7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:-

PRESENTATION ON STANDARDSDISTRIBUTION TRANSFORMERS BUREAU OF INDIAN STANDARDS BHOPAL

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES :

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

TECHNICAL SPECIFICATION FOR 11 KV AIR BREAK (A.B.) SWITCHES:

BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER ALLOY GATE, GLOBE AND CHECK VALVES FOR WATER WORKS PURPOSES ACCORDING TO IS 778:1984

Bus bar Bushings up to 1.1kV and from 1.6kA to 4kA for Liquid Filled Transformers:

Schedule No.: 13. Diesel Engine Driven Monoset Pumps for Agricultural Purposes

Guideline No.: E-03(201806) E-03 MOTORS. Issued date: June 7, China Classification Society

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society

SKN_N0106AnnexJ_R2. Annex J - Specific requirements for PVT collector Certification. 1. Introduction and definition

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society

Construction and Connection of Street Light Assets

Dakshin Gujarat Vij Company Limited

Guideline No.: E-03(201610) E-03 MOTORS. Issued date: October 28,2016. China Classification Society

Distribution transformers Efficiency over life-cycle

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

Technical Specification of GECOL. Packaged Transformers

Exceeding the standards with MNS

Technical Specification for 12kV and 24kV Current Limiting Fuse- Links for Overhead Applications

Technical Specification for 12kV Powder Filled Current Limiting Fuse-Links for Use in Switchgear (In Oil)

023 : 2006 CEB STANDARD. 12kV & 36kV LOAD BREAK SWITCHES CEYLON ELECTRICITY BOARD SRI LANKA

S.No. Tender Queries BRPL Reply 1 For 11KV(E) 3Cx300sqmm A2XWY High Ampacity cable conductor details specification not

Technical Specification for 12kV and 24kV Powder Filled Current Limiting Fuse Links for Use in Switchgear (In Air)

Guideline No.: E-07(201501) E-07 TRANSFORMERS. Issued date: October 20,2015. China Classification Society

Louisville Gas and Electric Company

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Guideline for Parallel Grid Exit Point Connection 28/10/2010

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

045 : 2000 CEB STANDARD

4. MARKING: Each cistern shall be provided with a label containing the following information or the information paper strip pasted to it.

MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING, URBAN DEVELOPMENT AND PUBLIC WORKS

Understanding BS 1363 Amendment No.4

Appendix Item Addendum

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

Maximum temp. rise in oil by 40 thermometer above design ambient (deg C) specified time Short circuit rating (Sec) for As per IS 2026

Marina Bay Sands Guidelines for Electrical and Wiring Service

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

ABB Transformers Egypt

Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts

Technical Specifications

ST. VINCENT AND THE GRENADINES

TECHNICAL SPECIFICATION FOR 11 KV DROP OUT (D.O.) FUSE with Polymeric Insulators:

DEPARTMENT OF TRADE AND INDUSTRY NO APRIL 2016

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS

شركة كهرباء محافظة القدس المساهمة المحدودة

Technical Specification for 12kV and 24kV Powder Filled Fuse-Links and Fuse Holders

A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system.

: DGVCL/11KV D.O.FUSE/SPECIFICATION : : 11KV DROP OUT FUSE CUTOUTS :

Doc:TED 11(794)W 1 September 2012 Draft Standard Automotive Vehicles - Windscreen Wiping System for 3 Wheeler Vehicles - Specification

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

37-SDMS-04 SPECIFICATIONS FOR INTERFACE LOW VOLTAGE MAIN CIRCUIT BREAKERS

COMMISSION REGULATION (EU) / of XXX

Certification Scheme

REFERENCE CP_TSSPEC_138 0 DATE: JUNE 2006 PAGE: 1 OF 17 TITLE SPECIFICATION FOR POLE- MOUNTED AUTO-RECLOSERS TABLE OF CONTENTS

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II/16: July 2014

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

MGVCL//11KV D.O.FUSE/SPECIFICATIONS -:11KV DROP OUT FUSE CUTOUTS:-

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

Guidelines for connection of generators:

Amendment No th September 2016 To AIS 037: Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components

ABB Ltd. FACTORY IN HANOI

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

1ZSC AAA EN, REV. 7. Transformer bushings type GSBK Technical guide

TGK Prefabricated Substation Technical Data

017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

Bushings for High Voltage AC Applications

Power and Distribution Transformers

abb SafeLink SF 6 Insulated Ring Main Unit Installation and Operating Instructions Switchgear Division Auckland, New Zealand SLMIO ver 2.

