BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) )

Similar documents
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U338-E) NOTICE OF EX PARTE COMMUNICATION

Updates and Modifications to Report

Updates and Modifications to Report

Decision on Merced Irrigation District Transition Agreement

Merger of the generator interconnection processes of Valley Electric and the ISO;

Updates and Modifications to Report

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

APPENDIX F: Project Need and Description

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) NOTICE OF EX PARTE COMMUNICATION

February 13, Docket No. ER ; ER Response to Request for Additional Information

PREPARED REBUTTAL TESTIMONY OF BETH MUSICH SOUTHERN CALIFORNIA GAS COMPANY AND SAN DIEGO GAS & ELECTRIC COMPANY

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

Re: California Independent System Operator Corporation

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

best to you all Gail Carbiener Page 1 of 5

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U-338-E) SUPPLEMENTAL REPLY BRIEF

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Pacific Gas and Electric Company TM

City of Palo Alto (ID # 6416) City Council Staff Report

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

West Station-West Cañon 115 kv Transmission Project

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Arizona Transmission Challenges

September 9, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, DC 20426

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

Appendix D Black Hills Project Summary

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

for DRECP Alternatives

California and the Western Grid: Transmission Challenges

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

STATE OF CALIFORNIA ) ) ) ) ) ) )

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

July 16, Dear Mr. Randolph:

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

October 30, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Microgrids A Regulatory Perspective

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company

Summer Reliability Assessment Report Electric Distribution Companies Perspective

Electric Vehicle Charge Ready Program

Tehachapi Renewable Transmission Project. Chino Hills Proposed Alternative. for Segment 8A of the. Chino Hills - September 11, 2007

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

Michigan Thumb Loop Transmission Line Project

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

SunZia Southwest Transmission Project

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

California Independent System Operator. Memorandum

May 2017 Pei Sue Ong, Capital Accounting Advice Manager Pacific Gas and Electric Company

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

WestConnect Regional Planning Update

SCE s 2017 Integrated Distributed Energy Resources Request for Offers ( IDER RFO ) Market Awareness Webinar. August 30, 2017

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

Issue 23 draft for Nuvve

Draft Results and Recommendations

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

WHEREAS, LADWP seeks to enable the continued growth of customer generation, including solar-powered generation; and

Black Hills Project Summary

Interconnection and Net Metering Service in Ohio

SunZia Southwest Transmission Project

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Four Corners Queue Transmission Interconnection Study

The Development of Competitive Renewable Energy Zones in Texas

Coachella Valley Plug-in Electric Vehicle Coordinating Council

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

Challenges With Underground High Voltage Transmission SCE Tehachapi Renewable Transmission Project First 500 kv Underground T/L in North America

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

VAN NESS AVENUE BUS RAPID TRANSIT

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

July 6, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Extension of the Electric Vehicle Adjustment Clause (EVAC)

Transcription:

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E for a Certificate of Public Convenience and Necessity for the West of Devers Upgrade Project and for an Interim Decision Approving the Proposed Transaction Between Southern California Edison Company and Morongo Transmission LLC. A.13-10-020 (Filed October 25, 2013 SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E AND THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR S NOTICE OF EX PARTE COMMUNICATION JORDAN PINJUV BETH GAYLORD Attorney for REBECCA AUSTIN FURMAN GARY CHEN THE CALIFORNIA INDEPENDENT Attorneys for SYSTEM OPERATOR 250 Outcropping Way SOUTHERN CALIFORNIA EDISON Folsom, California 95630 COMPANY Telephone: (916 351-4429 2244 Walnut Grove Avenue Facsimile: (916 608-7222 Post Office Box 800 E-mail:jpinjuv@caiso.com Rosemead, California 91770 Telephone: (626 302-3475 Facsimile: (626 302-1935 E-mail:rebecca.furman@sce.com Dated: January 29, 2016

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E for a Certificate of Public Convenience and Necessity for the West of Devers Upgrade Project and for an Interim Decision Approving the Proposed Transaction Between Southern California Edison Company and Morongo Transmission LLC. A.13-10-020 (Filed October 25, 2013 SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E AND THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR S NOTICE OF EX PARTE COMMUNICATION Pursuant to Rule 8.3 of the California Public Utilities Commission (CPUC or Commission Rules of Practice and Procedure, Southern California Edison Company (SCE and the California Independent System Operator (CAISO hereby gives notice of their ex parte communications. On January 27, 2016, the CAISO and SCE conducted three meetings with the following individuals: (1 Commissioner Carla J. Peterman (9:00 a.m. to 9:30 a.m., (2 Commissioner Liane M. Randolph, Rachel Peterson, Leuwam Tesfai, Sean Simon (advisors to Commissioner Randolph (1:00 p.m. to 1:20 p.m.; and (3 Commissioner Mike Florio and Matthew Tisdale (advisor to Commissioner Florio (2:00 p.m. to 2:35 p.m.. The meetings were conducted in person at the CPUC Building, located at 505 Van Ness, San Francisco, California. A copy of the presentation is attached hereto as Attachment A. In attendance from SCE was Pedro Pizarro, President, Laura Genao, Director, CPUC Regulatory Affairs and Ryan Stevenson, Principal Advisor, Regulatory Affairs Infrastructure Licensing. In attendance from the CAISO was Stephen Berberich, President and Chief Executive Officer and Keith E Casey, Vice President of Market and Infrastructure Development. - 1 -

