Exhibit R-2, RDT&E Budget Item Justification

Similar documents
UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification February 2004

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: RQ-4

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Airborne SIGINT Enterprise (JMIP) FY 2012 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

Exhibit R-2, RDT&E Budget Item Justification

Predator ACTD. Presentation To NDIA IOT&E

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Exhibit R-2, RDT&E Budget Item Justification

MQ-1C Gray Eagle Manned/Unmanned Teaming (MUM-T) Update. LTC Tony Davila 19 March 2015

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Tactical Unmanned Aerial Vehicles FY 2012 OCO

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Aeronautical Systems Center

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Predator Program Office

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology. FY 2011 Total Estimate. FY 2011 OCO Estimate

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-5. FY-10 FY-11 FY-12 FY-12 OCO FY-12 Total FY-13 FY-14 FY-15 FY-16

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Predator B: The Multi-Role UAV

UNCLASSIFIED CLASSIFICATION: EXHIBIT

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

J-UCAS Program Update

Jay Gundlach AIAA EDUCATION SERIES. Manassas, Virginia. Joseph A. Schetz, Editor-in-Chief. Blacksburg, Virginia. Aurora Flight Sciences

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

Weaponizing Small Unmanned Aircraft Systems. Cody Tretschok Capture Manager, Advanced UAS Weapons Advanced Missiles and Unmanned Systems

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UAS ISR Sensors Roadmap Update to 26 th Annual AUVSI Pathfinder Symposium 19 March 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: End Item Industrial Preparedness Activities FY 2012 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #30

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-135

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Qty (Each)

Presentation. 16 September Piaggio Aerospace: Fuel Cells in Unmanned Aerial Vehicle Research Perspectives

UNCLASSIFIED 3/29/02. xxxgr.xx.02 46PMSW.1.02

FLYEYE Unmanned Aerial System

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

MA THOR SolarLight UAS

Uninhabited Air Vehicle (UAV) Costing Considerations PSI Team. SCAF Workshop 22 November 2010

Integrated Airborne Surveillance Systems. November 2014

Unmanned Aircraft Systems

Transcription:

PE NUMBER: 0305219F PE TITLE: PREDATOR Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Cost to Total Actual Complete Total Program Element (PE) Cost 37.642 36.906 18.101 0.000 0.000 0.000 0.000 0.000 Continuing TBD 37.642 36.906 18.101 0.000 0.000 0.000 0.000 0.000 Continuing TBD FY 2010 funding totals do not include $1.4M requested for Overseas Contingency Operations. FY2009 funding totals include $12.4M in Congressional Adds. A. Mission Description and Budget Item Justification The basic MQ-1 system consists of the aircraft, a control station, communications equipment, support equipment, simulator and training devices, Readiness Spares Packages (RSP), technical data/training, and personnel required to operate, maintain, and sustain the system. This funding supports development and enhancements to the Predator weapon system to include aircraft, Ground Control Stations, sensors, communication equipment, training systems and support elements. The system is designed to be modular and open-ended: mission-specific equipment is employed in a 'plug-and-play' mission kit concept allowing specific aircraft and control station configurations to be tailored to fit mission needs. The MQ-1 aircraft is a single-engine, propeller-driven, unmanned aerial system (UAS) designed to operate over-the-horizon at medium altitude for long endurance sorties. The aircraft is designed to provide real-time Intelligence, Surveillance, Reconnaissance, and Target Acquisition (ISR TA), and attack capability to aggressively prosecute Time Sensitive Targets (TST). The MQ-1 will operate primarily at medium altitudes, integrating with joint aerospace, ground, and maritime forces as well as coalition and Allied forces, to execute combatant commander priority missions. The aircraft carries a Multi-spectral Targeting System (MTS) (a sensor turret that incorporates electro-optical (EO), Infra-Red (IR), laser designator, and IR illuminator) capable of transmitting real-time motion imagery throughout the operational theater. The program will develop and integrate Target Location Accuracy and Metric Sensor improvements. Additionally, the aircraft is multi-configurable to carry either a Synthetic Aperture Radar (SAR) or Hellfire laser-guided missiles. The program plans to develop a capability for Ka-band MILSATCOM and Mode S. Major changes will be classified as distinct blocks or Mission Design Series updates. Activities also include studies and analysis to support both current program planning and execution and future program planning. The Ground Control Station (GCS) functions as the aircraft cockpit and can control the aircraft either within line-of-sight (LOS) or beyond LOS (BLOS) via a combination of satellite relay and terrestrial communications. The GCS is either mobile to support forward operating locations or fixed at a facility to support Remote Split Operations (RSO). The GCS has the capability to perform mission planning; provide a means for manual control, and a GCS configuration to allow control of multiple aircraft and payloads; allow personnel to launch, recover, and monitor aircraft, payloads, and system communications status; secure data links to receive payload sensor data and command links; monitor threats to the aircraft; display common operation picture; and provide support functions. Additionally, GCS allows for servicing, systems checks, maintaining, launching, and recovering aircraft under LOS control for hand-off to a mobile or fixed facility GCS. The GCS will continue to evolve and upgrade its capabilities to keep pace with MQ-1 aircraft capabilities and the missions they perform. This program is budget activity 7, Operational Systems Development, because it involves Air Force R&D to field a highly capable operational system and provide Page-1 of 7 Exhibit R-2 (PE 0305219F) 733

Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE essential operational capabilities. B. Program Change Summary ($ in Millions) FY 2008 FY 2009 FY 2010 Previous President's Budget 33.781 24.773 21.039 Current PBR/President's Budget 37.642 36.906 18.101 Total Adjustments 3.861 12.133 Congressional Program Reductions Congressional Rescissions -0.267 Congressional Increases 12.400 Reprogrammings 3.861 SBIR/STTR Transfer Significant Program Changes: FY09 $12.4M Congressional increase includes; $6M for sense and avoid work, $4M for Center for UAV Excellence Education, and $2.4M for PMATS upgrade RDT&E funding decrease between FY09 and FY10 is result of stopping MQ-1 production after FY09. Page-2 of 7 Exhibit R-2 (PE 0305219F) 734

Exhibit R-2a, RDT&E Project Justification Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Cost to Total Actual Complete 37.642 36.906 18.101 0.000 0.000 0.000 0.000 0.000 Continuing TBD Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 FY 2010 funding totals do not include $1.4M requested for Overseas Contingency Operations. FY2009 funding totals include $12.4M in Congressional Adds. A. Mission Description and Budget Item Justification The basic MQ-1 system consists of the aircraft, a control station, communications equipment, support equipment, simulator and training devices, Readiness Spares Packages (RSP), technical data/training, and personnel required to operate, maintain, and sustain the system. This funding supports development and enhancements to the Predator weapon system to include aircraft, Ground Control Stations, sensors, communication equipment, training systems and support elements. The system is designed to be modular and open-ended: mission-specific equipment is employed in a 'plug-and-play' mission kit concept allowing specific aircraft and control station configurations to be tailored to fit mission needs. The MQ-1 aircraft is a single-engine, propeller-driven, unmanned aerial system (UAS) designed to operate over-the-horizon at medium altitude for long endurance sorties. The aircraft is designed to provide real-time Intelligence, Surveillance, Reconnaissance, and Target Acquisition (ISR TA), and attack capability to aggressively prosecute Time Sensitive Targets (TST). The MQ-1 will operate primarily at medium altitudes, integrating with joint aerospace, ground, and maritime forces as well as coalition and Allied forces, to execute combatant commander priority missions. The aircraft carries a Multi-spectral Targeting System (MTS) (a sensor turret that incorporates electro-optical (EO), Infra-Red (IR), laser designator, and IR illuminator) capable of transmitting real-time motion imagery throughout the operational theater. The program will develop and integrate Target Location Accuracy and Metric Sensor improvements. Additionally, the aircraft is multi-configurable to carry either a Synthetic Aperture Radar (SAR) or Hellfire laser-guided missiles. The program plans to develop a capability for Ka-band MILSATCOM and Mode S. Major changes will be classified as distinct blocks or Mission Design Series updates. Activities also include studies and analysis to support both current program planning and execution and future program planning. The Ground Control Station (GCS) functions as the aircraft cockpit and can control the aircraft either within line-of-sight (LOS) or beyond LOS (BLOS) via a combination of satellite relay and terrestrial communications. The GCS is either mobile to support forward operating locations or fixed at a facility to support Remote Split Operations (RSO). The GCS has the capability to perform mission planning; provide a means for manual control, and a GCS configuration to allow control of multiple aircraft and payloads; allow personnel to launch, recover, and monitor aircraft, payloads, and system communications status; secure data links to receive payload sensor data and command links; monitor threats to the aircraft; display common operation picture; and provide support functions. Additionally, GCS allows for servicing, systems checks, maintaining, launching, and recovering aircraft under LOS control for hand-off to a mobile or fixed facility GCS. The GCS will continue to evolve and upgrade its capabilities to keep pace with MQ-1 aircraft capabilities and the missions they perform. This program is budget activity 7, Operational Systems Development, because it involves Air Force R&D to field a highly capable operational system and provide essential operational capabilities. Project 5143 Page-3 of 7 Exhibit R-2a (PE 0305219F) 735

