FIGURE 310AM, 310AMSW & 311AM 3-PIECE BALL VALVE

Similar documents
FIGURE 310A & 311A 3-PIECE BALL VALVE

INTRODUCTION INSTALLATION

6701 KNIFE GATE VALVES

RESILIENT SEATED CARTRIDGE STYLE BFV S

CAST STEEL FLANGED GATE, GLOBE, & CHECK VALVES

Ball Valves. Quality Valves at Low Cost

SERIES 7400 THREE PIECE BALL VALVES

TBM Series 3-Way Ball Valve

SERIES 7200 FULL PORT BALL VALVES

SERIES 7100 STANDARD PORT BALL VALVES

MetroPrime 22MPC Self-Priming Centrifugal Pump

INSTALLATION & MAINTENANCE MANUAL

½ DODGE CUMMINS OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

Guardian Steel Gear Shaft Coupling

VERTICAL AND HORIZONTAL SPLIT CASE FIRE PUMPS

Pneumatic Cylinder 14 Bore X 21 Stroke Part No. P Replaces Part No. P

DODGE CUMMINS 24V ISB OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

1800,1900 MODELS VERTICAL AND HORIZONTAL SPLIT CASE FIRE PUMPS

SERIES 9000 Double Offset HP Butterfly Valves

Model BP6150. Triplex Ceramic Plunger Pump Operating Instructions/ Manual

900 SERIES SPLIT CASE FIRE PUMP REPAIR PARTS INDEX

Guardian Taper Grid Shaft Coupling

DODGE CUMMINS Arctic-Heat Grid Relocation Kit

Type Flexair Pneumatic Pressure Control Valves

PIPE FITTING ACCESSORIES EFFECTIVE FEBRUARY 5, 2018

Series CP200. Triplex Ceramic Plunger Pump Operating Instructions/ Repair and Service Manual. For Models: CP218 CP219 CP220 CP230

Model GXR Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

PIPE FITTING ACCESSORIES EFFECTIVE JANUARY 14, 2019

DODGE CUMMINS MK-2 Micro-Kleen System

Pneumatic Cylinder 14 Bore X 22 Stroke Part No. R (Formerly P )

Model GXR Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

Model. Triplex Ceramic Plunger Pump Operating Instructions/ Repair and Service Manual SP100W/SP351W

430B SERIES HORIZONTAL SPLIT CASE PUMP

GA Industries, LLC 9025 Marshall Road Cranberry Township, PA USA Telephone (724) Fax (724)

Air-Boss VP Intake Plenum

SPL HICAS ELIMINATOR KIT

Mega-Rail System Installation

20250 Module Installation Guide

8" - 12" Hydraulic Steel Squeeze Off Tool

Models P420A-3100 & P420A-5100

P SERIES PUMPS. 18mm Versions Nickle-Aluminum Bronze Models: P , P , P , P , P , P , P

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Model GP Triplex Ceramic Plunger Pump Operating Instructions/ Manual

Guardian FBA Flywheel Coupling

L DODGE CUMMINS Maximizer System

Watts Series CSM-91. Grooved/Flanged Flow Measurement/Balancing Valves. Installation and Operating Instructions. Table of Contents. 1.

INSTALLATION & OWNER'S MANUAL

Model GXR Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

30100 Module Installation Guide L

Manufacturing Facility is ISO9001:2000. Welded Steel Pipe Conform to ASTM A53. Threads Conform to ASME B1.20.1

DODGE CUMMINS GDP Big Line Kit

Product/ Title Guardian Super Flex Shaft Coupling Product/ Title

L DODGE CUMMINS MK-2 + BLK APPS Mount

Mercedes MBE 906/ L & 7.2L Engine Module. Part # Installation Instructions

Rear Sway Bar for XC90 ( ) 2.5T and T6 ipd mounting kit SBK42

VSI INDUSTRIAL BALL VALVES SERIES 7100 SERIES 8100 SERIES 7200 SERIES 8300 SERIES 7400 SERIES 8400 SERIES 8000 SERIES 8500

