FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

Similar documents
FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

Included in this Stakeholder Information Package:

SOUTHWEST CALGARY RING ROAD (SWCRR)

Bohn to Kettle River Transmission Project

Kettle River Transmission Project

Currant Lake Transmission Project

Electric system improvements near you

Wainwright 51S Substation Connection Enhancement Needs Identification Document

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP)

APPENDIX C - AESO PIP SUMMARY

Willingdon Substation Decommission

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

conversation SHAPE the May 2015 The AUC

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

DFO STATEMENT OF NEED REPORT

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station.

Welcome. Green Line in Your Community

JCP&L Verbatim Response to Middletown Township s Questions

welcome to the BC Hydro community open house

Powering Sydney s Future

Sheridan 2085S Substation. Needs Identification Document

Alternatives for meeting the need for transmission improvement described

Dawes Substation Project

WELCOME. North Central LRT Open Houses. June 11, Ascension of Our Lord School June 12, Winston Heights June 13, Thorncliffe Community Hall

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

Decision The City of Calgary. 30-kW Solar Power Plant. March 8, 2012

Coalspur Mines (Operations) Ltd.

Our proposal is to replace the existing pipeline with a new pipeline, to ensure the continued safe transportation of refined petroleum products.

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Segment Update April 19, 2017

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

Decision on Merced Irrigation District Transition Agreement

ATTACHMENT - DFO STATEMENT OF NEED

Brion Energy Corporation

Mystic to Woburn Line Project. Town of Winchester Board of Selectmen Lincoln School Auditorium February 11, 2016

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

Appendix D Black Hills Project Summary

MUNICIPAL CLASS EA PROCESS 1

Merger of the generator interconnection processes of Valley Electric and the ISO;

TERRACE TO KITIMAT TRANSMISSION PROJECT OPEN HOUSE 5 P.M. 8 P.M. GDS14-027

Explaining AER Setbacks

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

ENMAX Power Corporation

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Western Alberta Transmission Line (WATL) HVDC Project

Weasel Creek Transmission Project

HIGHWAY 28 FUNCTIONAL DESIGN

THE WAY WE MOVE LRT FOR EVERYONE

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

CREATING CONNECTIONS IN WATERLOO REGION

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council:

The Engineering Department recommends Council receive this report for information.

Transportation Infrastructure Investment Program moving

/ Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ

15 Nelson-Marlborough Regional Plan

APPENDIX E: ELECTRIC AND MAGNETIC FIELDS MANAGEMENT PLAN

The Capital Grid Project:

15 Nelson-Marlborough Regional Plan

Decision D Finlay Group. Complaint Regarding FortisAlberta Inc. Distribution Line Rebuild Project. February 3, 2016

Investigation Report Worker fatally crushed in equipment November 18, 2014

Community Advisory Committee. October 5, 2015

Vantage to Pomona Heights Transmission Project Frequently asked questions

High Prairie Area 144 kv Transmission Upgrade Project

Green Stocking Transmission Project

Alberta Energy and Utilities Board. Application to Construct and Operate Transmission Facilities

Proposed Dounreay - Mybster 275 kv / 132 kv

PROJECT BACKGROUND 3

West Station-West Cañon 115 kv Transmission Project

Frequently Asked Questions Leander-Round to Rock 138-kV Transmission Line Project Williamson County

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

University of Alberta

2018 AER Social Research Report

Battery Electric Bus Technology Review. Victoria Regional Transit Commission September 19, 2017 Aaron Lamb

NEW ECTOR COUNTY NORTH TO MOSS 138 kv TRANSMISSION LINE PROJECT PUBLIC OPEN HOUSE MEETING

1 Downtown LRT Connector: Draft Concept

July 24, Rhode Island Transportation Innovation Partnership AUTONOMOUS VEHICLE MOBILITY CHALLENGE

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

Evaluating Stakeholder Engagement

CREATING CONNECTIONS IN EAST GWILLIMBURY

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

RE: Regulatory Proposal under the Condominium Act, 1998 (17-MGCS021)

Business Advisory Committee. July 7, 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Chirmorie Wind Farm Grid Connection

This page is intentionally left blank.

