OPERATING INSTRUCTIONS FOR. Gold-Place TM. Manual Pick & Place with Dispenser System Model MPP-21

Similar documents
SMT Place Manncorp 1610 Republic Road Huntingdon Valley, PA PIK-MANN ( )

TAKE-A-LABEL Power Dr. Nunica, MI Phone: (616) Fax: (616)

OEM TM-50 Quick Start Guide

DESIGNED BY EXPERIENCE PLASTIC SPHERE DISPENSER USER MANUAL. Manufactured by PSDS, Inc. for sole distribution by:

OPERATING INSTRUCTIONS FINISHER 4300

INSTALLATION MANUAL. Thunderstone Manufacturing LLC 3400 West O Street Lincoln, NE (Fax)

JBI Docupunch P33 Automatic Punch

SUPER 30 AUTO EJECT -AE

RoadComfort TM. Installation Manual Vibration Massage & Heat

TC1000 Service Manual SALES: CUSTOMER SERVICE:

2020 Dual Tabber Operation Manual

Perfmaster Air V3. Serial Number. Date

Heavy Duty Sprayer Owners Manual Model MS-O

SIGNETMARINE. Livewell Bait Pump Alarm. No Dead Bait.

MACHINE SENSORS CONTROL PANEL CONVEYOR SYSTEM SYSTEM SENSORS...

DC Series Owners Manual

Tattle-Tapet. Operator s Guide. Application System Model 611. Read all Safety Information Before Using this Product

Mitre Band Saw. Installation and Operating Instructions Note: Not all saw parts are shown in this booklet. Replaceable Aluminum Saw Table

OLYMPIAN MODEL 740 Operation and Service Manual

IMPORTANT! DO NOT THROW AWAY THE SHIPPING CARTON AND PACKING MATERIAL

OCTOPUS SELECTION & INSTALLATION GUIDE Rev. C CRA SERIES CONTINUOUS RUNNING PUMPSET

200 Shadylane Drive Philipsburg, PA Phone: (814) Fax: (814) Service Manual. Model 642E Centrifuge

XS500 Load Bank. Read all instructions before using the load bank. Contents

Fluid Dispensing Systems

PN DODGE CORONET Two panel Sequential LED Taillight kit installation guide. Kit Contents:

INSTRUCTION MANUAL for the TYPE 086A and 086AS SEMI AUTOMATIC BAG CLOSER

INSTALLATION AND OPERATING INSTRUCTIONS

Auto Sentry-eXP Maintenance. Revised 12/21/07

DMR 3005 WM ONE ZONE WIRELESS DIMMER RECEIVER

Asepsis 21 Delivery Unit

Breezair TBA 550 Installation Manual

Motor Failure on the 9x, C and M-Series Milling Machines

MPT-250B SPECIFICATIONS AND OPERATING INSTRUCTIONS

ACD-PRO Install in 2008 EvoX

General Information. Notations and Conventions. Compatibility Check. Kit Description. Call-Outs. Part Lists Great Plains Manufacturing, Inc.

REC-11+ REMOTE RECEIVER UNIT

INSTALLATION AND OPERATING INSTRUCTIONS

AmTryke Adult Recumbent Model HP1000 #50-HC-1000

XL1000 Load Bank. Read all instructions before using the load bank. Contents

LOOKOUT LED LIGHT BAR INSTALLATION MANUAL 7900 SERIES

INSTALLATION AND OPERATING INSTRUCTIONS

Power Distribution System User s Manual. Model: PDS-100

INSTALLATION INSTRUCTIONS

User Manual JS-ICON. 624 ARCH Dimmer Rack. JOHNSON SYSTEMS INC. Spring

Product Manual. Model DCT-6 Series. Version 1.

PORTABLE ASPEN. Part Number 42643

VECTRIX VX-2 SERVICE MANUAL. Version 1.0/May 2011 VECTRIX, LLC

INQUIRY: HYROBOTICS CORP SAM LEE ( ) 5988 MID RIVER MALL DR. ST.CHARLES MO TEL : FAX :

Installation Guide TB499 Conveyor/Dryer/Stacker Part #: M-3250 Revision Date:

INFINITY-1 HALOGEN LIGHT BAR INSTALLATION MANUAL 7000 SERIES

Reservedele Parts Catalogue November 2015

Installing the Integral Platen Blow Off Valve

INFINITY-3 STROBE LED BAR INSTALLATION MANUAL 7700 SERIES

INSTALLATION AND OPERATION MANUAL

PICO 175 Precision Saw

PowerFlo 20 Parts List/Assembly Instructions/Users Guide ***PLEASE READ ALL INSTRUCTIONS CAREFULLY AND THOROUGHLY***