DELHOIST DOUBLE ACTING TELESCOPIC CYLINDERS Stoney Rise Road (P.O. Box 20), Devonport, Tasmania 7310

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

MULTIPOSITION AIR CYLINDER

Size : Ends : Min Temperature : Max Temperature : Materials : Carbon or stainless steel

DeZURIK 24 and Larger BHP High Performance Butterfly Valves WITH (FB) FYRE-BLOCK SEAT

Guardian HH Shaft Coupling

Kennedy Valve. A Division of McWane, Inc. AWWA PRODUCTS

PFS Rotameter. Variable Area Flowmeter. Instruction Manual PFS-RM200, RM230, RM250

15100 Module Installation Guide Mercedes EPA07 w/dpf

COMMERCIAL. BV & BVM Series Installation Instructions 06/29/15

INSTALL GUIDE Dodge/RAM 5.7L HEMI

Guardian NV Flywheel Coupling

Pressurized Pond Filter Up to 850 gallons

Installation & Operating Instructions for Zone Valve Boxes & Ball Valves

DODGE CUMMINS Air-Boss CR Intake Plenum

DODGE CUMMINS GDP Twin CP-3 Big Line Kit

CV Control Valves Installation and Operation Manual

DeZURIK KUL KNIFE GATE VALVES

Instruction & Operation Manual

Slimline Duals Installation Instructions Harley-Davidson Touring Models 2009-Current

Val-Matic QuadroSphere Trunnion Mounted Ball Valve

Installation and Maintenance Instructions

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

Sanitary Yard Hydrant Installation Instructions

4000SS. For other repair kits and service parts, send for Ames Repair Parts Price List, PL-A-RP-BPD.

PCC O P E R A T I O N S. Pump Cycle Counter M A N U A L. Environmental Systems

BC Brake Caliper. (i) MEX (55) QRO (442) MTY (81) DIST. AUTORIZADO

Illumifalls Patio Pond

Hand Expansion Valves Built Stronger to Last Longer Sizes: 6mm (¼ ) to 305mm (4 )

Scope. Applicability. Caution. I & M CV3000 Series. Storage. Installation & Maintenance Instructions for Marwin CV3000 Series Three Piece Ball Valves

GM 6.6L Duramax. Up to 90HP Gain. AgDieselSolutions.com

Strainer and Check Valves

DeZURIK 2 20" BOS BUTTERFLY VALVES

Guardian FH Flywheel Coupling

Installation Instructions

SHARPE HIGH PERFORMANCE VALVES STANDARD FEATURES ADVANTAGES

Grapple Kit Install & Grapple Bucket Manual

DRAFT August 12, :56 PM

AVK SERIES 41 SWING CHECK VALVE FIELD MAINTENANCE AND INSTRUCTION MANUAL FOR SWING CHECK VALVES 3" - 12"

Cummins N14 Celect & Celect Plus Engine Module. For Agricultural Applications Only. Part # 31200

Richmond Conveyor. Hydraulic Ultimate Manual. January 2013

BALL VALVES 4Evergreen Valve

Model GX Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

Transcription:

INTRODUCTION This instruction manual includes installation, operation and maintenance information for the figure 310AM, 310AMSW, and 311AM 3-piece 1000CWP, threaded end (NPT) or socket weld end (SW) ball valve. INSTALLATION WARNING To avoid personal injury to your self, fellow workers, or damage to property from release of process fluid, before installation: a. Shut off all operating lines to the valve site b. Isolate the valve site completely from the process c. Release process pressure d. Drain the process fluid from the valve site 1. Remove the protective plastic cap from the threaded ends and clean or flush the valve. 2. Before installing the valve, inspect the valve body port and associated equipment for any damage that may have occurred and for any foreign matter that may have collected in shipping or storage. Make certain the body interior is clean. 3. Before installing the valve, inspect the pipe line and mating pipe threads, making sure the pipe is free of foreign material and the threads are clean and have no burrs or pits that could cause leakage. 4. Cycle the valve a couple of times before installation. Valves that are tested to MSS SP-110 may have water trapped between the ball and body cavity. This can be removed by partially opening the valve, exposing the cavity to the through port of the ball. Allow the water to drain out. 5. Ensure that piping is aligned properly so there is no tension applied to the valve when installed. Use pipe hangers or other supports as necessary to properly align piping. 6. For Threaded End Valve: o Use applicable sealant (e.g. - PTFE tape, high temperature pipe seal, etc.) to seal threaded ends on the pipeline. o If required for installation (i.e. The pipe can not be rotated), remove the body bolts and end caps. Secure the seats and body seals with tape so they are not lost. o To prevent distortion or damage to the valve, do not apply torque through the valve. When tightening the valve, always use a wrench on the end nearest the pipe being tightened. It is preferred that the pipe be screwed into the valve, holding the valve stationary at the end being connected. Do not use the handle to tighten the assembly as damage to the valve may occur. o If the valve was disassembled for installation, reinstall the body assembly and reinsert the body bolts. SLIGHTLY tighten all bolts, making sure the body and end caps are parallel to prevent distortion of the end caps during the final tightening phase. Using the torque values in Table 1, tighten the body bolts evenly. Check the valve for proper operation. The valve should stroke smoothly and evenly with no binding (Higher seating and unseating torque is normal). 7. For Socket Weld End Valve: o With the valve in the open position and pipe fully inserted into the socket weld ends, tack-weld the valve to the pipe in four equidistant points on both end caps. o Remove all but one of the body bolts and loosen the remaining one so that the valve body assembly can swing out of the way. o Secure the seats and body seals with tape so they are not lost. It is recommended to temporarily cover the body assembly during welding to protect the soft seats and seals from damage. o Finish welding both end caps onto the pipe. o After all components have cooled, clean all valve surfaces. o Swing the body back to the original position and reinsert the body bolts. o SLIGHTLY tighten all bolts, making sure the body and end caps are parallel to prevent distortion of the end caps during the final tightening phase. o Using the torque values in Table 1, tighten the body bolts evenly. o Check the valve for proper operation. The valve should stroke smoothly and evenly with no binding (Higher seating and unseating torque is normal). 8. Clean/flush the pipeline and leak test the system prior to using. DOC: IOM_FNW310(1)AM_ ver_4-2011 Page 1 of 6

BODY BOLT TORQUES for ASTM A193-B8 Valve Size Bolt Size In-Lbs NM 1/4" 1/4-20UNC 70 7.9 3/8" 1/4-20UNC 70 7.9 1/2" 1/4-20UNC 70 7.9 3/4" 5/16-18UNC 100 11.3 1" 5/16-18UNC 100 11.3 1-1/4" 3/8-16UNC 160 18.1 1-1/2" 3/8-16UNC 160 18.1 2" 3/8-16UNC 160 18.1 2-1/2" 9/16-12UNC 580 65.6 3" 9/16-12UNC 580 65.6 4 5/8-11UNC 800 90.5 Table 1 OPERATION 1. Ensure that the valve materials are compatible with the service and that the operating characteristics are below the valve maximums. 2. Fluids containing particles or coagulating agents are not acceptable as they can reduce the life of the seats and cause the torque to increase dramatically. 3. Care must be taken if throttling the valve (operation in partially open position). Critical pressure drops and high flow rates can decrease the life of, or damage, the seats. For optimum operation, open/close applications are recommended. 4. The valve comes standard with a locking device. Slide the locking plate up the lever before operating. Open and close the valve by turning the handle one-quarter turn (90 ). 5. The valve is in the open position when the handle is parallel to the pipe, and in the closed position when perpendicular to the pipe. DOC: IOM_FNW310(1)AM_ ver_4-2011 Page 2 of 6

