Fitting instructions for all. SitaAttika roof outlets and accessoires

Similar documents
Price list MODERN ARCHITECTURE NEEDS POWERFUL TECHNOLOGY. Valid from April 1st 2014

Price list 2016 MODERN ARCHITECTURE NEEDS POWERFUL TECHNOLOGY. Valid from January 1st 2016

PSI SEALING PLUGS PRESSURE TIGHT UP TO 3 BAR HORIZONTAL AND VERTICAL MOUNTING POSITION FIVE RUBBER QUALITIES FOR DIFFERENT APPLICATIONS

HARD TRI-FOLD COVER SPECIAL BOLT ON SIDE RAIL INSTRUCTIONS 2016-ON TOYOTA TACOMA 6 BOX

PSI Anti-Corrosion Tape

HARD TRI-FOLD COVER SPECIAL BOLT ON SIDE RAIL INSTRUCTIONS 2016-ON TOYOTA TACOMA 5 BOX

THOMAS. Low Pressure SS Couplings. Couplings & Flange Adaptors Non Restrained Products PIPE PRODUCTS

Product facts Geryon SRD Security Revolving Doors STS Security Turnstiles

MAR031615A 1. PABD Installation & Maintenance. Guide *Parts will differ for high pressure valves.

Mounting SySteMS ApplicAtionS overview version 1.2 March 2013

INSTRUCTION MANUAL- PLANT OPERATIONS

Reinforced edge channels KE-100

PIPE LOG BOOK. Project no:... Project:... Construction section:... On behalf of:... Commissioned by:... Order no:... Date:... Construction period:...

Above ground hydrants Modifi cation rights reserved

PRINETO Price List Prineto

Suggested Specifications

Original operating instructions. Transit silo. Model. Transit silo

Ductile Iron. Fittings and Accessories for pressure pipelines. 1 st issue

Installation Instructions For Part Number: Scoop and Snorkel Kit

MILLCENTRIC FULL/100% POR T ECCENTRIC PLUG VALVE

Talos Revolving Doors Talos Circular Sliding Doors

HPS SERIES. Steam Joints DEUBLIN COMPANY Norman Drive, West Waukegan, IL USA Phone: 847/ Fax: 847/ Rev.

Hydraulic Motors. Radial Piston Motors with fixed displacement Series RM...X Vg = 250 cm³/u cm³/u. Repair manual. Doc.-No.

TITGEMEYER Tf1568GB(0614)2. GETO Sider Frame base assembly for truck chassis Assembly instructions

Supplementary instructions. Water cooling - MINITRAC 31. Active water cooling system for radiationbased. Document ID: 48522

Blast Valves for HVAC Ducting

TOYOTA RAV RUNNING BOARD

Socar New Management Office Project. Baku, AZERBAIJAN m2 ExtruBit D ECB Geomembrane

0 = 0 mm rear cover panel edging (standard) Number = rear cover panel edging according to table

FRIATHERM multi / FRIATHERM uni Push-fit system / Press-fit system for drinking water and heating networks

Discount-Equipment.com

Discount-Equipment.com

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

RECEIVING AND INSPECTION

INSTALLATION & MAINTENANCE MANUAL

RECEIVING AND INSPECTION EXAMINE ALL COMPONENTS FOR POSSIBLE SHIPPING DAMAGE PRIOR TO INSTALLATION.

1. Main structure. Main structure Jet-288 Exploded views. Bearings and impeller shaft

FLEXWELL Safety Pipe. Pipe systems for installations Technical details

1. Main structure. Main structure Exploded views, AJ 288. Bearings and impeller shaft

BR 01b Control valve

Installation Instructions

Real Trains, Inc. Owners Manual and Parts List. Steam Era Plane Bearing Freight Car Truck, 1 1/2 Scale Catalog Number 15T3A or 15T3B

Table of Contents WARRANTY...3 APPLICATION...4 MECHANICAL...5 Joint Sealant...5 Grease Duct Standard Connection...6 Collar and Adjustable Duct

Components, Mounting Systems, In-roof PV Solutions FATH Solar About us Page 3

Standard Parts for Mould Making

SWING DOOR SOFT ENCLOSURE (part# 16733)

Chapter 1 Pipes and fittings PVC - PE

Talos Revolving Doors Talos Circular Sliding Doors

Table of contents. Chapter 1: Fusiotherm. Chapter 4: climasystem Produktgruppe 20. Chapter 5: aquatherm. Chapter 2: aquatherm SHT.

