year of 2009 1 ALIF DIAMOND (M) SDN 1 pc - 20" Butterfly 24/08/2009 2 SIME DARBY ENGINEERING SDN 17 pcs - 1" -20" Ball 25/08/2009 3 ALIF DIAMOND (M) SDN 1 pc - 14" Butterfly 09/09/2009 4 TEAMCOAT METALCARE AND DEVELOPMENT SDN TEAMCOAT METALCARE AND DEVELOPMENT SDN TO SUPPLY OF ZINC ANODE 29/09/2009 5 PETRONAS CARIGALI SDN 35 pcs of Ball & Butterfly 28/08/2009 6 Service, Repair & Testing of 31 pcs Gate 17/11/2009 7 TANJUNG CSI Service, Repair & Testing of 12 pcs Ball 30/12/2009 8 BC PETROCHEMICAL SDN PETRONAS CARIGALI SDN 1 pc - 16" Control 16/12/2009 9 MAKHOSTIA SDN GDC, PUTRAJAYA Replace 8" ABS Pipe 18/11/2009 page 1
year of 2010 1 TANJUNG CSI Service, Repair & Testing of 4" 150# Ball 08/01/2010 2 BC PETROCHEMICAL SDN TALISMAN (M) LIMITED Testing of 14 pcs Ball 20/01/2010 3 MURPHY OIL Service, Repair & Testing of 6" 1500# DBB 28/01/2010 4 MAKHOSTIA SDN GDC, PUTRAJAYA Cleaning and Servicing Work for DOSH Inspection 18/01/2010 5 Service, Repair & Testing of 31 pcs Gate 20/01/2010 6 Testing of 30" 150# Gate 20/01/2010 7 Testing of 36" 150# Gate 26/01/2010 8 Testing of 6" ANSI 300 Globe 11/03/2010 9 AQEEL ENGINEERING & CONSTRUCTION SDN TITAN PETCHEM (M) SDN Service 12" Check 02/05/2010 10 ALIF DIAMOND (M) SDN Service 12" 150# Ball 27/04/2010 11 Supply, Machining & Installation of Bushing 28/04/2010 12 ALIF DIAMOND (M) SDN CARIMIN ENGINEERING SERVICES SDN Service, Repair & Testing of 26 pcs 23/04/2010 13 ALIF DIAMOND (M) SDN Service, Repair & Testing of 8 pcs Gate 10/05/2010 14 PETRONAS GAS BERHAD PETRONAS GAS BERHAD GPP1 TA: Q-101 Cable Replacement Works 01/06/2010 15 Drive Bush for 24" MOV 25/06/2010 16 PWS MANUFACTURING SDN MISI SETIA OIL & GAS SDN Testing Ball 3" 150-2 Pcs 02/11/2010 17 PETRONAS GAS BERHAD PETRONAS GAS BERHAD To Servicing, Inspection and Installation at Optimal Metering 22/12/2010 18 Supply, Machining & Installation of Bushing 09/12/2010 page 2
year of 2011 1 ATS OILFIELD SUPPLY & SERVICES SDN Testing & Mounting of 24" 300# Gate 06/01/2011 2 PETRONAS GAS BERHAD PETRONAS GAS BERHAD Replace 20" 600 Insulation Gasket & 4" 600 SPW Gasket at PGB Setiawan TOD Metering Station 19/01/2011 3 DERMAGA OIL & GAS SDN PETRONAS AMMONIA SDN 4 TANJUNG BIN POWER PLANT TANJUNG BIN POWER PLANT Supply Manpower for AMMONIA Shutdown Supply Manpower for Removal and Installation 17/02/2011 16/03/2011 5 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC 6 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC Site Visit of HP Flow Assurance Pump at Puteri Platform Provision of Spare Part for Open Drain and Closed Drains Pump 10/05/2011 27/05/2011 7 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC Service of Drain Pump 10/05/2011 8 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC Supply of manpower to Install the Spare Parts for HP Flow Assurance Pump 23/06/2011 9 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC Supply of Spare Part for HP Pump 30/06/2011 10 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC Supply manpower, consumables & tools for the inspection & dismantle of CHU accessories at Puteri Platform. 