Field Service Bulletin CNG and LNG Leak Repair Tutorial

Similar documents
Field Service Bulletin

Field Service Bulletin Welding and Hot Work Precautions Near CNG and LNG Vehicles

Field Service Bulletin Service Facility Fuel Handling Equipment

Pony Tank Operation Manual

First Responder Guide: CNG and LNG Vehicle Fuel Systems

Universal CNG System Operation Manual

Auxiliary Transmission Filter Kit

Gaugeable Alloy 400 Mechanically Attached Pipe and Tube Fittings

TCU Flushing Manifold and RTD Installation

(FLB-1000 & FLB-5000)

Description. Rhino SD2/XD2 Follower Modules

Description. Rhino EFD Bulk Unloader Packages

Product Catalog. Fittings ½ AIR PIPE FITTINGS Fitting, 1/2 Air Pipe End Cap Coupler, with Tank Valve

Inverted Dual High-Pressure Fluid Filter Assemblies

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

Description. Rhino SD2/XD2 Follower Modules

Nylon Fluid Regulators

Inverted High Pressure Fluid Filters

NUMBER: rev S.M. REF.: Refer to 2.47 ENGINE: 50 DATE: June 2001

CNG Fuel Cylinder Inspection Manual

LEAK TEST PROCEDURE DC CHANNEL LIFTERS SINGLE VACUUM SYSTEMS TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON KEEP FOR FUTURE REFERENCE

ASSEMBLY MANUAL HOSE KIT 2410 LOADER NEW HOLLAND TN, TNA, TND AND TNDA TRACTORS WITH NEW HOLLAND MID MOUNTED VALVE

Overview. Selection of System Components VT BBK/CWH. Chart LNG Vehicle Tank and Fuel System Installation Guidelines

METERING VALVE 2" STEM GUIDED

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER AUTOMATIC INSERTION PROBE

General Information. Assembly Instructions B L R F. 3000TM Fold Assist Kit

$1.50 $3.00 U.S. &adaptors chart

Introduction Parker are designed for uni-directional flow control of fluids and gases in industries such as chemical processing, oil and gas productio

Model DFR 070/156/220 Rotary Actuator

Instruction Manual Includes:

LEAK TEST PROCEDURE MRT4-DC LIFTERS SINGLE VACUUM SYSTEMS TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON KEEP FOR FUTURE REFERENCE

VALVE AND PLUMBING KIT INSTRUCTIONS SMC 84Q & 2408 LOADERS NEW HOLLAND TRACTORS MODEL 2WD 4WD LESS CAB WITH CAB 1720 X X X 1920 X X X

Circulation Kits for CP Pumps

Check Valves (C Series) Catalog 4130-C Revised, July 2004

ENTIRE FUELING PROCESS IN & OUT IN 5 MINUTES*!

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER PROBE MOUNTED LIQUID ELIMINATOR

FIT-2. Inch. Ø Â" to Ë" O/D tube

: 1250 gpm in the deck mode : 800 gpm while operating in the ground base - Dual Inlet : 1000 gpm while operating in the ground base - Single Inlet

82 Series Fittings Table of Contents

Filter. Table of Contents. Section 10. Filter NOTE: This section applies to applicators with an in-out filter.

QUICK SERVICE GUIDE. Haldex Reservoir Purge Valve (RPV)

Installing the CO 2 Cryogenic Oven Cooling Kit

BBK Liquid-Filled Fuel Pressure Gauge (86-93) - Installation Instructions

Table of Contents. Page. See Catalog and Product Updates on our Website

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

ASSEMBLY MANUAL. Keep With Operator s Manual

STYLE 3463 FireFox. With Position Feedback Potentiometer

VALVE AND PLUMBING KIT 2408TL LOADER AGCO & MASSEY FERGUSON TRACTORS

BOLT TENSIONERS. carefully before use and retain it for reference.

Check Valves Product Specs and Ordering SINGLE BALL STEEL CHECK VALVES. Specifications. Operation. Features

Blow Off Valve Retrofit Kit

LEAK TEST PROCEDURE MRTALPCH611LDC REMOTE READY LIFTERS W/ 3 BUTTON CONTROL APPLICABLE TO LIFTERS WITH SERIAL NUMBERS GREATER THAN #

VALVE AND PLUMBING KIT 2409 LOADER CUB CADET & KIOTI TRACTORS

Figure 1: HB Series Ball Valve Cross Sectional View DISASSEMBLY WARNING: MAKE CERTAIN THE SYSTEM IN WHICH THE VALVE IS INSTALLLED IS EXHAUSTED OF ALL

Brass Push-Type Fittings. Tube Thread. Part O.D. (M) NPT. No. in. in.