2.1 TRANSIT VISION 2040 FROM VISION TO ACTION. Expand regional rapid transit networks STRATEGIC DIRECTION

FREQUENTLY ASKED QUESTIONS

Crestmont Development Update 2017 AGM

Grid Energy Storage: Policies

Mississauga Bus Rapid Transit Preliminary Design Project

Wal-Mart Canada Corp.

City of Palo Alto (ID # 6416) City Council Staff Report

DEPUTATION TO THE COMMITTEE OF THE WHOLE of the TOWN OF THE BLUE MOUNTAINS. ANDREA MACECEK AND GLENN BIER for the RESIDENTS OF WOODLAND PARK ROAD

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

Irvington to Kino 138 kv Transmission Line Project April 2018 EXHIBIT J 9

FREQUENTLY ASKED QUESTIONS

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

Transcription:

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT Proposed 138kV Transmission Line Photo courtesy of The City of Calgary Project Overview The demand for power is increasing as Calgary continues to grow. The Alberta Electric System Operator (AESO) has determined the existing transmission system in south Calgary will become overloaded as the demand for power rises. The reliability of your power supply is reduced as transmission lines become overloaded and the likelihood of power outages increases. The AESO has identified the need to add a new 138 kv transmission line between ENMAX No. 65 Substation (intersection of Highway 22X and 88 Street SE) and ENMAX No. 41 Substation (213 Shalom Way SW) via ENMAX No.54 Substation (3023 210 Avenue SE) in order to prevent transmission line overloads in the South Calgary area. To meet this need, ENMAX Power Corporation (ENMAX Power) has identified two viable transmission routes a preferred and an alternate. The total length of the proposed transmission line to be constructed is approximately 14 22 kilometres depending upon the approved route. New equipment will be added at ENMAX Substations No. 65 and No. 41 to accommodate the new transmission line (see attached map). Electricity consumption in the Calgary area is forecast to increase by approximately 26 per cent in the next decade. Source: Alberta Electric System Operator

Potential Route Locations During the process of determining possible route options, ENMAX Power considers the following factors to select a route(s) with the lowest overall impact: agricultural residential environmental electrical cost visual special constraints After assessing several transmission route options, ENMAX Power has selected two route options, a preferred and alternate as identified in the map on the next page. The preferred route: Is approximately 14 km and is the shorter of the two routes Is the lower cost option Utilizes the existing Transportation Utility Corridor (TUC) The alternate route Has fewer residences at this point, however is zoned for future development Is the longer of the two routes at 22 kilometres Is the more expensive option Only one route will be required for the project, however, both route options will be included in the Facilities Application (FA) submitted for decision to the Alberta Utilities Commission (AUC). What is a Transportation Utility Corridor? In the mid-1970s, the Government of Alberta established Restricted Development Areas (RDAs) around Calgary. The lands included in these RDAs were designated to accommodate linear transportation and utility facilities. These uses include ring roads (and associated interchanges), stormwater management facilities, petroleum pipelines, power transmission lines and municipal regional water, sanitary and storm sewer lines.

