Nordson/Drexelbrook Material Level Control Kit

Similar documents
Hot Melt Guns. Part A NORDSON CORPORATION. AMHERST, OHIO. USA

Normally Open H200 and 90_ CF200 Module Seal Rebuild Kit

Installation Instructions for Series 3100V Low Level Indicator

SP30 6:1 Piston Pump. Installation and Maintenance Instructions. Part D NORDSON CORPORATION AMHERST, OHIO USA

Sure Coat Modular Gun Control System Part D: Gun Purge Module. Customer Product Manual Part B

Time Interval Control

SPRAY RUN-UP CONTROL KIT ( 4-20 ma Version)

MELTEX Electropneumatic Hot Melt Application Head EP 26 SD

Auto-Flo Panel Reinforcement Automatic Dispensing Valve

Auto-Flo Air-Assist Automatic Dispensing Valve

Prodigy HDLV Manual System Installation Instructions

Series 3000V Low Level Indicator

Sure Coat Modular Gun Control System Part B: Pneumatic Modules. Customer Product Manual Part B

Series 3900/M Pump Retrofit Kit

Prodigy HDLV Generation II Pump Panel

Electric Vibratory Box Feeder Retrofit Kit

EP-2 Three-Piston Pump

EP-2 Si Three-Piston Pump

E-200 O-rings Service Kit

Parts. Part B, Section 5. Model 3500 Voltage 1, 2. Manifold 6-Port (B or C) 2-Port (S or T) Issued 11/00 B5EN-05-[3-PARTS]-6

Sure Coat 90 Degree Spray Extension

Parts. Part B, Section 5. This section covers the following unit configurations Model 3500 Voltage 1. 2 Piston (E,) Issued 11/00

Inverted High Pressure Fluid Filters

E-750 Electric Applicator Technical Manual

Filter. Table of Contents. Section 10. Filter NOTE: This section applies to applicators with an in-out filter.

NRPS-100 Rotary Sieve

Notdson MANUAL REFILL/MELTER RETROFIT KIT. SUPERSEDES -i I/ f3 NORDSON CORPORATION 1984 All Rights Reserved

Installing the Low Level Indicator (P/N or P/N )

E-200 Module Service Kit

Manifold-Mounted to Flange-Mounted Solenoid Valve Conversion

Encore HD Powder Spray System with Prodigy Pump Cabinet

Low Level Indicator. Part E, Section 1. This section covers the following unit configurations. 3500V 3700V 3800V 3900V E2EN 03 [3V LLI] 4

Mobile Powder Spray System Dolly with Hopper for Cable-Fed Systems

SP30 10:1 Piston Pump

Mobile Powder Spray System Dolly with Hopper

Installing the Integral Platen Blow Off Valve

Prodigy HDLV Pump. Customer Product Manual Part A02

Filter. Table of Contents. Section 10. Filter NOTE: This section applies to applicators with a Universal in-out filter.

Description. Rhino EFD Bulk Unloader Packages

CoolWave 2 Phase Control Board and Cable Replacement Kit

55-Gallon Powder Drum Truck

Encore HD Automatic System Standalone Pump Stand

Minimum Cavity Guns. Technical Manual. Part A NORDSON CORPORATION AMHERST, OHIO USA

Installing an H-200 Integral Right-Angle Module

TCU Flushing Manifold and RTD Installation

5000 Gerotor Pump Service Instructions

Preventive Maintenance for Pail Melters

Filter. Table of Contents. Section 10. Filter NOTE: This section applies to applicators with an out-in filter.