Exhibit R-2a, RDT&E Project Justification B. Accomplishments/Planned Program ($ in Millions) FY 2008 FY 2009 FY 2010 MQ-1 Pre-planned Product Improvement. Includes advanced capabilities (such as multiple aircraft 15.183 16.824 9.589 control/operations), engine upgrades, sensor and radar development/integration, quick reaction capabilities, payload development/integration, weaponization and experimentation, data link upgrades (including encryption and tactical common data link (TCDL)), mission planning, simulator/training devices, and ground station and communication equipment development/upgrades. Developmental and Operational Test support 0.062 1.084 0.900 MQ-1 TLA/Metric Sensor 0.797 4.203 3.543 Sense and Avoid for Predator (Congressional Add) 5.000 6.000 Center for Defense UAV Education (Congressional Add) 3.200 4.000 Integrator UAS Advanced Concept Develpment (Congressional Add) 3.500 Ka Migration 2.395 4.069 Mode S PMATS (GWOT and Congressional Add) 9.900 2.400 Total Cost 37.642 36.906 18.101 FY2009 funding totals include $12.4M in Congressional Adds. C. Other Program Funding Summary ($ in Millions) Other APPN Aircraft Procurement, AF (PE 0305219F) Aircraft Modification, AF (PE 0305219F) FY 2008 Actual FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Cost to Total Cost Complete 299.220 377.674 0.000 TBD TBD 52.387 148.128 126.128 TBD TBD D. Acquisition Strategy The MQ-1 Predator system will be acquired sole-source with General Atomics-ASI as the prime contractor. Project 5143 Page-4 of 7 Exhibit R-2a (PE 0305219F) 736

Exhibit R-3, RDT&E Project Cost Analysis Cost Categories (Tailor to WBS, or System/Item Requirements) ($ in Millions) Contract Method & Type Performing Activity & Location Product Development MQ-1/MQ-9 Development Various General Atomics-ASI, Rancho Bernardo CA Target Location Accuracy Various Raytheon, McKinney TX Total Prior to FY 2008 Cost FY 2008 Cost FY 2008 Award Date FY 2009 Cost FY 2009 Award Date FY 2010 Cost FY 2010 Award Date Cost to Complete Total Cost Target Value of Contract 15.183 Feb-09 16.824 Feb-09 9.589 Mar-10 Continuing TBD TBD 0.797 Sep-08 4.203 Jan-09 3.543 Dec-09 Continuing TBD TBD Congressional Adds Various Various 11.700 Dec-08 12.400 Jun-09 24.100 TBD PMATS GWOT Supplemental CPIF L3 Comm, Salt Lake City 9.900 Feb-09 9.900 Ka Migration CPFF L3 Comm, Salt Lake City 2.395 May-09 4.069 May-09 Continuing TBD TBD Mode S CPFF General Atomics-ASI, Rancho Bernardo CA 0.000 TBD Subtotal Product Development 0.000 37.580 35.822 17.201 Continuing TBD TBD Remarks: Test & Evaluation Development and Operational Test Support Various Various 0.062 Oct-07 1.084 May-09 0.900 Mar-10 Continuing TBD TBD Subtotal Test & Evaluation 0.000 0.062 1.084 0.900 Continuing TBD TBD Remarks: 0.000 Subtotal 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Remarks: Total Cost 0.000 37.642 36.906 18.101 Continuing TBD TBD Prior to FY08 MQ-1 and MQ-9 costs combined. Project 5143 Page-5 of 7 Exhibit R-3 (PE 0305219F) 737

Exhibit R-4, RDT&E Schedule Profile Project 5143 Page-6 of 7 Exhibit R-4 (PE 0305219F) 738

Exhibit R-4a, RDT&E Schedule Detail Schedule Profile FY 2008 FY 2009 FY 2010 Target Location Accuracy Phase 1 Complete 2Q MQ-1 Simulator Development Complete 4Q Improved Target Location Accuracy Development Complete 4Q SIGINT Payload Integration Complete 4Q Target Location Accuracy Deliveries Start 3Q Project 5143 Page-7 of 7 Exhibit R-4a (PE 0305219F) 739

THIS PAGE INTENTIONALLY LEFT BLANK 740