CHAPARRAL BV SE DEERFOOT TR SE Rendering map of route options SE BV SW AWNESSY MILLRISE BV SW 41 162 AV SE LAKE MIDNAPORE MIDNAPORE SUNDANCE PARKLAND 146 AV SE DEER RUN FISH CREEK PARK MCKENZIE TOWNE BV SE MCKENZIE LAKE MCKENZIE TOWNE LAKE MCKENZIE LAKE MCKENZIE TOWNE 6 ST SW STONEY TR SE PREFERRED ROUTE DEERFOOT TR SE NEW BRIGHTON MCIVOR BV SE COPPERFIELD 65 RSET 6 ST SW LAKE SUNDANCE SUN VALLEY BV SE SIKOME LAKE 26 AUBURN BAY 52 ST SE MAHOGANY 88 ST SE CHAPARRAL 194 AV SW SILVERADO MACLEOD TR SE LAKE CHAPARRAL 194 AV SE CRANSTON SETON WY SE SETON 210 AV SW SHERIFF KING ST S 194 AV SE MAP LEGEND WALDEN BV SE 210 AV SE WALDEN B O W R I V E R ALTERNATE ROUTE ENMAX Substations Preferred Route Alternate Route Existing Transmission Lines To Be Re-used Transportation Utility Corridor LEGACY 54 Preferred Route - green The Preferred Route runs from ENMAX Substation No. 65 west along Highway 22X to MacLeod Trail in the TUC and then north on MacLeod Trail to ENMAX Substation No. 41. The existing double circuit transmission line along Deerfoot Trail from 22X to ENMAX Substation No. 54 will be used to connect this new line to ENMAX Substation No. 54. The Preferred Route is the least costly of the two routes. In addition, the route passes through the TUC specifically allocated by the provincial government for utility facilities such as power transmission lines. Alternate Route - yellow The Alternate Route proceeds south on 88 Street from ENMAX Substation No. 65 to 210 Ave; west on 210 Ave, via ENMAX Substation No. 54 to MacLeod Trail and then north to ENMAX Substation No. 41. The Alternate Route currently impacts a lower number of residences; however, it is adjacent to several undeveloped areas which are zoned for future residential development and have conceptual plans in place for new and emerging communities.

Transmission Structures The proposed single circuit transmission structures for both the preferred and alternate routes would be self-supporting steel monopoles and will have a: Height of 18 to 24 metres ( 58 to 78 feet) Distance between structures of 100 to 125 metres (325 to 410 feet) Examples of single circuit steel monopoles Transmission line To move our electricity from power generating facilities to local areas, ENMAX Power relies on a system of high-voltage power lines across Alberta, including our own 288 kilometre transmission network within the City of Calgary. These transmission lines enter a substation where a transformer reduces voltage to a level that can be safely delivered to customers.

Electric and Magnetic Fields (EMF) ENMAX Power understands some individuals may have concerns regarding electric and magnetic fields (EMF). Scientific evidence to date has not established adverse health effects resulting from exposure to power frequency EMF at levels normally encountered in homes, schools and offices. However, we continue to monitor this issue through our work with the Canadian Electrical Association s task group, and recognize no single study will resolve this issue. Information and in-home measurements are available to our customers so they can make their own informed decisions regarding this issue. Electric and magnetic fields are invisible lines of force surrounding any wire or device that uses electricity. They are created whenever electricity flows through a wire (eg. overhead power lines, electric appliances, or electrical cords or wiring) because these fields are found wherever there is electricity. For further information, please visit https://www.enmax.com/safety/electrical-safety/electric-and-magnetic-fields-(emf) Safety and Reliability Calgarians rely on us every day to provide them with safe and reliable power. As our city grows, so do our needs for electricity. At ENMAX Power, we are committed to providing long-term, innovative solutions to meet the growing demands of our city. What is a Substation? Substations are important components of the electrical infrastructure required to keep reliable electricity available for customers. Substations consist of high voltage electrical equipment like transformers, switchgear, circuit breakers and associated devices.