Installation Instructions

DeZURIK R1 AND R2 POWERRAC ACTUATORS

Hand Beading Tool.12 Hand Tube Bender.13 EZ-Beading Tool.14 PTFE Tape & Paste...15 Pressure Test Kit.15 Aluminium Wrenches.16 Aluminium Vice Jaws.

DAH Left Hand Hose Inlet Kit Instruction Sheet For Use with 700 SERIES DAH Dilution at Hand Blend Centers

An Installer s Pocket Guide for Swagelok Tube Fittings

CNG Frame Mount FSM Parts Manual

Lube Level Maintainer

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

Valtek Flow Boosters

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Model 6518FR. NOTE TO INSTALLER: Please leave this information with the Maintenance Department. LIMITED WARRANTY

STYLE 3462 FORESTRY BUMPER MONITOR INSTALLATION, OPERATING and MAINTENANCE INSTRUCTIONS

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: June 2012 SUBJECT: E3 FUEL INJECTOR TUBE ADDITIONS, REVISIONS, OR UPDATES

OPERATION MANUAL NT50 NOMAD TRANS-FLO AIR-OPERATED DOUBLE DIAPHRAGM PUMPS. A JDA Global Company. 7/11 rev. 1

Battery Powered Hydraulic Pump; Kit PN [ ]

HM860 FLOWMETER OPERATOR S MANUAL DO NOT USE OR OPERATE THIS EQUIPMENT UNTIL THIS MANUAL HAS BEEN READ AND THOROUGHLY UNDERSTOOD

Bleed Valves and Purge Valves

2001 SERIES CRYOGENIC BAR STOCK BODY VALVES

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Operation & Service Manual

SB 160 QUICK REPAIR GUIDE FOR HALE THERMAL RELIEF VALVE TRV 120, TRV 170, TRV L

LEAK TEST PROCEDURE APPLICABLE TO DC3 INTELLI-GRIP LIFTERS MODELS MRT4-DC3, MRTA8-DC3, MRTALP8-DC3 AND PC/P1-DC3 SERIES

Virtual Pipeline FSM Parts Manual

Upchurch High Pressure Fittings & Connectors

AEROMOTIVE Part # & Generic Fuel System Kit INSTALLATION INSTRUCTIONS

SERIES 8100 HAND-OPERATED PRESSURE CALIBRATION UNITS

The following is intended to provide the basic instructions for installation, operating and maintenance of the Severe Duty Monitor.

INSTALL MANUAL. FOR ON LINE ORDERING- E Commerce Visit Our Website

Lube Level Maintainer

Compression Style Transportation

Instructions for Installation, Operation, Care and Maintenance

VALVE AND PLUMBING KIT NEW HOLLAND 7310 LOADER NEW HOLLAND TRACTORS

Installation, Operation & Maintenance Manual for Flo-Max II Coupler Model FM126

Auto-Flo Panel Reinforcement Automatic Dispensing Valve

I-317. AWWA Check Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS SERIES 317 WARNING

( Versions Available)

DuraMAC LIGHT COMMERCIAL & IRRIGATION WATER PRESSURE BOOSTER SYSTEM INSTALLATION INSTRUCTIONS

DISCONTINUED. Installation. Aerada 900 Series Futura Faucet. With Accu-Zone (AZ) Infrared Control

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

MERIDIAN, 2 or 3 PIECE, TRUNNION MOUNTED BALL VALVES

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

If there is additional labor or other costs above the 4 hrs labor you must call VMAC for approved coverage

ACHL Series Pump. Operation and Maintenance Manual Air Driven, Hand Operated High Pressure Liquid Pump

STANDARD & MEGA RIM CLAMP Operations and Maintenance Manual

Cyclone II. Cyclone. and OPERATOR S MANUAL IMPORTANT- READ OPERATOR S MANUAL BEFORE USE.

