FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units

Similar documents
FPU SYSTEMS OPERATION MANUAL BOH PORTABLE DRAWER MODULE (PDM) (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack-up Units CHAPTER 4

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH Modular Workshop Container (MWC) BOH FPU Field Pack-up Units CHAPTER 5

FPU SYSTEMS OPERATION MANUAL BOH PORTABLE DRAWER MODULE (PDM) (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack-up Units CHAPTER 5

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units

As a safety precaution, remove keys from the ignition while working under or around the vehicle.

This chapter describes how to perform periodic inspection and maintenance to ensure the long operating life of the chamber.

SHORTENING FILTER. Operating Instructions INSPECT CARTON SPECIFICATIONS PARTS. MODEL NO'S 102 & 107 CE Series

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE

D Instructions/Parts. Siphon Feed Detail Spray Gun D

SECTION AIR INTAKE SYSTEM

MGFHVLP. Instructions/Parts. Mini Gravity Feed System E. Part No Includes MGFHVLP Mini Gravity Feed Spray Gun and MGC 125 Gravity Cup.

Dial-A-Ride Coles County Council on Aging, Inc. Facilities/Equipment Maintenance

Coolant Purification Systems Ultra 360 INSTRUCTION MANUAL

Coolant Purification Systems Ultra 90 INSTRUCTION MANUAL

SUNC3000 / Item #40885

Rev: Flow Max 115V AC Fluid Pump

MAINTENANCE MANUAL FOR THERMOSTATIC TEMPERATURE REGULATING VALVE TRAC STYLE P

Water Dispenser Owner s Manual 100 Series

SUNC1200 / ITEM #40882 SUBMERSIBLE UTILITY PUMP OPERATIONS MANUAL

Flow Max. by Duraself. Flow Max by Duraself. Fluid Pump. Installation and Owner s Manual (For Aftermarket Applications)

SECTION 5 MAINTENANCE

Hanna Daily Preventive Maintenance Schedule

Coolant Purification Systems Ultra 360 INSTRUCTION MANUAL

GARDEN HOSE UTILITY PUMP

Flow Max Fluid Pump. by Duraself OEM INSTALLATION MANUAL

TECHNICAL MANUAL. Operator's, Organizational and Direct Support Maintenance Manual (Including Repair Parts and Special Tools List) for

M-1115S Series Fuel Pump

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

T1-Titanium Non-HVLP Spray Gun

OWNER S MANUAL SUBMERSIBLE UTILITY PUMP

STEP-BY-STEP INSTALLATION GUIDE

TWO-STAGE HYDRAULIC PUMP. RWP55-IBT-Air

Utility Distribution Systems Installation, Operation, and Maintenance Manual

COLDFUSION. Operator s Manual

PRE-PLUMBED SEWAGE SYSTEM

36-1 DP PLEASE READ BEFORE USING THIS EQUIPMENT

SECTION 3.00 WARNING WARNING ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION

DESIGNED BY EXPERIENCE PLASTIC SPHERE DISPENSER USER MANUAL. Manufactured by PSDS, Inc. for sole distribution by:

Starting up hydraulic systems

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

Owner s Manual WARNING

2-DOOR LAUNDRY CABINET KIT

Sales Parts Service Installation Rigging RAMCO SWE T Washer/Extractor Series MAINTENANCE & TROUBLESHOOTING

Operating Manual Includes Pumps: PG-9000 Part #R809606

CARE & PREVENTIVE MAINTENANCE GUIDE

Airless Spray Gun INSTRUCTIONS DP psi (345 bar) Maximum Working Pressure

2003 FORESTER SERVICE MANUAL QUICK REFERENCE INDEX

Aerial Maintenance. Drip less oil or light machine oil is used on control cables, door latches, and hinges.

INSTALLATION and OPERATION BALL WASHER MODEL NO: BW-001N

M-3025CB-AV Fuel Pump

QWIK JON ULTIMA 204 SYSTEMS INSTALLATION INSTRUCTIONS PREINSTALLATION CHECKLIST

WARNING. Filter Service. Section Refer to the following pages for timing and procedures of fi lter element replacement.