Installation, Operation, Replacement Parts and Service Manual

OCTOPUS SERVICE PROCEDURE - SP007 REV NEW 15-FEB-2008

Select II Portable Braking System

TB-690 Conveyor/Stacker

PS24/AC Volt AC 16 Amp

Quick user guide for the DM dispenser

CHEMINSTRUMENTS HOT ROLL LAMINATOR MODEL HL-100, HL-101 OPERATING INSTRUCTIONS

U L T I M A T E R A D A R / L A S E R D E F E N S E S Y S T E M

AmTryke Adult Recumbent Model JT2000 #50-FC-2000

Rollstar Shade Installation Instructions

Tagger with Stand. Manual

ASTRO AMC-2000 SERIES ENVELOPE FEEDER

OPERATING MANUAL FOR 603, 604, 608 MACHINES

Procharger Stage II Intercooled Supercharger System (11-14 GT)

LI-ION BATTERY UPFIT KIT

PANASONIC Models: MC-9410, MC-9420, MC-9430, MC-9440

ESA II. I - Revive Slider Conversion Kit. Installation instructions

Doorway Foamer. Packers Chemical 3729 Peddle Hollow Rd Kieler Wi, Phone Fax

TABLE OF CONTENTS. S4000 LT Omron

ADHESION/RELEASE TESTER

Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide

PACER 30 VACUUM IMPORTANT SAFETY INSTRUCTIONS READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE OPERATING OR SERVICING MACHINE

PowerFlo Parts List/Assembly Instructions/Users Guide ***PLEASE READ ALL INSTRUCTIONS CAREFULLY AND THOROUGHLY***

Service Manual Mozart Fireplace

Rechargeable Air Compressor

ILLUSTRATIONS & PARTS LISTS FRONT VIEWS GDF14

California Friendly Landscape Training

MODEL MA4210 Installation and Operation Manual Important:

SMT LED Assembly Presentation

PACIFIC Recumbent Height-Adjustable Bath System Parts Breakdown and Assembly Manual

IDEAL Stripmaster Model 950 Wire Stripper #45-950

INSTRUCTIONS. #82044 Race Diesel Nitrous System

SX1000 Service Manual SALES: CUSTOMER SERVICE:

3143 Production Drive Fairfeild, Ohio Model HA-45. Installation and Service Manual

RESOURCE GUIDE. P r o d u c t M a n u a l. START International

Techcon Systems TS6500 CIM Automatic Techkit Mixer

MotorScrubber MS2000S/M/L Instruction Manual

COMPLETE AND FLEXIBLE SMT SOLUTIONS. dispense ALL. Innovation and quality made in Germany

Tooling Assistance Center

PARTS LIST ELECTRIC CHARGER 1500

FILLING MACHINES SINGLE HEAD

Owner s Manual. (Keep in glove compartment for quick reference) Rollx Vans Power Door Vans v1.3

A B C D E F. Tools Required (supplied by others)

Ferrari 328 Standard Brake System Bleed/Flush (Non-ABS)

Transcription:

OPERATING INSTRUCTIONS FOR Gold-Place TM Manual Pick & Place with Dispenser System Model MPP-21 AUTOMATED PRODUCTION SYSTEMS, INC. 2840 Pine Road Huntingdon Valley PA 19006 Phone: (215) 938-1000 FAX: (215) 938-8480 www.apsgold.com The Finest in Equipment for the Electronics Industry

TABLE OF CONTENTS I. SYSTEM INVENTORY...2 II. UTILITIES...2 III. SET-UP AND INSTALLATION...3 IV. PICK & PLACE OPERATION...4 V. DISPENSE OPERATION...5 & 6 V. RIGHT TO LEFT-HANDED CHANGEOVER...7 VI. MAINTENANCE AND ADJUSTMENTS...8 VII. SYSTEM OPTIONS...8 VIII. TROUBLESHOOTING...8 IX. STAND OPTION ASSEMBLY...9 X. TAPE FEEDER INSTRUCTIONS...10 XI. PARTS LIST...11-1-