Transcription:

Field Service Bulletin CNG and LNG Leak Repair Tutorial ENP-552 Rev. A: July 26, 2017

1. Introduction Figure 1 Leak detection for CNG (left) is the same as LNG (right). Leak detection and repair is one of the basic skills all fleet maintenance, inspection and service personnel must have. For monthly maintenance, the entire fuel system can be leak tested with leak detection solution, and/or a methane detector. All joints and connections should be tested. Leaks usually occur at fitting connections. When checking for leaks always use certified methane detecting equipment and solutions designed for use with stainless steel and brass. Videos on basic leak detection and repair for CNG and LNG are available on the Agility Fuel Solutions website. Warning Messages Used in this Bulletin Personal injury or death will occur if procedures are not followed. Damage to equipment, fuel system or vehicle is possible if instructions are not followed. ENP-552: CNG and LNG Leak Repair Tutorial 2 of 11

2. Affected Units This service tutorial can be applied to any and all natural gas fueled vehicles and fuel systems, in any configuration or from any manufacturer. 3. Corrective Action Does not apply. 4. Tools and Materials Personal protective equipment (PPE), including eye and hearing protection as needed Standard hand tools Electronic methane detector (optional, see below) Leak detection solution O-ring lubricant, high pressure, silicone-based such as Parker Super-0-Lube Nickel anti-seize tape for LNG fittings O-ring kit, Agility Fuel Solutions part number 10500059. Consists five (5) each of the most common O-rings in Agility CNG fuel systems. 5. Procedure Safety Practices Figure 2 Beware of the pressure zones on CNG systems, and know when to depressurize and when to defuel. ENP-552: CNG and LNG Leak Repair Tutorial 3 of 11

Figure 3 Know and understand the LNG safety zones, too. 5.1 Locating Leaks 1. An electronic leak (methane) detector ( sniffer ) may be used to find the general leak area. However, most units are broadband and often give false warnings. And, in order to pin-point the exact leak location, a liquid leak detector is necessary. A practical suggestion is to skip to Step 2. 2. Apply a certified leak detecting solution and look for bubbling or foaming. 3. Allow at least 10 minutes so the smallest leaks can be detected. 4. Examine connections for ice, frost or signs of condensation around the tubing. 5. Visually check for damaged fittings or tubing. A. Always depressurize (or defuel as needed) the system before starting repair work. B. Never tighten a fitting under pressure. C. You must be qualified to service any natural gas fuel system. D. Adjusting fittings requires accredited Swagelok or Agility Fuel Solutions fitting assembly training. E. Never mix fittings from other companies. Agility systems use Swagelok fittings unless noted otherwise. ENP-552: CNG and LNG Leak Repair Tutorial 4 of 11

Figure 4 Various fittings and connections are used in a typical Agility fuel system. All connections should be leak-free. Top: CNG systems. Bottom: LNG systems. 5.2 General Procedures Perform leak repairs in the order shown below and move on to the next repair only if the previous repair did not fix the leak. 1. If a leak is detected, depressurize the system, see Section 6. 2. Once the system is depressurized, tighten all leaking fittings. See below for notes on specific fitting types. 3. Repressurize the system. 4. When the system is pressurized, search for leaks again. 5. If leaks are found, depressurize the system and continue. 6. Remove fittings that are leaking and make sure the mating surfaces are clean. 7. Repressurize the system and test for leaks. 8. If the leak cannot be repaired, the component should be replaced. 9. If replacement is necessary, obtain replacement parts, install them and repeat the leak test. 10. Fix any leaks, re-pressurize the system and return the vehicle to service. ENP-552: CNG and LNG Leak Repair Tutorial 5 of 11

5.2.1 Compression Fittings Swagelok compression fittings used on Agility systems feature a front and a rear ferrule and a compression nut. A wedge action seals the connection. Figure 5 Left: Compression nut and ferrule set. Right: Compression tee fitting. 1. Swagelok recommends that fitting nuts should be tightened 1-1/4 turns beyond snug for tubing one inch and below. 2. Note: 1/16-, 1/8- and 3/16-in. tubing requires 3/4 turns beyond finger-tight. 3. If fitting threads are not clean or are damaged, the fitting must be replaced. 4. If tubing is not de-burred or if the tube is not cut square, the tube must be properly cut square and de-burred. This may require a new tube. 5. Snug is defined as the point at which the tube cannot be rotated freely in the pre-set swaging tool or fitting body. Swagelok fittings employ a two-ferrule design, the front ferrule provides the seal and the rear ferrule provides a firm grip on the tubing. 5.2.2 O-ring Boss (ORB) Fittings ORB fittings seal with an O-ring and a sealing surface. The threads provide mechanical strength but does nothing to seal the fitting. Using the correct O-ring lubricant and applying the correct torque is important when using this fitting. See special note on O-rings in Section 6. Figure 6 Left: 90-degree elbow with male ORB and compression fitting. 1. Check O-rings for damage. They must be properly lubed. 2. Check threads and O-ring mating surfaces for damage or debris. Any damage to the preformed packing (O-ring) will cause a leak. 3. Lubricate the O-ring with silicone-based lube, such as Parker Super-0-Lube. ENP-552: CNG and LNG Leak Repair Tutorial 6 of 11

