Series Type ROi400 DE EN FR. Montage- und Betriebsanleitung Installation and operating instructions Instructions de montage et d utilisation

Similar documents
Series Type Модельный ряд ROi500

Автоматическое тягово-сцепное устройство

Montage- und Betriebsanleitung Installation and operating instructions Instructions de montage et d utilisation. Member of JOST-World

Manuelle Kugelkupplung Non-automatic ball coupling Attelage à boule verrouillage manuel

Für Modellreihen / for Series / pour les séries

RI-E. 3. Operation Maintenance Care Inspection Technical data 30 Übersicht, Einbaulage, Schaltplan 30

-Montage- und Betriebsanleitung

-Montage- und Betriebsanleitung

Montage- und Betriebsanleitung Sattelkupplung JSK 26 D 5. Installation and operating instrutions for fifth wheel coupling JSK 26 D 17

JSK 34. Installation and operating instructions

STÜTZVORRICHTUNG MODUL

RO RC-PC DE EN. Montage- und Betriebsanleitung Installation and operation instructions. Member of JOST-World

Instruction Manual Montage- und Betriebsanleitung Notice d utilisation

Drawbars. Installation and operating instructions

RO Automatic trailer coupling. Repair instructions. 5KPVM02000 Towing Hitch Automatic Rockinger RO244A

RINGFEDER. Automatic Trailer Couplings for connecting to 40 mm drawbar eyes according to DIN Type 604/ 605/ 6041/ 6051/ 6061.

Repair manual for. JSK 26 D fifth wheel coupling

Installation and Operating Instructions

BPW Stützvorrichtungen BPW Landing Gear. BPW Bergische Achsen MONTAGE- UND BEDIENUNGSANLEITUNG INSTALLATION AND OPERATING INSTRUCTIONS

WAP disc brake technology. Assembly, operating and maintenance instructions

Installation and Operation Instructions RINGFEDER Type 2050 AM RINGFEDER Type 2050 AP

Support legs. Installation and operating instructions

FLENDER ARPEX Plate packs with close-fitting bolt connection. ARW-4 Sizes to Assembly instructions An 4239 en 12/2015.

Hook coupling UN 76 Installation,operating and maintenance instructions

Sales Information IVECO NEW! JSK 34.

Technical Description Edition 2007 Mounting, maintenance and repair of propshafts with flanged universal joints

Repair kits. Original-Spare parts. Better safe than sorry Original-Spare parts in handy kits.

Installation and operating instructions. BPW Landing gear. BPW-BA-SV e

Airbag lifting device. Installation and operating instructions

TRUCKMATE OPERATING INSTRUCTIONS FOR

Repair manual for Exchanging locking mechanism sensor JSK37C

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil

EXTRACT of chapter XXXIV coupling devices (version of ) ANNEX XXXIV Requirements on mechanical couplings

Common position by FR and CEMA on mechanical couplings for towed vehicles 28/9/2015

3 Axles and brakes. 3.1 Function and construction of the axles Construction Function

PAN 17 MECHANICAL SLIDING CALLIPER DISC BRAKE ASSEMBLY AND MAINTENANCE INSTRUCTIONS

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use!

Sales Information DAF

Lifting device for standard removable versions

Montage- und Betriebsanleitung Installation and operating instruction Instructions de montage et d'utilisation Istruzioni per il montaggio e l uso

EC 94/20. Fig. 2 Fig. 3 Fig. 4

BALL RACES SINGLE-ROW AND DOUBLE-ROW

RO 57. Reparaturanleitung Repair instructions Reparationsvejledning Reparationsanvisning Руководство по монтажу. ROCKINGER Member of JOST-World

FLENDER ZAPEX couplings. Type ZWT. Operating instructions BA 3505 EN 10/2011. FLENDER couplings

2006 MINI Cooper SUSPENSION Wheels & Tires - Repair Instructions - Cooper (1.6L) R50/W10 & Cooper S

Installation instructions

It is advised that the jack head should have a large area to spread the load.