PSI CASING END SEALS FOR CASING PIPE CLOSURE FOR PROTECTION AGAINST MOISTURE AND DIRT ALSO FOR RETROFITTING INDIVIDUAL CUSTOMIZED SOLUTIONS

KRAL Screw Pumps. L Series. Catalog. L Series Edition 05/2011 Subject to change.

Profile Gaskets. Profile Gaskets with Covering Layers. Grooved Gaskets with Standard Profile. Grooved Gaskets with Convex Profile.

Air Handling Units RM-/RL-Line. AHU Casing Characteristics, Design Details For Outdoor Installation And Increased Hygiene Requirements

Replace shaft sealing ring, bevel pinion (final drive removed) Preparatory work. Core activity

LPE C5 Battery Relocation Kit

Mustang Shaker

AVK SERIES 55 AND 06 GATE VALVES, DN 450/500/600

ZERO-POINT CLAMPING SYSTEM

CC /2013 Part Number A

TECHNICAL DATA OBSOLETE

PARTS LIST FOR NO. 1 SERIES 1AM ANGLE TOOLS 17 (SERIAL B )

ROLLERS SERIES 3500 Fixed drive conveyor roller. ROLLERS SERIES 3500 Fixed drive conveyor roller. Technical data

SIHI LPH-X - Liquid Ring Vacuum Pump Two Stage

Range of single layer waterproofing membranes for roofs, façades and buildings

HST 20 lifting/sliding door flat threshold

Assembly instructions. Veranda sunblind VZ510. art.nr

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

99-03 V6 "Shaker" System Instructions. *03 Model requires new hood Contents w/ Kit. Tool List For Appliqué:

Operating manual Keula gate valves DN PN10/16

Centrifugal performance characteristics with axial flow pattern: RADAX VAR

Supplementary instructions. Air cooling - FIBERTRAC 31. Active air cooling system for radiation-based sensors. Document ID: 50339

ZJ 4-Link Rear Long Arm Upgrade Instructions

Arrow Shark 2016 M8 II Sterndrive - Collector Edition Owner Manual. M8 II weight: 925 grams Dimensions

Mustang V6 Shaker 99-04* Components Check List:

Pipeline Accessories. Wall Penetration Seals 4 pipes Pressio-Rings Pressio Individual Pressio Universal Pressio 4 cables

Ø mm. SYSTEM KAN-therm. High quality for reasonable price TECHNOLOGIA SUKCESU ISO 9001

Step 4 Press the sleeve gear assembly through the center of the bearing plate assembly so that the gear and bearing are in contact.

Competitor. Ultra Light Plus, Semi Electric Bed. Item # Owner s Assembly And Operating Manual

B. B. 4. Remove the bed bolts A.) Using a 1/2 socket, remove the four inner bed bolts. B.) Using a T-25 Torx driver, remove the four outer bed bolts

DP A.2.50B. Grundfos pump GRUNDFOS DATA BOOKLET

DIE DESIGN AND CONSTRUCTION SPECIFICATIONS STAMPING - EUROPE GENERAL INFORMATION CAM DIES

Type 2000, 2002, 2012

13.3 List of Maintenance Documents for fitted Equipment

ACTUATOR HON

Table of contents. Valves 141. Check valves 142. with threaded connector 142. with ISO-flange connection (SAE) 144

Mandatory X Information Recommended Change. Series/Parts Affected: LS40D, LS40TD, LS50TD and LS60TD Concrete Pumps