During the meetings, SCE updated the participants regarding the status of the West of Devers Upgrade Project (WOD Upgrade Project or Proposed Project proceeding. SCE expressed concerns with the Final Environmental Impact Report (FEIR issued by the CPUC, including concerns about the reduced capacity of the Phased Build Alternative and the increased environmental impacts of construction of multiple phases of the Phased Build Alternative. SCE also discussed the importance of the agreements with the Morongo Tribe and Morongo Transmission and how if either the Proposed Transaction or the Proposed Project is not approved that the Morongo Tribe have the contractual right to terminate the 50-year right-of-way agreement. SCE also informed the CPUC that it would seek an alternate decision approving SCE s Proposed Project if the Proposed Decision approved the Phased Build Alternative. The CAISO explained how the Phased Build Alternative as identified in the FEIR did not take into account the renewable portfolios provided by the CPUC to the CAISO and expressed concerns with the reduced capacity of the Phased Build Alternative to meet the State s clean energy goals. The CAISO also discussed how retroactively changing the renewable portfolios provided by the CPUC would result in stakeholder uncertainty and could potentially chill development of new resources. Additionally, after the conclusion of the meeting with Commissioner Randolph and her advisors, SCE had an ex parte communication with Rachel Peterson (advisor to Commissioner Randoph (1:40 p.m. to 1:43 p.m.. Laura Genao and Ryan Stevenson from SCE telephoned Ms. Peterson to correct a statement that the Phased Build Alternative would require a minimum wire stringing angle of 3:1 whereas the Proposed Project would require a minimum wire stringing angle of 2:1, as opposed to a disturbance impact of 3:1 for the Phased Build Alternative. - 2 -

Respectfully submitted, REBECCA AUSTIN FURMAN /s/ Rebecca Austin Furman By: Rebecca Austin Furman Attorney for SOUTHERN CALIFORNIA EDISON COMPANY AND 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626 302-3475 Facsimile: (626 302-1935 E-mail:rebecca.furman@sce.com JORDAN PINJUV /s/ Jordan Pinjuv By: Jordan Pinjuv Attorney for THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR 250 Outcropping Way Folsom, California 95630 Telephone: (916 351-4429 Facsimile: (916 608-7222 E-mail: jpinjuv@caiso.com Dated: January 29, 2016-3 -

Attachment A

SM West of Devers Upgrade Project Briefing Document January 2016

SM Summary Proposed Project is needed to interconnect and provide deliverability to renewable generation to meet the State s clean energy goals Approval of the Proposed Transaction is critical for the continued use of the existing facilities and construction of the Proposed Project across the Morongo Reservation Energy Division s FEIR finds a Phased Build Alternative (PBA that utilizes a portion of the existing 220 kv structures and a composite core conductor with lower capacity as environmental preferred Proposed Project is supported by all parties to the proceeding except ORA which proposed the application be dismissed and the project restudied SCE asks the CPUC to reject ORA s recommendation and the FEIR s PBA and approve the Proposed Project 2

SM FEIR Conclusion is Based on Incorrect Assumptions FEIR concludes a smaller project is justified based on the establishment of a minimum targeted capability / deliverability level FEIR methodology used to assess need for the project was inadequate Did not use the Commission-developed renewable portfolios relied upon in CAISO s transmission planning process Inappropriately applied a Reliability base case to assess RPS and Deliverability needs Failed to analyze the future phase of the PBA despite concluding a future 500 kv T/L in the WOD corridor is foreseeable PBA lacks scope definition, is more difficult to build, has environmental impacts that were not adequately analyzed or were dismissed in the FEIR and certain elements cannot be constructed without multiple line outages PBA has critical flaws including lower transfer capability / deliverability, inability to meet the State s clean energy goals, and ultimately higher environmental impacts and costs when compared to the Proposed Project 3

SM SCE s Proposed Project is Superior than the PBA Proposed Project provides greater transfer capability / deliverability Proposed Project reduces environmental impacts by providing for a single coordinated construction effort versus remobilizing construction efforts multiple times over subsequent phases Proposed Project best positions the State to meet the increased 50% RPS goals and increased GHG reduction goals Proposed Project provides for the earliest in service date; PBA would delay the in-service date by at least 12 months Proposed Project limits double-line outages to less than 24 hours in duration whereas PBA would require multiple-line outages of up to 6 months in duration resulting in generator curtailment and economic loss 4

