Installing the G2743A/G2745A Valve Actuator Kits

Similar documents
Installation Guide. Thermal Conductivity Detector on a 6850 GC Accessory G2623A

Installation Guide. Flame Ionization Detector on a 6850 GC Accessory G2621

Valve Box and Valve Accessories G4315A, G4316A, G4317A

Installing a PTV Inlet

Installing a Cool On-Column Inlet

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Agilent G1554A On-Column Capillary Inlet with EPC

Installing a Purged Packed (PP) Inlet

Installing a Purged Packed Inlet

Installing an Auxiliary Pressure Control Module

1350 Valves. 1 of 14. Jun Illustrated Parts Breakdown Agilent 6890 Gas Chromatograph Service Manual

Installing a PTV Inlet

Not Included. Rear Half Harness

TRW STEERING COLUMN MODELS CA (TILT/TELESCOPIC) AND CT (TILT ONLY) CAM REPLACEMENT KIT

Installation and Operation

INSTALLATION INSTRUCTIONS RDO 2904 POWER DOOR OPERATORS FULL SIZE GMC VAN, REAR KIT # 01240

A g i l e n t A G a s C h r o m a t o g r a p h Service Manual

Installation instructions

TESLA MODEL S REAR UNDER SPOILER & DIFFUSER SYSTEM

Installation Guide. Heater Interface Cable for Mass Sensitive Detector Accessory G1590A

INSTALLATION INSTRUCTIONS

Installing the 6850 Direct Valve Column Connector Kit

Installing the CO 2 Cryogenic Oven Cooling Kit

Installation instructions

Installation Guide Thermal Conductivity Detector Accessory 19232E

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Guide. Purged Packed Inlet, Electronic Pneumatics Control on 6890 GC Accessory G1551A

INSTALLATION INSTRUCTIONS

ELECTRIC START KIT KIT P/N

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

BMW 7 Series (E38) Installation Guide StealthOne Version 1.6

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Porsche 911/996/997 Carrera Do-It-Yourself Convertible Top Hydraulic Cylinder Inspection, Removal and Shipping Instructions

INSTALLATION MANUAL

FOLDING TOP HYDRAULIC CYLINDER HOSE IDENTIFICATION

Installing the Flame Ionization Detector EPC Flow Control Manifold

(31 ) ZEON CONTROL PACK RELOCATION KIT

INSTALLATION AND OWNER S MANUAL Side Illumination Lights Z5150 for use with K 1200 LT

Installation instructions

Nissan Armada up A Nissan Titan Crew Cab up A Nissan Titan King Cab up A

INSTALLATION INSTRUCTIONS

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

RECOMMENDED SEQUENCE OF APPLICATION

Installing an Auxiliary Pressure Control Module

INSTALLATION INSTRUCTIONS

This harness kit includes: Civic harness (2003 to 2005) Installing the Hybrid ReVolt Universal grid charger in a First Gen Civic ( )

Agilent G2738A Upstream Capillary Interface

INSTALLATION INSTRUCTIONS

Installation Instructions for Key Switch SNOWRATOR

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

TOYOTA COROLLA ILLUMINATED DOOR SILLS Preparation

= Experienced

INSTALLATION INSTRUCTIONS

TOYOTA TUNDRA BED EXTENDER Preparation. Part Number: PT

= Experienced

Ford F150 SuperCab Ford F150 SuperCrew

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

TOOLS REQUIRED: Panel Removal Tool Phillips Screwdriver 10mm Nut Driver Ratchet 10mm Socket 7mm Wrench 7mm Nut Driver Straight Screwdriver

INSTALLATION INSTRUCTIONS

TOYOTA TUNDRA BED EXTENDER Preparation. Part Number: PT

Ford F150 SuperCab A Ford F150 SuperCrew A

Installation Guide. Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

1996 Aerostar/Ranger/Explorer

Dodge Ram Quad Cab A Dodge Ram Quad Cab 2500/ A Dodge Ram Mega Cab A

Single-Sided Storage Rack Assembly Instructions

INSTALLATION INSTRUCTIONS

Installation Guide. Flame Ionization Detector on a 6890 GC. Accessories G1561A, G1562A, G1591A, G1598A

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Instruction Sheet Kit Number:

* * E996L Series. E996L for Rim/Vertical. E996L for Mortise CAUTION

LEXUS CT 200h ILLUMINATED DOOR SILLS Preparation

(31 ) ZEON CONTROL PACK RELOCATION KIT

INSTALLATION INSTRUCTIONS

AKRAPOVIC CARBON-FIBER PARTS for the SUZUKI B-KING (2008)

DISPLACEMENT PUMP INSTRUCTIONS-PARTS LIST Rev. K. Model , Series A Model , Series B Model , Series A

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Instruction Sheet. Kit Numbers: , , & CRANK PULLEY KIT DISASSEMBLY. Package Contents

GPS AutoSteer System Installation Manual

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Installation instructions

Owner smanual. Banks Techni-Cooler Charge Air Cooler Assembly Dodge 6.7L Cummins (24-valve) ISB Pickup Trucks. with Installation Instructions

TECHNICAL DOCUMENT. PCNC Mill Enclosure Door Switch Kit. Installation

lkm7001 key override module Installation Instructions Converting The LKM7000 to The LKM7003

TOYOTA 4-RUNNER TOWING HITCH Preparation

TOYOTA AVALON EC REARVIEW MIRROR

Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

HUMMER H A. 3-5 Hours INSTALLATION GUIDE INSTALLATION TIME SKILL LEVEL. 4= Experienced TOOLS REQUIRED APPLICATION MODEL YR PART #