01 09 Installation guidelines Air suspension units GL70 GL70HD GL70L GN Air suspension units GL70 GL70HD GL70L

O P E R A T I N G M A N U A L

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.1

TSCHAN - TORMAX VSG. Installation and Operation Manual TSCHAN Highly flexible shaft coupling BAWE 009-GBR-0 05/2004

Copyright 2001 by AMAZONEN-Werke H. Dreyer GmbH & Co. KG D Hasbergen-Gaste All rights reserved

Original Operating Manual

Super T QR20 INSTRUCTIONS GENERAL RULES

ORIGA SYSTEM PLUS Guides, Brakes and Valves for Modular Linear Drive Systems OSP Appendix to the Operating Instructions

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Operating Instructions Flexdip CYA112

Workshop Manual. Chapter 1 Towball couplings

Guides, Brakes and Valves

The GK units differ from the LK units in that the springs of the GK units have a spring eye at the front.

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

V2 02/11/15 D Newton P FitzPatrick. Changes to coupling and uncoupling processes Task. Coupling and Uncoupling Coupling. Uncoupling.

BR 31a Rack-and-pinion Actuator,

Compensation unit AGE-XY 50-80

Electrically Released Brakes ERS VAR10 SZ 5000/5000

Operating Instruction

Version VDL Weweler b.v. Maintenance & Installation Manual

Fifth Wheel, Fontaine H5092 Series 31.07

Front mechanical suspensions

Installation and Operating Instruction for Brake Caliper HW 150 HFA and HW 180 HFA E e

ZE ZE ZE. Simplex expanding wedge brake Assembly and Maintenance Instructions

Sales Information Mercedes-Benz ACTROS

Hitch systems. for John Deere Tractors series 5000, 6000, 7000 and

Locking Assemblies Shrink Discs Rigid Couplings.

Translation of the Original operating instructions Lifting device Z 70 /...

BPW height-adjustable drawbars

MS2200, MS2500, and MS3000 Suspension Installation Manual ON/OFF HIGHWAY SUSPENSION SYSTEM

CENTAFLEX-K Assembly and operating instructions 014K S... M EN Rev. 1

W BW GW. Workshop manual. Mechanical suspensions BPW, series ECO Cargo W / BW / GW. BPW-WH-W-BW-GW e

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

Hydraulic Motors. Radial Piston Motors with fixed displacement Series RM...X Vg = 250 cm³/u cm³/u. Repair manual. Doc.-No.

MAXXUS 22. Mechanical Sliding Disc Brake Caliper

MEYER-Rotating Fork Positioners are attachments used to transport loads and replace

Concrete Mixer DBM 750

disc brake axle with WABCO calipers

DRIVER AND MAINTENANCE OPERATIONS. TD steering system

Type 2060, 2061, 2063, 2064, Accessories. Zubehör Accessoires

RINGFEDER 5055-NZ. Automatic Trailer Coupling

Electrically Released Brakes ERS VAR11-01 FT = 4100 N

MAXX TM 22T MECHANICAL SLIDING CALIPER DISC BRAKE INSTALLATION AND MAINTENANCE INSTRUCTIONS

Belt Conveyor Pull Rope Switch Types HEN, HEK and SEM OPERATING INSTRUCTIONS

TOYOTA HILUX Suspension Installation Instructions. NOTE: Occupational Health & Safety procedures must be observed at all times.

Double piston rotary drive DRQD-6/... / b [ ] (en) Operating instructions

BURQUIP INTERNATIONAL (PTY) LTD

48CP 48 CORE PLUG LAWN AERATOR Patent Pending

Bumper Bumper Removal and Installation. 1. Bumper 2. Front Mounting Brackets 3. End Mounting Brackets

Assembly and Maintenance Manual Type RSBW

Bowl feeder BF20 / BF25 / BF30 BF35 / BF40 / BF50

FLENDER couplings. FLENDER ARPEX plate packs with conical bolting. ARS-6 sizes to K430 sizes 235 to 820

FLENDER ARPEX plate packs with conical bolting. ARP Size Assembly instructions AN 4256 en 07/2016. FLENDER couplings

Transcription:

Montage- und Betriebsanleitung Installation and operating instructions Instructions de montage et d utilisation DE EN FR Member of JOST-World Modellreihe Series Type ROi400 Vollautomatische Anhängekupplung Automatic Trailer Coupling Attelage de remorque entièrement automatique