Econo-Coat Manual Powder Spray Gun

Paint/Solvent/Dump Valve and Flow-Through Valve

Prodigy HDLV Pump Manifold and Circuit Board

OPERATOR S CARD. Select Series H-400 Hot Melt Dispensing Guns. Safety. Description/Intended Use. Nordson Corporation P/N E

0-800 psi Carbide Seat Fluid Pressure Regulator

Blow Off Valve Retrofit Kit

A CAUTION: The kit should not be fitted on Series 3800 or 3900

One-Gun Add-On Kit For Smart-Coat Controllers

Electrical Service Kit Installation for the Model 5550 Drum Melter with OmniScan Controller

Hydraulics. Part B, Section 1. This section covers the following unit configurations. 3400V 3500V 3700V

Nofdson* CORPORATlOU / Amherst. Ohio 44001

Circulation Kits for CP Pumps

Solenoid Valve Installation Kit

VL400 Melters. Safety. Introduction. Nordson Corporation OPERATOR S CARD P/N A

Soft Seat Fluid Pressure Regulator

Prodigy HDLV Generation II Manual System Installation Instructions

OPERATOR S CARD. Select Series H-440 Hot Melt Dispensing Guns. Safety. Description. Nordson Corporation P/N D

WM 600PE Product Ejection System

0 900 psi Pressure-Reducing Diaphragm Regulator

Installation. Part A, Section 3. This section covers the following unit configurations. 3400V 3500V. Voltage 4. Pump Piston (E, F, or G)

Installation. Part A, Section 3. This section covers the following unit configurations: 3400V 3500V Voltage 1, 2, 3 Pump Piston (E, F, G)

Series H-400 Guns. Customer Product Manual Part D. NORDSON CORPORATION D Duluth, Georgia

Spray Pressure Control Manifold

Hydraulics. Part B, Section 1. This section covers the following unit configurations. 3700V 3800V 3900V

Spray Pressure Control Manifold

Hot Melt Applicator. Model VII. Part C NORDSON CORPORATION. AMHERST, OHIO. USA

0-500 PSI Soft Seat Fluid Pressure Regulator

Hard Seat Fluid Pressure Regulator

Swivel I/O Manifold. 3. Operation After intallation, no further attention to the swivel manifold is required. Foam AG-900 Swivel I/O Manifold 1

TANK LID REPIACtiMENT

Section 8. Parts A Issued 7/00. Manual V -MA -01 (formerly 7-505/6V -MA -01) E 2000 Nordson Corporation All rights reserved

Prodigy Mobile Box Unloader System

Vantage Manual Powder Spray Gun

High-Pressure Fluid Filters

Tray Box Former. Option Parts & Illustrations FIGURE NORDSON GLUE GLUE GUNS, ENCODER. W. E. Plemons Machinery Services, Inc.

Fluidizing Pickup Tube Kits

Filter. Table of Contents. Section 10. Filter NOTE: This section applies to applicators with a threaded filter.

RediCoat by Nordson. Hopper and VBF Dolly Systems. Customer Product Manual Part A Issued 10/07

8. Illustrated Parts Lists

Inverted Dual High-Pressure Fluid Filter Assemblies

Air Spray Proportioning Valve

Hydraulics. Part B, Section 1. This section covers the following unit configurations. 3700V

TCU Static Mixer Installation

Converting an FP-200 Extrusion Gun to an FP-200 Swirl Gun

Replacing a Gun RTD. Instruction Sheet P/N B. 1. Introduction. Using this Instruction Sheet

High Flow and 100 PLUS FB Powder Pumps

Inverting Fault Circuit Breaker Kit for FlexPak 3000 and WebPak 3000 Digital DC Drives VAC and VAC

OBSOLETE. RA-16 Rotary Atomizer Upgrade Kit. Instruction Sheet P/N A. 1. Introduction. 2. Disassembly

Rhino SD/XD Depressurization Modules for Electric Changeover Controls

Control System. Part B, Section 1. This section covers the following unit configurations. Model Voltage 1, 2 Pump Piston (E, F, or G)

SP30 21:1 Piston Pump

Optional Nozzles for Versa-Spray and Versa-Spray II Guns

Transcription:

Nordson/Drexelbrook Material Level Control Kit NORDSON CORPORATION. AMHERST, OHIO. USA