INSTRUCTION MANUAL RECTANGULAR BUTTERFLY VALVE 3-SIDED SEAT

KK-K9-F16-K INSTALLATION INSTRUCTIONS K9 Kit for FORD EXPLORER (Retail Model Vehicle with OEM Center Shifter Console)

Manually Operated Diaphragm Valves

Volkswagen New Beetle Body - Exterior 64 Glass, Window regulators (Page GR-64)

SP41A B-Pillar. Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0

Material: Hinge Parts: zinc die, matt chrome plated, or zinc die, matt black. Pin: stainless steel Nut plate: steel, zinc plated

LS Series. Remix Shaft Installation Instructions REQUIRED TOOLS PARTS WORK SAFELY! PREPARATION/SAFETY PROCEDURES

Fizzle Intercooler Kit Installation Instructions

INSTALLATION INSTRUCTIONS

Talos revolving doors

Installation Instructions For Part Number: Scoop and Snorkel Kit

KLINGER Monoball One-Piece ball valves

Supplementary instructions. Air cooling - FIBERTRAC 31 with Conduit tube connection. Active air cooling system for radiation-based sensors

Transcription:

s for all SitaAttika roof outlets and accessoires

Contents General information 3 1. SitaTurbo Facade breakthrough.. 4 2. SitaTurbo Steam vapour barrier plate.. 5 3. SitaTurbo Steam vapour barrier flex.. 6 4. SitaTurbo Attika outlet... 7 5. SitaTurbo cover plate... 10 6. SitaTurbo cladding-cover plate... 10 7. SitaTurbo outlet transition piece... 10 8. SitaTurbo Terrace installation kit.. 12 9. SitaSteam vapour barrier plate with round pipe. 13 10. SitaRondo base plate.... 14 11. SitaRondo. 15 12. SitaEasy and SitaEasy Plus. 17

General instructions When installing flat roof drainage elements, the following regulations, amongst others, must be observed: DIN EN 12056-3, DIN 1986-100, DIN 1986-3, DIN 18531, DIN 18195, DIN 18234, flat roof guidelines Some important points of these systems of rules are listed below: o o o o o o o o o o Roof outlets are to be fitted at the lowest point of a roof. In the case of steel trapeze profile substructures, penetrations are to be reinforced by a strengthening sheet. The basic body is to be joined with the substructure. A skewing of the extension unit through relative movements of the roof construction must be prevented (e.g. through mechanical fixing of the unit). The flanges of the roof outlets and extension units are to be installed Roof outlets must be freely accessible for maintenance purposes. Roof outlets and the connected pipelines have to be protected against "sweating", where appropriate, with e.g. aluminium-coated rock wool. In the case of waterproofing seals of only one layer and/or loosely laid, then screw-on flange joints must be installed with permanently compatible material of the same type as the waterproofing (or a suitable elastomer) fitted on both sides. The bolts of screwed-on-flange joints must be checked and tightened at least three times during the course of the fitting work, using a torque wrench. Roof outlets have to be serviced at least twice per year. 3

1. SitaTurbo - Facade breakthrough The position of the breakthrough (ø 170 mm) through the facade / parapet is dependent on the placement of the SitaTurbo Attica outlet and is determined as follows: a) Determine the distance x from facade leading edge to drain pipe leading edge b) Find the value in the chart and read off the corresponding height y. The height y is the center of the breakthrough (diameter 170 mm) and is measured from the top edge of thermal insulation. Example: The distance x to the facade front edge is 500 mm. Thus the height y of the breakthrough is 60 mm. Distance x [mm] Height y [mm] 100 200 300 400 500 600 700 800 900 39 44 49 54 60 65 70 75 81 4

2. SitaTurbo Steam vapour barrier plate 2.1 Secure the thrust-flange of the SitaTurbo Steam vapour barrier plate rigidly in front of the provided recess on the attic. 2.2 Define the position of the steam vapour barrier plate in the the vapour barrier. Punch out the hole pattern with a punch and postpone the vapour barrier over the steam vapour barrier plate up to the thrust-flange. Cut out the vapour barrier inside of the thrust-flange. 2.3 Postpone the connection sleeve over the threaded pins up to the vapour barrier. 5

