Requirements for Generators European Network Code

Similar documents
CMP294: National Grid Legal Separation changes to CUSC Section 14. CUSC Modification Proposal Form

CMP266 Removal of Demand TNUoS charging as a barrier to future elective Half Hourly settlement

Page 1 of 5. 1 The Code Administrator will provide the paper reference following submission to National Grid.

CUSC Modification Proposal Form CMP270

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS

Electricity Transmission network charging

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC DISTRIBUTION SYSTEM

Introduction to Charging: Which Parties Pay Which Charges?

GC108: EU Code: Emergency & Restoration: Black start testing requirement

Brexit Update for US Industry Neil Williams 18 October 2018

Proposal to initiate Expert Working Group on Grid Supporting FFCI

UK Power Networks Use of System Charging Methodology

CUSC Panel 30 September 2016 John Martin National Grid

GC0101 Mod Title: EU Connection Codes GB Implementation Mod 2

GC108: EU Code: Emergency & Restoration: Black start testing requirement

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS

Draft Guidance for generators: Co-location of electricity storage facilities with renewable generation supported under the Renewables Obligation or

Transmission Charging Methodologies Forum & CUSC Issues Steering Group. 13 th September 2017

Guidance for generators: Co-location of electricity storage facilities with renewable generation supported under the Renewables Obligation or Feed-in

GC0023 Protection Fault Clearance Time & Back-Up Protection

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Potential Transmission Charging Arrangements at Exporting Grid Supply Points (GSPs)

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk

Generation Connections

Electricity Operational Forum

GC0096 Storage Grid Code Workgroup. Monday 30 th January 2017

MCS. MCS Metering Guidance V1.0. Gemserv Ltd 10 Fenchurch Street, London. EC3M 3BE.

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Introduction of the Digital Tachograph

Emissions Legislation

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Co-location Informal Guidance Note. March 2018 Version 1.1

SUMMARY OF THE IMPACT ASSESSMENT

RIIO-T2 Energy Scenarios

Comparison of price incentive models for locally matched electricity networks. Appendix C: Private Wires - Legal Definitions

HOUSE OF REPRESENTATIVES STAFF ANALYSIS REFERENCE ACTION ANALYST STAFF DIRECTOR

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

CMP260: TNUoS Demand charges for 2016/17 during the implementation of P272 following approval of P322 and CMP247 Justification of Urgent Status

Power Park Modules and Synchronous Generating Units Working Group

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

CMP271 Initial thoughts on Cost Recovery of GB Demand Transmission Charges

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Good Practices for Grid Connection: European Wind Industry perspective. Iván Pineda EWEA Research Officer Grids and Internal Electricity Market

accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

CLS Bank Protocol for FX. Overview

Innovative technologies ready for the Supergrid

Application of claw-back

How to implement higher efficiency motors

Transition To WLTP Facilitating Changes in Low Carbon Car Policy and Car Buyer Information

Commissioning Director for Environment. Officer Contact Details Lisa Wright; Summary

THE ISSUE AND USE OF SECTION 10B PERMITS FOR ROAD PASSENGER TRANSPORT AND MINIBUS DRIVING IN NORTHERN IRELAND

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

THE ELECTRICAL POWER SECTOR IN THE REPUBLIC OF BULGARIA

Research RES LEGAL Grid issues Country: Hungary

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE

The TV regulation review, due for 12 August 2012, was reported to the Consultation Forum on 8 October 2012.

Guideline for Parallel Grid Exit Point Connection 28/10/2010

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

OGRR DIRECTIVE

Energy from Waste Grid Connections

Power market Natural gas market Redesign of mechanisms for RE promotion and integration

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa

Data Link Services Airworthiness and Conformance to Commission Regulation (EC) No 29/2009

Reducing Noise Emissions. Commission legislative proposal

Energy Storage: A UK Perspective

Viking Link Interconnector

Response of the Road Haulage Association to the Scottish Government. Removal, Storage & Disposal of Vehicles Regulations.

University of Alberta

An update of vehicle emissions control policies and regulations in Europe

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015

Chirmorie Wind Farm Grid Connection

ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

The Role of Offshore Wind

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

RENEWABLES INTEGRATION STATUS REPORT

New EU Regulation on General Safety. Implementation of Tyre Aspects

Revision 34 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 1 st April 2009.

TORONTO TRANSIT COMMISSION REPORT NO.

Charging Delivery Body. 29 th January 2018

COUNCIL OF THE EUROPEAN UNION. Brussels, 31 May /13. Interinstitutional File: 2012/0288 (COD)

3.7 Areas where increasing levels of DER potentially affects operation of the system under Emergency Conditions

committee report General Permitted Development Order SPT response to consultation

13917/18 CB/AP/add 1 ECOMP.3.A

Indicative Gas Transportation Charges from 1 April 2012 for East of England, London, North West and West Midlands Distribution Networks

FAQ. Frequently Asked Questions on exhaust emission requirements for tractors. European Agricultural Machinery Association.