Table of contents ROi400 Series ROi400 technical release 1 ECE E1 55 R-01 0350 Typ ROi400-G 150 ECE E1 55 R-01 0351 Typ ROi400-G 145 ECE E1 55 R-01 0352 Typ ROi400-G 135 Suitable for: drawbar eyes 40 DIN 74054 and class S (ECE)! The coupling must be installed by authorised personnel! Read these instructions carefully before fitting! Official note When fitting the trailer coupling the re gulations for fitting mechanical faste ning systems in accordance with Appendix 7 of Directive ECE R 55 and the national regulations for commercial vehicles must be observed. Subject to technical changes without prior notice Safety instructions 18 1. Fitting 19 22 1.1 Before installation 20 1.2 Installation 20 22 2. Operation 23 24 2.1 Hitching 23 2.1 Check 23 2.2 Closing coupling manually 24 3. Maintenance 24 27 3.1 Care 24 3.2 Inspection 25 27 Technical data 28 29 Upgrade kits 29 Member of JOST-World 17

Safety instructions ROi400 The safety instructions are summarised in a single chapter. In any situation where the user of the trailer coupling is at risk,! the safety instructions are repeated in the individual sections and marked with the warning symbol shown here. When handling hitches, prime movers and trailers the relevant safety regulations in the respective country must be observed (e.g. Berufsgenossenschaft in Germany). Any safety instructions in the operating manual of the tractor vehicle and the trailer remain valid and must be observed. For operation, maintenance and assembly the safety instructions listed below must be observed. Further safety instructions are then given in the individual case which relate directly to the respective activity. Safety instructions for operation x The hitch may only be operated by authorised persons. x The installation and operating instructions of the respective hitch retain their validity and must be observed. x Only use the hitch and the towing eye of the trailer if they are in perfect technical condition. x Only carry out hitching / unhitching operations on firm, level ground. x During hitching, nobody may stand between the tractor vehicle and the trailer. x After every hitching operation the correct locked status of the trailer coupling must be checked by means of the control pin or the remote indicator. Only drive the rig in the correctly locked status. x The remote indicator does not exempt the driver from the obligation to check before driving off subject to StVZO (Regulations Authorising the Use of Vehicles for Road Traffic). Before driving off, among other things, the coupling status of the mechanical connection device for the tractor vehicle and the trailer must be checked. Safety instructions for maintenance x For maintenance work, only use the prescribed lubricants. x Maintenance work may only be carried out by qualified personnel. Safety instructions for installation x Installation may only be carried out by authorised workshops. x Installation must be carried out in compliance with the relevant accident prevention regulations and the technical regulations for mechanical equipment.. x Only original components may be used. x Instructions and installation guidelines of the vehicle manufacturer must be observed, e.g. type of fastening, clearances etc. x All screwed connections must be tightened with the prescribed tightening torque. x Work may only be carried out on the trailer coupling when it is closed. Risk of injuries! The installation of the hitch on the prime mover must be carried out in accordance with Annex 7 of Directive ECE R 55-01 and must be checked accordingly. As applicable, the relevant licensing regulations in the respective country must be observed. 19, 20 and 21 StVZO apply in Germany. The mechanical remote control and the mechanical remote indicator are equipment with safety components. This is why the installation must be documented. The hitch, the remote control and the remote indicator are connection devices which require model approval and are! subject to the highest safety requirements. Alterations of any kind shall cause the warranty to lapse and invalidate the type approval, which in turn invalidates the vehicle operation permit. 18 Member of JOST-World

1. Fitting ROi400 Mounting technical release 1 2c 2b 1 Fig. 1 10 9 T 8 7 6 5 4 3 01 Sealing cap 02a Cheese-head screw 02b Spacer bushing (2) 02c Hexagon nut 03 Hexagon nut 04 Conical cap 05 Rubber buffer 06 Protective buffer cap 07 Bearing T Vehicle cross member 08 Protective buffer cap 09 Rubber buffer 10 Jaw with drawbar 2a Member of JOST-World 19

1. Fitting ROi400 1.1 Before installation Note: Please comply with following when fitting hitch: applicable national regulations vehicle manufacturer s specifications clearance for axial rotation of coupling head of at least e 25h Fig. 1 and 2 depend on technical standard x Unscrew 3 x Remove 4, 5, 6 and 7, 8 and 9 remain on 10 Note: x 1 and 2 in equipment pack, do not remove grease from 6, 8 and 10! 1.2 Installation x Install the bearing (7) onto the inner side of the cross member (T) x Secure with 4 hexagon bolts (DIN 931, grade 8.8) and self-locking nuts, grade 8. Size of bolts, nuts and torque to be chosen, see table Note: Observe manufactures instructions in case different bolts and nuts are recommended! ATTENTION: Mount bolt heads on the side directed towards the jaw (outside the cross member) to avoid impairing movability of the hitch (see Fig. 2) (UVV Fahrzeuge, VBG 12, KBA-Merkblatt) 20 Member of JOST-World