Industry Partners and the Regulatory Process The AUC must approve this project before upgrades to the system can begin. The AUC is a quasi-judicial agency that ensures the fair and responsible delivery of utility services. Before any work takes place, the AESO identifies a transmission system requirement and determines the manner in which that need can be met. The AESO is then required to submit a Needs Identification Document (NID) outlining their recommendation to the AUC for review and approval. The AESO is an independent, not-for-profit organization responsible for the safe, reliable and economic planning and operation of the provincial transmission grid. For more information about why this project is needed, please refer to the AESO s newsletter included with this package, or visit www. aeso.ca. If you have any questions or concerns about the need for this project you may contact the AESO directly or you can make your concerns known to an ENMAX Power representative who will communicate them to the AESO on your behalf. In Alberta, the system that delivers electricity to consumers is owned, built and maintained by companies known as Transmission Facility Owners (TFOs). Based on system requirements, the AESO will direct a TFO to determine routing and infrastructure. In this instance, ENMAX Power is the TFO as the proposed project occurs in ENMAX Power s service territory and will explore various alternatives to locate the transmission lines, considering routing, environment, costs, stakeholder input and project components. ENMAX Power submits an FA to the AUC for review and approval describing how it proposes to meet the requirements for the transmission project. The application includes technical details, routing and results of the participant involvement program. The NID created by the AESO and the application created by ENMAX Power will be submitted for AUC review simultaneously. The AUC then reviews both the NID application from the AESO and the FA from ENMAX Power. The AUC ensures there is an opportunity for interested parties to provide feedback and input on the applications before a decision is made. Additional information on participant involvement is included in the AUC booklet as part of the information package. Privacy Commitment ENMAX Power is committed to protecting your privacy. Your personal information that is collected will be protected under ENMAX s Privacy Policy and Freedom of Information and Protection of Privacy Act. As part of the regulatory process for new transmission projects, ENMAX Power may provide your personal information to the Alberta Utilities Commission. If there is more than one TFO involed For more information about how ENMAX Power protects your personal information, visit our website at https://www.enmax.com/legal/privacy or contact us directly via email at privacy@enmax.com.

Proposed Schedule ENMAX Power plans to file the FA with the AUC in late June 2014. Subject to approvals being granted, ENMAX Power expects construction to begin in June 2015 with a proposed in-service date of October 2016. Proposed Project Schedule Initial stakeholder engagement January - June 2014 June 2015 Construction begins 2014 2015 2016 June 2014 ENMAX Power submits FA to the AUC June 2015 Permit and Licence from AUC granted to ENMAX Power 2017 October 2016 In-service date Ongoing stakeholder engagement January 2014 - October 2016 Open Houses ENMAX Power and AESO representatives will be available at open houses to share information, gather your input and address any questions or concerns you may have. We hope to see you there. Date Location Morning Evening April 1, 2014 Heritage Pointe Golf Course #1 Heritage Pointe Drive, DeWinton April 2, 2014 Century Hall Heritage Room, 11 Cranarch Road SE, Calgary April 3, 2014 South Fish Creek Recreation Centre Super 8 Room, #100, 333 Shawville Blvd. SE April 8, 2014 South Fish Creek Recreation Centre Super 8 Room, #100, 333 Shawville Blvd. SE April 9, 2014 Century Hall Heritage Room, 11 Cranarch Road SE, Calgary

Commitment to Community ENMAX Power is committed to being a responsible corporate neighbour in the community. This commitment includes providing timely and meaningful engagement with stakeholders about this project. We have developed a comprehensive public involvement program to provide opportunities for area residents, occupants and landowners to be informed about this proposal and to engage with ENMAX Power in dialogue from the planning phase through to construction. More Information About ENMAX Power ENMAX Power Corporation, a subsidiary of ENMAX Corporation, and its predecessors have provided Albertans with safe and reliable electricity for more than 100 years. One of the most reliable urban utilities in Canada, ENMAX Power owns, operates and maintains the distribution and much of the transmission network in and around Calgary, which are activities regulated by the Alberta Utilities Commission. Non-regulated subsidiaries of ENMAX Power provide engineering, procurement, and construction services as well as maintenance for electrical servicing of residential and commercial developments and light rail transit systems. Visit our website at enmax.com For more than 100 years, ENMAX has delivered safe and reliable electricity in Calgary. Moving electricity from the point where it is generated to our customers homes and businesses is split into two areas: transmission and distribution. Your input is very valuable to us. We will work with you to ensure you get answers to your questions and your concerns are understood. For more information about the proposed transmission line, please contact: ENMAX Power Corporation Phone: (403) 514-1471 E-mail: stakeholderrelations@enmax.com Website: enmax.com/transmissionprojects For more information about the need for this project, please contact: Alberta Electric System Operator (AESO) Phone: 1-888-866-2959 E-mail: stakeholder.relations@aeso.ca Website: poweringalberta.com For more information about the regulatory process, please contact: Alberta Utilities Commission (AUC) Phone: (780) 427-4903 (Toll free: dial 310-0000 before the 10 digit number) Website: auc.ab.ca