Ocean Class AGOR Acquisition Update. UNOLS Council June 6, Harvard University

Similar documents
Ocean Class AGOR Program Acquisition Status 11 February 2013

Ocean Class AGOR Program Program Status 21 October 2014

Prepared For RVTEC. Ocean Class AGOR Program Program Status 19 November 2013

Ocean Class AGOR. Baseline and Priorities Mission Equipment Specification (MES) 13 October 2010

Ocean Class AGOR Program Program Status 11 March 2014

RVOC Discovery Replacement Project Robin A Williams OBE Project Technical Adviser to the Natural Environment Research Council.

Ocean Class AGOR Update. FIC Mee4ng March, 2015 J.M. Prince

CLV SIA. Vessel Specification. M-Tech Offshore Torskekaj Esbjerg, Denmark

BUILT: 2009 Dry Dock World Pertama FLAG: Panama CLASS: ABS + A1 + (E) + AMS + ACCU + ICE CO + DP3 + HE LIDECK + ES + FiFi 2

Topaz Master. 85T BP M 5700 kw DP2 - AHTS. Vessel Specifications

A Updated report to reflect latest engineering documents 29 September 2016

GPA 670 PSV Series DP2 Diesel-Electric Platform Support Vessel Exceptional Maneuverability

LONG CORE-CDH port 250,000 # 42m 87M

GPA 654 PSV Series D-P2 Diesel Electric Platform Support Vessel Low Emissions Crew Safety

SEABED WORKER Multi-Purpose Subsea Vessel

M/V Paul Candies PERFORMANCE GENERAL HELIDECK MAIN ENGINES AND PROPULSION MAIN DIMENSIONS TONNAGE CAPABILITIES

SeaRobotics Facility. Integrated Facility for the Design and Build and Test. Location. Facility. Test Capability

SOUND FLEET FACTS: SUSTAINED COMMITMENT, INCREASING CAPABILITIES

PRIDE / EXCELLENCE Vessel Specification

Research vessel Mar Portugal

CLASS 245 LIFTBOAT SEACOR EAGLE SEACOR EAGLE CLASS 245 LIFTBOAT. LEG CAPACITIES ELECTRONIC AIDS & COMMUNICATIONS HULL

CAPABILITIES TANK CAPACITY DECK EQUIPMENT

A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology.

BOA DEEP C Subsea / IMR / Offshore Construction Vessel

GRC43m GLOBAL RESPONSE CUTTER

DDG 1000 Class Destroyer

SEABED CONSTRUCTOR Multi-Purpose Offshore Construction Vessel

Acoustic Design, Construction and Testing of Fisheries Research Vessels

BOĞAÇAY RAmparts 2400 SX 60/70/75 BUILDING FOR THE FUTURE

KEY FEATURES. DP-3 250T Offshore Crane 1600m 2 Deck Space Moonpool High sea state capability ARIADNE

Accommodation vessel DP Gezina

Dr. Fridtjof Nansen Building progress

SEA ROYAL. Dimensions Length Overall : 60 m. Registration. Breadth Moulded : 16 m. Depth Moulded : 6 m

BOURBON LIBERTY 300 SERIES. Anchor Handling Tug Supply Vessel. DP2-85 t Bollard Pull

Some of the Submarine Transducers Developed and Manufactured by Massa

BOURBON LIBERTY 150 SERIES. Platform Supply vessels. DP2-1,701 t DWT

DG-60M/540T BARBAROS Class PATROL BOAT ASuW, ASW, AAW

SIKULIAQ & RCRV Scope of Supply

This slack line tensioner will potentially be used for the following types of deployments:

STG. Offshore Vessel Summary Sea Trucks Group. Sea Trucks Group

Efficient and flexible solution

Designed for customers

Design: Aker OSCV 06L DSV Built: 2009 IMO No: Call sign: C6XW3 SKANDI ARCTIC DSV

Diving Support Vessels

IHC Holland BV IHC WFSV Brief Specifications

Commercial Off the Shelf Ships for Naval Applications. By Peter Lucey Director Planning, Major Surface Combatants

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D

Design: KMAR 404 Built: 1998 IMO No:

Delta 85 Flushdeck Flybridge MY Feelin' Free

O C E A N T O W I N G C O N D I T I O N S C H E C K L I S T T U G : T O W :

Meridian 411 Sedan Satori

M A R I T I M E E N G I N E E R S P T Y L TD A Member of James Fisher and Sons plc