4. Carefully install the O-ring into the fitting groove. 5. Screw the fitting into the mating component hand-tight until fully seated. Tighten fitting until snug. 6. Tighten lock nut to torque specification in Table 1. 5.2.3 National Pipe Thread Taper (NPT) Fittings NPT fittings depend on the threads to seal the fitting. Since the thread is tapered, it creates a wedge between the fitting and the threaded port. A sealant is recommended, but it must not contaminate the system. PTFE tape and paste or liquid sealants are available. Agility recommends the use of methane-compatible nickel tape to seal NPT connections. Here are some precautions: 1. Skip the first one or two male threads to help prevent pieces of tape going into the plumbing system. 2. Wrap in a clockwise direction, no more than two turns of tape on the threads. 3. Tighten the fitting by hand, then wrench tighten. 4. Because thread and fitting quality may differ, there is no torque specification. Instead, use the following turns from finger tight recommendation, based on information from Parker Hannifin Corporation, Tube Fittings Division 5.2.4 Hose Barbs Tapered Pipe Thread NPTF Turns from Finger Tight 1/2-27 2 3 14-18 2 3 3/8-18 2 3 1/2-14 2 3 3/4-14 2 3 Usually found on silicon coolant hoses. In CNG systems, coolant lines are used to go from the engine block to the regulator water jacket. On LNG systems, coolant lines go from the engine to heat exchanger. There are two hose barb fittings, as shown below. It is important to use the correct stainless steel hose clamps for these connections, as shown in Figure 8. Figure 7 Left: 90-degree elbow with beaded hose barb and ORB male fitting. Right: 90- degree elbow with hose barb and NPT male pipe thread. ENP-552: CNG and LNG Leak Repair Tutorial 7 of 11

Figure 8 Stainless steel hose clamps for Agility systems must be compatible with silicone hoses. Although they may look like conventional worm gear rubber hose clamps, a closer look shows the smooth band that contacts the hose circumference. 5.2.5 JIC Fittings The JIC fitting is usually found on low pressure fuel lines lines coming from the fuel system regulator low pressure output to the engine. The seal is achieved by the internal wedge that is formed between the mating male and female fittings. Apply the recommended torque as shown in Table 1. Figure 9 Size -8 Male JIC union, right: Male JIC to Swivel Male JIC fitting. 5.2.6 Hose End Fittings Hoses are used when lines must accommodate flexing or movement, and are used in both CNG and LNG systems. Figure 10 Left: Stainless steel high pressure CNG hose with tube stub end. Center: Cryogenic LNG hose with JIC swivel end. Right: Parker Parflex hose with JIC fitting end. ENP-552: CNG and LNG Leak Repair Tutorial 8 of 11

6. Depressurize the System 1. Ensure the vehicle is turned off. 2. Locate and close all cylinder shutoff valves (turn handle fully clockwise). 3. Make sure the manual shut off-valve on the FMM panel is in the ON/OPEN position. 4. Start and run the engine until it stops. 5. Ensure the vehicle is off and the proper vehicle lock-out procedures are followed. (Remove the ignition key). 6. Check the gauges on the fill panel to ensure pressure is relieved (gauges read zero). 7. Slowly open the bleed valve inside the FMM. 8. Close the bleed valve to prevent fuel loss when work is completed and the system is re-fueled. 7. O-Rings O-rings must be compatible with methane and temperatures encountered for either CNG or LNG. Agility recommends Viton or Buna O-rings. Standard rubber O-rings must never be used since they will fail prematurely and cause significant leaks. A handy O-ring kit is available from the Agility Fuel Solutions parts department. Figure 11 A handy O-ring kit is available. Part number 10500059. The Agility Fuel Solutions O-ring kit, part number 10500059, consists five (5) each of the following: 10500021: O-Ring, 2-216, 1 1/8, -40 To 225F, NBR/Buna, N1470-70 10500025: O-ring, for face of LD36/LB36 Receptacle 10500047: O-ring, 2-208, -40F to 180F 10500056: O-ring, 3/8-16 SAE, 3-906, 0.47/0.63, -15F to 400F, Viton-90 10500057: O-ring, 1/2-13 SAE, 3-908, 0.64/0.82, -15F to 400F, Viton-90 10500058: O-ring, 1/4-20 SAE, 3-904, 0.35/0.49, -15F to 400F, Viton-90 ENP-552: CNG and LNG Leak Repair Tutorial 9 of 11