SM Proposed Project is More Cost Effective Description Proposed Project Phased Build Alternative (Phase 1 Phased Build Alternative (Phase 2 Phased Build Alternative (Phase 1 & 2 Construction Cost (Constant 2015$ millions 1 $992 $887 $726 $1,613 In Service Date 2 2021 2022 2029 2022 / 2029 Level of Engineering Detailed Preliminary / Preliminary / Preliminary / Conceptual Conceptual Conceptual Incremental Transfer Capability (MW 3,200 1,400 1,800 3,200 Present Value of Revenue Requirements (Nominal $ $975 $907 $304 $1,211 millions PVRR / MW (Nominal $ $304,688 $647,857 $168,889 $378,438 1 PBA estimated construction cost only includes 15% contingency (same as Proposed Project. SCE requests a 10% adder to the Maximum Cost if the PBA is selected due to conceptual design information. 2 FEIR identification of 2024/2025 as the possible period when a subsequent phase ( Phase 2 of the PBA may be needed to be in service is not feasible per regulatory and construction constraints. 5

SM In Conclusion, SCE Asks the Commission to: Approve the Proposed Project and find the FEIR s PBA infeasible on policy, regulatory, economic, environmental and legal grounds Approve the Proposed Transaction to allow tribal investment and facilitate SCE s continued use of the transmission ROW that traverses the Morongo Reservation If the FEIR s PBA is adopted, Morongo have a right to terminate the ROW Agreement Reject ORA s suggestion to start over FEIR properly rejects the No Project Alternative 6

SM Back Up 7

SM Project Map Current WOD Scope (Proposed Project: Transmission: Tear down and rebuild ~181 circuit miles of existing 220 kv T/L facilities (~ 48 corridor miles, including seven 220 kv lines: Devers-Vista #1 and #2, Devers-San Bernardino #1, Devers-El Casco, El Casco-San Bernardino, and portions of San Bernardino-Vista and San Bernardino-Etiwanda Other: Upgrade telecom, substations, and property rights along existing WOD corridor Morongo: New southern WOD 220 kv corridor per Morongo ROW Agreement 8

SM Purpose and Need Existing facilities in the WOD corridor are fully subscribed Proposed Project will increase transfer capability from 1,600 MW to 4,800 MW CAISO 2010 studies first identified that the WOD Upgrade Project was required for renewable resources in eastern Riverside County to achieve Full Capacity Deliverability Status 6,090 MW currently in Queue Facilitate compliance with CA RPS goals Since the 2010-2011 transmission planning cycle, each TPP has confirmed the WOD Upgrade Project as a policy-driven project to support the 33% RPS goal 50% RPS goal further accentuates the Need for the Proposed Project Provide sufficient downstream transfer capability to enable CAISO to increase the Maximum Import Capability from the Imperial Irrigation District s area Comply with NERC, WECC and CAISO transmission reliability planning standards Support CA GHG reduction program, Federal energy renewable goals, Desert Renewable Energy Conservation Plan and CA Energy Commission Integrated Energy Policy Report goals Support power flow increase associated with the Delaney-Colorado River 500 kv Transmission Project 9

SM SCE-Morongo Agreements ROW 50-year Grant of Easement between SCE and Morongo for existing and upgraded electric/telecommunication facilities $6.5M per year, $500K increase every 5 years DOI Approved in Dec. 2013 Subject to termination by Morongo if Proposed Transaction is not approved by FERC and CPUC DCA Provides Morongo Transmission with an option to lease a portion of the transfer capability of the WOD Upgrade Project s transmission facilities Investment option up to $400 million or 50% of estimated transmission cost Transmission lease option comes available at time of commercial operation (2020 Morongo Transmission to become Participating Transmission Owner (PTO and dedicate transfer capability to CAISO FERC approved joint 203 application in Sept. 2013 FERC approved Morongo Transmission s hypothetical capital structure and 30-year levelized fixed rate of recovery of capital requirements request in Aug. 2014 Proposed Transaction Lease 30-year lease of a portion of the transfer capability SCE owns and maintains the assets Morongo Transmission to pay its proportionate share of operating costs 10

SM Milestone Status Completed Milestones: Oct. 2013 CPCN Application Filed at CPUC Mar. 2014 Plan of Development submitted to BLM July 2014 CPUC and BLM Scoping processes completed Aug. 2014 Refined Engineering completed Mar. 2015 CPCN Pre-hearing Conference completed Aug. 2015 Draft EIR/EIS issued Nov./Dec. 2015 CPCN Hearings completed Dec. 2015 FEIR issued Jan. 2016 CPCN Opening Briefs Upcoming Milestones: Jan. 2016 CPCN Reply Briefs Q1/Q2 2016 FEIS issued Q1/Q2 2016 CPCN ALJ Proposed Decision Q2 2016 CPCN Final Decision Q3/Q4 2016 USFW Biological Opinion (Per selection of the Proposed Project Q4 2016 BLM ROD (Per selection of the Proposed Project Q1/Q2 2017 Construction start (Per selection of Proposed Project Q3 2021 In-Service (Per selection of Proposed Project 11