Smartflow FasTie Quick-Connect Ejector Tie-In System

Similar documents
- Quick ejector Tie-in system

Tracer VM with User Interface

Tracer VMA with AutoReg

INTRODUCTION INSTALLATION

Installation Guide. Marking and Inspection Gauge. Marking Gauge. Inspection Gauge E 1. Marking and inspection gauges are combined into one gauge.

DODGE CUMMINS 24V ISB OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

½ DODGE CUMMINS OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

DODGE CUMMINS Arctic-Heat Grid Relocation Kit

- C8. SINGLE AND MANIFOLD TYPE INJECTORS for dispensing fluid lubricants and greases not exceeding Lincoln ventmeter viscosity of 600 psi.

LEXION SINGLE FUNCTION HYDRAULIC VALVE KIT

INSTALLATION INSTRUCTIONS

Straight-Bore Clutch LSCC-32, 44, 54

SPECIFICATIONS CONTENTS: Specifications Warning Information. Operating Instructions Preventative Maintenance and Troubleshooting

L DODGE CUMMINS Maximizer System

DODGE CUMMINS GDP Twin CP-3 Big Line Kit

Tracer Electronic Switching

A2P Single Phase Automatic Industrial Battery Charger

Pump Installation and Service Manual HRS Hydromatic Retractable System

Ford Mustang 2013 GT500 Rear Break Install Guide for Mustang GT

RAM 1500, 2019 CLASSIC & 2010-ON 2500/3500 INSTALLATION INSTRUCTIONS

PARTS LIST. Guardian VR-Series. Material Pumps

DODGE CUMMINS GDP Big Line Kit

Power Float Manifold. Installation and Operations Manual Module 11A

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

Harvil 4 Foot Air Hockey Table

Z-Tech Severe Chemical Service Valves We Put Control Where You Need It.

INSTALLATION INSTRUCTIONS

RED23305 Owner s Manual

Harvil 4 Foot Air Hockey Table

PowerMax Diesel Upgrade For Cummins Engines

Model No , -2, -3, -4, -5, , , -2, -3, -4, -5, and SL-V INJECTOR Series A

DAP-625S and DAP-875S

DODGE CUMMINS MK-2 Micro-Kleen System

Mega-Rail System Installation

DODGE CUMMINS Air-Boss CR Intake Plenum

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Lubricator Gun: 10,000 psi (700 bar) Maximum Delivery Pressure when disconnected from Dispenser

INSTALLATION INSTRUCTIONS

DRAGO. Corn Header Manual f HEADSIGHT.COM

PMD DRIVER RELOCATION KIT For Chevy 6.5L Diesel Trucks

Air-Boss VP Intake Plenum

TALCO FIRE SYSTEMS. LSF Start-Up Instructions. 1) IMPORTANT: Inspect the unit for damage. Report any damage to the freight carrier immediately.

2019-ON RAM 1500 INSTALLATION INSTRUCTIONS

GETZ EQUIPMENT INNOVATORS PART NO.: 3G59419 MODEL: BV 101 P PNEUMATIC BELT VISE WITH EXTENDED BELT & ROLLER

BC Brake Caliper. (i) MEX (55) QRO (442) MTY (81) DIST. AUTORIZADO

SERIES 9000 Double Offset HP Butterfly Valves

INSTALLATION INSTRUCTIONS

Extreme Duty Grapple (Rock, Skeleton, Scrap & Tine) Operation and Maintenance Manual

REPLACING ROLTEC SPRING ARMS

7.3L POWERSTROKE BANJO BOLT KIT Fits L Powerstroke Diesel. Installation Guide

Extreme Duty Grapple (Rock, Skeleton, Scrap & Tine) Operation and Maintenance Manual

L DODGE CUMMINS MK-2 High Flow Fuel Filter Kit

Female Plug. connecting to Fuel Quantity

MEX (55) QRO (442) Web Controls

OWNER S MANUAL Z SERIES TRACKS. Rev. 355_05

BEFORE YOU BEGIN LIST OF COMPONENTS. Isopropyl SWITCH SCOTCH-BRITE PAD ALCOHOL PREP PAD SWITCH HARNESS REVOLVER PCM COVER STICKER

