Project: Borgfeld Dr Phase I (ROW )

Similar documents
Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

PUBLIC INFRASTRUCTURE PROJECTS

City of Houston Fondren Road Paving and Drainage

Dixie Transportation Planning Office

US 67 WIDENING PROJECT

Riverside County Transportation Department Summary of Bids

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

GATTIS SCHOOL RD / SH 130 SUBDIVISION

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

State Avenue Corridor Bus Rapid Transit (BRT)

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014

IH 35 FEASIBILITY STUDY

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

Recommended Transportation. Capital Improvement Program

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

800 Access Control, R/W Use Permits and Drive Design

PERFORMANCE ACTIVITY 603 SIGNS

Wentzville Parkway South Phase 2 & 2A

MICROMARKET REPORT EVERGREEN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

COST ESTIMATES: Curb-Running

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

Public Works. Capital Projects FY

Proposed Project I 35 Improvements from SH 195 to I 10

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

CITY OF STEVENS POINT AGENDA

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

EXCEPTION TO STANDARDS REPORT

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

FREQUENTLY ASKED QUESTIONS

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

2019 Bond Program. Bond Advisory Committee Rankings. November 12, 2018

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

IMPROVEMENT CONCEPTS

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

SCHEDULE OF CAPITAL PROJECTS BY FUND

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Landtech...a measure of excellence

Transportation Improvement Program (TIP) Candidate Project List for Public Review

NCTCOG CATEGORY 5 RECAP FY 2016

Appendix F-1 Description of the Long-Term Alternatives

FREQUENTLY ASKED QUESTIONS

STATE LOOP 195 PUBLIC MEETING. Footer Text

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT

Leg 1 (D) 7.1 Miles - The Chase Begins. The majority of this leg is run on a trail / abandoned road while the remainder is on quiet country lanes.

Riverside County Transportation Department Summary of Bids

MICROMARKET REPORT NORTH & WEST SHORE LAKE TAHOE YEAR END 2015 WWW.

What Does it All Mean?

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

CTA Capital Construction Update May 17, 2007

Received June 2, 2017 PLN-PUDC

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

STANDARD DRAWING INDEX

Loop 375 Border Highway West Extension Project

Sherman Oaks Community Traffic Plan

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

ANDERSON PROPERTY SITE ANALYSIS

Revised Evaluation Scores. System Preservation

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

Plan Check Policies and Guidelines

SIDEWALK CAFE GUIDELINES

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

Sidewalk Working Group Update October 22, 2018

Develop ground transportation improvements to make the Airport a multi-modal regional

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

DESIGN STANDARDS SECTION DS 3 STREETS

APTA Rail Conference 2017 Mark L. Dorn Design Manager for Oklahoma City MAPS 3 Modern Streetcar Jacobs/AECOM Team

CITY OF SAN MARCOS ENGINEERING DIVISION

Traffic Engineering Study

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

Interstate Drive Extension

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

To: Al Martin From: Brian Munson CC: Date: Wednesday, February 24, 2010 Re: UDC Informational Submittal: Grandview Commons Grocery Store

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

FY Regional Surface Transportation Program (RSTP) Allocations *

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018

Click to edit Master text styles

FY Projects

Transcription:

Project: Borgfeld Dr Phase I (ROW ) Precinct: 3 From Timberline Dr US Hwy 281. Clear ROW and relocate fences necessary to facilitate utility relocation needed prior to the roadway reconstruction. Consultant: Carter & Burgess Inc Advertise Date: 3 Q 2010 Contractor: Shannon Monk Inc Construction Start Date: 3 Q 2010 Construction Cost: $ 303,945 Construction end Date: 4 Q 2010 Joint Bid: n/a December 11, 2012 1

Project: Blanco Rd Precinct: 3 From Glade Crossing to West Oak Estates Dr. Reconstruct Blanco Rd to include two lanes in each direction, center median, turn lanes at major intersections, curbs, sidewalks and necessary drainage. Bike lanes were included in this project. Consultant: CP & Y Advertise Date: 1 Q 2008 Contractor: Capital Excavation Construction Start Date: 2 Q 2008 Construction Cost: $ 29, 748,282.00 Construction end Date: 1 Q 2011 Joint bid Agreement: December 11, 2012 2

