MADHYA PRADESH FOREST DEPARTMENT, BHOPAL

Similar documents
PINANK ENERGY An ISO 9001: 2015 (QMS) Certified Company Channel Partner: Ministry of New and Renewable Energy, Govt of India

100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD

GRID CONNECTED 400kWp SOLAR ROOF TOP POWER PLANT NET METERING AT KARNATAKA STATE CRICKET ASSOCIATION M. CHINNASWAMY STADIUM, BENGALURU

SUBSIDY SCHEME FOR GRID CONNCTED AND OFF GRID SOLAR SYSTEMS AT IOCL PETROL PUMPS

3.6 Kwp Solar system Supply, Installation, Commissioning & Maintenance of Solar Systems to YEMAC office in HADDA street, Sana a city

PROJECT PROPOSAL FOR INSTALLATION OF INDIVIDUAL SOLAR ROOF TYPE POWER PLANT 30 KW PV system at Chennai

OFF GRID SOLAR PV SYSTEMS

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Renewable Hybrid / Off-grid Solutions

LOT Kwp Solar PV Power Solution with Battery Backup

Onix Structure Private Limited. Solar PV Power Generation System Detailed Project Report

Sun-Grid Electric Private Limited. Presented by:

Green Solutions to Power Problems (Solar & Solar-Wind Hybrid Systems )

Lot 26 WBS 1150 Bill of Quantities

Uninterrupted Efficient Energy Solutions through Solar For Urban Office Building And Cold Storage Applications

Bill of Quantity (BOQ) PAL / Renewable Energy for ALL: Photo Voltaic Cells for Gaza Hospitals

TECHNICAL SPECIFICATIONS OF 2 KVA POWER CONDITIONING UNIT

Glossary. * Credit for glossary starter: Florida Solar Energy Center. August 2015 PV Installer's Course: Glossary 1

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

International Journal of Advance Research in Engineering, Science & Technology

NOTICE INVITING TENDER

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

Designing Stand Alone Systems. Overview, components and function, Elements in Design

Generalised Technical Specifications for Grid Tie Solar Power plants

Design and Installation of A 20.1 kwp Photovoltaic-Wind Power System

Shkel Photovoltaic Parks in Albania. August 2017

Performance Analysis of 40 KW Solar Photovoltaic System at DTU

Solar Photovoltaic Solutions

INDEPENDENCE. Invest today. Reap benefits for a lifetime.

Technical specifications

ROLE OF HAREDA IN NET METERING. By : P.C. Sharma Project Officer

Joint Inspection Report

ASSESSING THE PUBLIC LIGHTING WITH SOLAR PANELS IN THE SUB SAHARAN COUNTRIES IN AFRICA: YAOUNDE CASE STUDY

y rg e a w tim e R t T s e fin A

SOLAR POWER PACKS OFF-GRID SYSTEMS (150Wp-10kWp:Single Phase)

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

U.S. Energy Consumption. U.S. Energy Consumption

Solar PCU/Inverter 1 KVA to 100 KVA

SOMALI ENERGY TRANSFORMATION (SET) PROJECT

Ampd Silo. Energy Storage System. Maintenance-free Li-ion energy storage for mission critical backup. Power to Empower

Techno-Economic Design of 432 KW P Grid Interactive Rooftop SPV Power Plant at Delhi Technological University (DTU)

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

Net +Plus Connection Code

Components for your PV Solar Electric System

Invest today. Reap benefits for a lifetime.

Technical Specifications for Solar PV System for Retail Outlets. 5.3 Technical specifications of major components of Solar PV power plant

off-grid Solutions Security of supply Basics: Off-grid energy supply

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

Energy Storage Systems by. Positronic. Manufacturing Pty Ltd

Environmental benefits. Lamp disposal problems are eliminated due to the long life of LED lights, and no resources are used in routine maintenance.

Solar PV Projects PPA Model

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

SPG-400. Solar-powered generators

O&M Requirements for Utility-Scale Solar PV and Energy Storage. Nicholas Jewell, Ph.D., PMP Sr. Research Engineer Research & Development LG&E and KU

GKMinda MLUX MINDA. GKM ENERGY PVT. LTD. Toll Free :

Energy Savings through Solar Energy for Municipalities

MERU Solar Off-Grid Inverters

Solar Multi-Utility Centre and Smart Minigrid Experience in implementing and maintaining off-grid projects in rural areas

100% SOLAR AIR CONDITIONER. India's first. Conceptually. Working Principle. Designed, Developed & Manufactured Solar Air Conditioner

Photovoltaic Solar Plan Review

Achieving Energy Independence with Off-grid, Battery-based Solar Energy Systems. Vinod Tiwari Director Renewable Power Solutions (Telectron LLC)

MANHARI SOLAR. (Your own renewable energy management experts)

The Grid Link Project. Summary of the Report for the Independent Expert Panel

Use your own power grid.