Nordson Corporation welcomes requests for information, comments and inquiries about its products. Address all correspondence to Nordson Corporation 475 Lakefield Drive Duluth, GA 3036 Notice This is a Nordson Corporation publication which is protected by copyright. No part of this document may be photocopied, reproduced, or translated to another language without the prior written consent of Nordson Corporation. The information contained in this publication is subject to change without notice. Trademarks AquaGuard, Blue Box, Control Coat, Equi=Bead, FloMelt, FoamMe lt, FoamMix, Helix, Hot Shot, Hot Stitch, Meltex, MicroSet, MultiScan, Nordson, the Nordson logo, OmniScan, iporous Coat, Posi-Stop, RBX, Sure-Bond, UniScan, UpTime, and Versa-Spray are registered trademarks of Nordson Corporation. BetterBooksM, CF, Controlled Fiberization, Easy-Screen, Fibenelt, I-lo-Tracker, PrintGuard, and Package of Values are trademarks of Nordson Corporation. Manual (S) 46.7 Issued 4/87 Q 987 Nordson Corporation All Rights Reserved

THE NORDSON/DREXELBROOK MATERIAL LEVEL CONTROL KIT INTRODUCTION The Nordson/Drexelbrook Material Level Control Kit automatically regulates the amount of hot melt material supplied to one or more applicator unit(s) from a single bulk melter feeder. This eliminates the need for an equipment operator to manually start and stop the filling process. PARTS LISTS There are several versions of the Nordson/Drexelbrook Material Level Control Kit available: Item No. Part No. Description Req'd 805 634 Level Control Assembly jw/o Mounting Hardware Ref 803 320. Condulet w/fitting 2 803 32 Cable, Drexelbrook 25 ft 3 803 322 9 Control, Level, Electronic Unit 4 803 323. Probe, Level Control, 0.5 in. Item No. Part No. Description Req'd 805 634 2 803 36 3 98 029 4 803 35 5 98 23 6 803 37 7 98 225 8 983 40 9 803 34 0 973 399 972 620 2 803 38 972 69 3 983 02 Level Control Kit w/mounting Hardware (fits HM XI, XVIII, FMlOlA, OlB and 5) Level Control Assembly (see above) Cover, Enclosure. Screw, Fillister Head, 6-32 x 0.50 in.. Cylinder, Enclosure Screw, Round Head, lo-24 x 0.63 in. Cover, Bleed Hole Screw, Socket Head, l/4-20 x 0.63 in. Lockwasher, Split, 0.25 in. Cover, Tank 9 Bushing, Pipe, Hyd, 0.75 x 0.50 in. Connector, Male, Hyd, 37 deg, l/6-2 x 0.50 in. Connector, Male, Hyd, 37 deg, g/6-8 x 0.50 in. Lockwasher, Split, No. 6 Ref 8 4 8 8 8 (S)46.7mIssued 4/87@Nordson Corporation 987

2 Item No. Part No. Description Req'd 70 689 Level Control Assembly w/o Mounting Hardware Ref 803 320. Condulet w/fitting 2 803 32 Cable, Drexelbrook 25 ft 3 70 690. Control, Level, Electronic, Unit 4 70 69. Probe, Level Control, 8 in. Item No. Part No. Description Req'd 803 47 Level Control Kit w/mounting Hardware Ref (fits HM XIIA, FM 03A, 03B and 53) 803 099 70 689 98 906 983 40 803 0 98 59 973 399 972 69 9 972 620. Plate, Mounting, Level Control Level Control Assembly (see above). Screw, Socket Head, Cap, l/4-20 x 0.75 in.. Lockwasher, Split, 0.25 in.. Cover, Hole. Screw, Pan Head, lo-3:2 x 0.50 in.. Bushing, Pipe, Hyd, 0.75 x 0.50 in. Connector, Male, 37 deg, g/6-8 x 0.50 in. Connector, Male, 37 deg, l/6-2 x 0.50 in. W46. 7.Issued 4/87WNordson Corporation 987

