Maharashtra State Load Despatch Centre. Partial Grid Disturbance in Mumbai system on 18 th Nov-2010 at 17:45 hrs and 21 st Nov-2010 at 17:10 hrs

Similar documents
Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

Case No. 112 of In the matter of Application of Tata Power Company Limited for grant of Transmission Licence

Intentional Islanding Operation to Improve the Service Reliability of Thailand Electric Power System

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

Reliance Infrastructure Limited Reg. Office: H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai Website:

The Tata Power Company Ltd Title : OCCURRENCE ANALYSIS REPORT

The Electric Power System

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

Jemena Electricity Networks (Vic) Ltd

Double earth fault in a PSP during back to back launching sequence

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

Fifteenth National Power Systems Conference (NPSC), IIT Bombay, December 2008

Report. the feasibility of

Texas A&M Microgrid and Electrical System Study. Cushing Memorial Library & Archives

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

American Electric Power s Energy Storage Deployments

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Distributed Energy Resources

Agenda of 11 th System Studies Meeting in NER

DESCRIPTION OF REQUIREMENTS FOR GENERATION SYSTEMS SEEKING TO PROVIDE SYSTEM RESTART SERVICES

Wang Bin & Michael Ho, TIIAE Power management system

Guidelines for connection of generators:

TRANSMISSION PLANNING CRITERIA

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

MINUTES OF THE 47 th SLCF MEETING HELD ON

The Evolution of System Protection Schemes for the Sarawak Power System By Victor Wong Sarawak Energy Berhad Presented at PQSynergy 2012, Sarawak

100 MW Wind Generation Project

Islanding of 24-bus IEEE Reliability Test System

Islanding of 24-bus IEEE Reliability Test System

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Distributed Generation

Helpline Ambulance. Organisation. Arya Samaj / Bombay City Corps / Golden Hour Project /

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Unit Protection System for Pumped-Storage Power Stations

KONČAR Group. Research and Development

Impact of Islanding and Resynchroniza?on on Distribu?on Systems

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Northeast Wisconsin/Upper Peninsula Separation 11/14/01. Incident Investigation Report

Exemptions currently in force

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014

CIGRE US National Committee 2013 Grid of the Future Symposium. Facilitating Bulk Wind Power Integration Using LCC HVDC

Small Electrical Systems (Microgrids)

Rev. Harimohan Gehlot Ji's (Jodhpur, Rajasthan) Tour Programme in Mumbai Zone (39) From to

EPRI Intelligrid / Smart Grid Demonstration Joint Advisory Meeting March 3, 2010

STUDY ON IMPLEMENTING THE EFFICIENT TRANSPORTATION SYSTEM

Power Conditioning of Microgrids and Co-Generation Systems

Refurbishment & Upgrade of the Celilo HVdc Converter Station

Electric Utility Power Systems. Generation of Electricity

Line using HTLS Conductors to increase

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience

Fully Automated Wind Project: Automating the Substation

Emerald Reactive Support Alternative Solution Expressions of interest

Final Written Examination.

Standards, Procedures and Policies for Grid Connection

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Flexible Distributed Generation. FDG-F Burwell (EPN) May 2017

Consequences on Grid Operation by Decentralized Renewable Power Generators

i-pcgrid Workshop 2017

NITIN CORPORATION 402, 4 th Floor, Bezzola Commercial Complex, Sion Trombay Road, Chembur, Mumbai , India.