2.4 Postpone the loose-flange over the threaded pins up to the connection sleeve. 2.5 Set the spring rings and hex nuts on the threaded pins and tighten the nuts diagonally (max. torque 8 Nm). 3. SitaTurbo Steam vapour barrier flex 3.1 Roof construction with identified recess in the parapet. 6

3.2 Mount the SitaTurbo Steam vapour barrier flex in front of the parapet recess. 3.3 Define the position of the steam vapour barrier plate in the vapour barrier and cut out in such way that the vapour barrier can be connected vapour-tight to the vapour barrier plate adhesive flange. 4. SitaTurbo Attika outlet 4.1 Cut out the contour of the SitaTurbo Attica outlet from the insulation. Place the thermal insulation onto the vapour barrier. 7

4.2 Grease the sealing of the steam vapour barrier plate and the pipe end of the SitaTurbo with lubricate. Push the rectangular pipe through the sealing and insert the SitaTurbo in the defined position in the flat roof construction and fix it mechanically. 4.3 Apply to the rectangular pipe a wedge-shaped part of the cutted thermal insulation and adjust so that a flat surface is formed. (If necessary, an insulation wedge can be applied) 4.4 Set up the large rubber sealing sleeve over the threaded pins on the thrust-flange of the SitaTurbo. In case of a bituminous sealing the rubber sealing sleeve is not required. Grease the thrust-flange with bituminous primer and weld the bituminous track (tracks) on the roof structure. 4.5 Determine the position of the SitaTurbo in the roof track. Use The loose-flange as template for the hole pattern of the threaded pins of the SitaTurbo. Mark the hole pattern and punch it out with a punch (ø13). Pull The roofing track (tracks) over the threaded pins and lay them on the rubber sealing sleeve. Cut out the roofing track inside the inlet pot. A seam overlap in the flange area is not allowed. 8

4.6 Lay the small rubber sealing sleeve over the threaded pins on the roof track. In case of a bituminous seal a sealing sleeve is not applicable. 4.7 Heat the roof track and lay the loose-flange over the threaded pins on the small sealing sleeve. 4.8 Lay the washers over the threaded pins on the loose-flange. Put the nuts on and tighten them diagonally and alternately with a torque of max. 30 Nm. According to DIN 18195 is a loosethrust-flange construction at least three times to be controlled and tighten up in a timing of > 24 hours. 4.9 Lay the dome grate over the threaded pins on the nuts. Lay washers and nuts up and tighten them tangible. Press the caps on the nuts. 9

5. SitaTurbo cover plate 5.1 Lay the cover plate on the dome grate and align them that the holes of the cover plate are laying directly above the holes of the dome grate. Mount the cover plate with the enclosed screws. 6. SitaTurbo cladding-cover-plate 6.1 Place the cladding-cover plate over the out of the facade standing rectangular pipe of the SitaTurbo and fix it mechanically. 7. SitaTurbo outlet transition piece 7.1 Place the lamellar sealing of the SitaTurbo outlet transition piece on the pipe end of the rectangular pipe and postpone it so much, that the stainless steel pipe lays in the three-sided U- profile. It is important to ensure that the page without U-profile is directed downwards. 10

7.2 Grease the lamellar sealing from the outside and the stainless steel transition piece from the inside with lubricant. 7.3 Postpone the transition piece over the lamellar sealing so much that the protruding lamellar lays from all sites in the transition piece. (See following detail). Transition piece Lamellar sealing Postpone the on the facade mounted coupler downpipe on the transition piece. 7.4 In case of to be connected zinc downpipe, the adapter to zinc pipe can be used between the downpipe and the transition piece. 11

8. SitaTurbo Terrace installation kit 8.1 The protective caps over the nuts put on respective central or respectively remove the outer protective caps. 8.2 Place the SitaTurbo terrace installation kit with the four brass bushings on the four remaining threaded pins and adjust them to the desired height. 8.3 On terrace floorings above 93 mm the terrace installation kit adapter for extension have to be screwed in between the frame of the terrace installation kit and the brass baushings. 8.4 Insert the grid into the terrace installation kit frame. The terrace flooring can be fitted to the terrace installation kit. 12

