Well Completions. Thursday, 4 July 13

Similar documents
Permapak Seal Bore Packer

Subsurface Flow Controls

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators.

PRODUCT LINE. CPS Oil & Gas Equipments Private Limited. Liner Hanger System. Gas Lift Equipment. Cementing and Casing Accessories

Special Features. u Blanking plug seats in top of. u Bonded seal allows disconnects. and re-connects. u Right-hand or left-hand release

Completion Tools Catalog

Set, seal, and retrieve with confidence. Packers Catalog

Special Features. u By-pass below upper slips to wash. debris when valve is opened. u By-pass is opened before upper slips.

Drilling & Down-hole Completion Tools

Downhole Tools Worldwide.

Service Tools Catalog

Capillary Deliquification Safety System

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14

TABLE OF CONTENT. Description

Drop-In Inside Blowout Preventer Valve

SERVICE TOOLS. Magnus MDT Service Packer V-III Un-Loader Valve MANC Storm Valve

MESQUITE OIL TOOLS, INC. PRODUCT CATALOG

Completion Systems & Mechanical Products

Express Series Multi Configuration Composite Body Bridge / Frac Plugs

Dynamic MDT Service Packer V-III Un-Loader Valve ANC Storm Valve

TAM-J. Highest reliability multiple-set inflatable packer system available. Element sizes for 2-3/8 tubing through 30 casing

RODEC "C" Low Profile Rotator / RODEC "C" Integral Rotator (3 in 1)

Product Overview Last date of Revision:

SLIDING SLEEVE. BSS-S Profile BSS-H Profile

REDA Coil. Coiled tubing-deployed ESP system

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

WELLCARE OIL TOOLS PVT LTD PACKER ACCESSORIES & TOOLS

Generation IV Single- Trip Multizone FracPac System. Overview

Completion Solutions Inc.

SAPEX OIL TOOLS LTD. DOWNHOLE COMPLETIONS PACKERS & COMPLETION EQUIPMENT WORKOVER & COMPLETION SERVICE TOOLS PRODUCTS, APPLICATIONS & SPECIFICATIONS

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil

Tryton. Tool Services. People. Products. Performance. Canadian Locations

Tryton. Tool Services. People. Products. Performance. Calgary - Sales/Marketing Office 1100, 250 2nd St. SW Calgary, AB T2P 0C1 Ph:

SAND CONTROL. enhanced. Save time and cost while improving reservoir producibility HALLIBURTON. Solving challenges.

Tubing-Casing Technologies STX , 4.5 INCH 13.5 PPF.

MagnusSeal Retrievable Seal Bore Packer Product No.: MSP 7500

COILED TUBING TOOLS SALE RENTAL - LEASE

Minimizing risk with innovative design. Dual ESP Systems and Accessories

We Know Downhole. PRODUCT CATALOG

Coiled Tubing Tool EXTERNAL SLIP CONNECTOR. Feature. Specification Tool O.D. inch. Coiled Tubing O.D. inch. Tool I.D. inch. Conn.

SECTION VIII: TEST TOOLS and CHECK VALVES

W I L D W E L L C O N T R O L WIRELINE OPERATIONS

TMK QUANTUM Infinity. Unlimited Stage Fracturing System COMPLETIONS

Tryton. Tool Services. People. Products. Performance. Canadian Locations

Intervention Barriers

Casing Scraper. Service Equipment. Features

Safety Valves. How Capillary is Integrated. Past and present. Agenda. Br oad Usage of Capillary Str ings

We Know Downhole. PRODUCT CATALOG

Tryton People. Products. Performance.

Technical Description and Specifications of the VibraEnforcer Systems for Freeing Stuck Pipe in Drilling Operations

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Well Test Products. Invention, Unique Design & Extraordinary Craftsmanship

RODEC TUBING ROTATOR SOLUTIONS

Control Lines & Flatpacks Flatpacks

Casing Cementation Equipment

Composite Plugs. Index

- you succeed! We do Welcome to. Holland OilTech Services BV.