1. Fitting ROi400 Torque of bolts on the bearing Size of Size of Width Tightening hitch bolts across flats torque 1 set of bolts S (mm) (Nm) part no. 150 M 20 30 410 70971 145 M 16 24 210 70952 135 M 14 22 135 70970 1) Tightening torque for screws use a torque meter to fix according to DIN ISO 6789, class A or B Fig. 2 Grip Flange thickness Screw length Grip (thickness) of cross member (s. fig. 3) Size of hitch: 145 / 150 135 Central-axle-trailer: 11 35 mm 11 32 mm Drawbar trailer: max. 35 mm max. 32 mm x Insert spring cap (8) (concave side facing 9) onto 7 x Shaft of hitch 10 with 9 into 7 (do not remove grease, if necessary regrease with EP3 grease) x (6) concave side facing 5), 5 and 4 (like 6) onto 10 Member of JOST-World 21

1. Fitting ROi400 1.2 Mounting ROi400 technical release 1 x Tighten 3, tightening torque 500 Nm 1 (350 Nm 1 by G 135) x Locate 1 x 2b onto 2a x Slide 2a and 2b through the bore in 3 x Locate1 x 2b onto 2a and tighten with 2c: tightening torque 25 Nm 1 x Fit the sealing cap (1) to protect against corrosion. Note: Before painting, it is essential to close hitch and grease or cover coupling pin. After painting clean and regrease the coupling pin. 1 Tightening torque, screws are to fix with a torque wrench at DIN EN ISO 6789, classe A or B 422 Member of JOST-World

2. Operation ROi400 2.1 Hitching Fig. 3 Fig. 4 Tractor unit with drawbar trailer Tractor unit with rigid trailer Note: The relevant national regulations (f.e. safety-at-work) must be observed when hitching and unhitching. No one must stand between the vehicles! x To engage, press hand lever upwards until it engages x Check whether funnel is locked. x Position drawbar eye in centre of funnel x Disengage brake on front axle of turntable drawbar trailer x Set drawbar eye to height of coupling point (centre of funnel). x Slowly reverse prime mover When hitching to a central-axle trailer (see fig. 3): x Reverse prime mover very slowly x The drawbar eye must be inserted into the middle of the jaw. Otherwise the jaw, the drawbar eye or the drawbar support legs might be damaged. Kontrolle: After each hitching procedure, it is essential to check that the hitch is correctly closed and locked. The lock-control pin must not protrude out of its guide after hitching (see fig. 4) If the lock-control pin protrudes from its guide (in the dark detectable by touching it), the hitching procedure has been carried out incorrectly and there is the risk of an accident! Driving a trailer in that condition is not allowed. If not correctly coupled: move the prime mover forward (approximately 1 m) check again In-cab status indicator upgrade kit available for retrofitting. Member of JOST-World 23

2. Operation ROi400 2.2 Closing coupling manually (e.g. for tow-rope) x Raise coupling pin with suitable tool 3. Maintenance ROi400 A 3.1 Care Before starting maintenance work on the hitch ensure that hitch is closed. Risk of Accident! (see para. 2.2) x Lubricate coupling bin, support ring and drawbar eye with heavyduty grease (EP3) which is waterproof if possible before first use and after extended period in use. x Under harsh operating conditions or severe exposure to dirt or water regrease automatic unit (A) when coupling is open (see fig. 5): use multi-purpose grease NLGI 2 intervals: 6 months or 50,000 km x Lubricate lower funnel bearing (F) with EP3 grease. Fig. 5 F Note: Close coupling before cleaning with high-pressure washers (see para. 2.2). x After cleaning, relubricate coupling pin and support ring with EP3 grease. 24 Member of JOST-World

3. Maintenance ROi400 Please note following when carrying out repairs on coupling (e.g. changing coupling pin): x Remove as much of old grease as possible. x Relubricate with multi-purpose grease (NLGI 2; temperature range 40h bis 120h C) Fig. 7 Fig. 8 3.2 Inspection Bearing: Longitudinal play x Grip coupling head (not jaw funnel) with both hands when uncoupled and move vigorously in longitudinal direction (see fig. 7): No longitudinal play is allowed. Vertical play x Open hitch. x Move coupling head up and down with appropriate tool (see fig. 8): Vertical play may not exceed 3 mm measured at coupling head (centre axis of coupling pin). Coupling pin: Check wear using reference gauge (order no. 57026) (see Fig. 8): Coupling pin may be used until diameter of crowned section has worn to less than 36.5 mm, after which it must be replaced. ı ı Fig. 9 Member of JOST-World 25