Initial Project and Group Identification Document. Senior Design I EEL Off-Grid Clean Energy Power Generation

Senior Project Off Grid Solar Array. Courtney Elliott Winter 2017

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

Liebert. FP 50Z kva

Details and specification for 30 W solar powered LED street lights.

A Review on Grid Connected 100 kw Roof Top Solar Plant

Technical standard for AC, DC and street light systems

Optimal route scheduling-driven study of a photovoltaic charging-station (parking lot) for electric mini-buses

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

DemoEV - Demonstration of the feasibility of electric vehicles towards climate change mitigation LIFE10 ENV/MT/000088

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

Origin Solar Presentation

Power Conversion Systems 2005/2006. Schaefer the Power to make it happen.

Section 6 - Employer s Requirements

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

LAYOUT REPORT OF ROOFTOP PROJECT. For 115 kwp. Order No. # Date 13 October, Name of Place California.

Analysis of Indian electricity distribution systems for integration of high shares of rooftop PV By Joerg Gaebler, IGEN Solar, GIZ India

Advanced Active And Reactive Power Control For Mini Grids

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

ALZ Electrical Solar Consumer Guide

Todae Solar s 1.22 MWp Rooftop Solar Photovoltaic Installation for Stockland Shellharbour, NSW.

TECHNICAL PAPER ON SOLAR PV INSTALLATION & DESIGN AT IIT BHUBANESWAR

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation

Off-grid lighting testing and certification processes. Pradeep Kumar

Up to 45% more yield - possible only with the DEGERconecter.

SOLAR PUMPING SOLUTIONS

MYPD3 tariff restructuring plan use-of-system charges. Brochure

Powerstar Virtue Brochure. British Chambers of Commerce.

- Solar PV systems and integration - GIZ - All rights reserved

PRESENTATION ON HYBRID SOLAR SYSTEM BASED ON SUN SINE SMART MICRO INVERTERS

Solardyne Corporation Renewable Home Power Design Guide Call

Title Goes Here and Can Run Solar Photovoltaic up to 3 lines as shown here Systems as you see

Station Identification. Results. PV System Specifications. Energy Specifications. Solar Radiation (kwh/m 2 /day) Energy Value ($) AC Energy (kwh)

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Your Needs. Our Technology.

Transcription:

DETAILED PROJECT REPORT ON SUPPLY, INSTALLATION AND COMMISSIONING OF SOLAR PHOTO VOLTAIC POWER PACKS 1 KWP FOR MADHYA PRADESH FOREST DEPARTMENT BHOPAL SUBMITTED BY MADHYA PRADESH FOREST DEPARTMENT, BHOPAL

TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 2. INTRODUCTION 3. OBJECTIVES 4. TECHNICAL DETAILS & SYSTEM SPECIFICATIONS 5. BILL OF MATERIAL 6. FINANCIAL ASPECTS

1. EXECUTIVE SUMMARY The demand of electricity has increased a lot in last decade and even after putting all out efforts in increasing the production of electricity it has been realized that by only doing in this way the increasing demand can not be met by conventional energy sources. One of the ways of bridging this gap in energy demand and supply is by putting Renewable Energy Power Plants in rural/semi urban areas, which will assist the utility grid in providing independent power to a dedicated load. This will reduce the load on the conventional power systems and results in saving of precious fossil fuels. Looking above in mind, Madhya Pradesh Forest Department has decided to put up 1 Kwp Roof top SPV Power Packs at 113 nos. remote Forest Range offices in Madhya Pradesh for providing uninterrupted power to communication equipments (computers and wireless system). The purpose of putting SPV Power Plant is to provide uninterrupted power to dedicated loads such as computers, fans, CFL s and other essential loads. The installation of SPV Power Packs at Forest Range offices will not only serve the purpose of smooth operation of communication equipments but will also save conventional energy and fossil fuels thereby more conventional energy will be available for other applications. The proposed solar pv power packs will be procured by calling tenders as is required under the GoMP rules and regulations. The estimated cost of the project is Rs 380 Lacs only. The subsidy component is Rs 125 Lacs, while State of MP will bear 255 lacs.