OWNER S MANUAL SELF-PRIMING PORTABLE UTILITY PUMP

WELLWORTH WATER-GUARD WITH PEACEKEEPER VITREOUS CHINA SIPHON JET TOILETS

TABLE OF CONTENTS. 1. Before You Begin 3 Disclaimer 3 What Is Included 3 Optional Accessories 3 Unpacking Instructions 3 Claims 3 Contact Us 3

TC Series Cooling Systems

SECTION 4 - FUEL/LUBRICATION/COOLING

Wastewater Air Release Valve Models 48A, 49A

GRINDER PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 13

SRT OPERATIONS MANUAL

SECTION 6 5 SERVICE PROCEDURES AND SPECIFICATIONS. Body

ATTENTION! READ BEFORE ATTACHING THE AIR HOSE

Shades Technics. 2050RS Toilet Cubicle. Manual

BASYS INSTALLATION INSTRUCTIONS FOR ELECTRONIC CAPACITANCE SENSING LAVATORY FAUCETS EFX-3XX Pedestal, Sensor Activated Lavatory Faucets

PowerFlo 50 Parts List/Assembly Instructions/Users Guide ***PLEASE READ ALL INSTRUCTIONS CAREFULLY AND THOROUGHLY***

Installation and Instruction Manual. Cold Weather Starting Aid Part No A. Jet-Ex 4 Diesel Generator Sets

KING CANADA 950W PORTABLE GENERATOR MODEL: KCG-951G INSTRUCTION MANUAL COPYRIGHT 2011 ALL RIGHTS RESERVED BY KING CANADA TOOLS INC.

INSTRUCTION MANUAL. CAT Place Table Top Centrifuge

OPERATIONS MANUAL. Mini Centrifuge Model MCF Certified

Model &

7 Maintenance Do not allow the sludge accumulation in the tank to exceed a 1 depth. Otherwise, the sludge build-up could damage the heating element(s)

PowerFlo 20 Parts List/Assembly Instructions/Users Guide ***PLEASE READ ALL INSTRUCTIONS CAREFULLY AND THOROUGHLY***

Tools Needed for Mounting Cleá Filling Station

Principals of Operation... 1 Rotary Vane Priming Pump VPE and VPES... 2 Rotary Vane Priming Pump VPO and VPOS Priming Valve...

EDGEMERE DUAL CONTROL WIDESPREAD LAVATORY FAUCET INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS PATIENCE

WARNING Carefully Read These Instructions Before Use

Wastewater Combination Air Valve. Operation, Maintenance and Installation Manual

NILFISK BA 500 Service Manual

6722 Rev. A CAPACITY: 22 TON TRUCK AXLE JACK WITH AIR RETURN

s_enn Exterior Stainless Steel Shading System by Draper

COOL DRAFT INSTRUCTIONS OWNER S MANUAL CONTENTS. Cool Draft MiniMister 14 Misting Fan CDMP1420BLU

Mounted Instrument Head

SEWAGE PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 14

PowerFlo Parts List/Assembly Instructions/Users Guide ***PLEASE READ ALL INSTRUCTIONS CAREFULLY AND THOROUGHLY***

2004 IMPREZA SERVICE MANUAL QUICK REFERENCE INDEX

ROYAL Cyclone 1 Extruder Operators Instruction Manual

Power Inverter. User s Manual. Diamond Series CPD1200EILCD

Troubleshooting 3Z8 038 Rev B

EBF-750 Deck-Mounted Battery Powered Sensor Operated Gooseneck Faucets

3-TONNE GARAGE JACK OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: CTJ3000GB PART NO: ORIGINAL INSTRUCTIONS

Oreck Magnesium Series Service Manual. The Oreck Manufacturing Company

INSTALLATION AND MAINTENANCE GUIDE ELITE SERIES ELECTRONIC LAVATORY FAUCET

K-SERIES SERVICE MANUAL

60V RECHARGEABLE LITHIUM-ION BATTERY

Asepsis 21 Delivery Unit

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Wilo SP Series Submersible Utility Pumps ETT. ETT Installation and operating instructions

