APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

Similar documents
Construction Realty Co.

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Appendix S. Shared Parking Analysis

appendix 4: Parking Management Study, Phase II

Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station

Trip Generation and Parking Study New Californian Apartments, Berkeley

2.0 Development Driveways. Movin Out June 2017

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

IV. REVISIONS TO THE DRAFT IS/MND

TRAFFIC PARKING ANALYSIS

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

King Soopers #116 Thornton, Colorado

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair

Traffic Impact Analysis for 2171 Rosecrans Avenue

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

Costco Gasoline Fuel Station Transportation Characteristics

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Trip and Parking Generation Study of the Peaks Ice Arena

Downtown Lee s Summit Parking Study

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Transportation Land Development Environmental S e r v i c e s

Oakbrook Village Plaza City of Laguna Hills

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Revised Strategy for Downtown Parking

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Traffic Impact Study Speedway Gas Station Redevelopment

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

Existing Traffic Conditions

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Diablo Vista Pumping Plant Replacement

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT

Napa Meritage Resort Expansion

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

370 Queen Elizabeth Drive Transportation Overview

MEMORANDUM TO: Oak Park and River Forest High School District 200. Kenig, Lindgren, O Hara, Aboona, Inc.

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW

3.15 SAFETY AND SECURITY

II. PROJECT DESCRIPTION

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Section 5.8 Transportation and Traffic

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

Lacey Gateway Residential Phase 1

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois

This letter summarizes our observations, anticipated traffic changes, and conclusions.

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION

Town of Newmarket. Parking Directions Report. Prepared for: Town of Newmarket

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Key Findings and Recommendations Introduction and Overview Task 1 Existing Conditions Analysis Task 2 Parking Demand Analysis...

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

11 October 12, 2011 Public Hearing APPLICANT:

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply

Parks and Transportation System Development Charge Methodology

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

FOR SALE Lancaster Avenue- Bryn Mawr, PA SALE PRICE: $1,095,000.00

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

IMPROVEMENT CONCEPTS

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

ARTICLE 501 OFF-STREET PARKING AND LOADING

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT

TRAFFIC IMPACT ANALYSIS

Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window. District 5 Tennessee Section: Memphis, TN

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

PARKING OCCUPANCY IN WINDSOR CENTER

ON-STREET AND OFF-STREET PARKING SURVEY: METHODOLOGY AND RESULTS

Mineola Village Green

Draft Report: West Berkeley Bowl Project

DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS

STANDARD LIMITATIONS

METRO Light Rail Update

Click to edit Master title style

TRANSPORTATION REVIEW

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

CENTENE CLAYTON CAMPUS CLAYTON, MO

Attachment D Environmental Justice and Outreach

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING

Transcription:

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach, CA 90266 Phone (661) 799-8423 E-mail: otc@overlandtraffic.com May 25, 2017 Ms. Jennifer M. Daw Restaurant Development Chick-fil-A, Inc. 15635 Alton Parkway, Suite 350 Irvine, CA 92618 RE: Parking and Queueing Assessment for Proposed Chick - fil - A Restaurant (740 N. Sepulveda Boulevard, El Segundo CA) Dear Ms. Daw, As requested, Overland Traffic Consultants has prepared this parking and queueing assessment to assist in the development of a proposed Chick - fil - A restaurant to be located at 740 N. Sepulveda Boulevard in the City of El Segundo. The project site is currently occupied by a FedEx Employees Credit Association vacant building and parking structure, as shown in the following aerial photo, Figure 1. The focus of this assessment is to evaluate the parking generation created by the proposed Chick - fil - A restaurant using industry data and to evaluate the potential vehicle queue for the drive thru operation using survey data of several Chick-fil-A restaurants in Southern California. Project Description The project includes demolition of the existing FedEx Employees Credit Association building (approx. 8,100 s.f.) and drive thru service canopy for the proposed construction of a new Chick - fil - A restaurant and small surface parking lot. The existing structured parking will remain. The proposed Chick - fil - A restaurant consists of approximately 4,996 square feet of fast food restaurant floor area (118 seats) with a drive thru window / service lane and 60 parking spaces. The drive thru window is served by a double stacked drive thru lane of approximately 380 feet in total length and will accommodate approximately 19 vehicles on-site. A Traffic Engineering and Transportation Planning Consulting Services Compa

PROJECT SITE PROJECT SITE CHICK - FIL- A RESTAURANT 740 N. SEPULVEDA BOULEVARD FIGURE 1 Overland Traffic Consultants, Inc. 24325 Main Street, #202, Santa Clarita, CA 91321 4/2017 chick fil a el segundo

