FFY Transportation Improvement Program (TIP) Development

Similar documents
Cape Cod Transportation Improvement Program Federal Fiscal Year

Kinlin Grover Real Estate

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

ACTION TRANSMITTAL No

Richmond Area MPO Regional Priority Transportation Projects

Dixie Transportation Planning Office

Woods Hole - Falmouth Trolley SUMMER 2018

Public Information Workshop

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Proposed Lowe s Home Improvement Center

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

Williamson County Projects

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Pavement Management 2015 Status Report

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

Turnpike Mitigation Program Application

Appendix 3. Transportation Narrative and Supplements

EXCEPTION TO STANDARDS REPORT

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

City of Pacific Grove

METRO Orange Line BRT American Boulevard Station Options

HSIP FUNDING APPLICATION

Richmond Area MPO Regional Priority Transportation Projects

CROSSING RAIL PROJECT (P4) RAIL

ITEM 13 - NOTICE May 20, 2009

CNG Discussion Senate Energy Policy Issues Committee. Jim Trogdon, COO, N.C. Department of Transportation March 21, 2012

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Transit Project Delivery Status Report. Significant Issues

TransNet Dollars Keep San Diego Moving

North Front Range Regional Commuter Rail Concept Discussion North Front Range MPO Technical Advisory Committee. Windsor, CO June 20, 2018

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

FY Regional Surface Transportation Program (RSTP) Allocations *

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Leadership NC. November 8, 2018

Call for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee

Key Project Elements Status Report

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

CEDAR AVENUE TRANSITWAY Implementation Plan Update

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Regional Transportation. Priority Projects. Richmond Area Metropolitan Planning Organization

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Turnpike Mitigation Program Application

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

Waco Rapid Transit Corridor (RTC) Feasibility Study

West Broadway Reconstruction/LRT Design. March 19, 2015

DEPARTMENT OF TRANSPORTATION OVERVIEW OF SAFETY PROGRAMS

Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

STH 60 Northern Reliever Route Feasibility Study Report

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar)

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY

Major Widening/New Roadway

Utilizing GIS Models in Prioritizing and Selecting Transportation Projects

Community. Connectivity

Maryland Gets to Work

Metropolitan Freeway System 2013 Congestion Report

Wentzville Parkway South Phase 2 & 2A

Exposition Light Rail Transit Project


Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Draft Results and Recommendations

Welcome. Please Sign In

US 70 Corridor Planning for the Future

Transportation Improvement Program

Background Information for MPRB Community Advisory Committee for 2010 Southwest Light Rail Transit Project DEIS Comment Letter Section 2

Summary of the Alcoa Highway Redevelopment Project

Overview of Transit Funding and Planning in the PACTS Region

The Screening and Selection of Regionally Significant Projects

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Regional Transportation Priority Projects 2009 Richmond Area MPO

Basic Project Information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Proposed Project I 35 Improvements from SH 195 to I 10

South Lexington Transportation Study Lexington, Massachusetts

City of University Place

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

ESTIMATION OF HIGH GROUND-WATER LEVELS FOR CONSTRUCTION AND LAND USE PLANNING- A CAPE COD MASSACHUSETTS EXAMPLE- UPDATED 1991 REVISED 2006

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Draft Results and Open House

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Valley Metro: Past, Present and Future. September 11, 2014

DRAFT Subject to modifications

DART Priorities Overview

Transcription:

FFY 2016-2019 Transportation Improvement Program (TIP) Development MAY 18, 2015 CAPE COD METROPOLITAN PLANNING ORGANIZATION

Highway Funding Regional s Year STP HSIP CMAQ FFY 2016 2019 TOTAL Regional with State Match 2016 $5,755,612 $458,514 $1,432,857 $357,528 $8,004,511 2017 $7,348,079 $458,514 $1,432,857 $232,306 $9,471,756 2018 $7,760,742 $458,514 $1,432,857 $232,306 $9,884,419 2019 $7,814,284 $458,514 $1,432,857 $178,764 $9,884,419 2016-2019 $28,678,717 $1,834,056 $5,731,428 $1,000,904 $37,245,105 STP - Surface Transportation Program STP funds are for general highway projects in the region: roadways, intersections, and bridges. HSIP - Highway Safety Improvement Program HSIP funds are for projects designed to improve safety in the region's highest crash locations. CMAQ - Congestion Mitigation and Air Quality Improvement Program CMAQ funds are for projects designed to reduce congestion and improve air quality. - Transportation Alternatives Program is a new category in Moving Ahead for Progress in the 21st Century (MAP-21), for projects similar to those previously eligible under Transportation Enhancements, Recreational Trails, and/or Safe Routes to Schools