Merger of the generator interconnection processes of Valley Electric and the ISO;

Renewable sources of electricity a brief overview

OC1 OC2 Phase 2 short term Proposals

Transcription:

Requirements for Generators European Network Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Antony Johnson National Grid TNS Technical Policy October 2014

Overview Fault Ride Through Background to Current GB Structure Licensing and Connection Requirements Transitional Arrangements Structure Ways Forward Summary 2

Fault Ride Through GB Grid Code Working Group established to address fault ride through issues for Synchronous Generators mainly focussed for very large directly connected Generators but also will consider smaller Generators The proposal is to consider early adoption of the RfG requirements but within the context of the GB framework Extensive study work completed and three options proposed Assessment still required for Generators to understand the impact in terms of their auxiliary supplies Fault Ride Through requirements for Smaller Embedded plant has not yet been considered but the issue has been discussed and the initial view is that Type B, C and D Generators which are Embedded should satisfy the fault ride through requirements for Transmission System faults only not at the Connection point as currently proposed in RfG. 3

Where do the Codes come from European Legislation European Network Codes (from 2014) UK Legislation Electricity Act 1989 Utilities Act 2000 Energy Act 2011 C11 Electricity Ten Year Statement Transmission Licence C4 C6 System Charging Connection Charging B12 C3 C10 C14 STC BSC CUSC Grid Code Transmission Licence Distribution Licence Generation Licence Supply Licence 4

Applicable Requirements and Agreement Type These are influenced by The requirements of the Industry Codes Licensing Requirements Size of Generator (Large, Medium or Small) Point of Connection Transmission Area to which the User is connected Is the Generation Directly Connected or Embedded 5

The Effect of Licensing Administered by DECC Mandatory requirement for any Generator in excess of 100MW Penalties apply without a Generation License. In England and Wales Licence Exemption is available between 50 100MW No License is required below 50MW in England and Wales The current Licensing arrangements complement the existing definitions of Large, Medium and Small Power Stations Under RfG, the adoption of Type A, B, C and D Generators only without reference to Small, Medium and Large is likely to require a review of the Licensing requirements 6

Applicable Requirements Some Examples England and Wales Size (MW) 100 (Large) 150 (Large) 99.9 (Med) 49.9 (Small) Embedded or Directly Connected Directly Connected TO Area Agreement Type TEC Metering Applicable Industry Codes NGET BCA Yes CVA CUSC, Grid Code, BSC Embedded NGET BEGA Yes CVA CUSC, Grid Code, BSC, DCUSA, D Code, G59 Embedded NGET BEGA Yes CVA CUSC, Grid Code, BSC DCUSA, D Code G59 LEEMPS No SVA DCUSA D Code G 59 Grid Code (Part) Embedded NGET None No SVA DCUSA D Code G59 7

Applicable Requirements Some Examples Scotland Size (MW) 100 (Large) 30 (Large) 10 (Large) 50 (Large) 9.9 (Small) Embedded or Directly Connected TO Area Agreement Type TEC Metering Applicable Industry Codes Direct SPT BCA Yes CVA CUSC Grid Code BSC Direct SPT BCA Yes CVA CUSC Grid Code BSC Direct SHE-Trans BCA Yes CVA CUSC Grid Code BSC Embedded SPT BEGA Yes CVA CUSC, Grid Code, BSC, DCUSA, D Code. G59 BELLA No SVA CUSC, Grid Code, DCUSA, D Code, G59 Embedded SHE - Trans None No SVA DCUSA, D Code G 59 8

Transitional Arrangements At the September meeting an action was raised on the implications for impending Generator Connections who could be seeking a connection in the immediate future which will overlap the RfG implementation phase Discussed with NGET Legal Requirement to identify:- Who the current applicants are and Who could be affected by the ENTSO-E RfG Code Requirement to develop generic wording either through the covering letter of a connection offer, through a generic Code change or via NGET s website The process is complicated by existing Users who may choose to Mod App. An arrangement to manage this process needs to be developed. 9

Transitional Arrangements - Example Assume Comitology is finalised on 1 st January 2015 and the Codes need to be in force by 1 st January 2017 A Generator also applies for a connection on 1 st January 2015 with a completion date expected on 1 st January 2019 with major plant items expected to be procured in February 2017 and hence will be caught by the ENTSO-E RfG Requirements NGET will need to issue an offer by the end of March 2015 but at the time of the offer the Grid Code and Bilateral Agreement will not have been updated to capture the RfG Requirements. The Offer will need to refer to the approved version of the RfG and current Grid Code with some potentially significant amendments to the Technical Appendices within the Bilateral Connection Agreement. At this stage however the exact technical requirements would be uncertain. A similar issue will arise for Modification Applications ie Generators who already have a connection offer / agreement This will be particularly challenging to manage in the early phases of the transition process 10

Transitional Issues / Ways Forward Uncertainty over national parameters Eg National Grid can suggest and recommend National Parameters but these need to be subject to industry Governance which could be a time consuming process especially for new technical requirements Significant potential uncertainty for Generators in specifying equipment Identify preferred Structure Option Start limited legal drafting to ensure the structure will work but recognising this is an iterative process Similar issues have been encountered previously but to a lesser extent Technical Requirements for Wind Generation 2005 Offshore Transmission - 2009 11

Summary Fault Ride Through developments Review of GB Connection Process Impact of Licensing Complexities of Transition Transitional Issues / Ways forward 12

Useful links ENTSO-E https://www.entsoe.eu/resources/network-codes/ ACER http://www.acer.europa.eu/portal/page/portal/acer_ho ME/Activities European Commission http://ec.europa.eu/energy/index_en.htm JESG http://www.nationalgrid.com/uk/electricity/codes/systemc ode/workingstandinggroups/jointeurosg/ 13

Questions 14