3 SAFETY PRECAUTIONS A a 3 A WARNING: Wear safety glasses, safety gloves (P/N 902 54), and protective clothing to prevent injury from hot applicator parts, splashed hot melt adhesive material and hot gun surfaces. WARNING: This equipment contains energized electrical components with potentials that could be fatal. Only qualified personnel should operate this equipment. Lock out and tag electrical power to the bulk melter and applicator before beginning installation procedures. CAUTION: Do not touch the hot melt equipment during operation. It is hot. PROBE INSTALLATION Kits P/N 803 47 and P/N 70 689 Kit P/N 70 689 requires user-supplied mounting hardware.. Replace the hinged lid on the applicator hopper cover with the level control kit mounting plate. Use three of the socket head screws and split lock washers provided in the level control kit. 2. Insert but do not secure the level control probe in either of the two 0.75 in. NPT holes in the mounting plate.? To Control Unit 3.4 5 Figure -- Probe mounting details (Kits P/N 803 see parts lists on page 2 (S)46.7mIssued 4/87@Nordson Corporation 987 47 and 70 689);

4 PROBE INSTALLATION Kits P/N 803 47 and P/N 70 689 3. Install the remaining two socket head screws in the two 0.25 in. tapped holes in the mounting plate. 4. Install the hole cover and pan head screw in the mounting plate. 5. Install the pipe bushing and male connector in the mounting cover. Use male connector P/N 972 69 for connection to a 0.3l in. ID hose and P/N 972 620 for connection to a 0.63 in. ID hose. PROBE INSTALLATION Kits P/N 803 38 and P/N 805 634 Kit P/N 805 634 requires user-supplied mounting hardware.. Remove the hinged lid and condensate pan from the applicator. Refer to your applicator operations manual for specific instructions and assembly drawings of the unit. 2. Attach the enclosure cover to the cylinder enclosure using the fillister head screws and split lock washers supplied in the level control kit. 0,2 or 0,ll Appltcator Ta Figure 2 -- Probe mounting details (Kits P/N 803 38 and 805 634); see parts list on page (S)46.7mIssued 4/87@Nordson Corporation 987

PROBE INSTALLATION Kits P/N 803 38 and P/N 805 634 (Continued) 3. Attach the enclosure cover/cylinder enclosure assembly to the top of the applicator tank using the fillister head screws and split lock washers supplied in the level control kit. 4. Secure the tank cover to the unit using the socket head screws and standard lock washers supplied in the level control kit. 5. Plug the tapped hole in the socket head screw tank cover with another 6, Install the hole cover and round head screw. 7. Install the pipe bu,shing and male connector in the mounting cover. Use male connector P/N 972 69 for connection to a 0.3 in. ID hose and P/N 972 620 for connection to a 0.6.3 in. ID hose. 8. Insert but do not secure the level control probe in enclosure cover. CONTROL UNIT INSTALLATION AND WIRING All Kits la. (Kits P/N 803 47 and 70 689) Mount the electronic control unit in a location as free as possible from vibration, corrosive atmosphere and potential mechanical damage. Then proceed to step 2 of this procedure. lb. (Kits P/N 803 38 and 805 634) The electronic level control unit is enc:losed in the probe condulet. Proceed to step 2 o:e this procedure. 2. Unscrew the control unit housing cap to control unit terminal block. expose the 3. Couple the bulk melter hose to the male connector on the mounting plate or enclosure cover (for multiple applicator configurations, see MULTIPLE APPLICATORS). 4. Wire the control unit to the level control probe as shown in Figures 3 and 4. Note that the probe wire and tote shield wire are insulated as a single unit. The tote shield wire branches off just prior to end of cable. 5. Wire the control unit terminal marked GND to a ground connection. (S)46.7mIssued 4/87=ONordson Corporation 987

Probe connections Power In (5 VAC!n! F Probe Rod 5080 Hz) To bulk melter terminals +l & 2 Figure 3 -- Level control probe and control unit installation (Kits P/N 803 47 and 70 689 shown) 6. Wire the control unit terminals 4 and #5 to the bulk melter per the following:. Model 500: to TBl terminals #9 and #lo. 9 Model 5505: to TBl terminals #6 and #7.. Model 550: to TBl terminals #6 and #7.. Model 5520: to TB2 terminal #6 and TBl terminal #7 (NOTE: Remove the factory-installed jumper wire that connects these two terminals). 7. Connect level control unit terminals #l and #2 to a 5 VAC, 60 Hz power source. MULTIPLE APPLICATORS All Kits When using more than one applicator with a single bulk melter:. Wire all control units in parallel to the bulk melter (do not wire one control unit to another). (S)46=7Qssued 4/87@Nordson Corporation 987