SKID STEER COMBO PLOW

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

VANGUARD A EZ INSTALL OPERATOR S MANUAL

Fifth Wheel Power Hitch Operations Manual

Firstmate Installation Manual and User's Guide May, 2003

ECONOMAIR SERIES CYLINDERS

MaxLite LED Linear HighBay Fixtures

LUBRICATOR GUN INSTRUCTIONS-PARTS LIST. 10,000 psi (700 bar) Maximum Delivery Pressure. Detachable-type

Hose reel. Models and Installation and maintenance guide. Danger

DeZURIK KUL KNIFE GATE VALVES

PARTS LIST. Guardian A- Series. Material Pumps

RV-10 Center Arm Rest Console

Harvil 5 Foot Air Hockey Table

HPx-JDx3-xx HARNESS INSTALLATION

Inline & 90 Live Swivels Fax:

20250 Module Installation Guide

L DODGE CUMMINS MK-2 + BLK APPS Mount

Installation Instructions

MULTIPOSITION AIR CYLINDER

Type Flexair Pneumatic Pressure Control Valves

V400D VERIS Verabar (Double Rod) Installation and Maintenance Manual

OWNER/OPERATOR MANUAL. Airmotor effective dia. in. 2.5

INSTALL GUIDE Silverado/Sierra L/6.2L

Elgin Hydraulic Clutch-Brake ECB-240, Product Number FORM NO. L F FORM NO. L F-0704

INSTALLATION INSTRUCTIONS

Installation Instructions / Warranty

MLS KICK-OFF TABLETOP SOCCER TABLE ASSEMBLY INSTRUCTIONS

SERIES 7400 THREE PIECE BALL VALVES

Benchmark HD Series Heavy Duty Bench Scale. Installation Manual

JD 900F TILT SENSOR INSTALLATION

UNIVERSAL CUSTOMIZABLE MUD FLAP INSTALLATION INSTRUCTIONS

Yukon Gear & Axle. D30, D44 & GM 8.5" Hardcore Locking Hub Installation Guide PLEASE READ COMPLETELY BEFORE INSTALLATION

RENEGADE SLATE BUMPER POOL TABLE ASSEMBLY INSTRUCTIONS

SPC-PANEL Simplex, Single Phase Pump Control Panel

Before installing your Roush Performance Product(s), read through the entire installation procedure and check to make sure all items are present.

OWNER S MANUAL. LOEGERING th Street SE Casselton, ND USA Fax:

DeZURIK 2 20" BOS BUTTERFLY VALVES

Premium Series Grease Dispensing Handle One and Two Piece Body Styles

LINEAR MOTION CONTROL

OPERATION & SERVICE MANUAL DRUM (MANUAL DRUM LIFTER)

Dual Fueler CP3 Pump Kit Installation Guide for LB7

FCB-450, LCB-600, MCB-800

DeZURIK KGC-MD KNIFE GATE VALVES

MODEL BARE REEL SERIES E

Transcription:

Smartflow FasTie Quick-Connect Tie-In System 1"HS, 1-3/8", 2" & 3" Components, Installation Instructions US Patent No. 6,379,072 General FasTie Quick-Connect System ties-in the mold ejector plate to the press ejection system. A pneumatically-operated piston inside the coupler releases the pull stud from the press ejection system to reduce set-up and change-out times. Fixed-length FasTie s may be used with the couplers and pull studs. The FasTie air manifold option distributes shop air to each coupler. The aluminum manifold supplies air to up to four couplers. Pneumatic fittings and tubing are included. Caution: s must be in the open position before connecting with pull studs. See figure 1. damage will result from improper set-up. Maintenance Use Ultra High Temperature Synthetic Anti-Seize grease regularly on the couplers for smooth operation. Visually inspect coupler each month or each tool change for the presence of grease. Generously apply grease to pull stud end, connect the coupler to the pull stud, then release and repeat. Before Installation Before clamping a mold to the injection molding machine, the machine ejector plate must be completely retracted to the home position. Alignment Per figure 2, maximum center line misalignment per coupler outside diameter is as follows. Multiple Lengths When using two or more knockout bars in an installation, knockout bars must be the same length within.05mm (.002") to assure even coupler operation. Open (sleeve forward) FasTie s shown in open position HS Closed (sleeve back) Maximum Center Line Misalignment figure 1 HS figure 2 Bar Length Note: Individual ejector bars should not exceed 24" in length to prevent sagging and excessive coupler/pull stud misalignment. It may be necessary to use two ejector bars for extra-long ejector bar applications, one for each pull stud and coupler. Minimum Clearance Needed to Disengage and 1" HS 15mm (0.59") 1-3/8" 21mm (0.81") 2" 25mm (1.00") 3" 34mm (1.34") 4500 E. 142nd Street Grandview, MO 64030 Tel. (816) 878-6675 www.smartflow-usa.com Form #154 (08.17)