I. SYSTEM INVENTORY A. Base unit includes: 1. Hand/arm rest with manipulator head 2. Control box assembly- vacuum pick & place controls B. One (1) component rack C. Two (2) 8" x 4" trays with lids D. (32) 1" x1" bins E. (8) 2" x 2" bins F. Two (2) magnetic board supports G. Three (3) vacuum pick-up needles (substitutions may be used) 1. 17 AWG white nozzle with suction cup 2. 18 AWG pink nozzle 3. 21 AWG green nozzle H. One (1) hex key for assembly I. One (1) Foot switch for dispenser J. Stand option with hardware (some assembly required) K. Dispenser Assembly 1. 10 cc empty syringe 2. Hose attachment 3. Rubber stopper 4. Syringe adaptor II. UTILITIES Power...110 VAC, 50/60 Hz Air (MUST BE CLEAN AND DRY)...90 psi Max. NOTE: Self-contained vacuum unit available upon customer request Max Board size...14 x 18-2-

Control Box Magnetic Board Supports 10cc Syringe Flat Cable Assembly Pick-up Head Dispenser Connector Connection Box Head Assembly Pick-up Needle Hand/Arm Rest Fig. 1 Feeder Rack Option Stand Option Component Rack Component Tray Component Bins Front Rail III.SET-UP AND INSTALLATION (Refer to Figs. 1, 2 & 3) A. PICK & PLACE SYSTEM 1. Place unit on flat sturdy work area. (For Stand Option assembly instructions see Pg 7). 2. Carefully remove packing materials from unit. 3. Mount Pick-up Head on front Short Arm with 2 socket head cap screws (SHCSs) 4. Connect electrical cable on head to connector box. (snake thru holes in arm, -Fig. 3) 5. Connect 1/4" hose from shop air to main AIR IN at bottom right rear of control box. 6. Connect vacuum line on pick & place arm to left connector on box at rear of arm rest. 7. Connect dispenser hose to right connector on box at rear of arm rest. 8. Place component rack on front rail and ensure that it slides properly (refer to Fig. 1). 9. Place (2) component trays in component rack and ensure that bins are seated properly in trays. 10. Place magnetic board supports in place to accept boards. Arrange boards to be as close to bins as possible for ease of working. 11. Plug in Foot switch to connector at bottom right rear of control box. 12. Plug in unit to 110 VAC outlet. 13. Slide pick-up needle onto pick-up head.. 14. Load parts in bins. B. DISPENSER SYSTEM 1. Load syringe with solder paste or other dispensing compound. -3-

2. Fasten adaptor to top of syringe 3. Attach hose from syringe adaptor to connector box 4. Mount syringe in holder on manipulator head Fig. 2 Rear of Control Box Main Air-in 1/4" Hose 110 VAC Power Dispense Foot Switch Input 1 Amp/250v Fuse Audible Power receptical 9/16 push-on air connector option IV. PICK & PLACE OPERATION (Refer to Fig. 1.) A. Push Main Power Switch to ON. B. Turn P&P switch ON (Red indicator will light). C. Set Vac Flow to maximum (Counter-clockwise increases vacuum, clockwise turning decreases vacuum flow. Set to operator preference). D. Place hand and arm on Hand/Arm Rest and grip spindle on manipulator head. E. Turn gripper spindle for theta rotation; move up and down for Z axis.. F. Pick components from bins or feeders. (Vacuum will automatically turn on when part is touched and indicators will light at head and VAC ON on control panel) G. Place components on pads. (Vacuum will automatically turn off when part is placed and indicators will go off at head and VAC ON on control panel) H. For inverted components use square pad in bin tray as follows. 1. Place device on pad. 2. Use placement needle to flip device by lifting edge and turning part right-side-up.. I. Auto-Pick TM Feature (For parts that are hard to pick & place the conventional way). 1. Press AUTO PICK button, red indicator will light. Vacuum will automatically turn on 2. Pick up component - vacuum will remain on. (you barely have to touch the part) 3. Place component; vacuum will turn off and automatically turn back on in 0.5 seconds. 4. Repeat procedure to pick and place additional components -4-