7 MULTIPLE APPLICATORS (Continued) Equip each bulk melter hose with a Nordson H20LBS gun. Each gun should itself be equipped with an adapter nozzle (P/N 708 08). This nozzle allows you to connect the bulk melter hose with the exposed threaded fitting on the level control kit mounting plate. For H20LBS gun and nozzle installation, refer to your H20 series operations m,anual (Manual 42-5) for assembly drawings and follow these steps:. Remove the pipe bushing/male connector from the level control kit mcounting plate or enclosure cover. 2. Remove the male connector from the pipe bushing. See note 2 6. 5* -/ ee note GND --l-t - GND Notes:. With multiple level controls, connect all terminals 4 and terminals 5 in parallel. 2. Solenoid valve (5 VAC) at H20 guns, if used (required with multiple guns). Figure 4 -- Level control kit wiring diagram (all kits). (S)46.7mIssued 4/87WNordson Corporation 987

8 MULTIPLE APPLICATORS (Continued) 3. Invert the pipe bushing, then reinstall it with the fixed nut on the bushing above the mounting plate and the jam nut below the mounting plate. 4. Use the H20LBS retaining nut to secure the adapter nozzle (P/N 708 08) to the gun. 5. Install the free end of the adapter nozzle inside the pipe bushing. 6. Install a 5 VAC solenoid valve on each H20LBS gun. The solenoid actuates the gun and must be wired in line between control unit terminals #l and #8. Then install a jumper wire between control unit terminals #2 and #7. LEVEL CALIBRATION All Kits. With the control unit terminal block exposed and all wiring connections completed, locate the: Operate point potentiometer (bronze-colored hex head screw) Differential adjust potentiometer (yellow plastic slot screw). Brown capacitor (Iextends above the top of the control unit.. Jumper bar. Operate Point Potentiometer Jumper Bar Figure 5 -- Jumper bar and operate point potentiometer (differential adjust potentiometer not shown). (S)46.7mIssued 4/87@Nordson Corporation 987

9 LEVEL CALIBRATION All Kits (Continued) 2. 3. 4. 5. 6. 7. 8. 9< Confirm that the jumper bar is positioned for "High Level Fail Safe" (HLFS) operation. The jumper bar should not be located under the slot-head screw labeled "L". Loosen the two slot-head screws that secure the capacitor to the terminal block, then remove the capacitor. Turn the operate point potentiometer counterclockwise until it stops. NOTE: Do not force this potentiometer beyond its stop point. Damage to the unit may result. Turn the differential potentiometer fully counterclockwise. This signals the end of the OFF range. Install and activate electrical power to the bulk melter, hot melt applicator unit(s) and level control unit. a 4 WARNING: This equipment contains energized electrical components with potentials that could be fatal. Only qualified personnel should operate this equipment. Fill the applicator tank to within one inch (") of the top of the tank. A WARNING: Wear safety glasses, safety gloves (P/N 902 54) and protective clothing to prevent injury from hot applicator parts, splashed hot melt adhesive material and hot gun surfaces. NOTE: Be careful to keep hot melt material from overflowing when manually filling the tank. Overflowing the tank could create a fire hazard. Raise the level control probe from the tank until only the bottom is still immersed in hot melt material. Turn the operate point potentiometer clockwise until the red LED on the control unit lights. (S)46.7mIssued 4/87+Nordson Corporation 987

0 LEVEL CALIBRATION All Kits (Continued) 0. Turn the differential adjust potentiometer fully clockwise. NOTE: This is the LOW level set point. The bulk melter will activate when the level of hot melt material in the applicator tank reaches this point on the level control probe.. Fully insert the level control probe into the tank and secure it to its connection. 2. Turn the differential adjust potentiometer counterclockwise until the red LED lights again. NOTE: This is the HIGH level set point. The bulk melter will deactivate when hot melt material in the applicator tank reaches this point on the level control probe. 3. The bulk melter, hot melt applicator unit(s) and level control are now ready for operation. (8)46. 7 Issued 4/87@Nordson Corporation 987