Corsair Motors THE NEW STANDARD

MINING & DRILLING PRODUCTS. P Core Retrieval System

Delivering innovation through engineering

SECTION VI: BHP INSTRUMENT HANGERS ACCESSORIES

GT GAS-TIGHT SERIES ELIMINATOR. Addressing your wellbore isolation and cement needs through an ISO V0-rated stage-cementing package

#10 Setting Tool Assembly Product Family No (10)

MINING & DRILLING PRODUCTS. N2U Core Retrieval System

PetroPi Industries Ltd. Wellhead

!" #$%&' )*'+$,- + Wellhead systems with electrical submersible pumps are exported worldwide for water or oil extraction.

SECTION XIII: LANDING NIPPLES 2013

Nut The standard bottom nut is a bullnose nut. Optional nut types, sub, mill, and side hill, are available.

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

New Technology Concept. Thru-Tubing Multiple Conduit Super Abrasive Filament Cutter

The Lease Pumper s Handbook CHAPTER 8 HYDRAULIC LIFT

DSL. Drilling Services Limited PROFESSIONAL DRILLING SERVICES AND EQUIPMENT

DSI THRU-TUBING INC. Bear Claw Composite Bridge & Frac Plug Systems. Proof in Performance

W I L D W E L L C O N T R O L COILED TUBING

WELLBORE PRODUCTION STRING AND METHOD BACKGROUND

DAILY DRILLING REPORT

PACKER MILLING & RETRIEVAL SYSTEMS

Thru-Tubing. Motors and standard tools

(12) United States Patent (10) Patent No.: US 7.225,870 B2

JESSE HERNANDEZ: ARTIFICIAL LIFT ENGINEER WITH 35 YEARS IN ARTIFICIAL LIFT AND SUPPORT OF NEW TECHNOLOGY IN COUNTRIES ALL AROUND THE WORLD.

Large Size Coiled Tubing Offshore Velocity String Campaign

Specialized Tools & Filtration. version 5

Coiled Tubing Solutions

MWD Components Ceramic & Carbide Parts MWD Electronics Running Gear Handling Equipment Drill Pipe Screens Float Valves Repair Kits Job Boxes Gamma

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

Use of Pressure Activated Sealants to Cure Sources of Casing Pressure David W. Rusch, SPE, and Barry C. Ellis, Seal-Tite, LLC

Restoring Functionality to Subsurface Safety Valves with Extreme Damaged Seal Bores. Graeme Allan, BP Well Intervention Engineer

C BOP. TC Cooper Cameron, Cameron Division

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

DATE: 01/03/ DAILY COMPLETION REPORT

Continuous Sampling OVERSHOT STYLE ROD STYLE SWIVEL OVERSHOT ASSEMBLY CONNECTING ROD NWJ J SERIES LATCH HOUSING LATCH ASSEMBLY BEARING ASSEMBLY

MINING & DRILLING PRODUCTS. B Core Retrieval System

AS-1 Retrievable Packer

Installation and Service Manual

Oiltools main product lines

Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible

Full Flow Reverse Circulation Junk Baskets. Manual B320

Increasing Tubular Life & Performance.

QuickCut Casing Exit System RMN-Type or RHN-Type Anchor*

Transcription:

Well Completions

Well Completions

Well Completions

Components and Functionality

Components and Functionality

Components and Functionality

Xmas Tree & Wellhead

Open-Hole Completion

Open-Hole Completion

Slotted-Liner, Wire-Wrapped (WWS) Screen

Slotted-Liner, Wire-Wrapped (WWS) Screen

Cemented & Perforated Liner/Casing

Cemented & Perforated Liner/Casing

Different Production Methods

Tubing & Make-up

Tubing & Make-up Premium (gas-tight) connection

Tubing & Make-up Premium (gas-tight) connection ONLY A BARRIER WITH CORRECT MAKE-UP!