FOR SALE m (89'11"ft) Ocean Alexander Miss Michelle

Hydrographic society

NEW JAPANESE SURVEY VESSEL TAKUYO

Engtek Manoeuvra Systems Pte Ltd

Introduction of AVIC International

VESSEL SPECIFICATION

Ship Specification Sheet

45.5m LCT For Sale or Charter - Price Reduced for a Fast Sale! Listing ID:

Caspian Supplier 76.6 M DWT - DP 2 - Platform Supply Vessel. Vessel Specifications

AZIMUTH STERN DRIVE 35/105 TERMINAL SUPPORT/ESCORT TUG

EXECUTIVE SUMMARY - TUGS ASD TUG 2810 DECEMBER 2015

OFFSHORE SUPPORT VESSELS

63' FAST INTERCEPTOR BOAT

Topaz Daughter Class Amani / Faye / Isra / Megan / Seema / Sophie / Xara 75 M 3,300 DWT Platform Supply Vessel. Vessel Specifications

CHARACTERISTICS OF POLLUTION RESPONSE VESSELS FOR THE GULF OF FINLAND

BOA SUB C. Subsea / Offshore Construction Vessel

This block will potentially be used for the following types of deployments: See Reference 3.2.3, Section B.3.5 for descriptions of operations.

EDT PROTEA DPIII MULTI-PURPOSE SUPPORT VESSEL (MPSV) NAVIBAY SHIPPING COMPANY LTD EDT SHIPMANAGEMENT LTD 1991, FLEKKEFJORD SLIP, NORWAY

Yulia Zarayskaya Rochelle Wigley

BOA SUB C Subsea / Offshore Construction Vessel

FAST CREW TRANSFER VESSEL M P 1 5 0

Explore another world with RiSEA Propulsion Group

Azimut 55S (GRP) Price: EUR 945,000. Number:

JU Operator And Service Provider For Offshore Works

CHAPTER 10 FLOATING WHARVES

SIEM MARLIN - MT 6017 MK II

Design: MT 6016 Build: 2000 IMO No:

2017 Concorde Marine Sport Cruiser Call for Price

Asia Pacific Research Initiative for Sustainable Energy Systems 2011 (APRISES11)

The all-aluminum Metal Shark 100 Defiant is based on the state-ofthe-art Damen Stan Patrol This

RO-PAX FERRY April 28 th, Gabriel, Shaun, Timothy

Flying bridge SD122-08

DMS Fortune 57m BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

N IKOS ODYSSEAS PAPADAKIS I N T E R N A T I O N A L YA C H T S A L E S & C H A R T E R S

Coast Guard s Fleet Renewal Plan 2017 November, 2017

OML INTERVENTION I. Diesel Electric/ Self-Propelled/ Self-Elevating/ DPS-2 Accommodation/ Maintenance Jack-Up Barge PRINCIPAL PARTICULARS

SIEM SPEARFISH - OSCV 03

August Equipment A HEEREMA COMPANY

Design: VS 480 Build: 2002 IMO No: Skandi Giant

SUBSEA Petroleum service -- Page 1 of 5 Website

Apreamare (GRP) Price: EUR 395,000

AUSTAL TRIMARAN TECHNOLOGY

Wire and Cable Subcommittee Report. Rich Findley UNOLS RVTEC 2007

Tollycraft 37 Custom SF Stable At Sea

Economy and Flexibility of the Damen Container Feeder 800. for Motorways of the Sea

Ferretti 53 Fly. Number:

Design: MT 6000 Build: 2003 IMO No:

Transcription:

Ocean Class AGOR Acquisition Update UNOLS Council June 6, 2012 Harvard University

Ocean Class AGOR Shipyard: Dakota Creek Industries Anacortes, WA Design Agent Guido Perla & Associates Seattle, WA 1 1

Ocean Class AGOR Phase II Schedule Phase II: Detailed Design & Construction Contract award (AGOR 27) 14 October 2011 Option for AGOR 28 February 2012 Start of Construction (AGOR 27) June/July 2012 Keel Laying (AGOR 27) ~Jul/Aug 2012 Start of Construction (AGOR 28) ~Nov/Dec 2012 Launch (AGOR 27) Jan/Feb 2014 Launch (AGOR 28) Jul/Aug 2014 Deliveries: ~ October/November 2014 & April/May 2015 2