Driver Instructions. Hydraulic Launch Assist (HLA ) TRDR1200

INSTALLATION AND MAINTENANCE GUIDE SF1596 B/E ELECTRONIC LAVATORY FAUCET

Transcription:

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units CHAPTER 4 OPERATOR MAINTENANCE INSTRUCTIONS 2016 BOH Environmental LLC

This page was intentionally left blank

0011 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units SERVICE UPON RECEIPT INITIAL SETUP: Materiel/Parts References None None Personnel Required Equipment Condition One Latrine set-up Tools 12 Adjustable and 3/ open End Wrench, Slip-Joint Pliers, Flashlight and Electricians tools SERVICE UPON RECEIPT Upon receipt of the BOH Containerized Latrine, ensure all components are in proper working order. Note the following requirements. Unpacking The BOH CONTAINERIZED LATRINE containers are shipped with all components and equipment packed inside. To unpack upon receipt, set up the BOH Containerized Latrine as described in Chapter 2 (WP 0005 00). 1. Six compartment doors with retaining chains, locks, tag holder and door spring restraint. 2. Toilets, Urinals. 3. Toilet lid in wall storage pocket. 4. Overhead light fixture. 5. Vanity and sink with wall mirror. 6. Floor drain. 7. Wall mounted toilet paper holder, soap and towel dispenser. 8. Wall outlet GFCI. 9. Exterior outlet weather proof GFCI. 10. Electrical Box. 11. GFCB Circuit Breakers. 12. 4 black water drain and ¾ cold water inlet. 13. One Ground Lug with ground rod stored inside a compartment. 14. One City Water Check valve with shutoff valve stored with the ground rod. 15. Clean out line and cap. END OF WORK PACKAGE 0011 00-1

This page was intentionally left blank

0012 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INTRODUCTION TO PREVENTATIVE MAINTENANCE CHECKS & SERVICES (PMCS) INITIAL SETUP: Materiel/Parts References None WP 0004 Personnel Required Equipment Condition Two Latrine set-up INTRODUCTION TO PREVENTATIVE MAINTENANCE CHECKS & SERVICES (PMCS) Preventative Maintenance Checks and Services (PMCS) are performed to keep the FPU System containers in good operating condition. These checks aid in finding, correcting, or reporting problems. Operator personnel are to perform the PMCS tasks as shown in the PMCS table. Perform PMCS procedures each day the BOH CONTAINERIZED LATRINE is in operation, using the PMCS table in WP 0013 00. There are different intervals to perform PMCS procedures: before, during and after using the equipment, as well as weekly and monthly. Look at the table carefully to identify the required PMCS interval. Perform all checks and services keeping in mind the following guidelines: Before you begin using the BOH CONTAINERIZED LATRINE, do Before Operation PMCS While the BOH CONTAINERIZED LATRINE is in use, do During Operation PMCS After using the BOH CONTAINERIZED LATRINE, do After Operation PMCS If you find something wrong when performing PMCS, fix it using troubleshooting and/or maintenance procedures. Pay attention to WARNING and CAUTION statements. A WARNING means someone could be injured or killed. A CAUTION means equipment could be damaged. If tools that are required to perform PMCS are not listed in the procedures, notify your supervisor. Inspection Look for signs of trouble. Use your senses to feel, smell, hear, or see problems that may exist. Inspect to see if items are in good condition. Are components correctly installed and secured? Is any damage to the frame or components visible? Correct any faults or notify Unit Maintenance. 0012 00-1

0012 00 Associated Components There are some common items to check on the FPU SYSTEM and associated equipment. These include the following: Condition and proper connection of waste water drain hose. Condition of the container level. Condition and connection of the 1 Cold water supply. Condition and connection of the ground device. Condition and connection of the electrical supply. Service Proper service of the BOH CONTAINERIZED LATRINE and components is an integral part of maintenance. Regular cleaning prevents possible problems in the future, so make it a habit to clean the BOH CONTAINERIZED LATRINE and components whenever necessary. NOTE The exterior of the container is CARC painted. Clean with water only. WARNING The electrical ground must be established first to prevent electrical shock to personnel. Ensure all circuit breakers and the power source is switched off before making electrical connections. Ensure the electrical proper 120 VAC cable connectors are installed by a certified electrician (Army MOS 21R). CAUTION The Containerized Latrine must be placed on a level surface of a platform, pillars or ground surface to operate properly and prevent waste water backups. CAUTION Ensure sanitation of the latrine with preoperational, regular scheduled and post operation cleaning. WARNING Always establish a safe footing operational site. The interior floor should be kept clean and dry. 0012 00-2

