the option of Tycon Systems, products may be returned either as repaired or replaced. If it is determined that there is no fault found (NFF) on a unit within warranty, the customer will be charged $75 USD for testing time. For products out of warranty, the standard NFF charge is $200. This charge will be at the discretion of Tycon Systems. The RMA number is valid for 14 days from date of issue. The product must be received by the repair depot within these 14-days or the shipment may be refused. Shipping and Damage Claims All shipping damage claims are the purchaser's responsibility. Inspect each shipment upon delivery and IMMEDIATELY report all damage to the carrier. There may be time limits and inspections may be required. phone: 801-432-0003 support@tyconsystems.com 8000022 Rev 9 Page 8