2. INTRODUCTION Energy from the Sun not only sustains life on earth but is also the source of almost all forms of energy used by man. Fossil fuels such as coal and oil represent solar energy that was received on earth millions of years ago and converted into other forms. Renewable sources of energy such as wind, hydropower, biomass and ocean energy are also indirect forms of solar energy. Solar energy, experienced by us as heat and light, can be used in a number of ways and for many applications. The two Principal routes and technologies of solar energy utilisation are: (i) The thermal route using the heat for heating, cooling, drying, water purification and power generation; (ii) The photovoltaic route which converts the light into electricity which can then be used for a variety of purposes such as lighting, pumping, communications and refrigeration etc. Energy from Sun has many features, which make it an attractive option such as its widespread distribution, pollution-free nature and virtually inexhaustible supply. India receives solar energy equivalent to over 5,000 trillion KWh / year which is far more than the total energy consumption of the country. The daily average solar energy incident varies from 4-7 KWh / m2 depending upon the location. There are around 250-300 Sunny days in most parts of the country. If 1% of the total land area is used to generate electricity from this radiation at a net efficiency of only 1%, it will be possible to produce about 300,000 MW of power. The potential of the solar energy in meeting the growing energy needs of the country was recognised in mid 70s. Research and development efforts in both solar thermal and photovoltaic routes were initiated. Several applications were developed and demonstrated during the 80s. These efforts received an impetus with the establishment of Ministry of New & Renewable Energy Sources (MNRE). The Ministry's programmes helped in R&D, demonstration, commercialisation and utilisation activities in respect of a wide variety of renewable energy technologies. The

programmes are implemented through a network of state level agencies, industrial, research and academic organisations and non-governmental bodies. India has one of the world's largest programmes in solar energy. A sizeable research and technology base, a growing manufacturing capability and a countrywide infrastructure for the distribution and after-sales service of solar energy products have emerged. Solar energy is beginning to be used for a large number of applications. Nevertheless, the achievements so far add up to only a tiny fraction of what is possible. The efforts initiated during the last few years by MNRE to restructure the programmes and giving them a market orientation are contributing significantly in accelerating the utilisation of solar energy commercially in the country.

3. OBJECTIVES Madhya Pradesh, the largest state of the country is endowed with rich and diverse forest resources. Lying between lat. 21º 04 N and long. 74º 02 and 82º 49 E, it is a reservoir of biodiversity. The geographical area of the state is 308, 144 km 2 (118, 975,sq mi) which constitutes 9.38% of the land area of the country. The forest area of the state is 95,221 km 2 (36,765 sq mi) constituting 31% of the geographical area of the state and 12.44% of the forest area of the country. Madhya Pradesh Forest Department (MPFD) is a very big organization manned by a twenty five thousand strong force that is responsible for the management and conservation of this large area of forests. MPFD needs to reach to the remotest of those interiors of the state that no other department would probably need to. This can not be possible without quick communication. In today s ever changing scenario and ever increasing pressures on the forest eco-systems and wildlife, quick dissemination of information is mandatory for an efficient forest management strategy. MPFD is not only one of the few forest departments of the country that have put modern Information Technology to extensive use in its forest management planning, implementation and monitoring but is probably a pioneer in the use of many of these technologies for better eco-system management. But there have lots of road blocks in the optimum utilization of these technologies and availability of power has probably been the biggest deterrent. Many of the Forest Range offices (a Forest Range happens to be the key administrative unit in forestry parlance) are situated in extreme remote interiors and communication even in this WEBage can be extremely frustrating and painful just because of unavailability of power. Gen-sets with heavy diesel bills ad a long list of negative externalities have so far been the only solution, if that can be termed as a solution. In this context, Solar Photo Voltaic (SPV) standalone (SPPs) appear to be a tailor made solution to make available regular power to these remotely situated forest Range offices. This proposal puts out a plan to put roof top SPVs on 100 of the remotest of these Forest Range offices and to utilize the so generated electricity for the IT facilitated communication network that incorporates use of the Web, GPS and MIS supported by an online live database. Besides providing electricity to Range Offices, MPFD envisages that every remote location where the Range Offices exist, a kiosk will be created which will provide wide ranging web based services to the villagers. The kiosks will be managed by the respective Range Offices and can be accessed by all for fixed time duration to be decided by the villagers, Gram Sabha or Panchayats.