Display Screen Key Pad "Round" Gauge Dispense ON/OFF A. GENERAL DISPENSER OPERATION 1. Turn dispense power ON (red indicator switch). a. PLEASE NOTE: When main power power switch is originally turned on, the display screen illuminates. b. Even though illuminated the dispenser is not functional until dispense power switch is turned on. 2. Press any key to initiate display screen. 3. Turn PRESS REG until desired pressure is achieved, indicated at "round" pressure gauge, max 90 psi. 4. Use (left/right arrows) to move cursor to one of the 5 fields 6. Use (up/down arrows) to change number or mode settings. NOTE:Use proper dispense foot pedal (right side). As soon as dispense is complete, vacuum Pull Back Flow is instantly applied. Refer to Section "G" for Pull Back Flow setting. B. HOW TO STORE SETTINGS IN MEMORY (OPTIONAL STEP) 1. Use (left/right arrows) to move cursor to M (memory) and set desired number by using (up/down arrows) 2. Use (left/right arrows) to move cursor to DL, DS, PR and Mode. 3. Set desired number and Mode by using arrows and press STORE. C. MAN: Manual Dispense Mode 1. DL (delay) and DS (dispense) will indicate 000 in MAN Mode. 2. Turn PRESS REG until desired pressure is achieved, indicated at "round" pressure gauge. 3. Set PR to pressure shown on gauge. (for memory storage only) 4. Press foot pedal to dispense; release foot pedal to stop. NOTE: Dispense time is equal to the amount of time the pedal is pressed. D. SEM: Semi-Automatic Dispense Mode 1. DL (delay) will indicate 000. 2. Set DS (dispense) to desired time in seconds. 3. Turn PRESS REG until desired pressure is achieved indicated at "round" pressure gauge. 4. Set PR to pressure shown on gauge. (for memory storage only) 5. Set M (memory) two digit number 01 to 99 and press STORE 6. Press & release foot pedal and dispense will activate for the set amount of time in seconds. -5- Delay (interval) DL= 000 DS= 000 PR= 52.0 M= 01 MAN Pressure DISPLAY SCREEN Memory Dispense DL= 000 DS=1.50 PR= 45.0 M= 08 SEM (Sample) Mode

E. AUT: Automatic Dispense Mode 1. Set DL (delay) to desired time in seconds. 2. Set DS (dispense) to desired time in seconds. 2. Turn PRESS REG until desired pressure is achieved indicated at "round" pressure gauge. 3. Set PR to pressure shown on gauge. (for memory storage only) 4. Set M (memory) two digit number 01 to 99 and press STORE 5. Press foot pedal to initiate Automatic Dispense and Delay cycle. 6. Press foot pedal again to stop automatic cycle. F. LRN: Learn Mode (Method of learning real time dispensing) 1. Set M (memory) two digit number 01 to 99 and press STORE 2. In LRN mode field, set to LRN (lower right on display). 3. Set PRESS REG to desired pressure and note. 4. Press and release dispense pedal and time will automatically be displayed at DS in seconds 5. Press STORE 6. Set PR to pressure shown on gauge. (for memory storage only) 7. Set DL (delay), 8. Set Mode to SEM or AUT DL= 1.55 DS=1.00 PR= 55.0 M= 22 AUT (Sample) DL= 000 DS=1.83 PR= 50.0 M= 09 LRN (Sample) G. SET PULL BACK FLOW (Applies vacuum to dispense to prevent overflow after each application) 1. Turn clockwise to close Pull Back Flow valve. 2. Dispense amount, note overflow excess and turn counterclockwise to increase pull back flow vacuum. 3. Dispense amount again and adjust as necessary NOTE: When turned on, unit will remember last setting; even if settings were not stored in memory. -6-

Electrical Chord (snake thru holes) Pick & Place Hose Connection Connector Box Dispense Hose Connection Holder Short Arm(s) Z Axis Thumb Screw Hand/Arm Rest Pick-up needle Spindle Gripper Spindle Manual Head Pick & Place Needle Grip Lever Fig. 3 Manipulator Head Assembly (outlined) V. RIGHT-HANDED TO LEFT-HANDED CHANGEOVER (REFER TO FIG. 3) 1. Disconnect manipulator electrical cord at Connector Box 2. Remove 2 button head screws from Holder in front of Connector Box using 1/8" hex key. 3. Remove Manipulator Head Assembly, flip horizontally 180 and remount at Holder using 2 button head screws. 4. With 5/32 allen key remove (2) 10-32 SHCSs at rear Short Arm (refer to Fig.3). 5. Remove Manual Head from Short Arm, flip horizontally 180 6. Remount on front Short Arm (two SHCSs). 7. Re-install electrical chord at Connector Box. 8. Remove Grip Lever (2 top 6-32 SHCSs with 7/64 allen key). 9. Flip Grip Lever 180 horizontally and remount. 10. Move Feeder Rack option to opposite side of base unit (2 SHCSs) To change back to right-handed operation use same above procedure. -7-