Overland Traffic Consultants, Inc. Project Vehicle Access The site is currently served by one two-way driveway on Maple Avenue, one two-way driveway on Sepulveda Boulevard and one exit only driveway on Sepulveda Boulevard. Sepulveda Boulevard is a divided highway which allows right turn ingress and egress only. Below are the proposed modifications to the site access: 1. It is proposed that the Maple Avenue driveway will be converted to an entry only driveway to serve the drive - thru operation and to provide access to the ground level parking spaces (20 parking spaces). 2. The existing southerly Sepulveda Boulevard exit only driveway will remain but modified (reduced width) to only serve the drive thru operation. 3. A new exit only driveway on Sepulveda Boulevard is proposed to serve traffic entering from Maple Avenue and the 20 parking spaces including 3 ADA parking spaces. 4. The existing northerly two - way driveway will remain and serve the second level parking deck with 40 parking spaces. This driveway, however, will no longer serve the parking spaces fronting Sepulveda Boulevard. It is recommended that the driveway width be reduced to better align with the second level ramp and create separation from the proposed Sepulveda Boulevard driveway discussed above. Figure 2 illustrates the proposed Chick - fil - A site plan. A Traffic Engineering and Transportation Planning Consulting Services Company

1 39 40 29 15 10 28 9 16 20 21 60 GROUND LEVEL SECOND LEVEL PARKING CHICK - FIL- A RESTAURANT 740 N. SEPULVEDA BOULEVARD FIGURE 2 Overland Traffic Consultants, Inc. 24325 Main Street, #202, Santa Clarita, CA 91321 5/2017 chick fil a el segundo

Overland Traffic Consultants, Inc. The City of El Segundo Zoning Code (Access and Circulation) Zoning Code Section 15-15-5A. establishes the access and circulation design requirements as follows: Design: Parking facilities must be designed so that a car within a facility will not have to enter a street to move from one location to any other location within the same facility. The current design does not comply with this design requirement because the existing deck parking is not connected to the site s existing or future surface parking. Section 15-15-5A.3 allows for the director of planning and building safety to approve administrative adjustments from the site access and circulation standards as provided in chapter 24, "Adjustments", of this title. Deviation from the development standards are allowed for reasonable access accommodations. A Traffic Engineering and Transportation Planning Consulting Services Company

Overland Traffic Consultants, Inc. Project Parking The project proposes 60 on - site parking spaces with 20 surface parking spaces and 40 spaces on the existing second level parking deck, see Figure 2 for the location of the parking spaces. On - street parking restriction on Sepulveda Boulevard and Maple Avenue are as follows: On - street parking is not allowed on Sepulveda Boulevard at any time. On - street parking is allowed approximately 60 east of the Maple Avenue driveway. On - street parking is not allowed west of the Maple Avenue driveway, there is a bus shelter and red curb between the driveway and Sepulveda Boulevard, however based on the transit records from MTA and Torrance there is no active bus stop at this location. The City of El Segundo Zoning Code (Automobile Spaces Required) Zoning Code Section 15-15-6A establishes the number of on-site parking spaces required for fast food and drive through restaurants at 1 space for each 75-square foot area, including outdoor dining areas. (Parking for outdoor dining areas is required only for the portion that exceeds 200 square feet or 20 percent of the indoor dining area, whichever is less.) The code required automobile parking is 67 parking spaces at 1 space per 75 square feet. As mention above, the project is providing 60 parking spaces, 7 spaces short of code. Section 15-15-3.J.1 allows the director of planning and building safety to review and approve requests for administrative adjustments from the requirements of this chapter as provided in chapter 24, "Adjustments", of this title including, without limitation, the required number of parking spaces. The City of El Segundo zoning code (Section 15-15-6B. Bicycle Spaces Required) establishes the number of on - site bike spaces required for nonresidential uses at a minimum of 4 spaces for buildings up to 15,000 square feet, plus a minimum of 5 percent of the required vehicle spaces for the portion above 15,000 square feet. The project is providing 8 bike spaces, 4 bike spaces above code. A Traffic Engineering and Transportation Planning Consulting Services Company

