Project: Borgfeld Dr Phase I (ROW ) Precinct: 3 From Timberline Dr US Hwy 281. Clear ROW and relocate fences necessary to facilitate utility relocation needed prior to the roadway reconstruction. Consultant: Carter & Burgess Inc Advertise Date: 3 Q 2010 Contractor: Shannon Monk Inc Construction Start Date: 3 Q 2010 Construction Cost: $ 303,945 Construction end Date: 4 Q 2010 Joint Bid: n/a December 11, 2012 1
Project: Blanco Rd Precinct: 3 From Glade Crossing to West Oak Estates Dr. Reconstruct Blanco Rd to include two lanes in each direction, center median, turn lanes at major intersections, curbs, sidewalks and necessary drainage. Bike lanes were included in this project. Consultant: CP & Y Advertise Date: 1 Q 2008 Contractor: Capital Excavation Construction Start Date: 2 Q 2008 Construction Cost: $ 29, 748,282.00 Construction end Date: 1 Q 2011 Joint bid Agreement: December 11, 2012 2
Project: Bulverde Rd Phase I Precinct: 3 From US 281 to Smithson Valley Road. Reconstruction of Bulverde Road to include two lanes of traffic in each direction, turn lanes and 4 foot shoulders. Project removed roadway from the 100 years plain. Consultant: HDR Engineering Advertise Date: 2 Q 2010 Contractor: D & D Contractors Construction Start Date: 2 Q 2010 Construction Cost: $ 1,978,333 Construction end Date: 1 Q 2011 Joint Bid Agreement: SAWS, CPS December 11, 2012 3
Project: Heritage Park Phase II Precinct: 1 Include, Sandy Field Dr, Bluff Fields Dr, Birch Field Dr, Misty Plain (Echo Plain to Quiet Plain Dr) Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks and drainage as necessary (1.25 miles approx.). Consultant: LNV Engineering Advertise Date: 1 Q 2010 Contractor: RL Jones LP Construction Start Date: 1 Q 2010 Construction Cost: $ 1,720,989.40 Construction end Date: 2 Q 2011 Joint bid Agreement: BexarMet December 11, 2012 4
Project: Heritage Park Phase III Precinct: 1 Include, Echo Plain, Cedar Plain, Coastal Plain, Beech Plain, Moss Plain, Quiet Plain, (Raven Field to Misty Plain) Timberline Dr US Hwy 281. Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks and drainage as necessary. Consultant: LNV Engineering Advertise Date: 4 Q 2010 Contractor: RL Jones Construction Start Date: 1 Q 2011 Construction Cost: $ 1 904,219 Construction end Date: 4 Q 2011 Joint Bid: SAWS, Bexar-Met December 11, 2012 5
Project: Ventura Subd Phases IX & X Precinct: 4 Estrid Trail Drive, Mescal Trail Drive, Justino Trail Drive, Shadow Trail Drive, Roveen Trail Drive, Ludlow Trail Drive, Seldom Trail Drive, Cinnabar Trail Drive, Foss Meadow, Oval Meadow, Pepper Trail, Wayside Trail & Wayword Trail (Elm to Sunlit Trail) Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks as necessary. Consultant: San Antonio Design Group Advertise Date: 3 Q 2010 Contractor: Slack & Co Construction Start Date: 4 Q 2010 Construction Cost: $ 3,853,906 Construction end Date: 4 Q 2011 Joint bid Agreement: SAWS December 11, 2012 6
Project: Ventura Phase VIII Precinct: 4 Sunshine Tower Drive, Trail Village Drive, Wistful Trail, Myrtle Trail, Radford Trail, Millers Trail, Corona Ridge, and Sonny Ridge. This project included design and full reconstruct the roadway infrastructure including pavement, curbs, 4-foot sidewalks and drainage as necessary. Consultant: Unintech Advertise Date: 1 Q 2009 Contractor: Silverado Brothers Construction Start Date: 3 Q 2009 Construction Cost: $ 1,363,252 Construction end Date: 1 Q 2011 Joint bid Agreement: SAWS December 11, 2012 7
Project: Ventura Phase VIII Part 2 Precinct: 4 Sunshine Tower Dr, Trail Village Dr, and Myrtle Trail. The completed project included Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks and drainage. Consultant: Unintech Advertise Date: 2 Q 2011 Contractor: Slack & Co Construction Start Date: 3 Q 2011 Construction Cost: $ 499,121 Construction end Date: 4 Q 2011 Joint bid Agreement: n/a December 11, 2012 8
Project: Shaenfield Road Precinct: 2 From Loop 1604 to FM 1560. Full reconstruction of roadway with two travel lanes in each direction and a 14-foot curbed center median, 6-foot sidewalks and necessary drainage, to benefit the surrounding developing neighborhoods and the North Side Independent School District. Consultant: Pape - Dawson Advertise Date: 3 Q 2009 Contractor: EE Hood & Sons Construction Start Date: 4 Q 2009 Construction Cost: $ 5,438,765 Construction end Date: 1 Q 2012 Joint bid Agreement: SAWS December 11, 2012 9
Project: Woodlake Pky & Lakeview Dr Precinct: 4 Woodlake Pky and Lakeview Dr Reconstruction of Woodlake at Lakeview Drive residential roadway consists of pavement restoration, concrete median, ADA compliant sidewalks and wheelchair ramps, curbs and necessary drainage improvements. Consultant: CH2M Hill Advertise Date: 3 Q 2009 Contractor: Capital Excavation Construction Start Date: 1 Q 2012 Construction Cost: $ 374,272 Construction end Date: 3 Q 2012 Joint bid Agreement: N/A December 11, 2012 10