0013 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INITIAL SETUP: Materiel/Parts Rags, Water Personnel Required Two PMCS TABLE References None Equipment Condition LATRINE Set-ups Table 1 Preventative Maintenance Checks and Services for the BOH CONTAINERIZED LATRINE PMCS B (Before), D (During), A (After), W (Weekly), M (Monthly) B D A W M Inspection Item and Procedure 1 * * * 2 * * Waste Water Drain Inspect drain connection WARNING Rubber gloves should be worn when handling or cleaning the black water connections Electrical Cable Connections Inspect cable and cable end connections for damage. WARNING Damaged cable connections may cause improper connection and electrical shock. Notify electrical maintenance. Equipment Not Ready/Available If Waste water drain connection becomes clogged. Electrical connections become loose or corroded. 3 * 4 * * * * Lubricate hinges, locks and latches, as required. Hinges, locks and latches will not operate smoothly. Toilet Flush Valves Toilets fail to flush properly. Inspect toilet tank water level CAUTION The Containerized Latrine must be placed on a level surface of a platform, pillars or ground surface to operate properly and prevent waste water backups. 0013 00-1

B D A W M Inspection Item and Procedure 5 * * * * * 6 * * * 7 * * * 8 * * * Vanity Doors and Sink Check interior for dirt and debris. Clean with detergent, water, and rags as required. Door Seal Check door seals for cuts, cracks, distortion, proper alignment and attachment. Reattach with proper glue or replace if necessary. Check for moisture on floor. Attachment Hardware Check for missing or loose attachment hardware, door handles, drawer latches. Forklift Pockets Check for weld cracks, bends, dents or frame distortion. Schedule weld shop repair if needed. 0013 00 Equipment Not Ready/Available If Not sanitized. Failure of the seal allows water and moisture to enter the container compartment and damage the floor; floor is wet and slippery. Loose or missing hardware will impede the operation and may cause injury or damage. Failure to repair welds will cause damage or injury. 9 * * * 10 * * Urinal Flush Valves Inspect for proper operation Data Plates Check plates and labels for legibility, damage and/or missing. Clean with water and rag. Replace as needed. Urinal flush valves will not operate properly. Operation, cautions and warnings are not legible. END OF WORK PACKAGE 0013 00-2

0014 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INITIAL SETUP: Materiel/Parts Rags, Water, Detergent Personnel Required One CLEANING AND LUBRICATING References None Equipment Condition Latrine Set-up CLEANING AND LUBRICATING Cleaning and Lubricating of the BOH CONTAINERIZED LATRINE is performed to keep the latrine and its associated equipment in good operating condition. The cleaning and lubrication of the latrine can be conducted along with the Preventative Maintenance Checks and Services (PMCS) procedures described in WP 0013 00. Specific areas described below need to be cleaned after an operational event or periodically if stored/staged outside of a fixed facility to keep the modules and accessories performing as designed. Cleaning also assists in maintaining the condition of the materiel stored within the system. Any damage discovered when cleaning and/or lubricating that cannot be corrected using the troubleshooting procedures described in Chapter 3 WP 0010 00 should be reported for corrective maintenance. CLEANING AND SANITATION SUPPLIES WARNING Never blend or mix cleaning supplies. Toxic vapors may develop, causing injury or death. Follow proper storage and use instructions on the cleaning product labels. CAUTION Ensure sanitation of the latrine with preoperational, regular scheduled and post operation cleaning. WARNING Always establish a safe footing operational site. The interior floor should be kept clean and dry. 0014 00-1