2016-2019 TIP - Cape Cod 'Highway' Projects Based on 5/8/15 CCJTC Recommendation with newly-approved CMAQ projects TIP Year 2016 Project Score Status Fund Amount Orleans, Main St. at Rte 28 & Main St. at Route 6A [Total TIP Funding = $715,056 606461 4.5 100% $3,547,482] CMAQ $2,832,426 606596 Chatham, Route 28 - George Ryder Road to Barn Hill Road 3.9 25sub STP $2,735,090 608033 Barnstable, Route 6 Exit 5 Lighting and Landscaping 0.0 0.0 HSIP $600,000 201601 Barnstable, CCRTA Hyannis Villager Project (Year 1 of 3) 0.0 0.0 CMAQ to FTA $659,100 201602 Capewide, Regional Bicycle Rack Program 0.0 0.0 CMAQ $50,000 Total $8,004,511 $7,591,672 $412,839 Available Max STP $5,755,612 $2,377,562 Min HSIP $458,514 $600,000 $3,899,054 Min $357,528 $715,056 TIP Year 2017 Project Score Status Fund Dennis, Route 28 Corridor & Streetscape Improvements [Total TIP Funding 606707 4.2 25sub = $4,063,064] CMAQ 607444 Falmouth, Route 28A at Route 151 6.0 prelim HSIP 607435 Barnstable, Route 28 at Osterville-West Barnstable Road 4.1 25sub HSIP 201701 Barnstable, CCRTA Hyannis Villager Project (Year 2 of 3) 0.0 0.0 CMAQ to FTA Total $9,471,756 $9,228,528 $243,228 Available Max STP $7,348,079 $0 Min HSIP $458,514 $4,480,000 $4,516,222 Min $232,306 $232,306 TIP Year 2018 Project Score Status Fund 607397 Wellfleet, Rt 6/Main St [Total TIP Funding = $2,240,000] 5.2 prelim HSIP 606272 Barnstable, Route 28 at Yarmouth Road 8.0 25sub CMAQ 607753 Barnstable, Rt 28/Strawberry Hill Rd 5.3 prelim HSIP 201801 Barnstable, CCRTA Hyannis Villager Project (Year 3 of 3) 0.0 0.0 CMAQ to FTA Total $9,884,419 $9,848,306 $36,113 Available Max STP $7,760,742 $0 Min HSIP $458,514 $2,503,574 $6,880,120 Min $232,306 $464,612 TIP Year 2019 Project Score Status Fund Chatham, Rte. 28 at Main St., Depot Rd., Queen Anne Rd. and Crowell Rd. 607405 5.2 prelim [Total TIP Funding = $2,400,000] CMAQ Mashpee, Route 151 [Total Estimated Cost (2019 Dollar) = $9,570,000-607319 6.0 prelim HSIP Remainder of project to be programmed in 2020] 606900 Bourne, Belmont Circle Traffic Improvements 5.6 prelim HSIP $9,884,419 $9,140,000 $744,419 Available Max STP $7,814,284 $0 Min HSIP $458,514 $6,740,000 $2,221,236 Min $178,764 $178,764 Unprogrammed Projects or Concepts for Discussion Project Score Status Potential Fund 607394 Yarmouth, Route 6 Exit 8 Ramps 0.0 prelim HSIP 606082 Bourne, Route 6 Scenic Highway Median Installation 0.0 prelim HSIP Amount $232,306 $3,830,758 $2,240,000 $2,240,000 $685,464 Amount $464,612 $1,775,388 $6,400,598 $495,880 $711,828 Amount $178,764 $2,221,236 $5,000,000 $1,740,000 Est. Construction Cost $5,000,400 $8,000,000 Discussion of Highway Regional Project Selection Notes: 25app = 25% design plans approved, 25sub = 25% design plans submitted, CCNS = Cape Cod National Seashore; CCRT = Cape Cod Rail Trail; CCRTA = Cape Cod Regional Transit Authority; CMAQ = Congestion Mitigation and Air Quality Program; FDR = Functional Design Report; HSIP = Highway Safety Improvement Program; NHPP = National Highway Performance Program; prelim = preliminary design phase; RSA = Road Safety Audit; STP = Surface Transportation Program; = Transportation Alternatives Program; TIP = Transportation Improvement Program; TL = Town line

Projects 5/8/15 CCJTC RECOMMENDATION WITH NEWLY-APPROVED CMAQ PROJECTS 2016 2017 2018 2019 Orleans, Main St. at Rte 28 & Main St. at Route 6A Dennis, Route 28 Corridor & Streetscape Improvements Wellfleet, Rt 6/Main St Chatham, Rte. 28 at Main St., Depot Rd., Queen Anne Rd. and Crowell Rd. $3,547,482 $4,063,064 $2,240,000 $2,400,000 Chatham, Route 28 - George Ryder Road to Barn Hill Road Falmouth, Route 28A at Route 151 Barnstable, Route 28 at Yarmouth Road Mashpee, Route 151 [remainder of project will be programmed in 2020] $2,735,090 $2,240,000 $6,400,598 $5,000,000 Barnstable, Route 6 Exit 5 Lighting and Landscaping Barnstable, Route 28 at Osterville-West Barnstable Road Barnstable, Rt 28/Strawberry Hill Rd Bourne, Belmont Circle Traffic Improvements $600,000 $2,240,000 $495,880 $1,740,000 Barnstable, CCRTA Hyannis Villager Project (Year 1 of 3) Barnstable, CCRTA Hyannis Villager Project (Year 2 of 3) Barnstable, CCRTA Hyannis Villager Project (Year 3 of 3) $659,100 $685,464 $711,828 Capewide, Bicycle Rack Program $50,000 $7,591,672 $9,228,528 $9,848,306 $9,140,000 $8,004,511 $9,471,756 $9,884,419 $9,884,419 Over/Under $412,839 $243,228 $36,113 $744,419 Unprogrammed Projects Project Description Est. Construction Cost Yarmouth, Route 6 Exit 8 Ramps $5,000,400 Bourne, Route 6 Scenic Highway Median Installation $8,000,000

Discussion of Transit Funding and Program FFY 2016 2019

NEXT STEPS + Anticipated Release of Draft TIP: June 15 th MPO Meeting + Anticipated 30-Day Public Comment Period: June 15 th July 15 th + Anticipated Endorsement of TIP: July 20 th MPO Meeting

THANK YOU 18 MAY 2015 STEVEN TUPPER 508-362-3828 STUPPER@CAPECODCOMMISSION.ORG