INSTALLATION INSTRUCTIONS

Jeep Wrangler Unlimited (JK) 2007 up A 2-Door. 3-5 Hours INSTALLATION GUIDE INSTALLATION TIME SKILL LEVEL. 4= Experienced TOOLS REQUIRED

Scion xb EC Rearview Mirror w/ Shift Light Preparation

Slave Cylinder Weep Hole Drilling Procedure

A Fitting Guide for the Forge Motorsport Front Mounting Intercooler for the BMW Mini Cooper S Turbo R56 Models

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Transcription:

Installing the G2743A/G2745A Valve Actuator Kits sa This document describes the installation of a valve actuator on the 4890 Series, 5890 Series, and 6890 Series Gas Chromatographs (GC). The kits contain: Description G2743A kit (6890 GC) Tubing connector 2 2 Screw, machine M4 8 mm 2 Screw, machine M4 12 mm 2 Actuator assembly 1 1 Solenoid valve* 1 1 Installation sheet (this document) 1 1 * Solenoid valve includes standoff screws and fittings G2745A kit (4890/5890 GC) Copyright 1999 1 Agilent Technologies Printed in USA 12/99 Part No. G2745-90107

Screws (1 or 2) Actuator Hex wrench Standoffs Tubing connectors Connector on 6890 GC; pins on 4890/5890 GCs Solenoid Figure 1. Part identification Tools required T-10 and T-20 Torx drivers Flat-blade screwdriver 3 mm hex key 7/64-inch hex key 4 mm hex key 2

Installing the actuator on a heated valve box WARNING The valve box is insulated with a fibrous material that can cause irritation to the skin, eyes, and mucous membranes. Always wear gloves when working with the insulation. If the insulation is flaky/crumbly, wear protective eyewear and a respirator. 1. Install the heated zone kit (if purchased) as described in the instructions included with that accessory. Leave the GC covers off and the power cord disconnected. 2. Hold the upper valve box over a trash can, then remove the pre-cut insulation from the appropriate hole in the upper valve box. Remove any excess or loose pieces from around the hole. Valve 1 position Valve 4 position Valve 2 position Valve 3 position 3. Close the valve box. 3

4. Align the actuator assembly over the appropriate valve position. Note that the cylinder always mounts away from the center of the valve box. Insert the actuator drive shaft through the hole. Cylinder away from center of valve box Back of GC Front of GC 5. Fasten the actuator to the upper valve box with two T-20 Torx screws. 4

Installing the actuator on a side mount bracket 1. Install the side mount bracket on the left side of the GC using four machine screws (6890 GC) or four self-tapping screws (4890/5890 GC). 2. Attach the clamp ring to the back of the bracket with two screws. 3. Align the actuator assembly with the upper or lower standoffs. The cylinder must be down. Insert the actuator drive though the hole in the bracket, and secure with two T-20 Torx screws. Torx T-20 screw Actuator, cylinder down Valve (to be installed later) Side mount bracket 5

Installing the solenoid on a 4890/5890 GC 1. If they are not already removed, remove the electronics cover and the GC right side cover. 2. Install the two tubing connectors into the new solenoid valve. Caution Do not remove the air supply fitting shown below. This fitting is cemented in place and must not be disturbed. Cables O-ring To normally-actuated actuator port Bracket 2 1 Threaded rod with nut and washer (1 of 2) 3 9-pin connector Air supply fitting, do not remove To normally-relaxed actuator port 3. Remove the nuts that hold the existing solenoids to the solenoid bracket. 4. Separate the end solenoid with the air fitting from the others. Insert the new solenoid between the end solenoid and the others. Be sure that there are O-rings on both sides of the solenoid. 5. Adjust the threaded rods and tighten the nuts. 6

6. Insert the cable pins in the top (wired side) of the connector. Press them down until they lock. Wire color Controls Number Blue (SOLENOID 1) 1 Blue (SOLENOID 2) 2 Blue (SOLENOID 2) 3 Blue (SOLENOID 1) 4 Grn/Yel (GROUND) 5 Blue (SOLENOID 4) 6 Blue (SOLENOID 3) 7 Blue (SOLENOID 3) 8 Blue (SOLENOID 4) 9 1 2 3 4 5 6 7 8 9 AS SEEN FROM WIRED SIDE View the connector from the back (wired) side. Pin 1 is farthest from the solenoid mount. 7. Connect the tubing from the actuator to the solenoid. 90 max Normally-actuated port Normally-relaxed port 7

Installing the solenoid on a 6890 GC 1. If they are not already removed, remove the electronics cover and the GC right side cover. 2. Install the two tubing connectors into the top of the new solenoid valve. 3. Use a 4 mm hex key to remove the two mounting screws that secure the solenoid block to the bracket. Tubing connectors Mounting screws 8

4. Use a 7/64-inch hey key to remove the two screws that hold the end plates and solenoids together. Standoff screws 5. Screw the two standoff screws supplied with your actuator kit into the standoff screws in the existing solenoid valve, then install the new solenoid valve. Be sure the O-rings are properly seated in the solenoid. 6. Re-assemble the end plates onto the solenoid assembly. 7. Re-install the assembly onto the bracket. 8. Cut the tie-wrap around the tubing leading from the actuator and route the tubing as shown in the next figure. The tubing from the side of the actuator connects to the outside fitting on the solenoid (the fitting farthest from the main board). Trim the tubing as needed to keep installation neat. See page 10. 9

sa Solenoid outside fitting Heater/sensor cables To solenoid inside fitting To solenoid outside fitting The actuator installation is complete. 10 Agilent Technologies G2745-90107