0014 00 Table 1 Cleaning and Lubricating SURFACE Exterior Walls OIL/GREASE Clean with rags. SALT/MUD/DIRT DEBRIS Check all exterior surfaces for cracks, dents that effect the operation of the Latrine. Check for accumulations of dirt, debris, ice, snow, or salt. Clean as required. RUST/CORROSION and SANITATION Clean dirt with water or Ice and snow with a nonmetal brush. Interior painted wall surfaces (All) Nonabrasive Chlorine based Detergent, Water, Rags Water, Rags Dry Rag or Spot Paint. Seals and Gaskets Damp and Dry Rags Damp and Dry Rags N/A Vanity Door handles, latches Door Hinges, latches and locks Latrine Floor Toilet and Seat and Lid Urinals Vanity sink Detergent, Water, Rags Detergent, Water, Rags Detergent, Water, Mop Detergent, Water, Rags Detergent, Water, Rags Detergent, Water, Rags Soapy Water, Brush, Rags Brush, Rag and lubricate as needed to ensure door opens freely Damp Mop and Dry Rags Damp and Dry Rags Damp and wet Rags Damp and Dry Rags END OF TABLE Corrosion Removal Wire Brush, Dry Rags, Coat with Lube Oil or Spot Paint. Corrosion Removal Compound and Wire Brush, Dry Rags and Lubricate as needed. Sanitation Required Sanitation Required Sanitation Required Sanitation Required END OF WORK PACKAGE 0014 00-2

0015 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INSPECTION INTERIOR AND EXTERIOR INITIAL SETUP: Materiel/Parts References None WP 0004 00-3 Personnel Required Equipment Condition One Operational Set-up INSPECT LATRINE EXTERIOR 1. Inspect exterior surfaces for damage, cracks, holes, dents, etc. 2. Inspect the container for being level. 3. Inspect door operation. 4. Inspect electrical connections. 5. Inspect waste water connection. 6. Inspect the fresh water connection and shutoff valve with check valve. 7. Inspect clean out plug. INSPECT LATRINE INTERIOR 1. Inspect door seals for cuts, cracks or damage. 2. Inspect fluorescent lighting. 3. Inspect floor for evidence of leaks. 4. Inspect floor drain for debris. 5. Inspect toilets for operation, flushing and refill. 6. Inspect urinals for operation and proper flushing. 7. Inspect vanity sinks for operation, water and drainage. 8. Inspect for latrine cleanliness and sanitation. END OF WORK PACKAGE 0015 00-1

This page was intentionally left blank

0016 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INSPECTION ELECTRICAL SERVICE INITIAL SETUP: Materiel/Parts References None WP 0004 Personnel Required Equipment Condition One Operational Tools Flashlight, Automotive Trouble Light or Electric Circuit Test Light. ELECTRICAL SERVICE 1. Inspect the ground lug and ground rod for connection (1). 2. Open circuit box door. 3. Switch on the main circuit (2). 4. Switch on the circuits, #1, #2, #3, and #4 (3). 5. Press GFCB test buttons (4). Each circuit should trip to off. 6. Switch all circuit breakers back to the on position to reset the circuit. 7. Open the lid on the external GFCI Outlet (5), plug in the trouble light (6), press the GFCI test button (7). The trouble light (6) should go out. 8. Depress the GFCI reset button (8); the trouble light (6) should come on. 9. Unplug the trouble light (6). NOTE If any of the above conditions fail, contact an electrician for maintenance. 3 4 1 2 8 END OF WORK PACKAGE 6 7 0016 00-1 5

This page was intentionally left blank

0017 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INITIAL SETUP: Materiel/Parts None Personnel Required One Tools Rags, 1 paint brush INSPECTION VENT FAN COVER References Appendix B Equipment Condition Operational VENT FAN NOTE For detailed repair information, refer to Appendix B, BROAN Vent Fan Specification Sheet. 1. Turn off the vent fan switch off the circuit breaker. 2. Pull down the vent grille (1). 3. Compress the mounting spring clips (2) to detach the grille. NOTE The grille (1) is nonmetallic and may be washed with soap and water when there is excessive dirt. 4. Inspect and clean the grille (1) and internal parts (3) with the rags and paint brush. 5. Attach the spring clips (2) and push the grille (1) back into place. 6. Switch on the circuit breaker and fan switch. 3 1 END OF WORK PACKAGE 2 0017 00-1