INDUSTRIAL HAUL AGREEMENT

Diesel Exhaust Fluid Certification Program Overview FEBRUARY 2009 REVISION 01

Draft Indian Standard FUSIBLE PLUG FOR DISSOLVED ACETYLENE GAS CYLINDER SPECIFICATION (first revision of IS 13497) (ICS )

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS

2. TEST RECORDS: All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

Principle Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act ZEK

TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY.

CAST RESIN DISTRIBUTION TRANSFORMERS 2016 EDITION

Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting

Technical Specification

Generating unit functional document submission form

Electrical District No. 3 SOLAR Q & A

Microgeneration Installation Standard: MCS

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

IMO fuel oil consumption data collection system

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION)

E/ECE/324/Rev.2/Add.108/Rev.1/Amend.3 E/ECE/TRANS/505/Rev.2/Add.108/Rev.1/Amend.3

Amendment No August, 2015 To AIS-037 Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components

34-SDMS-02 SPECIFICATIONS FOR

Transcription:

Agenda Electrical Transformers (Quality Control) Order Obtaining BIS Licence Requirements of Guidelines / IS 1180-1: 1: 2014 / STI Concerns in Getting BIS Licence Experience with BEE Regulations Recommendations Conclusion

Electrical Transformers (Quality Control) Order, 2014

Electrical Transformers (Quality Control) Order, 2014: Came in to Force: 27.07.2014 Electrical Transformers (Quality Control) Amendment Order, 2014 : Coming in to Force: 01.02.2015

Salient points of Electrical Transformers Quality Order: Obligation for certification: All manufacturers of electrical Transformers shall make an application to the Bureau for obtaining licence, within a period of six months from the date of coming into force of this order. No person shall commence manufacture, without obtaining a valid licence from the Bureau On obtaining certification marks licence, no person shall by himself or through any person on his behalf manufacture or store for sale, sell or distribute any electrical transformers specified in column (3) of the schedule, which do not confirm to the specified standards and do not bear Standard Mark of Bureau

Pros Improvement in Manufacturing Quality Reduction in failure rate Qualification of Manufacturers by BIS Confidence levels of clients will get increased Cons Commercial impact with Marking fee Delay in tendering activities if cycle time is more in getting the Licence

Few Concerns DTRs are made against order. If customer requirement is not in line with the requirements of IS 1180-1:2014, what manufacturer has to do? Lack of awareness to all customers and hence purchase policies are yet to be aligned with the obligations of the Quality Order (Till date no tender is floated with new requirements). BIS Guidelines & STI as per IS 1180-1: 2014 were issued lately in 1 st week of Dec-14 Lack of Clarity on some Guidelines to Manufacturers / BIS

BIS Licence

Obtaining Licence Submission of application BIS inspection Evaluation of Manufacturing facilities and Drawl of Sample for testing at BIS approved laboratories Receipt of Licence Operation of Licence Surveillance inspections Extension of Scope of Licence Tests on Market Samples

Licence Scope: Standard ratings as per IS 1180-1: 2014 Voltage Class > 200 kva and 2500 200 kva,3-ph,dtrs 25 kva, 1-Ph DTRs kva, 3-Ph DTRs 11 kv 250, 315, 400, 500, 6.3, 10, 16, 20, 25, 40, 630, 1000, 1250, 1600, 5, 10, 16 & 25 63, 100, 160 & 200 2000 & 2500 > 11 kv and 22 kv 63, 100, 160 & 200 250, 315, 400, 500, 630, 1000, 1250, 1600, 10, 16 & 25 2000 & 2500 > 22 kv and 33 kv 100, 160 & 200 250, 315, 400, 500, 630, 1000, 1250, 1600, 16 & 25 2000 & 2500 No. of Ratings: voltage classes (3.3, 6.6, 11, 22 & 33kV) and Sealed & Non sealed Total Grand Total 2*(10*3 + 4 + 3) = 74 2*(10*3 +10 + 10)=100 (4*3 + 3 + 2) = 17 74 +100 +17 = 191 (Without considering Energy Efficiency Levels) 3 * 191 = 573 (If Energy Efficiency Levels are considered)