It is proposed to set up 100 nos. Solar PV Standalone type Power Packs 1 KWp at M.P. Forest Range offices spread all over Madhya Pradesh. The power from the PV plant is natural and reliable power source. Further the quantum and availability of sunlight in M.P. is excellent to prompt the implementation of such a project The success of such projects has already been established, as number of projects has been installed and working satisfactorily. Ministry of New & Renewable Energy Sources, Govt of India has launched a scheme Implementation of Solar Photovoltaic (SPV) Programme during FY 2009-10 in order to: 1) To promote the use of SPV systems for lighting and various other applications in the country 2) To create awareness & demonstrate effective and innovative use of SPV Systems 3) To save diesel for power generation 4) To reduce burden on conventional electricity Solar PV Power Packs 1 KWP Power Plant are proposed with an objective to attain following benefits: - Providing uninterrupted power to the Wireless sets, light points and computer for better communication. - Saving of precious fossil fuels. - Noiseless, pollution free and Eco-friendly power. - Saving of revenue. - Can work as a demonstration project for further expansion of PV technology all over the country. 4. SITE DETAILS The proposed 1 Kwp Solar Pv Power Packs shall be be installed at following locations:

Remote M.P. Forest Range Offices spread all over M.P. - 113 sites S.N. Name of District Name of Division Ranges S.N. Name 1 Mandla D.F.O. (P) MANDLA 1 Anjaniya D.F.O.(East) MANDLA(T) 2 Bichhiya D.F.O.(East) MANDLA(T) 3 Motinala D.F.O.(East) MANDLA(T) 4 Mawai D.F.O.(East) MANDLA(T) 5 Jagmandal D.F.O.(East) MANDLA(T) 6 Mohgaon D.F.O.(East) MANDLA(T) 7 Ghughri D.F.O.(West) MANDLA(T) 8 Mandla D.F.O.(West) MANDLA(T) 9 Maharajpur D.F.O.(West) MANDLA(T) 10 Tikariya D.F.O.(West) MANDLA(T) 11 Bamhani D.F.O.(West) MANDLA(T) 12 Kalpi D.F.O.(West) MANDLA(T) 13 Barela D.F.O.(West) MANDLA(T) 14 WM D.F.O.(West) MANDLA(T) 15 Beejadandi D.F.O.(West) MANDLA(T) 16 Niwas DY. DIRECTOR BUFFER ZONE KANHA 17 Sijhora TIGER RESERVE DY. DIRECTOR BUFFER ZONE KANHA 18 Samnapur TIGER RESERVE DY. DIRECTOR BUFFER ZONE KANHA 19 Khapa TIGER RESERVE DY. DIRECTOR BUFFER ZONE KANHA 20 Khatia TIGER RESERVE DY. DIRECTOR BUFFER ZONE KANHA 21 Garhi TIGER RESERVE DY. DIRECTOR KANHA TIGER 22 Kisli RESERVE DY. DIRECTOR KANHA TIGER 23 Kanha RESERVE DY. DIRECTOR KANHA TIGER RESERVE 24 Phen Sanctuary DY. DIRECTOR KANHA TIGER 25 Mukki RESERVE DY. DIRECTOR KANHA TIGER RESERVE 26 Supkhar DY. DIRECTOR KANHA TIGER RESERVE 27 Bhaisanghat 2 Dindori DFO (T) DINDORI 28 Shahpur (T) DFO (T) DINDORI 29 Shahpura (T) DFO (T) DINDORI 30 Mehandwani (T) DFO (T) DINDORI 31 Dindori (T)