Sr. # Name of Retail Outlet Type OMC Location. Pune-Bangalore Bypass, Warje 2. Ishwar Service Station Daughter Booster BPCL

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

TEPCO's experiences of automatic voltage controllers and SIPS as measures to prevent massive power outages

Generator Interconnection System Impact Study For

Operational Objectives

Derrick Boltt Southern Region Hydro Generation Eskom South Africa

POWER SYSTEM OPERATING INCIDENT REPORT LIGHTNING STRIKES IN TASMANIA AND PACIFIC ALUMINIUM POTLINE LOAD REDUCTIONS 21 MARCH 2013

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011

North Oregon Coast Area Study. Adam Lint

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

TECHNICAL PAPER ON SOLAR PV INSTALLATION & DESIGN AT IIT BHUBANESWAR

Control System for a Diesel Generator and UPS

Laboratory Scale Microgrid Test-Bed Hardware Implementation

INTERCONNECT CHALLENGES IN THE DEVELOPING WORLD S DISTRIBUTED GENERATION INFANCY. David C. Oehl, P.E. President MAVEN POWER

Integration of Large Wind Farms into Electric Grids

Fall 1997 EE361: MIDTERM EXAM 2. This exam is open book and closed notes. Be sure to show all work clearly.

BC HYDRO T&D SYSTEM OPERATIONS SYSTEM OPERATING ORDER 7T 30. NORTH COAST INTERCONNECTION Supersedes 7T-30 issued 07 June 2018

IFC Workshop on Distributed Generation, 13 February 2013, Moscow, Russia

Grid Stability Analysis for High Penetration Solar Photovoltaics

SGT5-8000H/SCC5-8000H 1S. First experience of Commercial Operation at Irsching 4. Russia Power Moscow, March

STATE LOAD DISPATCH CENTRES (SLDC)

COGENERATION PLANT SWITCHGEAR REPLACEMENT IMPROVES SAFETY AND RELIABILITY WHILE MAINTAINING SERVICE TO CRITICAL LOADS

Thank you for the detailed information regarding the Refurbishment Project at Marchwood MTS. This project will facilitate equipment maintainability.

Case Nos. 12 & 48 of 2009

Guideline for Parallel Grid Exit Point Connection 28/10/2010

DG SYNCHRONIZING &AMF PANEL

Black StartDrill in Eastern Regional Power System-Case studies

Electric Transportation and Energy Storage

HVDC Back-to-Back Interconnections Enabling reliable integration of power system

SELECTION OF TRACTION SYSTEMS & ENERGY CONSERVATION IN METRO SYSTEMS. BY BRIJESH DIXIT MANAGING DIRECTOR Nagpur Metro Rail Corporation Ltd.

Microgrid Controller Requirements

3.7 Areas where increasing levels of DER potentially affects operation of the system under Emergency Conditions

Transcription:

Maharashtra State Load Despatch Centre Partial Grid Disturbance in Mumbai system on 18 th Nov-2010 at 17:45 hrs and 21 st Nov-2010 at 17:10 hrs

Maharashtra State Load Despatch Centre Partial Grid Disturbance in Mumbai sub-urban system on 18 th Nov-2010 at 17:45 hrs

Maharashtra System Conditions (Prior to Disturbance) State Catered Demand : 13007 MW State Generation : 9583 MW Central Sector (Receipt) : 3424 MW System Frequency : 49.76 Hz Mumbai System Mumbai Catered Demand : 2592 MW TPC Hydro : 186 MW TPC Thermal : 1257 MW R-Infra Thermal : 498 MW Exchange with MSETCL : 658 MW

System Conditions (Prior to Disturbance) [Contd Transmission Equipments Out: 220 kv Salsette {TPC-T} Bus- Coupler : status OPEN Bus-Coupler is normally kept open in order to control loading on 220 KV Kalwa-Salsett D/C 220 kv Borivali {MSETCL}- Borivali {TPC} : status OPEN Flow on this line normally remains above 300 MW and during Mumbai peak 380 MW. Major source to Borivali is from Kalwa S/s During forced outage of ICT-1 at Kalwa line kept off from 19 th Oct. 220 kv Kalwa - Borivali {MSETCL}: status OPEN - planned outage for numerical relay commissioning