Action Plan

BIS Licence - Documents Guidelines for Certification IS 1180-1: 2014 Scheme of Testing & Inspection (STI)

Guidelines for Certification

As per Guidelines, all applications shall be recorded as per IS 1180 (Part 1):2014. (Note: As per the amendment of Quality Order, schedule (3) is substituted the ratings as per New Standard. ) Clarity is needed on how to execute running orders / tenders floated as some of the designs may not be meeting all the requirements of IS 1180-1: 2014

Grant of Licence (Cl B.I) Following details to be submitted along with application - Ratings of the transformers for which BIS licence is required. - Relevant drawings and - Technical parameters of the said ratings Clarity is required on - whether Drawings to be submitted for all the ratings - list of drawings to be submitted

Grant of Licence, (Cl. B.I): Change in following parameters shall be taken as a change in the design, which would require type testing again: - Flux density - Current density and type of winding material (Cu/Al) - Tank design - Type of construction (core type/shell type) - Type of connection (star/delta) & Vector Group - Total loss and - Method of cooling The requirement may need to be reviewed for simplification. Ex: - Change in only vector group ----> Terminations will get changed. - Change in only method of cooling ----> Will effect only Temp. rise, but not SC, Impulse, etc.

Drawl of Samples and Conformity of Product, (Cl B.III): During Preliminary Inspection, samples shall be drawn from the following group to cover all the ratings Three phase transformers Nominal System Voltage 200 kva, 3 Phase > 200kVA and 2500 kva, 3 Phase 3.3 kv One sample of highest rating One sample of highest rating 6.6 kv -do- -do- 11 kv -do- -do > 11 kv and 22 kv -do- -do- > 22 kv and 33 kv -do- -do- Single phase transformers Nominal System Standard Ratings Voltage 11 kv One sample of highest rating 22 kv -do- 33 kv -do-

Drawl of Samples and Conformity of Product, During Preliminary Inspection (Cl B.III): - One sample of highest rating, offered by the firm to cover the entire range for which licence has been applied for, as per the above table. - Separate samples for sealed and non-sealed type DTRs - Scope of licence with higher energy efficiency level DTR shall also cover DTRs with lower energy efficiency levels To obtain Licence for entire range at once, is it acceptable to get the tests done on below 5 samples having Energy Efficiency Level-3 1) 200 kva, 33 kv, 3-ph, Sealed DTR 2) 200 kva, 33 kv, 3-ph, Non-Sealed DTR 3) 2500 kva, 33 kv, 3-ph, Sealed DTR 4) 2500 kva, 33 kv, 3-ph, Non-Sealed DTR 5) 25 kva, 33 kv, 1-ph, Sealed DTR

Drawl of Samples and Conformity of Product, (Cl B.III): The licenceshall be granted once the product passes in both the type tests and the routine tests as indicated. It is presumed that only type & routine tests are to be conducted and special tests are not required. Ex: SC test is required only up to 200 kva T/Fs

A. Type of Tests Routine Tests Type Tests Special Tests a) Measurement of winding resistance a) Lightning a) Determination of sound b) Measurement of voltage ratio & impulse test levels check of phase displacement b) Temperature-rise b) Short-circuit withstand c) Measurement of short-circuit test test (above 200 kva) impedance (principal tapping, when applicable) & load loss at 50 c) Short-circuit withstand test c) No load current at 112.5 percent voltage percent and 100 percent load (up to 200 kva). d) Paint adhesion tests. d) Measurement of no-load loss & d) Pressure test e) BDV and moisture current e) Measurement of insulation resistance f) Induced over-voltage withstand test g) Separate-source voltage withstand test h) Pressure Test i) Oil Leakage Test content of oil in the transformer

For inclusion of new rating of the transformer - If rating < Scope of Licence: Licensee shall submit a complete test report from BIS approved laboratories - If rating > Scope of Licence: testing. BIS shall plan preliminary inspection and draw a sample for Time limit may be defined by BIS for review of test reports / extension of scope of License as any delay will affect the tendering activities