Overland Traffic Consultants, Inc. Industry Parking Data for Fast Food Restaurants with Drive-Thru Facilities Parking data for many land uses has been complied by the Institute of Transportation Engineers and published in the ITE Parking Generation, 4 th Edition (2010) manual. This database was developed to be a source document to assist in estimating parking demand for different land uses. The document is based on parking demand studies submitted by public agencies, consulting firms, universities, developers and associations nationwide. The fast food restaurant with a drive through window database includes surveys from 51 sites on weekdays and 27 sites on Saturdays. The weekday peak parking demand occurred from 12 noon to 3 pm and 6 to 7 pm. The Saturday peak parking demand occurred from 12 noon to 2 pm. The parking demand represents all vehicles coming to and going from the restaurant including patrons, delivery vehicles and employees. These studies indicate that the average peak parking demand was 9.98 vehicles per 1,000 square feet on a weekday and 8.70 vehicles per 1,000 square feet on a Saturday for a fast food restaurant with a drive through window. The studies also show that the average peak parking demand using the number of seats was 0.40 vehicles per seat on a weekday and 0.35 vehicles per seat on a Saturday. The table below summaries the ITE average parking demand values using floor area and number of seats. Table 1 ITE Parking Demand Rates for Fast Food Restaurants with Drive-Thru Facilities Variable Parking Rate Parking Demand Parking Providing Parking Surplus 4,996 sq. ft. 9.98 weekday 50 60 10 8.70 Saturday 44 60 16 Seats (118) 0.40 weekday 47 60 13 0.35 Saturday 41 60 19 The ITE Parking Generation Handbook includes a 95% confidence interval which provides a measure of confidence in the statistical data to the average. It indicates the range within which there is 95% likelihood the average will fall. On a weekday, the confidence interval is 8.69 to A Traffic Engineering and Transportation Planning Consulting Services Company

Overland Traffic Consultants, Inc. 11.27 spaces per 1,000 square feet (43 to 56 spaces for this project) and 0.34 to 0.47 spaces per seats (40 to 56 spaces for this project). The ITE parking data shows that the project s proposed 60 parking spaces exceeds the 95% confidence interval using the floor area or number of seats as the measurable unit describing the study site. The ITE data for the weekday and weekend is attached. Another useful database for evaluating the peak parking by a land use has been developed by the Urban Land Institute (ULI) in its Shared Parking report. The database allows for the creation of hourly parking demand profiles. The creation of these hourly parking demand profiles provides the information necessary to more accurately evaluate the peak parking demand during different times of the day. The ULI adjustments include a 10% mode adjustment (non-auto and auto occupancy). The ULI hourly parking accumulation profiles for the Chick - fil - A restaurant shown in Table 2 for the weekday and weekend both show a peak parking demand of 60 parking spaces during the mid day dining period. A Traffic Engineering and Transportation Planning Consulting Services Company

Overland Traffic Consultants, Inc. Table 2 ULI Hourly Parking Demand PEAK MONTH: AUGUST -- PEAK PERIOD: 12 PM, WEEKEND Weekday Weekend Weekday Weekend Non- Non- Peak Hr Peak Mo Estimated Peak Hr Peak Mo Estimated Project Data Base Mode Captive Project Base Mode Captive Project Adj Adj Parking Adj Adj Parking Land Use Quantity Unit Rate Adj Ratio Rate Unit Rate Adj Ratio Rate Unit 12 PM August Demand 12 PM August Demand Fast Food Restaurant 4,996 sf GLA 11.33 0.90 1.00 10.20 /ksf GLA 11.43 0.90 1.00 10.29 /ksf GLA 1.00 0.99 51 1.00 0.99 51 Employee 2.00 0.90 1.00 1.80 /ksf GLA 1.90 0.90 1.00 1.71 /ksf GLA 1.00 1.00 9 1.00 1.00 9 Customer 51 Customer 51 Employee 9 Employee 9 Reserved 0 Reserved 0 Total 60 Total 60 Weekday Estimated Peak-Hour Parking Demand Monthly Adj 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM Fast Food Restaurant 99% 3 5 10 15 28 43 51 51 46 31 28 31 43 41 25 15 10 5 3 Employee 100% 1 2 3 4 7 9 9 9 9 6 5 6 8 8 5 4 3 2 2 Customer 3 5 10 15 28 43 51 51 46 31 28 31 43 41 25 15 10 5 3 TOTAL DEMAND Employee 1 2 3 4 7 9 9 9 9 6 5 6 8 8 5 4 3 2 2 Reserved - - - - - - - - - - - - - - - - - - - 4 7 13 19 35 52 60 60 55 37 33 37 51 49 30 19 13 7 5 August Weekend Estimated Peak-Hour Parking Demand 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM Fast Food Restaurant 99% 3 5 10 15 28 43 51 51 46 31 28 31 43 41 25 15 10 5 3 Employee 100% 1 2 3 4 7 9 9 9 9 6 5 6 8 8 5 4 3 2 2 Customer 3 5 10 15 28 43 51 51 46 31 28 31 43 41 25 15 10 5 3 TOTAL DEMAND Employee 1 2 3 4 7 9 9 9 9 6 5 6 8 8 5 4 3 2 2 Reserved - - - - - - - - - - - - - - - - - - - 4 7 13 19 35 52 60 60 55 37 33 37 51 49 30 19 13 7 5 A Traffic Engineering and Transportation Planning Consulting Services Company