06/07/2011 11 Supply of Ex-Stock 18" 150# Gate 18/07/2011 12 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC Supply manpower, consumables & tools for the inspection & dismantle of CHU accessories at Puteri Platform. 01/08/2011 13 KENCHANA HL SDN NEWFIELD PENINSULA MALAYSIA INC Onshore Refurbishment Servicing of CHU Parts. 01/08/2011 14 BEST WIDE ENGINEERING (M) SDN NEWFIELD PENINSULA MALAYSIA INC Supply manpower, tools & consumables to perform the offshore installation work for 2 units of Heater Bundle (E-5855 & E-5851) & of Heater Control Panel (E-5855 & E-5851) inside the Fuel Gas Skid. 16/08/2011 15 MULTI-ENGINEERING & MANAGEMENT SDN PETROFAC Supply of Manpower, Services, Repair & Testing of the below Leaked s. 03/10/2011 16 DIALOG PLANT SERVICES SDN PETRONAS PENAPISAN TERENGGANU SDN To supply manpower, tools & equipment to do pressure test for the Breather 23/08/2011 17 CARIGALI-PTTEPI OPERATING COMPANY SDN CARIGALI-PTTEPI OPERATING COMPANY SDN To survey, supply & install tyre for boat landing at JKA/MDB/MDC/MDA. 16/08/2011 18 CKJ ENGINEERING & SERVICES SDN. PETRONAS CARIGALI SDN. Provision of manpower to site visit, design & produce the piping drawing for TOPAZ DRILLING RIG 12/07/2011 19 VALSER ENGINEERING & SERVICES SDN VALSER ENGINEERING & SERVICES SDN Rental of 30 " x 150" RF Blind Flange for 2 Pcs. 21/12/2011 page 3
year of 2012 1 NEWFIELD PENINSULAR MALAYSIA NEWFIELD PENINSULAR MALAYSIA Supply, Deliver, Hydrotest & Seat Test of 4"900# RTJ Actuated Ball (2Pcs) 16/01/2012 2 PETRONAS CARIGALI SDN PETRONAS CARIGALI SDN Hydrotest & Seat Test of 24" 900# RTJ Ball 20/02/2012 3 BC PETROCHEMICAL SDN BC PETROCHEMICAL SDN Service, Repair & Testing of 2pcs Ball 13/04/2012 4 SAPURA POWER SERVICES SDN PETRONAS CARIGALI SDN Provision of material, manpower, consumables, tools & equipments for repair Gas Turbine Silencer (K2410) at Resak, Platform. 05/04/2012 5 SAPURA POWER SERVICES SDN PETRONAS CARIGALI SDN Supply of Manpower for Gas Turbine Exchange Support at Resak Platform 15/05/2012 6 BC PETROCHEMICAL SDN BC PETROCHEMICAL SDN HYDROTEST & SEAT TEST OF 1/2" 600#RF & 1 1/2" 1500#RTJ BALL VALVE 28/06/2012 7 VOSS ENGINEERING SDN PETROFAC E&C SDN Supply of Manpower for Refurbishment of Manual s 06/07/2012 8 BC PETROCHEMICAL SDN BC PETROCHEMICAL SDN 9 BC PETROCHEMICAL SDN BC PETROCHEMICAL SDN 10 BC PETROCHEMICAL SDN BC PETROCHEMICAL SDN 11 KENCANA HL SDN KENCANA HL SDN Hydrotest & Seat Leak Test for Ball 2" X 1500# RTJ Hydrotest & Seat Leak Test for 9 Pcs Ball Blasting & Painting of 8" 2500# RTJ Check Manpower for Test Seperator Bridle Instaalation & Transmitter Rectification 23/07/2012 23/07/2012 26/09/2012 09/10/2012 page 4
in progress DELIVERY 1 MAKHOSTIA SDN GDC, PUTRAJAYA Execution of Civil Work at Putrajaya Plant 1 23/11/2010 IN PROGRESS 2 PETRONAS CARIGALI SDN Supply Manpower for Services Works at PCSB Dulang 16/03/2011 IN PROGRESS 3 PT HEAT EXCHANGERS INDONESIA KNM Supply of Manpower at EPC of AMPA- 09 Compression 08/10/2012 IN PROGRESS page 5