System Disturbance Following lines and units tripped, 1] 220 KV Trombay-Salset-I at 17:39 followed by tripping of following lines at 17:45 hrs 2] 220 KV Trombay-Salset-II 3] 220 KV Boisar(MSETCL)- Dahanu(R) 4] 220 KV Boisar(MSETCL)-Versova(R) 5] 220 KV Borivali(T)-Aarey(R)-I 6] 220 KV Borivali(T)-Aarey(R)-II 7] 220/100 KV Borivali(M) 125 MVA ICT-I 8] 220/100 KV Borivali(M) 125 MVA ICT-II 9] 250 MW Dahanu TPS U-I (Generator) 10] 250 MW Dahanu TPS U-II (Generator)

System Disturbance Sequence of Events of disturbance in Mumbai suburban system on 18.11.2010 Sr No Time Sequence Events 1 17:39:17 At 17:39:17:852 Hrs 220 kv Trombay-Salsette ckt-1 carrying 170 MW, tripped on phase to phase fault caused due to kite string in span 70-71 at Tagorenagar, Vikroli. 2 17:44:43 At 17:44:43:868 Hrs 220 kv Trombay-Salsette ckt-2 carrying 290 MW, tripped at 220 kv Salsette end. Earlier both the lines where carrying 170 MW each. 3 Prior to tripping, at 220 kv Salsette, Bus coupler was off.

System Disturbance (contd.. Sequence of Events of disturbance - (Contd.) Sr No Time Sequence Events 4 5 17:44:44 R-Infra system remain connected to Borivali(Tata) and further to Borivali(MSETCL) on 100 kv BO-BO Lines. Borivali(T) started drawing from Borivali(M) on 100 kv Borivali, due to network configuration. 220/100kV, 2X125 MVA ICT s at MSETCL Borivali, which were carrying 180 MW (Pre fault loading) tripped on over load. 6 Due to tripping of Borivali ICT, Borivali(T) load shifted on Reliance network. 7 This has resulted in reversal of power flow from 190 MW, from Borivali(T) to RInfra Aarey to 274 MW export from RInfra Aarey to Borivali(T).

System Disturbance (contd.. Sequence of Events of disturbance - (Contd.) Sr No Time Sequence Events 8 9 17:45:19 10 17:45:19 11 17:45:20 Reliance network was carrying about 950 MW with a Dahanu generation of 498 MW. Reliance system remained connected to Boiser(M) system. Drawal from Boisar(M) increased and 220 kv Boisar-Versova carrying 319 MW and 220 kv Boisar-Dahanu carrying 229 MW consequently tripped on Load of @ 950 MW remained connected to Reliance network having source of 498 MW, which resulted in dipping of frequency at 17:45:19:563Hrs, Automatic load shedding of @ 400 MW was initiated at 48.00 Hz. Due to further frequency dipping to 47.6 Hz, islanding scheme at Aarey operated resulting in tripping of both TPC lines at Aarey at 17:45:20:252 Hrs

System Disturbance (contd.. Sequence of Events of disturbance - (Contd.) Sr No Time Sequence Events 12 13 17:45:37 14 17:45:39 Due to load throw off on account of loadshedding on U/f and disconnection of TPCL lines at Aarey, frequency shotup to 51.75 Hz of islanded system. During these frequency oscillations, the GT-1 at Dahanu TPS tripped on overspeed at 17:45:37 Hrs. Dahanu unit 2 remained in service with the island load of @ 370 MW. Thereby tripping on under frequency at 17:45:39 Hrs. 15 Thus Total AC failure in R Infra network was of 770 MW.

System Disturbance (contd.. Sequence of Events of disturbance - (Contd.) Sr No Time Sequence Events 16 17:46:21 220 kv Bus coupler at 220 kv Salsette was closed at 17:46:21:564 Hrs and supply to Borivali(T) restored. 17 Total restoration at 19:04 hrs 664MW load was restored in Rel Infra system (400 MW from TPCL and 264 MW from Boisar) 18 Unit-2 synchronized at 2014 hrs and Unit-1 synchronized at 21:18 hrs.