Overland Traffic Consultants, Inc. Drive - Thru Storage Surveys Studies have been conducted at three existing Chick - fil - A restaurants to collect data on average drive through service times and maximum vehicle queues. The restaurants were surveyed in November 2013 and located at Valencia, Northridge and Lakewood. A 2-day follow up survey was collected in 2017 at Northridge to determine if conditions had significantly changed, which they did not. Each restaurant was surveyed for 1 hour for the breakfast, noon and dinner dining hours. The queue surveys show a maximum 5 vehicle queue observed during the morning breakfast hour. The highest queues were observed during the noon lunch hour with a maximum 15 vehicle queue. The afternoon dinner hour recorded a maximum queue of 11 vehicles. The observed drive - thru queues have been plotted for the three dining periods for the restaurants included in the surveys. These observations indicate that the maximum observed lunch hour queue of 15 vehicles can be contained on site and will not spill back onto Maple Avenue. The drive thru lane(s) is approximately 380 feet in length and will accommodate approximately 19 vehicles on-site, as shown in Figure 3. The results of the service time study indicate that service times will vary by location but on average during light dining hours the drive through service time will range between 3-4 minutes. During the heaviest dining hours, the drive through service times will range from 5-8 minutes. Once the arrival time of the vehicles exceeds the service time at the ordering window the queues will build exponentially. During these time periods, it is recommended that Chick - fil - A implement the advance ordering procedures with extra staffing in the drive thru lane to speed up the ordering service time per customer. A Traffic Engineering and Transportation Planning Consulting Services Compa

14 15 10 19 1 CHICK - FIL- A RESTAURANT DRIVE - THRU QUEUE AND PASS THRU FIGURE 3 Overland Traffic Consultants, Inc. 24325 Main Street, #202, Santa Clarita, CA 91321 4/2017 chick fil a el segundo

Overland Traffic Consultants, Inc. CHICK - fil - A DRIVE THRU SURVEY DATA SOUTHERN CALIFORNIA 20 18 LARGEST QUEUE OBSERVED 16 14 12 10 8 6 4 2 0 0800-0815 0815-0830 0830-0845 0845-0900 1200-1215 1215-1230 1230-1245 1245-0100 0500-0515 0515-0530 A Traffic Engineering and Transportation Planning Consulting Services Company

Overland Traffic Consultants, Inc. Summary 1. Based on the parking evaluation using the industry parking data, the proposed 60 on site parking spaces should accommodate the project s parking demand with a 95 % confidence level. 2. The queueing studies indicate that peak vehicle queues typically are less than 16 vehicles during the peak dining hours which can be accommodated on site with a queue capacity of 19 vehicles. Please call me if you have questions. Sincerely, Jerry T. Overland Attachments A Traffic Engineering and Transportation Planning Consulting Services Company