For Operation of Licence Type Tests also be carried out, periodically, from a BIS recognized/group-2 category of laboratories. (The frequency of type test is to be decided in consultation with Ministry of Power.) Clarity is yet to be given on the below - Frequency of type tests - Methodology to be followed for selection - To ensure same sampling against all Manufacturers across India

For Operation of Licence Compliance of Market Samples: One of the following, in consultation with Ministry of Power: a. Buyers (Electricity Utilities) to send samples directly to BIS recognized laboratories b. BIS recognized Laboratory can draw samples on behalf of the Electricity Utilities c. BIS can draw samples as per the current practice prevailing in case of other products Clarity is yet to be given on the below - Methodology to be followed (Field/store sampling, data sharing, Compliance to the other clause of standards in addition to the testing, etc) - Frequency of testing on Market samples - To ensure same sampling against all manufacturers across India - Consideration of inter lab variations

IS 1180-1: 2014

If Customer specification calls for a deviation with IS 1180-1:2014.????

Standard Tapping range (For 3 Phase DTRs) : 200 kva: +2.5% to -5% in steps of 2.5% variation > 200 kva & 2500 kva: +5% to -10% in steps of 2.5% variation > 500 kva& 2500 kva: +5% to -15% in steps of 2.5% variation(oltc-optional) If customer wants a range of +5% to -5% in steps of 2.5%Terms.????

Terminal arrangements for 3-ph, Sealed type DTRs: Terminal arrangement shall be such that it shall be possible to replace bushings (external) without opening the top cover and affecting the sealing of the transformer. HV & LV Bushings: The bushing shall be made in two parts. The outer bushing shall be of porcelain. The internal bushing shall be of either porcelain or tough insulating material, like epoxy and shall have embedded stem. Note: Any other suitable arrangement can be used subjected to agreement b/w user & supplier. - Availability of huge quantities two part HV bushings.???? - It is Different from the IS standard and hence replacement may become difficult for utilities - Clarity on note is needed as without using two part bushing, effectiveness of sealing can t be ensured.

Transformer Tank: All nuts/bolts/washers exposed to atmosphere shall be of Stainless Steel if the size 12mm (Cl 15.3) If customer insist to take deviation to reduce cost.???? Is BIS going to ensure compliance of this requirement for all the quantities.????

Standard Fittings: Inspection hole, for DTRs above 200 kva rating. (Cl 20.1.r) If customer insist to take deviation to avoid additional welding / source of leakage.????

Scheme of Testing & Inspection (STI)

As per STI, from every lot Temperature Rise Test to be performed on one sample of 50 transformers (of identical design/ construction and of same nominal system voltage and rating) or part thereof. The sampling need to be amended as follows: One sample each of identical design/construction and of same nominal system voltage and rating once in five years (Like other type tests).

Experience with BEE Regulations

Requirements: - Every DTR being manufactured, commercially purchased or sold in India shall meet the compliance requirements - Sampling for verification and challenges would be carried out after the deliveries are made to the utility on the basis of tender. - BEE would conduct label verification survey in the market about the availability of registered models at various authorized dealers/retailers/warehouse of user. - Till date, some of the clients are not calling for such requirements - No evidence for conducting label verification survey uniformly across India. - It has become burden to the manufacturers those who are following rules honestly

Recommendations

User Guidelines for usage of BIS certified DTRs may be required for Site operations Storage / Handling Installation Maintenance Proper usage of Overloading / over voltage / over current protection system

Good Practices followed by some Utilities Better Handling System Proper storage

Proper Storage with elevated Platform

Improper Handling / Storage Dumped on road Dumped all material without any gap

Improper handling

Non Usage of Protection System MCCB is bypassed Arcing horns are not in place

Conclusions

Support Expecting from BIS Instant technical / administrative support from all BIS offices (Branch / Regional) Simplification of certification process for numerous varieties of DTRs BIS may take ownership on the products those are having BIS marking so that confidence levels of clients goes up and additional testing at factory / sites may intended to get reduced Ex: (1) Some customers are asking to conduct temp. rise test on 1 sample per 100 nos lot. Ex: (2) Routine tests to be conducted on all samples as part of Acceptance tests BIS to take lead in bridging the gaps with the requirements of customers Guidelines for site operations to be formulated and made mandatory for users of BIS certified product BEE label to be eliminated as BIS product meets the efficiency standards defined by BEE