9. Sita Steam vapour barrier Flex with round pipe Breakthrough dimension of an insulated parapet Facade breakthrough SitaAttika outlet with round pipe DN 50 ca. ø 100 mm SitaAttika outlet with round pipe DN 70 ca. ø 125 mm SitaAttika outlet with round pipe DN 100 ca. ø 150 mm The resulting air gap has to be full filled after the installation with a suitable material such as thermal insulation or similar. 9.1 Parapet with facade breakthrough. 9.2 Mount the SitaSteam vapour barrier flex centrically on the facade breakthrough. 13

9.3 Glue the vapour barrier on the adhesive flange of the flexible steam vapour barrier. In case of a bituminous vapour barrier a flexible steam vapour barrier with elastomeric bitumen needs to be connected. 9.4 Cut out the contour of to be incorporated component from the thermal insulation and apply it to the roof area as well as the parapet. 9.5 Grease the lamellar of the steam vapour barrier flex as well as the pipe of the component with lubricate. Push the pipe through the lamellar of the steam vapour barrier flex and insert the component to the determined position into the flat roof construction. The component needs to be fixed mechanically. 10. SitaRondo base plate The SitaRondo base plate needs to be mounted in the same way like the SitaTurbo Steam vapour barrier plate. 14

11. SitaRondo 11.1 Put the Sita rubber sealing sleeve large over the threaded pins onto the thrust flange of the SitaRondo. In case of a bituminous roof sealing a rubber sealing sleeve is not necessary. Grease the thrust flange with bitumen primer and weld the bitumen track (tracks) on the roof structure. 11.2 Determine the position of the SitaRondo in the roof track. Use the loose flange as template for the threaded pins hole pattern of the SitaRondo. Mark the hole pattern and punch it out with a punch (ø13 mm). Pull The roofing track (tracks) over the threaded pins and lay them on the rubber sealing sleeve. Cut out the roof track inside the loose flange. A seam overlap in the flange area is not allowed. 11.3 Lay the Sita rubber sealing sleeve small over the threaded pins on the roof track. Heat the roof track and lay the loose flange over the threaded pins on the Sita rubber sealing sleeve small. 15

11.4 Push the bulkheads and the washer ø 24 mm in the edge areas of the SitaRondo over the threaded pins on the loose flange. Apply the nuts and tighten alternating with a torque of max. 30 Nm. 11.5 Push the washers ø36 mm over the threaded pins on the loose flange in the sealing layer. Apply the nuts and tighten alternating with a torque of max. 30 Nm. 11.6 Put the dome grate with the angle bracket on the middle threaded pin in the parapet layer. Push the washer ø36 mm over the threaded pins on the loose flange or respectively angle bracket. Apply the nuts and tighten alternating with a torque of max. 30 Nm. 16

11.7 Press the caps on the nuts. 11.8 According to DIN 18195 is a loose- thrust-flange construction at least three times to be controlled and tighten up in a timing of > 24 hours. 12. SitaEasy 12.1 Grease the connection socket of the SitaEasy and the sealing of the coupler pipe with lubricate. Push the connection pipe on the socket of the SitaEasy. 12.2 Push the SitaEasy with connected connection pipe through the core drill into the parapet. 17

12.3 Fix the flange of the SitaEasy mechanically. 12.4 Glue or weld the roof track (tracks) onto the SitaEasy connection sleeve. 12.5 The SitaEasy dome grate can be inserted into the fixation ring of the SitaEasy if necessary. 18

Notes: 19

Notes: 20

Sita Bauelemente GmbH Ferdinand-Braun-Str. 1 D-33378 Rheda-Wiedenbrück Phone +49 (0) 2522-8340-160 Fax +49 (0) 2522-8340-260 E-Mail: info@sita-bauelemente.com www.sita-bauelemente.de Valid: 27.10.2010 Subject to technical changes, even without notice.