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 24180 MAGIC MOUNTAIN PARKWAY, VALENCIA DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 08:00 AM TO 09:00 AM FILE: 3 AM MORNING OBSERVATIONS / HR:MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 0800 0815 0815 0830 0830 0845 0845 0900 08:00:04 08:03:15 3:11 1 2 2 3 2 08:06:05 08:09:49 3:44 2 08:07:12 08:12:12 5:00 2 08:14:48 08:17:19 2:31 1 08:28:10 08:30:40 2:30 2 08:37:39 08:40:18 2:39 1 08:39:40 08:42:07 2:27 2 08:42:38 08:47:35 4:57 1 08:44:06 08:48:41 4:35 2 08:44:58 08:49:51 4:53 1 08:46:20 08:51:28 5:08 2 08:48:00 08:52:39 4:39 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 24180 MAGIC MOUNTAIN PARKWAY, VALENCIA DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 12:00 PM TO 01:00 PM FILE: 2 MD MID DAY OBSERVATIONS / HR:MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 1200 1215 1215 1230 1230 1245 1245 0100 12:00:01 12:08:38 8:37 2 7 14 15 14 12:03:50 12:10:01 6:11 1 12:07:30 12:16:27 7:57 2 12:09:15 12:13:59 4:44 1 12:10:57 12:19:07 8:10 2 12:12:30 12:21:10 8:40 2 12:13:09 12:17:25 4:16 1 12:15:09 12:21:03 5:54 1 12:16:04 12:24:55 8:51 2 12:17:50 12:23:10 5:33 1 12:18:06 12:26:44 8:38 2 12:21:18 12:30:09 8:51 2 12:22:31 12:27:15 4:44 1 12:24:00 12:32:35 8:35 2 12:28:46 12:37:35 8:49 2 12:32:50 12:40:20 7:30 2 12:35:04 12:43:08 8:04 2 12:34:00 12:38:26 4:26 1 12:38:10 12:47:01 8:51 2 12:40:32 12:45:14 4:42 1 12:42:30 12:49:59 7:29 2 12:45:15 12:48:56 3:41 1 12:46:19 12:51:56 5:37 2 12:48:23 12:51:28 3:05 1 12:50:28 12:58:36 8:08 2 12:51:20 12:55:53 4:33 1 THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 24180 MAGIC MOUNTAIN PARKWAY, VALENCIA DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 05:00 PM TO 06:00 PM FILE: 3 PM EVENING OBSERVATIONS / HR:MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 0500 0515 0515 0530 0530 0545 0545 0600 05:01:09 05:09:45 8:36 2 8 9 7 10 05:03:06 05:11:40 8:36 2 05:07:15 05:15:09 7:54 2 05:08:05 05:12:40 4:35 1 05:10:55 05:19:07 8:12 2 05:12:03 05:16:27 4:24 1 05:14:19 05:19:07 4:48 1 05:14:26 05:23:00 8:34 2 05:16:01 05:24:06 8:05 2 05:17:36 05:22:16 4:40 1 05:19:10 05:27:17 8:07 2 05:22:00 05:30:10 8:10 2 05:23:29 05:27:34 4:05 1 05:26:00 05:34:35 8:35 2 05:33:10 05:37:15 4:05 1 05:34:20 05:42:36 8:16 2 05:36:30 05:40:32 4:02 1 05:37:00 05:45:44 8:44 2 05:40:20 05:48:00 7:40 2 05:42:28 05:49:14 6:42 2 05:43:55 05:51:28 7:32 2 05:44:45 05:48:25 3:40 1 05:46:48 05:55:13 8:35 2 05:47:31 05:51:20 3:49 1 05:48:39 05:57:34 8:55 2 05:50:13 05:55:05 4:08 1 05:52:43 06:00:42 7:59 2 05:54:35 06:03:15 8:20 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 4895 CANDLEWOOD STREET, LONG BEACH DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 08:00 AM TO 09:00 AM FILE: 1 AM MORNING OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME ORIGIN 0800 0815 0815 0830 0830 0845 0845 0900 08:00:05 08:06:03 5:58 1 3 4 5 4 08:02:27 08:07:07 4:40 2 08:04:44 08:08:59 4:15 1 08:06:55 08:10:54 3:59 1 08:09:26 08:14:01 4:35 2 08:11:37 08:15:26 3:49 1 08:13:40 08:18:09 4:29 2 08:14:56 08:19:06 4:10 1 08:17:11 08:21:07 3:58 1 08:19:58 08:24:36 4:38 2 08:22:13 08:26:01 3:48 1 08:25:26 08:30:17 4:51 2 08:27:00 08:32:11 5:11 1 08:29:34 08:33:58 4:24 2 08:31:45 08:36:35 4:50 2 08:33:00 08:37:02 4:02 1 08:34:52 08:39:56 5:04 2 08:37:16 08:41:32 4:16 1 08:39:04 08:42:59 3:55 1 08:42:15 08:48:04 5:49 2 08:44:01 08:48:54 4:53 1 08:46:22 08:50:17 3:55 1 08:48:04 08:52:55 4:51 2 08:49:55 08:55:20 5:25 2 08:52:20 08:55:57 3:37 1 08:55:33 09:00:12 4:39 2