This page was intentionally left blank

0018 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INITIAL SETUP: Materiel/Parts New Fluorescent Tube Personnel Required One Tools Rags, Flashlight INSPECTION LIGHT FIXTURE References Appendix B Equipment Condition Operational LIGHT FIXTURE 1. Switch off the lighting and switch off the circuit breaker. 2. Release the latches (1) to open the fluorescent light fixture cover (2). 1 1 2 3. Wipe the cover (2) clean with a damp rag. 4. Wipe off the fluorescent tube (3) with a dry rag. 5. Replace faulty tubes and cover, switch on the circuit breaker and lighting switch. NOTE With power on, check for defective fluorescent tube (3) by twisting it in place and ensure contact. 3 WARNING Fluorescent tubes may contain hazardous material. END OF WORK PACKAGE 0018 00-1

This page was intentionally left blank

0019 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INSPECTION TOILET AND URINAL INITIAL SETUP: Materiel/Parts References Toilet repair parts WP 00017 00-2 Personnel Required Equipment Condition One Operational Tools Rags, Cleaning Supplies, Flashlight, Plunger, Slip Joint Pliers. TOILET and URINAL 1. With a flashlight, inspect the toilet base and urinal trap for leaks at the floor level. 2. Inspect the tank gasket and bowl for leakage (1). 3. Remove tank top from wall pocket (2). 4. Check the tank water level. 5. Place cover on toilet (2). 6. Check the flush urinal valve (3) for leakage. 7. Open the water supply valve (4) and test the toilet valve and urinal valve. See WP 0017 00-2 8. Clean and sanitize. WARNING Never blend or mix cleaning supplies. Toxic vapors may develop causing injury or death. Follow proper storage and use instructions on all cleaning product labels. 2 1 3 4 0019 00-1

0019 00 Shut Off Valves 1. Left and right sink shut off valve (1) 2. Urinal shut off valve (2) 3. Toilet shut off valve (3) OFF OFF 1 2 OFF 3 0019 00-1

0020 00 END OF WORK PACKAGE OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INSPECTION DOORS INITIAL SETUP: Materiel/Parts References None None Personnel Required Equipment Condition One Operational Tools Damp Rags, Spray lubricant and Door Keys INSPECT DOORS 1. Inspect and clean the door seals (1); wipe with a damp rag. 2. Inspect interior door latch (2) and key lock (3) for proper operation. 3. Inspect door intake vent (4), clean debris with damp rags. 4. Inspect for missing door chain (5). 5. Inspect interior magnetic door retention latch (6). 6. Check label holder (7). 7. Report damage to maintenance for replacement. 2 1 6 3 7 1 4 6 Obsolete on newer models 5 END OF WORK PACKAGE 0020 00-1

This page was intentionally left blank

0021 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INSPECTION SINK and FAUCET INITIAL SETUP: Materiel/Parts None Personnel Required One Tools Damp Rags, Flashlight, Slip Joint Pliers and Adjustable Wrench References Appendix D and E Equipment Condition Operational INSPECT SINK AND FAUCET 1. Inspect sink (1) for cleanliness. 2. Open water supply valves under the sink (2). 3. Inspect sink water supply connections (2) for leaks. Tighten as needed. 4. Check trap joints (3) for leaks. Tighten as needed 5. Check faucet (4) for leaks. 6. Check sink drain strainer (5) for debris. 7. Test faucet water flow. 5 1 2 3 3 4 5 END OF WORK PACKAGE 0021 00-1

This page was intentionally left blank

0022 00 OPERATOR MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units INSPECTION FLOOR DRAINS, CLEAN OUT PLUG and CITY WATER SHUTOFF VALVE INITIAL SETUP: Materiel/Parts References None 0004 00-4 Personnel Required Equipment Condition One Operational Tools Damp Rags, Flashlight, Slip Joint Pliers and Adjustable Wrench INSPECT FLOOR DRAIN AND CLEAN OUT PLUG 1. Inspect all interior floor drains (1) for debris. 2. Inspect for missing or loose exterior clean out plug (2). 3. Inspect City Water Shutoff Valve with Check Valve (3). 1 2 3 END OF WORK PACKAGE 0022 00-1

This page was intentionally left blank