8. Torque Specifications for Fittings FITTINGS MIN. TORQUE DESIRED TORQUE MAX. TORQUE ALLOWED Type 3 Tank: Valve/PRD/End Plug into tank (1.125-12 thread) 110 ft-lbs 140 ft-lbs 160 ft-lbs Valve/PRD/End Plug into Quantum Tank (1.125-12 thread) 110 ft-lbs 115 ft-lbs 120 ft-lbs Valve/PRD/End Plug into Lincoln Tank (1.125-12 thread) 100 ft-lbs 110 ft-lbs 120 ft-lbs Constant torque gear clamp 1-1/16 in. (#10) -- 50 in.-lbs -- 1/4-in. JIC* 11 ft-lbs 15 ft-lbs 18 ft-lbs 3/8-in. JIC* 18 ft-lbs 25 ft-lbs 31 ft-lbs 1/2-in. JIC* 36 ft-lbs 45 ft-lbs 59 ft-lbs 5/8-in. JIC* 57 ft-lbs 70 ft-lbs 85 ft-lbs 3/4-in. JIC* 79 ft-lbs 90 ft-lbs 118 ft-lbs * Ref SAE J514 Table 2A SAE Fittings in Manifold/Valve Ports O-Ring Boss (ORB)** 3/8-24 SAE Straight 7 ft-lbs 7.5 ft-lbs 9 ft-lbs 7/16-20 SAE Straight 14.5 ft-lbs 15 ft-lbs 17 ft-lbs 1/2-20 SAE Straight 18 ft-lbs 18.5 ft-lbs 20 ft-lbs 9/16-18 SAE Straight 25 ft-lbs 26 ft-lbs 30 ft-lbs 3/4-16 SAE Straight 51 ft-lbs 52 ft-lbs 58 ft-lbs 7/8-14 SAE Straight 73 ft-lbs 74 ft-lbs 81 ft-lbs 1-1/16-12 SAE Straight 122 ft-lbs 125 ft-lbs 138 ft-lbs 1-3/16-12 SAE Straight 155 ft-lbs 158 ft-lbs 175 ft-lbs 1-5/16-12 SAE Straight 195 ft-lbs 199 ft-lbs 220 ft-lbs 1-5/8-12 SAE Straight 206 ft-lbs 210 ft-lbs 231 ft-lbs 1-7/8-12 SAE Straight 268 ft-lbs 273 ft-lbs 300 ft-lbs ** Ref SAE J1926-2 Table 4 9. Warranty Information 1. This procedure is covered under the standard warranty. Leak repair after the warranty period is considered part of routine maintenance for the lifetime of the vehicle. 2. Standard repair time (SRT) is 0.5 hours (30 minutes) per the Warranty Manual, ENP-065. If you have any questions, contact Agility Fuel Solutions Customer Care: 949-267-7745, toll free: 855-500-2445 or support@agilityfs.com. ENP-552: CNG and LNG Leak Repair Tutorial 10 of 11

Proprietary Statement The information provided within this document is proprietary and confidential. All prior versions, including updates and revisions forwarded separately, are proprietary. The information provided by Agility Fuel Solutions to its customers and clients is solely for the use of those customers and clients. No portion of this manual may be reproduced or distributed without express written consent of Agility Fuel Solutions. Agility Fuel Solutions reserves the right to utilize the intellectual property contained within this publication as content for any other publication produced by Agility Fuel Solutions. Trademark Notice Agility and TUFFSHELL are registered trademarks of Agility Fuel Solutions. Drop-N- Go is a trademark of Agility Fuel Solutions. Trademarks of other manufacturers are the property of their respective companies. Agility Fuel Solutions 3335 Susan Street Suite 100 Costa Mesa, CA 92626 USA www.agilityfuelsolutions.com Revision Description Author Approved Date -- Initial Release W. Yoshida Y. Coy 11/22/16 A Revised company name, logo, address, format W. Yoshida M. Meyer 7/26/17 ENP-552: CNG and LNG Leak Repair Tutorial 11 of 11