Well Completions

Well Completions

Safety Valves (Ball/Flapper)

Safety Valves (Ball/Flapper)

Safety Valves (Ball/Flapper)

Control Line

Well Completions

Well Completions

Side Pocket Mandrel

Side Pocket Mandrel

Side Pocket Mandrel

Setting and Retrieving a valve in a SPM?

Well Completions

Well Completions

Sliding Side- Door (SSD)

Sliding Side- Door (SSD)

Well Completions

Well Completions

Why may a Seal Assembly be required?

Why may a Seal Assembly be required? Tubing Movement

Having an Anchor, & incorrect set completion

Seal Assembly

PBR Seal Assembly

PBR Seal Assembly

Well Completions

Well Completions

Production Packer

Packer Setting

Packer Setting To set Packer inner Mandrel moves up, driving the lower cone below slips, forcing them into the casing wall.

Packer Setting Sealing Element is compressed and extruded into the casing. To set Packer inner Mandrel moves up, driving the lower cone below slips, forcing them into the casing wall.

Mill-Out Extension

Mill-Out Extension If Packer run with a tailpipe, a Mill-Out Extension sleeve must be run immediately below packer in which the catch sleeve will locate. Catch Sleeve collects remains of packer when milling operation is complete and the tool retrieved

Well Completions

Well Completions

Profile ( Nipple )

Profile ( Nipple ) Installed at various points to allow: (a) Plugging tubing for: (i) Pressure testing (ii) Setting hydraulic packers (iii) Zonal isolation (b) Installing flow control equipment: (i) Downhole chokes, regulators, SSVs, (ii) Locating pressure gauges

Profile ( Nipple ) Installed at various points to allow: (a) Plugging tubing for: (i) Pressure testing (ii) Setting hydraulic packers (iii) Zonal isolation (b) Installing flow control equipment: (i) Downhole chokes, regulators, SSVs, (ii) Locating pressure gauges Classified into three basic designs: - Top No-go (No-go shoulder located above seal- bore. - Bottom No-go (No-go shoulder located below seal-bore - Selective Nipples (locking mechanism is selective, and has to be specifically actuated by wireline tool).

Halliburton XN (No-Go) Locking Mandrel

Well Completions

Well Completions

Perforated Joint /Flow-Tube

Perforated Joint /Flow-Tube Allows flow to enter tubing even if no access to base of tubing (pressure gauges, etc.)

Well Completions

Well Completions

Tail-pipe Tailpipe suspended beneath packer performs number of functions: (1) Provides entry flow path for produced fluids into tubing. (2) Provides nipple capability for plugging beneath the packer. (3) Provides nipple capability for landing off pressure/temperature gauges. (4) Provides a Mill-Out Extension as latch area for packer retrieval operations. (5) Provides additional seal bore length. (6) Allows for easy re-entry of wireline tools back into the tubing.

Tail-pipe Tailpipe suspended beneath packer performs number of functions: (1) Provides entry flow path for produced fluids into tubing. (2) Provides nipple capability for plugging beneath the packer. (3) Provides nipple capability for landing off pressure/temperature gauges. (4) Provides a Mill-Out Extension as latch area for packer retrieval operations. (5) Provides additional seal bore length. (6) Allows for easy re-entry of wireline tools back into the tubing.

Single Zone Completion with no Provision for Tubing Movement

Single Zone Completion Utilising Locator Seal Assembly

Single High Flow-rate Zone Completion Utilising Extra-Long Tubing Seal Receptacle for Tubing Movement

Single Zone High Flow-rate Injection/Production Completion Utilising Polished Bore Receptacle

Single Zone Completion Utilising a Gas Lift Facility

Single Zone Completion Utilising ESP

Dual Completion allowing Segregated Production

Selective Dual Zone Producer with optional Gas Lift Facility

Tubing-less Dual Completion

Subsea Completion Serviced by Through Flow-line Techniques (TFL)

Subsea Completion Serviced by Conventional Wireline Techniques from Workboat or Mobile Drilling Rig

Thank you for using us for your company training, please call on us again for anything else you need. www.king'et*oleum.co.uk