Alternatives Analysis Report. NYCT Contract #CM August Submitted to: Submitted by: SYSTRA Engineering, Inc. In Association with:

Restoration of Historic Streetcar Services in Downtown Los Angeles

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

West Broadway Reconstruction/LRT Design. March 19, 2015

Transit Access to the National Harbor

Crenshaw-Prairie Transit Corridor Study Public Meetings

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Restoration of Historic Streetcar Services in Downtown Los Angeles

Transit Access Study

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Bi-County Transitway/ Bethesda Station Access Demand Analysis

METRO Orange Line BRT American Boulevard Station Options

4.0 TIER 2 ALTERNATIVES

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

WELCOME. Transit Options Amherst - Buffalo Public Workshops

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Transit on the New NY Bridge

5. OPPORTUNITIES AND NEXT STEPS

Needs and Community Characteristics

DRAFT METROCENTER CORRIDOR STUDY

Proposed Program of Interrelated Projects

I-26 Fixed Guideway Alternatives Analysis

Operating & Maintenance Cost Results Report

Mississauga Bus Rapid Transit Preliminary Design Project

Executive Summary. Phase 2 Evaluation Report. Introduction

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Sound Transit East Link: Bus/LRT System Integration Study

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Community Advisory Committee. October 5, 2015

VAN NESS AVENUE BUS RAPID TRANSIT

What is the Connector?

Tier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis

VAN NESS AVENUE BUS RAPID TRANSIT

2.1 TRANSIT VISION 2040 FROM VISION TO ACTION. Expand regional rapid transit networks STRATEGIC DIRECTION

Public Meeting. June 15, :30 7:30 p.m.

Alternatives Analysis Findings Report

Waco Rapid Transit Corridor (RTC) Feasibility Study

TIER TWO SCREENING REPORT

Energy Technical Memorandum

Develop ground transportation improvements to make the Airport a multi-modal regional

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Community Open Houses November 29 December 7, 2017

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

I-26 Fixed Guideway Alternatives Analysis

What IS BRT, Really? Not BRT and RNY

Welcome. Please Sign In

3. PRELIMINARY DEFINITION OF ALTERNATIVES

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

Attachment 5 Eglinton West LRT Planning and Technical Update

Midtown Corridor Alternatives Analysis Initial Screening Analysis

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

CROSSING RAIL PROJECT (P4) RAIL

ARTERIAL BRT OVERVIEW

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Strategies to keep people and goods moving in and through Seattle

Tier 3 Screening and Selection. of the Recommended Alternative KISSIMMEE CORRIDOR. June Downtown CRA. US 192 Alternatives Analysis

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

East San Fernando Valley Transit Corridor. Information Session, October 10, 2017

The Screening and Selection of Regionally Significant Projects

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

A Presentation to: Project Advisory Group Meeting #10

State Avenue Corridor Bus Rapid Transit (BRT)

Recommended Vision for the Downtown Rapid Transit Network

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

7 COMPARATIVE EVALUATION OF ALTERNATIVES

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

RECOMMENDED ALTERNATIVE REPORT

Public Meeting. March 21, 2013 Mimosa Elementary School

Transit on the SC Rail Corridor

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

West Broadway Transit Study. Community Advisory Committee September 17, 2015

Attachment 5. High Speed Transit Planning Study REPORT SUMMARY. Prepared by: City of Edmonton Transportation Planning Branch. Stantec Consulting Ltd.

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Metropolitan Council Transit Capital Improvement Plan. September 23, 2009

engineering phase and during the procurement of design build contracts.

Central Park Drives Traffic Management Overview

Rapid Transit Implementation Working Group #4 February 9, 2017

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

Kendall Drive Premium Transit PD&E Study

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019

Metro Green Line to LAX Alternatives Analysis. March 2012

METRO Light Rail Update

Alternatives Analysis Summary Report

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

I-20 East Transit Initiative

Troost Corridor Transit Study

August 2, 2010 Public Meeting

Transcription:

North Shore Alternatives Analysis May 2012

Agenda Study Process and Progress to Date Short List Alternatives Screening Traffic Analysis Conceptual Engineering Ridership Forecasts Refinement of Service Plans Supplemental Environmental Data Collection Cost Refinements Recommendation and Conclusion 2

Study Area 3

Study Process Define Project Purpose, Need, Goals and Objectives Fatal Flaw Screening Long List Screening Short List Screening Select LPA and Complete Alternatives Analysis We are here Project Goals: 1) Improve Mobility 2) Preserve and Enhance the Environment, Natural Resources, and Open Space 3) Maximize Limited Financial Resources for the Greatest Public Benefit Environmental Impact Study Final Design Construction Operation Preliminary Engineering 4

Previous Activities Defined Project Purpose, Need, Goals and Objectives Long List Screening eliminated: Ferry alternative Alternatives terminating at Arlington Heavy rail and diesel light rail Short List retained for further study: Transportation Systems Management (TSM) Electric Light Rail to West Shore Plaza (LRT) Bus Rapid Transit to West Shore Plaza (BRT) 5