FasTie Quick-Connect Tie-In System s on for multiple molds in the same machine with different ejector patterns and different ejector strokes Unused in Open Position Manifold Accessory Pneumatic Fitting (SpeedBar or Fixed Length) Housing figure 3 1. Install the coupler into the press ejector plate populating for the required molding machine patterns (i.e. vertical, horizonal and/or center knockout positions). Use threadlocking compound to prevent movement during use. 2. Install pneumatic fitting to the coupler per figure 3. 3. If using the manifold accessory, mount the manifold and tubing so they do not interfere with moving parts. 4. Connect shop air lines to the pneumatic fittings that feed the FasTie couplers. s must be in the open position (see figure 1) before connection to pull studs, otherwise coupler damage will occur. 5. Install the pull stud onto the end of the knockout bar.* 6. Insert the knockout bar assembly in the moving platen. 7. Lower the mold into position and clamp the A side 8. Position the moving platen, providing clearance between the platen and the mold, for installation of the knockout bar assembly into the mold ejector plate. 9. Slowly position the moving platen against the mold, 10. Clamp the B side (moving side) of the mold to the platen. 11. Check that air supply to the coupler is off. If press ejector Machine Back setting to match Back 12. Tighten nuts to the press ejector plate (if using) after the FasTie components are coupled. This helps alignment of the FasTie system. 13. Maximum allowable center-to-center misalignment of 14. Follow Test Installation procedure on page 6. * 1 HS FasTie only: For installation using SpeedBar Adjustable Length Knockout bars, insert bars at step 5, taking care to insure all bars are exactly the same length. 2 burger & brown engineering tel. 800-764-3518

s and Center Adapters on for presses with limited access to the back of the. Custom molders using smaller presses will benefit from this installation. (SpeedBar or Fixed Length) Plate Manifold Accessory Center Adapter with Pneumatic Fitting Unused in Open Position Housing figure 4 1. Install the coupler with the center adapter into the press ejector plate populating for the required molding machine patterns (i.e. vertical, horizonal and/or center knockout positions). Use thread-locking compound to prevent movement during use. 2. Install pneumatic fitting to the center adapter per figure 4. 3. If using the manifold accessory, mount the manifold and tubing so they do not interfere with moving parts. 4. Connect shop air lines to the pneumatic fittings that feed the FasTie couplers. s must be in the open position (see figure 1) before connection to pull studs, otherwise coupler damage will occur. 5. Install the pull stud onto the end of the knockout bar.* 6. Insert the knockout bar assembly in the moving platen. 7. Lower the mold into position and clamp the A side 8. Position the moving platen, providing clearance between the platen and the mold, for installation of the knockout bar assembly into the mold ejector plate. 9. Slowly position the moving platen against the mold, 10. Clamp the B side (moving side) of the mold to the platen. 11. Check that air supply to the coupler is off. If press ejector Machine Back setting to match Back 12. Tighten nuts to the press ejector plate (if using) after the FasTie components are coupled. This helps alignment of the FasTie system. 13. Maximum allowable center-to-center misalignment of 14. Follow Test Installation procedure on page 6. * 1 HS FasTie only: For installation using SpeedBar Adjustable Length Knockout bars, insert bars at step 5, taking care to insure all bars are exactly the same length. burger & brown engineering tel. 800-764-3518 3

in Center Position for presses with a center ejector, replace the cylinder bolt with a Center Bar or Center Adapter and FasTie. Pull Stud Cylinder Center or Center Adapter with Pneumatic Fitting Housing figure 5 1. Install the pull stud into the mold ejector plate per figure 5. Use thread-locking compound to prevent movement during use. 2. Remove the Cylinder Bolt (if present) from the press. 3. Install the Center Bar or Adapter and FasTie Assembly through the platen and tighten into the cylinder. 4. Lower the mold into position and clamp the A side 5. Connect shop air lines to the pneumatic fitting for the coupler. must be in the open position (see figure 1) before connection to the pull stud, otherwise coupler damage will occur. 6. Install the pull stud into the mold ejector plate. 7. Slowly position moving platen against the mold, 8. Clamp the B side (moving side) of the mold to the platen. 9. Check that air supply to the coupler is off. If press ejector Machine Back setting to match Back 10. Maximum allowable center-to-center misalignment of 11. Follow Test Installation procedure on page 6. 4 burger & brown engineering tel. 800-764-3518