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 4895 CANDLEWOOD STREET, LONG BEACH DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 12:00 PM TO 01:00 PM FILE: 1 MD MID DAY OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 1200 1215 1215 1230 1230 1245 1245 0100 11:59:45 12:03:30 3:45 1 4 4 4 5 12:02:20 12:05:51 3:31 1 12:04:45 12:08:59 4:14 2 12:07:01 12:10:57 3:56 1 12:09:51 12:13:26 5:35 2 12:13:33 12:18:45 5:12 1 12:15:21 12:19:19 3:58 1 12:18:01 12:22:11 4:10 1 12:19:56 12:23:44 3:48 1 12:22:19 12:26:13 3:53 1 12:25:01 12:29:50 4:49 2 12:27:12 12:30:54 3:44 1 12:29:03 12:34:07 5:04 2 12:31:16 12:36:55 3:39 1 12:33:36 12:37:34 3:58 1 12:36:22 12:41:17 4:55 2 12:38:53 12:42:45 3:52 1 12:41:05 12:46:03 4:58 2 12:44:23 12:48:12 3:49 1 12:46:11 12:50:11 4:00 1 12:48:32 12:52:19 3:47 1 12:49:28 12:54:27 4:59 2 12:51:13 12:55:09 3:56 1 12:52:54 12:56:46 3:52 1 12:54:01 12:57:52 3:51 1 12:56:19 1:08:00 3:49 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 4895 CANDLEWOOD STREET, LONG BEACH DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 05:00 PM TO 06:00 PM FILE: 1 PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 0500 0515 0515 0530 0530 0545 0545 0600 05:00:10 05:05:28 5:18 2 4 5 4 4 05:02:16 05:06:22 4:22 1 05:04:25 05:09:13 4:48 1 05:06:37 05:10:59 4:22 1 05:09:43 05:13:56 4:13 1 05:12:33 05:18:02 5:29 2 05:16:16 05:21:54 5:38 1 05:18:29 05:23:49 5:20 2 05:21:49 05:25:40 3:51 1 05:22:35 05:27:47 5:12 2 05:25:17 05:29:43 4:26 1 05:28:24 05:32:27 4:03 1 05:30:29 05:35:24 4:55 1 05:33:31 05:38:32 5:01 1 05:36:15 05:40:13 3:58 1 05:39:02 05:44:26 5:24 2 05:42:11 05:46:07 3:56 1 05:44:16 05:49:55 5:39 2 05:45:49 05:50:03 4:14 1 05:47:08 05:52:37 5:29 2 05:49:56 05:54:23 4:27 1 05:51:37 05:55:37 4:00 1 05:52:55 05:56:52 3:57 1 05:55:32 06:00:43 5:11 2 05:58:50 06:02:54 4:04 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 8875 TAMPA, NORTHRIDGE DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 08:00 AM TO 09:00 AM FILE: 3 AM MORNING OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 0800 0815 0815 0830 0830 0845 0845 0900 08:00:04 08:03:24 3:20 2 2 3 2 5 08:03:46 08:06:42 2:54 1 08:05:26 05:07:30 2:04 1 08:13:29 08:17:09 3:34 2 08:15:06 08:17:43 2:37 1 08:18:01 08:21:55 3:54 1 08:20:56 08:25:28 4:32 2 08:24:58 08:28:16 3:18 1 08:27:30 08:32:07 4:37 2 08:30:17 08:34:01 3:44 2 08:34:26 08:37:28 3:02 1 08:38:16 08:41:05 2:49 1 08:40:09 08:43:50 3:41 2 08:43:17 08:47:18 4:01 1 08:44:32 08:49:03 4:31 1 08:50:39 08:55:31 5:08 2 08:53:11 08:57:41 4:30 1 08:58:41 09:02:46 3:05 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 8875 TAMPA, NORTHRIDGE DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 12:00 PM TO 01:00 PM FILE: 2 MD MID DAY OBSERVATIONS / MIN:SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 1200 1215 1215 1230 1230 1245 1245 0100 12:00:50 12:06:59 6:09 1 8 14 15 11 12:03:39 12:10:20 6:41 2 12:05:49 12:11:11 5:22 1 12:08:20 12:13:35 5:15 1 12:09:55 12:18:56 7:01 2 12:13:35 12:20:26 6:51 1 12:15:09 12:23:00 7:51 1 12:18:05 12:26:04 8:09 2 12:22:50 12:31:19 8:19 1 12:24:44 12:33:35 8:51 2 12:26:19 12:35:15 8:56 2 12:27:58 12:36:02 8:04 1 12:30:22 12:38:22 8:00 2 12:32:36 12:40:18 7:42 1 12:35:37 12:43:47 8:10 1 12:38:51 12:47:22 8:31 2 12:40:14 12:48:28 8:14 2 12:43:20 12:51:28 8:08 1 12:44:20 12:51:27 7:07 2 12:48:32 12:55:15 6:43 2 12:50:41 12:57:36 6:55 1 12:52:07 12:59:56 7:49 2 12:55:01 01:02:33 7:32 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