DFO (T) DINDORI 32 Amarpur (T) DFO (T) DINDORI 33 Bajag (T) DFO (T) DINDORI 34 Karanjia (T) 3 Shahdol 4 Umaria 5 Anuppur 6 Sidhi D.F.O. (NORTH) SHAHDOL 35 Beohari D.F.O. (NORTH) SHAHDOL 36 Godawal D.F.O. (NORTH) SHAHDOL 37 Amjhor D.F.O. (NORTH) SHAHDOL 38 Jaisinghnagar D.F.O., (SOUTH) SHAHDOL 39 Jaitpur D.F.O., (SOUTH) SHAHDOL 40 Keshwahi D.F.O., (SOUTH) SHAHDOL 41 Burhar D.F.O., (SOUTH) SHAHDOL 42 Shahdol D.F.O., (SOUTH) SHAHDOL 43 Gohparu D.F.O., (SOUTH) SHAHDOL 44 Khannoudhi DFO UMARIA 45 Ghunghunti DFO UMARIA 46 Manpur DFO UMARIA 47 Dhamokhar DFO UMARIA 48 Chandia DFO UMARIA 49 Umaria DFO UMARIA 50 Nourozabad DFO UMARIA 51 Panpath Director, Bandhavgarh National Project, 52 Panpatha Umaria Director, Bandhavgarh National Project, 53 Khitauli Umaria Director, Bandhavgarh National Project, 54 Magdhi Umaria Director, Bandhavgarh National Project, 55 Kallwah Umaria Director, Bandhavgarh National Project, 56 Tala Umaria Director, Bandhavgarh National Project, 57 Pataur Umaria D.F.O. ANUPPUR (T) 58 Rajendragram D.F.O. ANUPPUR (T) 59 Amarkantak D.F.O. ANUPPUR (T) 60 Ahirgawa D.F.O. ANUPPUR (T) 62 Anuppur D.F.O. ANUPPUR (T) 63 Jaithari D.F.O. ANUPPUR (T) 64 Kotma D.F.O. ANUPPUR (T) 65 Bijuri D.F.O.(WEST )Sidhi. 69 Majhauli D.F.O.(WEST )Sidhi. 70 Churhat D.F.O.(WEST )Sidhi. 71 Sidhi D.F.O.(WEST )Sidhi. 72 Bahari D.F.O.(WEST )Sidhi. 73 Madwas D.F.O.(WEST )Sidhi. 74 Mohan D.F.O.(East Sidhi) Singrauli. 75 Jiyavan D.F.O.(East Sidhi) Singrauli. 76 Karthua D.F.O.(East Sidhi) Singrauli. 77 Chitrangi D.F.O.(East Sidhi) Singrauli. 78 Bargawan D.F.O.(East Sidhi) Singrauli. 79 Sarai D.F.O.(East Sidhi) Singrauli. 81 Gorbi D.F.O.(East Sidhi) Singrauli. 82 Mada

8 Rewa 9 Satna 10 Katni D.F.O. (East Sidhi) Singrauli. 83 Waidhan Director, Sanjay National Park, Sidhi. 84 Son Gharial Director, Sanjay National Park, Sidhi. 86 Pondi Director, Sanjay National Park, Sidhi. 87 Bastua Director, Sanjay National Park, Sidhi. 88 Dubari D.F.O. REWA 89 Rewa D.F.O. REWA 90 Semaria D.F.O. REWA 91 Sirmour D.F.O. REWA 92 Atraila D.F.O. REWA 93 Dabhoura D.F.O. REWA 94 Mauganj D.F.O. REWA 95 Chakghat D.F.O. REWA 96 Hanumana D.F.O. REWA 97 Traning School Govind Garh DFO SATNA 98 Satna DFO SATNA 99 Unchehara DFO SATNA 100 Maihar DFO SATNA 101 Amarpatan DFO SATNA 102 Mukundpur DFO SATNA 103 Nagod DFO SATNA 104 Singhpur DFO SATNA 105 Baroundha DFO SATNA 106 Majhgawan DFO SATNA 107 Chitrakoot DFO, KATNI (T) 108 Katani DFO, KATNI (T) 109 Badwara DFO, KATNI (T) 110 Vijayraghav Garh DFO, KATNI (T) 111 Rithi DFO, KATNI (T) 112 Bahoriband DFO, KATNI (T) 113 Dheemarkhed a 5. TECHNICAL DETAILS & SYSTEM SPECIFICATIONS

A. System Description and Definitions Forest Range Office Load Estimate: A typical Forest Range Office that is enabled to use IT needs on a minimum basis the following a Computer, two wireless radio, at least three lights apart from at least one fan. This put out the following load requirements on a daily basis: Electrical Item Nos Load (W) Hours Powr Consumption (WH) Wireless Radio (20 W) 2 40 12 480 Fans (70 W) 1 70 6 420 Misc Lights (10 W) 3 30 6 180 Computer (150 W) 1 150 10 1500 Total - 440-2580 A.1 SPV MODULES: Type and Quality The total Solar PV Array Capacity shall be 1 kwp. Crystalline type solar modules of desired nominal voltage or peak power rating which meet specifications are considered appropriate for inclusion in this offer. Modules will be procured by MPFD with a warranty that: Fabrication is in compliance with the standards approved by MNRE. 70/75/125/140/150 Wp or any other capacity modules shall be used. Offered module shall have a power output warranty for 10 years. Solar cells / modules used have a proven record for the performance in actual field conditions of many states. The modules used shall have following specifications under STC:

Make : As registered with MNRE Type : 70W36/75W36/125W36/140W72/150W72 Peak Power Output : 70/75/125/140/150 Watts Maximum Current : 4.11/4.41/7.35/4.11/4.41 A DC Maximum Voltage : 17/17/17/34/34 VDC Type of Cell used : Crystalline Silicon A.2 MECHANICAL COMPONENTS ARRAY SUPPORT STRUCTURE Modules shall be mounted on a non corrosive support structure suitable for site conditions. The inclination angle of the array support structure shall be in accordance with the latitude of the place of installation. No provision for adjusting inclination angle is required. Complete set of engineering drawings for the array support structure proposed are enclosed. There shall be mild steel frame structures (Hot dipped, Galvanized) for holding the PV modules to form the PV panels Each panel frame structure shall be so fabricated as to be grouted using cement concrete

foundation. Each panel frame shall be complete with a weather proof junction box as per the relevant ISI specifications, where the module terminals shall be interconnected and output taken. The panel frame structure be capable of with standing a wind load of 150 km per hour, after grouting and installation. A.3 Power Conditioner Unit (PCU) The power conditioning unit will convert dc power produced by spv array into ac power. The capacity of PCU shall be 1 KVA. ELECTRICAL INVERTER Max. No. of Series panels Nominal Battery voltage AC out put voltage Maximum out put capacity Peak out put capacity Out put wave shape 1 or 2 nos. 24 volts 230 volt, 50 Hz 1 KVA Up to 150% of maximum current for 15 seconds Sine wave THD < 5 % Max current ripple No load power consumption 4% peak to peak 2.5 % of O/p rating Efficiency at 30 degree centigrade Up to a maximum of 85% SOLAR CHARGE REGULATOR Maximum capacity 1 kw

ENVIRONMENTAL Cooling Ambient temperature range Ambient humidity range Temperature controlled fan forced cooling 0 deg to 55 deg 5% to 90% condensing Construction The inverter shall be supplied in IP 30 outdoor enclosure. Protections: Following protections shall be provided: - Short Circuit - Battery deep discharge/overcharge - Overload - Battery reverse polarity - Input surge voltage A.4 Battery Bank: A battery bank of 24 Volt, 300 Ah capacity shall be provided with the power plant.. Suitable no. of acid proof storage racks shall be supplied to accommodate the cells. Specifications:

Type : Tubular Lead Acid type Capacity : 24V, 300 AH at C/10 rate Container : Made of hard rubber Total no. of cells : 12 nos. connected in series Self Discharge : less than 4% per month Ampere hour eff. : 96% Watt hour eff. : 81% Max. depth of : 80% Discharge Cycle life at MDOD: more than 1200 nos. A.5 Junction Boxes A array junction boxes shall be provided in PV array field for termination of connections from various pv modules. Features: Made of FRP Dust and vermin proof Suitable MOV s shall be provided for high voltage surge Copper bus bars of suitable rating A.6 Cables Cabling will be carried out as per IE rules. Cable Marking: All cables/wires shall be marked with good quality ferule for Cable identification. Cable Ends: All connections shall be made through suitable cable lugs/tags crimped properly and

with the use of cable glands. All cables shall be: Multistrand, anealed high conductivity copper/aluminium conductor Overall PVC insulation for UV protection Armoured cables for under ground laying All cables shall conform to BIS standards A.7 Civil Work Civil work shall include work related with foundation for installation of module mounting structures. B. Bill of Material

The bill of material for 1 Kwp SPV Power Plant is as under: S. No. Description of item Unit Quantity 1. Solar PV Modules70/75/125/140/150 Wp Set 1 Kwp 2. Mounting Structure Set 01 Set 3. Power Conditioning Unit (1 KVA) Nos. 01 no. 4. Array Junction Box No. 01 no. 5. Wires and Cables Set As per site requirement 6. Battery Bank (24 V, 300 AH) Set 01 set C. Project Duration

The complete work of supply, installation and commissioning shall be in a period of 6 months once the sanction is granted. 6. FINANCIAL ASPECTS

Project Cost The cost per system including of supply, installation, commissioning and 5 year maintenance is Rs 3, 50,000.00 Subsidy from MNRE @ Rs 125 per wp : Rs1, 25,000.00 per system Net cost to M.P. Forest Department : Rs2, 25,000.00 per system Net cost of the project for 113 locations : Rs3, 79, 25,000.00 Net cost to M.P. Forest Department : Rs2, 54, 25, 000.00 Net Subsidy on 113 Systems : Rs1, 25, 00,000.00