s at the end of Bars for multiple molds in the same machine with the same ejector pattern and ejector strokes Nut and Washer Manifold Accessory Plate (SpeedBar or Fixed Length) Housing figure 6 1. Install the coupler and the knockout bar assembly into the press ejector plate populating for the required molding machine patterns (i.e. vertical, horizonal and/or center knockout positions). Use thread-locking compound to prevent movement during use.* 2. Install washer, nut and pneumatic fitting per figure 6. Do not tighten completely at this time. 3. If using the manifold accessory, mount the manifold and tubing so they do not interfere with moving parts. 4. Connect shop air lines to the pneumatic fittings that feed the FasTie couplers. s must be in the open position (see figure 1) before connection to pull studs, otherwise coupler damage will occur. 5. Install the pull stud into the mold ejector plate. 6. Lower the mold into position and clamp the A side 7. Position the moving platen, providing clearance between the platen and the mold. 8. Slowly position the moving platen against the mold, 9. Clamp the B side (moving side) of the mold to the platen. 10. Check that air supply to the coupler is off. If press ejector Machine Back setting to match Back 11. Tighten nuts to the press ejector plate after the FasTie components are coupled. This helps alignment of the FasTie system. 12. Maximum allowable center-to-center misalignment of 13. Follow Test Installation procedure on page 6. * 1 HS FasTie only: For installation using SpeedBar Adjustable Length Knockout bars, insert bars at step 1, taking care to insure all bars are exactly the same length. burger & brown engineering tel. 800-764-3518 5

Test Installation Verify Connection 1. Open the mold. 2. Activate the ejector system. 3. Observe the ejector pins. They should move forward and return. Visually inspect the FasTie couplers to verify that they are connected to the pull studs. Verify Release 1. Apply air to the FasTie couplers. 2. Activate the ejector system. 3. Observe the ejector pins. They should move forward, but not return. Reconnect s 1. Ensure that the FasTie couplers are in the open position and the air pressure is off. See figure 1. 2. Move the ejector system forward 3. Return the ejector system. 4. Observe the ejector pins. They should be retracted If the system is not connected properly, open the platen, disconnect the couplers and pull studs, reconnect each ejector position and re-test the installation. Troubleshooting Symptom pins don t move back when retracting ejector system; FasTie does not connect Corrective Action Confirm shop air is off during connection. Check coupler operation. Check pull stud and coupler alignment. Pneumatic valve or selector switch must allow residual air pressure to dissipate when valve is off. Air pressure when off is zero. FasTie uncouples during ejector cycle Check mold position in the must be squarely installed and the FasTie coupler must not contact the platen. FasTie doesn t uncouple Check length. Check that the mold is clamped squarely to the Air pressure supply to the couplers should be 80 to 100 psi. Check air lines and fittings for leaks or breaks. If corrective action fails to correct the problem, please contact the factory. Ensure that couplers are not under tension when disconnecting. Apply grease to couplers per Maintenance on Page 1. Limited Warranty Seller warrants that this product supplied will conform to the description herein stated and that the product will be of standard quality. This is the sole warranty made by Seller with respect to this product. Seller expressly disclaims any other express or implied warranties, including, but not limited to, the implied warranty of merchantability and the implied warranty of fitness for a particular purpose. Seller shall not be liable for any cost or damages, whether direct, incidental or consequential, including, but not limited to, any injury, loss or damage resulting from the use of this product, regardless of whether any claim for such cost or damages is based on warranty, contract, negligence, tort or strict liability. The sole liability of Seller is limited to repairing or replacing this product. This warranty shall not apply to any products that have been repaired or altered by anyone other than Seller. The warranty shall not apply to any products subject to misuse due to common negligence or accident, nor to any products manufactured by Seller which are not installed or operated in accordance with the printed instructions of Seller or which have been operated beyond the rated capacity of the goods. Seller states that the product s useful safe life is 5 years. Actual life may vary widely depending on operating environment such as temperature, pressure, and chemical exposure. 6 burger & brown engineering tel. 800-764-3518