VI. MAINTENANCE AND ADJUSTMENTS Adjustment for manual pick & place "Z" axis movement (Refer to Fig. 3) 1. Turn Z axis Thumb Screw clockwise for less tension. 2. Turn Z axis Thumb Screw counter-clockwise for more tension. NOTE: Do not kink or bend flat cable assembly from connector box to top of control box. VII. SYSTEM OPTIONS A. Stand B. Feeder Rack C. Tape Feeders: 8. 12, 16, 24 mm D. Stick Feeders: 8, 12, 16 mm VIII TROUBLESHOOTING A. Vacuum head doesn't pick up device 1. Check vacuum hose for any kinks or blockages. 2. Take pick-up needle off and blow out any debris with compressed air 3. Blow off all debris from Pick-up Needle Spindle (Fig. 3) -8-

3 Base Unit 3 Right Side Panel Left Side Panel Rear Panel 4 Rear Cross Bar 5 2 1 Fig. 4 IX. STAND OPTION ASSEMBLY 1 Attach Left Side Panel to Rear Cross Bar with 2 socket head cap screws (2 SHCSs). 2 Attach Right Side Panel to Rear Cross Bar (2 SHCSs). 3 Set Base Unit on side panels and attach with 4 phillips flat head screws. 4 Attach Rear Panel using 6 button head screws. 5 Adjust Leveling Feet -9-

MPP TAPE FEEDER INSTRUCTIONS 215-938-1000 FAX 215-938-8480 Tape Carrier Tape Guide Rail Peelback Pin Tape Cover Thumb Wheel Slot in Thumb Wheel Axil From Tape Reel Tape Feeder Mount Empty Tape Carrier Wheel Guard Fig. 5 X. TAPE FEEDER INSTRUCTIONS (refer to Fig. 5) 1. Attach Tape Reel on Feeder Rack with tape cover facing up. (Slide on Reel Axil and keep reels separate using Tape Reel Dividers). 2. Insert tape into feeder under Peelback Pin. 3. Peel back the tape cover from taped components so that tape carrier is exposed. 4. Remove gold Thumb Wheel from feeder and slide tape cover into slot. 5. Wrap tape cover several times around Thumb Wheel Axil until secure & place back on feeder. 6. Ensure that tape from reel feeds beneath Wheel Guard, under the Peel Back Pin and along the guide rail to the front of feeder. 7. Turn Thumb Wheel so that tape is secure and carrier slides along guide rail. 8. To feed taped parts, simply turn thumb wheel until exposed parts in carrier are presented at front of rail guide for pick-up; advance tape as necessary. -10-

XI. RECOMMENDED SPARE PARTS LIST 1. Component Rack.....................................................MPP-CR 2. Needle Kit (white needle w/suction cup, pink nozzle, green nozzle)........mpp-nk 3. Dispenser Assembly (10cc empty syringe, hose attachment, rubber stopper, syringe adapter) MPP-11 & 21 only.......................mpp-da 4. Foot Switch...........................................................MPP-FS 5. Controller a. Solenoid (internal)...................................................mpp-s b. Lighted Power Switch (external)....................................mpp-lps c. Auto Pick Switch (external)........................................mpp-aps 6. Head Assembly......................................................MPP-HA 7. Manipulator Assembly................................................MPP-MA 8. Hand Rest Assembly................................................MPP-HRA 9. Arm Rest Assembly (MPP-20 & 21 only)................................mpp-ara 10. 110V Power Cord...................................................MPP-PWC 11. 1 Amp 250V Fuse.......................................................MPP-F 12. Electrical Circuit (PCB, controller & all wiring)............................mpp-ec 13. Pneumatic Circuit (all pneumatics, hoses, etc.)..........................mpp-pnc Manipulator Assembly Hand Rest Assembly Head Assembly Needle -11-

TM 215-938-1000 FAX 215-938-8480 VIDEO DISPLAY OPTION MANUAL Camera Cable Camera Lens Camera Bracket Right -hand mount shown Fig. 6 Socket Head Cap Screws Washers Fig. 7 Camera Bracket Head Swivel Arm XI. VIDEO DISPLAY OPTION SET-UP 1. Mount Camera Bracket as shown in Fig. 6 and Fig. 7 2. Connect Camera Cable to Camera 3. Route Camera Cable as shown in Figs. 6 & 8 and connect to Video at Video Box 4. Remove Lens Cap (follow video camera instructions) 5. Screw camera lens onto camera 6. Plug charger into AC outlet and connect charger cable to 12 volt DC at video box 7. Connect Monitor Cable from RF at video box to RF at monitor 8. Assemble Stand as per instructions that come with stand -1-

DO NOT Place Monitor on larger swivel shelf Video Box Cable from Charger to 12 Volt DC at Box Place Monitor Here Copy Holder Clip Camera cable to Cable Arch Lock Wheels for Stand Fig. 8-2-