Ocean Class AGOR Acquisition Schedule FY 07 FY 08 FY 09 FY 10 FY11 FY 12 FY 13 FY 14 FY 15 FY 16 O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S ACAT Designation CDD Signature ASR Approved RFP Release (combined phase I& II) Phase I Award (Preliminary/Contract Design) Key: Planned Event Completed Event Duration TBD ACAT: Acquisition Category ASR: Acquisition Strategy Report AT: Acceptance Trials BT: Builder s Trials CDD: Capability Development Document DPST: Dynamic Positioning Sea Trials FCT: Final Contract Trials FOC: Full Operational Capability IOC: Initial Operational Capability MT: Mission Trials OF: Outfitting PD: Post Delivery PRR: Production Readiness review RFP: Request for Proposal SOC: Start of Construction Preliminary/Contract Design Phase II Bid Preparation Phase II Source Selection Milestone B/C Phase II Downselect (Detail Design & Lead Ship Construction) Production Readiness Review (PRR) SOC KL Launch Delivery IOC BT DPST, AT FCT Phase III MT Second Ship Option Award SOC KL Launch Delivery FOC BT DPST, AT FCT Phase III MT 3

General Characteristics Length overall 238-0 Waterline length 230-0 Maximum breadth 50-0 (molded) Depth to Main Deck 22-0 Draft 15-0 Sustained speed 12 knots Max speed (estimated) Installed brake horsepower Installed total power 12.8 knots 2,324 hp 3,952 kw 4

General Characteristics Lightship weight (with 5.5% design and build margin) Full load displacement (without SLA) Range (at sustained speed) Endurance Accommodations 2,058 LT 2,916 LT 11,500 nm 40 days 20 single crew staterooms 12 scientist double staterooms 5

Power Plant and Propulsion Integrated diesel electric drive Four diesel gensets - Cummins Two AC propulsion motors and drives Two CPP s Bow thruster, azimuthing Stern tunnel thruster 6

Mission Systems Ship has been designed with space, weight and power reservations for the following sonar systems: Equipment Manufacturer 1 Model 1 Deep Water Multibeam Survey Kongsberg EM-122 System Mid Water Multibeam Survey Kongsberg EM-710 System Subbottom Profiler Knudsen Chirp 3260 with 16 Massa TR-1075 Array Single Beam Survey System Knudsen Designed with wells for 12, 38, 120, 200 khz transducers Acoustic Doppler Current Profiler Teledyne RD Instruments Ocean Surveyor 38 & 75 or 150 khz Workhouse Mariner 300 khz Acoustic Navigation and Tracking System Kongsberg HiPAP 500 Gantry System can be used with several systems. 1 from Mission Equipment Specification 7

Transducer Room Layout 75 khz ADCP 38 khz ADCP EM122 EM710 EM710 Knudsen 3260 USBL stem 300 khz ADCP 12 khz Transducer

Laboratory Space Comparison AGOR 27 (238 ) = 2,247 Square Feet [OC SMR = 1,850 to 2,100 SF] Atlantis (274 ) = 4, 182 Square Feet Knorr (279 ) = 2,893 Square Feet

SMR Target SF Main 1,000 Wet 400 Computer 300 Staging Bay - 300

Deck Working Space Aft clear deck space 1873 ft 2 Total clear deck space 2557 ft 2 SMR 2,000 to 2,600 SF total 1,500 to 1,800 aft of the deck house 80 x 10 along stbd side

Deck Equipment AGOR 27

Deck Crane: TK70-70. 01 Deck aft Portable Crane: TK4-30. 01 Deck fwd Per Design Specification (J-1) Cranes Shall be capable of: Loading and offloading vans and equipment weighing up to 20, 000 pounds 20 beyond stbd side pier side. Performing towing and coring operations with wire (including fiber optic) from the trawl/tow traction winch. Deploying buoys and other heavy equipment weighing up to 10K lbs. up to 12 over the Stbd. Side in sea state 4 Provided with a load hoist winch capable of providing hook drop at least 50 below the base of the crane and at least 40 /min hook drop test Hook speed of at least 40ft/min with a bare drum and at least 60ft/min with a full drum

CTD Handling System CTD-LARS Stbd.Side Handling System

Stern Frame Allied A-30 (243 x 324 ) Per Design Specification (J- 1) Stern Frame Shall be capable of: Dynamic Safe Working Load of 30,000 Lbs through full range of motions. Capable of withstanding the 46 CFR 189.35 breaking strength requirements for a wire with a breaking strength of 120,000 in fully extended position Rotation Period of no more than 35 Seconds from stop to stop Height from block attachment points to the deck of 27 feet and a clear width between the legs of at least 15 feet above the deck Minimum 12 foot inboard and outboard reach Maintenance position rotates top of frame within a safe working height above the main deck (4 9 ) to change blocks and cable fairleads.

Do you want to see the General Arrangement Drawings? Any Questions? 17