CHICK FIL A / DRIVE THRU OBSERVATIONAL STUDY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: 8875 TAMPA, NORTHRIDGE DATE: THURSDAY, OCTOBER 03, 2013 PERIOD: 05:00 PM TO 06:00 PM FILE: 3 PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 0500 0515 0515 0530 0530 0545 0545 0600 05:00:45 05:04:11 3:26 1 3 4 6 7 05:02:21 05:07:48 5:27 2 05:05:23 05:09:49 4:26 1 05:08:11 05:14:16 6:05 2 05:10:48 05:17:10 6:22 2 05:14:54 05:19:11 5:17 1 05:15:10 05:21:17 6:07 2 05:17:05 05:22:30 5:25 1 05:19:37 05:24:45 5:08 1 05:20:59 05:27:48 6:49 2 05:22:28 05:29:12 6:44 2 05:24:37 05:29:16 4:39 1 05:26:16 05:32:51 6:35 2 05:30:28 05:37:36 7:08 2 05:34:04 05:41:50 7:46 2 05:38:31 05:45:34 7:03 2 05:40:09 05:46:46 6:37 1 05:42:35 05:48:28 5:53 1 05:44:23 05:49:32 5:09 1 05:46:42 05:51:44 5:02 1 05:48:27 05:56:02 7:35 2 05:49:53 05:58:01 8:08 2 05:51:24 05:59:11 7:47 2 05:53:38 05:59:37 5:59 1 05:55:08 06:01:06 5:58 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: WEDNESDAY, JANUARY 04, 2017 PERIOD: 08:00 AM TO 09:00 AM FILE: 1-AM MORNING OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT 0800-0815 0815-0830 0830-0845 0845-0900 8:00:01 8:03:55 0:03:54 2 2 2 2 2 8:02:16 8:04:48 0:02:32 1 8:03:17 8:07:16 0:03:59 2 8:04:30 8:09:00 0:04:30 2 8:09:40 8:12:58 0:03:18 1 8:11:34 8:14:49 0:03:15 1 8:13:51 8:16:50 0:02:59 1 8:18:03 8:20:40 0:02:37 1 8:24:16 8:26:56 0:02:40 1 8:24:35 8:28:31 0:03:56 2 8:27:45 8:31:21 0:03:36 1 8:32:18 8:35:08 0:02:50 1 8:39:45 8:43:50 0:04:05 2 8:44:42 8:47:55 0:03:13 1 8:46:05 8:49:25 0:03:20 1 8:51:33 8:56:13 0:04:40 2 8:53:11 8:57:08 0:03:57 1 8:58:28 9:01:26 0:02:58 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: WEDNESDAY, JANUARY 04, 2017 PERIOD: 12:00 PM TO 01:00 PM FILE: 1-MD MID-DAY OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT 1200-1215 1215-1230 1230-1245 1245-0100 12:03:16 12:08:11 0:04:55 1 9 13 14 12 12:05:09 12:11:40 0:06:31 1 12:09:40 12:15:41 0:06:01 1 12:11:01 12:19:15 0:08:14 2 12:14:16 12:20:01 0:05:45 1 12:13:31 12:21:15 0:07:44 2 12:15:46 12:23:20 0:07:34 1 12:18:19 12:26:16 0:07:57 2 12:20:53 12:29:40 0:08:47 2 12:24:21 12:31:40 0:07:19 2 12:27:30 12:33:36 0:06:06 1 12:28:18 12:35:09 0:06:51 1 12:29:55 12:37:57 0:08:02 2 12:31:02 12:39:30 0:08:28 2 12:35:02 12:41:53 0:06:51 2 12:37:00 12:44:08 0:07:08 1 12:40:11 12:46:21 0:06:10 1 12:41:50 12:51:01 0:09:11 2 12:45:16 12:52:51 0:07:35 2 12:48:18 12:55:21 0:07:03 2 12:50:37 12:59:30 0:08:53 2 12:53:36 13:01:30 0:07:54 2 12:55:50 13:02:00 0:06:10 1 12:57:43 13:03:37 0:05:54 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: WEDNESDAY, JANUARY 04, 2017 PERIOD: 05:00 PM TO 06:00 PM FILE: 1-PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 0500-0515 0515-0530 0530-0545 0545-0600 5:00:37 5:05:45 0:05:08 1 7 9 8 9 5:01:18 5:09:55 0:08:37 2 5:03:24 5:12:34 0:09:10 2 5:07:34 5:15:51 0:08:17 2 5:10:44 5:16:17 0:05:33 1 5:11:55 5:19:01 0:07:06 2 5:14:50 5:20:00 0:05:10 1 5:17:19 5:22:06 0:04:47 1 5:21:46 5:26:48 0:05:02 1 5:24:31 5:31:58 0:07:27 2 5:26:30 5:35:16 0:08:46 2 5:28:05 5:37:46 0:09:41 2 5:32:25 5:38:33 0:06:08 1 5:35:29 5:42:43 0:07:14 2 5:38:18 5:43:31 0:05:13 1 5:40:11 5:45:11 0:05:00 1 5:43:16 5:51:43 0:08:27 2 5:45:50 5:54:37 0:08:47 2 5:48:13 5:55:02 0:06:49 1 5:49:07 5:57:05 0:07:58 2 5:53:23 5:59:15 0:05:52 1 5:55:14 6:00:01 0:04:47 1 5:57:04 6:05:13 0:08:09 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: THURSDAY, JANUARY 05, 2017 PERIOD: 08:00 AM TO 09:00 AM FILE: 2-AM MORNING OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT 0800-0815 0815-0830 0830-0845 0845-0900 8:00:08 8:05:33 0:05:25 2 2 3 3 2 8:06:14 8:09:10 0:02:56 1 8:08:11 8:11:33 0:03:22 1 8:12:24 8:15:37 0:03:13 1 8:13:25 8:16:08 0:02:43 1 8:16:05 8:19:11 0:03:06 1 8:19:54 8:23:38 0:03:44 1 8:20:32 8:24:45 0:04:13 2 8:21:58 8:28:27 0:06:29 2 8:25:16 8:29:00 0:03:44 1 8:27:30 8:30:28 0:02:58 1 8:32:48 8:35:39 0:02:51 1 8:37:15 8:40:55 0:03:40 1 8:41:34 8:44:04 0:02:30 1 8:44:17 8:47:38 0:03:21 1 8:47:37 8:51:55 0:04:18 2 8:53:20 8:56:04 0:02:44 1 8:58:36 9:02:46 0:04:10 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: THURSDAY, JANUARY 05, 2017 PERIOD: 12:00 PM TO 01:00 PM FILE: 2-MD MID-DAY OBSERVATIONS / MIN:SEC LARGEST OBSERVED QUEUE START TIME END TIME TOTAL TIME OBSV. POINT 1200-1215 1215-1230 1230-1245 1245-0100 12:02:20 12:08:13 0:05:53 1 10 12 11 14 12:03:31 12:12:50 0:09:19 2 12:08:05 12:15:09 0:07:04 2 12:10:00 12:16:00 0:06:00 1 12:11:12 12:19:25 0:08:13 2 12:13:17 12:23:15 0:09:58 2 12:17:33 12:24:22 0:06:49 1 12:18:27 12:26:55 0:08:28 2 12:20:20 12:27:27 0:07:07 1 12:23:04 12:29:30 0:06:26 1 12:25:41 12:34:33 0:08:52 2 12:29:21 12:37:17 0:07:56 2 12:30:16 12:39:19 0:09:03 2 12:32:51 12:40:10 0:07:19 1 12:35:15 12:41:52 0:06:37 1 12:37:30 12:45:46 0:08:16 2 12:41:13 12:48:18 0:07:05 1 12:43:43 12:52:34 0:08:51 2 12:45:57 12:53:10 0:07:13 1 12:47:49 12:54:00 0:06:11 1 12:48:03 12:57:17 0:09:14 2 12:50:32 12:57:59 0:07:27 2 12:51:28 12:58:21 0:06:53 1 12:54:09 13:03:24 0:09:15 2 12:58:43 13:07:04 0:08:21 1 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