(Scenario-1) : 1730 Hrs

(Scenario-2) 17:39:17 Hrs

(Scenario-3) 17:44:43 Hrs

(Scenario-4) : 17:44:44 Hrs

(Scenario-5) 17:45:19

(Scenario-6) 17:45:20

(Scenario-7) 17:45:39

(Scenario-8) 17:46:19

System Restoration 1] 220 KV Trombay-Salsette-II taken in service at 17:48 hrs 2] 220 KV Borivali (T)-Aarey (R)-I at 17:55 hrs (Aarey sub-station restored) 3] 220 KV Boisar (MSETCL)- Dahanu(R) at 18:03 hrs (aux supply todtps) 4] 220 KV Trombay-Salsette-I at 18:12 hrs 5] 220 KV Boisar (MSETCL)-Versova (R) at 18:15 hrs 6] 220/100 KV Borivali(M) 125 MVA ICT-I at 18:06 hrs 7]220/100 KV Borivali(M) 125 MVA ICT-II at 18:10 hrs At 19:04 hrs 664 MW load was restored in R-infra system. (400 MW from TPCL and 264 MW from Boiser). DTPS U-2 syn.at 20:14 hrs. DTPS U-1 syn.at 21:18 hrs.

Maharashtra State Load Despatch Centre Partial Grid Disturbance in Mumbai system on 21 st Nov. 2010 at 17:10 hrs

Maharashtra System Conditions (Prior to Disturbance) State Generation : 9093 MW State Catered Demand : 10675 MW System Frequency : 50.08 Hz Mumbai System TPC Hydro : 0 MW TPC Thermal : 936 MW R-Infra Thermal : 496 MW Exchange with MSETCL : 360 MW Mumbai Demand : 1792 MW

Disturbance on 21 st Nov. 2010 Following lines tripped 220 KV Trombay-Dharavi-V & 220 KV Trombay-Salsett-II tripped on fault at 1705 Hrs. 220 KV Trombay-Dharavi VI tripped at 1710 Hrs. This has resulted in failure of 220 KV supply to Dharavi S/s and tripping of other 110 KV lines on over load causing shut down to Dharavi S/s Bhira plant not working due to work in tailrace by irrigation department. No source to Dharavi on 220 KV Bhira-Dharavi D/C 220 KV Dharavi Backbay supply failed at Backbay.

Disturbance on 21 st Nov. 2010 Conti Area affected Load at Dharavi Load fed from Dharavi at Vikhroli Load fed from Dharavi at Mahalaxmi Load fed from Dharavi at Backbay Total Load affected Supply affected in full or partial in the part of 299 MW -- 67 MW -- 30 MW -- 29 MW -- 425 MW Marin Drive, Mantralaya, Backbay, Nariman point, Cuff parade, Colaba, lower Parel Mahalaxmi, Chinchpokali,Bomaby central Lalabag, Dadar, Mahim, Matunga, Sion, Dharavi, Bandra, Kurla, Ghatkopar, Vikroli, Chunabhatti, Mankhurd, Chembur

Disturbance on 21 st Nov. 2010 Conti 17:14 Hrs supply extended to Mahalaxmi from 110 KV Parel and about 30-35 MW load restored 17:23 110 KV Trombay-Dharavi II taken in service 17:27 220 KV Trombay-Dharavi VI taken in service 17:28 110 KV Dharavi-Vikroli taken in service 17:30 Hrs supply extended to Backbay from 220/110 KV Crnac S/s about 35 MW load restored including Mantralaya

Disturbance on 21 st Nov. 2010 Conti 17:32 Railway feeders at Dharavi & Vikroli charged Central Railway section from Chinchpokali to Mulund & Western Railway section from Dadar to Vileparle affected during 17:10 to 17:32 Hrs for about 22 min. 17:52 Hrs 220 KV Trombay-Dharavi V taken in service 18:01 Entire load at Dharavi & Vikhroli restored 18:02 220 KV Trombay-Salsett taken in service 19:49 110 KV Dharavi Mahalaxmi taken in service