3. Maintenance ROi400 v b Vertical play in coupling pin (see fig. 9) may not exceed 2mm. Lower bush: Check wear using reference gauge (order no. 57290). Max. admissible internal diameter of lower bush is 31.5 mm. Passage below pin must be free. Please consult repair leaflet (available on request) for details of replacing. Fig. 9 Support ring: Support ring for drawbar eye must be replaced if drawbar eye could touch lower bush because of wear or if wear limit H min. of 14 mm (see Fig. 10) has been reached. Lower bush must not be damaged under any circumstances as this will impair closure of coupling. Take care to prevent risk of accident! Always grease support ring to reduce wear (please consult repair leaflet, available on request, for details of replacing). Fig. 10 26 Member of JOST-World

3. Maintenance ROi400 Check lock of the funnel: 17 H R M Note: The funnel must be locked in its central position when coupling is opened to be prepared for coupling on! x Push the funnel sidewards x Move handlever in locking direction (up) x Release funnel x The funnel must swing back in central position and be locked again x If not, justify the central position by the lower unit as below. Fig. 11 R Adjustment for technical release 1: x Loosen screws (17) and bring the funnel into the central position: x Open coupling: Funnel lock should be inserted x Tighten screws (17) Tightening torque 85 Nm. x Both ends of torsion springs (R) must lie slack free (S) against the rib of the funnel. Between the spring holder (H) and the lay-on points of the torsion springs should also be no gap. x In case there is gap you can close it very easilyby bending the spring holder with a screwdriver (M) (see fig. (S = 0). x Please, check the lock and movement of the funnel again 1) Tightening torque for screws use a torque meter to fix according to DIN ISO 6789, class A or B Member of JOST-World 27

Technical data ROi400 Coupling closed Coupling open Technical data for ROi400 technical release 1 Tightening torque for SW 70: 500 Nm (for SW 55: 350 Nm) informative sticker for safety indicator dimension for releasing safety mechanism for drawbar eye Fitting clearance min. 230 mm (min. 180 mm) Centre line of drawbar Mont screw heads for attachment on coupling head side Series ROi400 ECE E1 55 R-01 0350 Typ ROi400-G 150 ECE E1 55 R-01 0351 Typ ROi400-G 145 ECE E1 55 R-01 0352 Typ ROi400-G 135 or drawbar eyes 40 DIN 74053 und ECE-Class S Flange size to ECE R 55-01 Nameplate position Size a b c d e f KL max. (mm) (mm) (mm) (mm) (mm) (mm) (mm) 135 120 055 155 090 15 74 32 145 140 080 180 120 17 84 35 150 160 100 200 140 21 94 35 28 Member of JOST-World

Technical data ROi400 part no. C e n t r a l - A x l e T r a i l e r hand lever hand lever size hole pattern maximum maximum maximum static maximum weight upwards downwards D-value* Dc-value* vertical load** V-value* (mm) (kn) (kn) (kg) (kn) (kg) 400A36001 400B36001 135 120x 55 70 70 0700 24 30 70 70 0500 26,4 30 400A46001 400B46001 145 140x 80 100 91.5 1000 31,2 34 400A51001 400B51001 150 160x 100 130 90 1000 35 35 ** Calculation see catalogue or internet: http//www.jost-world.com ** When using a central-axle trailer, the vertical load should amount to at least 4% of the trailer weight, in order to prevent increased wear caused by bouncing of the drawbar eye. Upgrade kits technical release 1 Upgrade kits remote operation part no. Mechanical remote operation power assistent opening ROE 71599FA Pneumatic remote operation power assistent opening and closing ROE 71461 Mechanical remote operation ROE 71676 ROi400 Upgrade kits remote control part no. Electronical remote indicator RI-BE ROE 71546 Electrical remote indicator RI-BC ROE 71654 Repair instructions and parts list to be obtained upon request! Member of JOST-World 29

30 Member of JOST-World

JOST-Werke Siemensstr. 2, D-63263 Neu-Isenburg Telefon +49(0)61 02295-0 Fax +49(0)61 02295-298 www.jost-world.com MuB 016 007 M20 (REV--) 05-2015 (PG)