Project: Bulverde Rd Phase I Precinct: 3 From US 281 to Smithson Valley Road. Reconstruction of Bulverde Road to include two lanes of traffic in each direction, turn lanes and 4 foot shoulders. Project removed roadway from the 100 years plain. Consultant: HDR Engineering Advertise Date: 2 Q 2010 Contractor: D & D Contractors Construction Start Date: 2 Q 2010 Construction Cost: $ 1,978,333 Construction end Date: 1 Q 2011 Joint Bid Agreement: SAWS, CPS December 11, 2012 3

Project: Heritage Park Phase II Precinct: 1 Include, Sandy Field Dr, Bluff Fields Dr, Birch Field Dr, Misty Plain (Echo Plain to Quiet Plain Dr) Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks and drainage as necessary (1.25 miles approx.). Consultant: LNV Engineering Advertise Date: 1 Q 2010 Contractor: RL Jones LP Construction Start Date: 1 Q 2010 Construction Cost: $ 1,720,989.40 Construction end Date: 2 Q 2011 Joint bid Agreement: BexarMet December 11, 2012 4

Project: Heritage Park Phase III Precinct: 1 Include, Echo Plain, Cedar Plain, Coastal Plain, Beech Plain, Moss Plain, Quiet Plain, (Raven Field to Misty Plain) Timberline Dr US Hwy 281. Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks and drainage as necessary. Consultant: LNV Engineering Advertise Date: 4 Q 2010 Contractor: RL Jones Construction Start Date: 1 Q 2011 Construction Cost: $ 1 904,219 Construction end Date: 4 Q 2011 Joint Bid: SAWS, Bexar-Met December 11, 2012 5

Project: Ventura Subd Phases IX & X Precinct: 4 Estrid Trail Drive, Mescal Trail Drive, Justino Trail Drive, Shadow Trail Drive, Roveen Trail Drive, Ludlow Trail Drive, Seldom Trail Drive, Cinnabar Trail Drive, Foss Meadow, Oval Meadow, Pepper Trail, Wayside Trail & Wayword Trail (Elm to Sunlit Trail) Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks as necessary. Consultant: San Antonio Design Group Advertise Date: 3 Q 2010 Contractor: Slack & Co Construction Start Date: 4 Q 2010 Construction Cost: $ 3,853,906 Construction end Date: 4 Q 2011 Joint bid Agreement: SAWS December 11, 2012 6

Project: Ventura Phase VIII Precinct: 4 Sunshine Tower Drive, Trail Village Drive, Wistful Trail, Myrtle Trail, Radford Trail, Millers Trail, Corona Ridge, and Sonny Ridge. This project included design and full reconstruct the roadway infrastructure including pavement, curbs, 4-foot sidewalks and drainage as necessary. Consultant: Unintech Advertise Date: 1 Q 2009 Contractor: Silverado Brothers Construction Start Date: 3 Q 2009 Construction Cost: $ 1,363,252 Construction end Date: 1 Q 2011 Joint bid Agreement: SAWS December 11, 2012 7

Project: Ventura Phase VIII Part 2 Precinct: 4 Sunshine Tower Dr, Trail Village Dr, and Myrtle Trail. The completed project included Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4- foot sidewalks and drainage. Consultant: Unintech Advertise Date: 2 Q 2011 Contractor: Slack & Co Construction Start Date: 3 Q 2011 Construction Cost: $ 499,121 Construction end Date: 4 Q 2011 Joint bid Agreement: n/a December 11, 2012 8

Project: Shaenfield Road Precinct: 2 From Loop 1604 to FM 1560. Full reconstruction of roadway with two travel lanes in each direction and a 14-foot curbed center median, 6-foot sidewalks and necessary drainage, to benefit the surrounding developing neighborhoods and the North Side Independent School District. Consultant: Pape - Dawson Advertise Date: 3 Q 2009 Contractor: EE Hood & Sons Construction Start Date: 4 Q 2009 Construction Cost: $ 5,438,765 Construction end Date: 1 Q 2012 Joint bid Agreement: SAWS December 11, 2012 9

Project: Woodlake Pky & Lakeview Dr Precinct: 4 Woodlake Pky and Lakeview Dr Reconstruction of Woodlake at Lakeview Drive residential roadway consists of pavement restoration, concrete median, ADA compliant sidewalks and wheelchair ramps, curbs and necessary drainage improvements. Consultant: CH2M Hill Advertise Date: 3 Q 2009 Contractor: Capital Excavation Construction Start Date: 1 Q 2012 Construction Cost: $ 374,272 Construction end Date: 3 Q 2012 Joint bid Agreement: N/A December 11, 2012 10