DRIVE-THRU OBSERVATIONAL SUMMARY CLIENT: OVERLAND TRAFFIC CONSULTANTS, INC. PROJECT: CHICK -FIL-A / 8875 TAMPA AVENUE NORTHRIDGE DATE: THURSDAY, JANUARY 05, 2017 PERIOD: 05:00 PM TO 06:00 PM FILE: 2-PM EVENING OBSERVATIONS / MIN: SEC LARGEST QUEUE OBSERVED START TIME END TIME TOTAL TIME OBSV. POINT 0500-0515 0515-0530 0530-0545 0545-0600 5:00:47 5:05:34 0:04:47 1 7 11 9 10 5:01:33 5:07:48 0:06:15 2 5:03:01 5:08:45 0:05:44 1 5:06:05 5:13:33 0:07:28 2 5:10:23 5:16:40 0:06:17 2 5:13:40 5:18:19 0:04:39 1 5:16:42 5:21:50 0:05:08 1 5:23:58 5:31:50 0:07:52 2 5:24:35 5:32:29 0:07:54 2 5:27:09 5:37:05 0:09:56 2 5:29:15 5:37:50 0:08:35 2 5:32:04 5:38:03 0:05:59 1 5:33:36 5:38:31 0:04:55 1 5:34:59 5:41:44 0:06:45 2 5:36:21 5:43:30 0:07:09 2 5:39:14 5:44:25 0:05:11 1 5:40:21 5:47:39 0:07:18 2 5:42:26 5:50:55 0:08:29 2 5:45:56 5:51:40 0:05:44 1 5:49:05 5:54:15 0:05:10 1 5:51:16 5:57:50 0:06:34 1 5:54:35 6:03:11 0:08:36 2 5:57:03 6:06:10 0:09:07 2 NOTE: (1) OBSERVATIONS / MIN:SEC FROM ORDER BOARD (2) OBSERVATIONS / MIN:SEC FROM DRIVE THRU ENTRY THE TRAFFIC SOLUTION 329 DIAMOND STREET ARCADIA, CALIFORNIA 91006 626.446.7978

APPENDIX TR-2 TRAFFIC IMPACT ASSESSMENT