Transportation System Management (TSM) Existing bus operations with two new routes. Would include some route extensions to proposed Transit Center at Arlington Does not make use of the former NS Rail right ofway Federal process requires consideration of a low cost alternative 6

Transportation System Management (TSM) Alignment Map 7

Electric Light Rail Alternative (LRT) Alignment & Stations Light Rail service on two new tracks Build a dedicated transitway generally using the North Shore right of way between St. George and Arlington Travels from Arlington to West Shore Plaza in mixed traffic on South Avenue Trains would meet St. George Ferry service, and depart shortly after ferry arrival 15 total proposed stations 8

Electric Light Rail Alternative (LRT) Associated LRT Service Changes Reduced number of buses on Richmond Terrace: S40/S90 route would be discontinued upon LRT opening. The S48/S98 would be extended west and north (to cover the area north of the ROW). S46/S96 is truncated at Elm Park/Morningstar Reduced number of stops on transitway between St. George Terminal and Arlington 9

Electric Light Rail Alternative (LRT) Alignment & Stations Elm Park/ Morningstar West Brighton Livingston New Brighton Ballpark St. George Arlington Forest Ave Mariners Harbor Port Richmond Bloomfield Goethals Rd Teleport Lois Lane West Shore Plaza 10

Bus Rapid Transit (BRT) Alternative Alignment & Stations Build a dedicated busway generally using the North Shore right of way between St. George and Arlington. Travels from Arlington to West Shore Plaza in mixed traffic on South Avenue. Buses would meet St. George Ferry service, and depart shortly after ferry arrival. 15 proposed stations 11

Bus Rapid Transit (BRT) Alternative Associated Bus Service Changes Reduced number of buses on Richmond Terrace: S40/S90 route would be discontinued upon BRT opening. S48/S98 would be extended to cover this service west of Arlington. S46/S96 is truncated at Elm Park/Morningstar Reduced number of stops on transitway between Arlington and St. George Terminal 12

Bus Rapid Transit (BRT) Alternative Alignment & Stations 13

Ridership Forecasts: AM Peak Ridership Ridership forecasts were produced for Short List Alternatives MTA Regional Transit Forecasting Model (same travel demand model used by the MTA for transit expansion projects) NYCT measures segment users: total travelers using the service in either direction Alternative AM Period Segment Users Transportation Systems Management* 5,060 Electric Light Rail to West Shore Plaza 10,590 Bus Rapid Transit to West Shore Plaza 12,120 *TSM total shows total AM riders on proposed TSM alternative S99 and S83 routes. 14

Environmental Analysis Environmental Categories and Potential Impacts Alternative Noise Visual Air Quality Env. Justice Land Use Hist/ Arch Haz Mat Coastal/ Ecology TSM LRT BRT Little or no impacts some impacts most impacts 15

Summary of Short List Alternatives Alternative # of Stations Traffic Impacts Existing Conditions Transportation Systems Management Electric Light Rail to West Shore Plaza Travel Time WSP to St. George (min.) Estimated AM Peak Ridership O & M Costs (2010$) Capital Costs (2010$) Potential Environmental Impacts N/A N/A 50 N/A N/A N/A N/A All Existing None 37 5,060 $4.5m $36m Least impacts 15 Some; fully mitigable 21 10,590 $7.0m $645m Some impacts Bus Rapid Transit to West Shore Plaza 15 with existing stops beyond busway Some; fully mitigable 23 12,120 $6.5m $371m Some impacts 16

Recommendation Bus Rapid Transit BRT Selected as Locally Preferred Alternative Lower capital costs than Light Rail Port Richmond Proposed Busway (aerial view) 17

Recommendation Bus Rapid Transit Port Richmond Proposed Busway close up 18

Recommendation Bus Rapid Transit View of street level connection between BRT service and Staten Island Ferry 19

Recommendation Bus Rapid Transit BRT Selected as Locally Preferred Alternative Would reduce travel time Would improve access to key locations Would attract new riders View of Snug Harbor from Kill Van Kull 20

Bus Rapid Transit (BRT) Alternative Arlington Station Park & Ride Arlington Proposed station (aerial view)

Bus Rapid Transit (BRT) Alternative Freight Rail Coordination PROPOSED FREIGHT TAIL TRACK EXTENSION 10 15 FT HIGH RETAINING WALL PROPOSED BUSWAY IN CUT KEEP EXISTING EMBANKMENT Potential future tail track on north side Proposed BRT guideway on south side

Bus Rapid Transit (BRT) Alternative Freight Rail Coordination Potential future tail track on north side Proposed BRT guideway on south side

Questions or Comments: MTA New York City Transit ATTN: North Shore Alternatives Analysis 2 Broadway, 17th Floor, Room A17.53 New York, NY 10004 or Email: NSAA@Zetlin.com 24