MAINTENANCE Valve parts are subject to normal wear and must be inspected and replaced as necessary. Inspection and maintenance frequency depends on the severity of the service conditions. This section includes instructions for packing adjustments, repacking, seat replacement and seating adjustment. WARNING To avoid personal injury, fellow workers, or damage to property from release of process fluids, before installation: a. Shut off all operating lines to the valve. b. Isolate the valve completely from the process. c. Release process pressure. d. Drain the process fluid from the valve. 1. Ball valves, if properly used, do not require internal lubrication or maintenance. However, a visual inspection should be part of a regular maintenance program. A higher frequency of inspection is recommended for valves operating under extreme conditions. Also, for proper operation it is recommended that the valve be opened and closed at least twice a year. 2. Before any maintenance, open and close the valve at least once to release the pressure completely from the valve body. 3. The valve includes live loaded packing that reacts to pressure changes and packing fatigue to reduce the intervals needed for packing adjustments. If the stem packing leaks, remove the operator to access the stem nut. Use a long reaching socket over the stem to turn the stem nut clockwise at 30 to 60 intervals until the leak stops. If the stem nut can not be turned clockwise any further, or if the stem packing continues to leak, it will have to be replaced or repaired. NEVER REPLACE VALVE PACKING WHILE THE VALVE IS IN SERVICE. 4. The valve can be rebuilt by using a Soft Goods repair kit from FNW. Disassembly A. In the closed position, secure the valve by the body in a vise. Do not over-tighten the vise or the valve may be deformed. B. Remove the operator if one is installed. C. For 4 valves, remove the set screw (21) that secures to the stem (6) and lift the handle assembly and stopper (22) off the stem. Remove the stop-lock-cap (15), stem nut (14), Belleville washers (13) and gland (12). D. If the end caps are present, remove the body bolts (18), nuts (17), and washers (16). E. Remove the seats (4), and the body gaskets (5). F. Remove the ball (3). G. Push the stem (6) down through the body (1), and then remove the o-ring (9) and thrust washer (8) from the stem. H. Remove the bushing (11) and packing (10) from the body. Assembly A. Rebuild the valve by using all the replacement parts of the rebuild kit. B. Ensure that all parts are clean and undamaged. C. Assemble the valve in reverse order of the disassembly instructions, except install the packing after the stem is inserted. D. Use the body bolt tightening steps listed in the installation instructions and tighten according to the torques listed in Table 1. It is recommended to cycle and test the valve prior to resuming service. After reinstallation into the piping system, it may be necessary to adjust the stem nut/packing gland as described in step 3. DOC: IOM_FNW310(1)AM_ ver_4-2011 Page 3 of 6

11 12 13 14 15 16 17 18 Lm 10 9 8 7 5 HEX.B H A Bod Bolts Sizes 1/4"~2 1/2" 4 Lm 6 Ød 3 2 1 L2 Ls L M Body Bolts Sizes 3" & 4" 23 22 21 20 19 Handle Assembly Size 4" DOC: IOM_FNW310(1)AM_ ver_4-2011 Page 4 of 6

Ref. Material Description No. 310AM 311AM Qty 1 Body ASTM A351 Gr. CF8M ASTM A216 Gr. WCB Carbon Stainless Steel 1 2 End Cap NPT ASTM A351 Gr. CF8M ASTM A216 Gr. WCB Carbon Stainless Steel SW ASTM A351 Gr. CF3M Stainless 2 3 Ball 316SS Stainless 1 4 Seat RTFE 2 5 Body Gasket PTFE 2 6 Stem 316SS Stainless 1 7 Anti-Static Device 316SS Stainless 2 8 Thrust Washer PTFE 1 9 O-Ring FKM 1 10 V-Ring Packing PTFE 1 Set 11 Bushing 50% Stainless + 50% PTFE 1 12 Gland 316SS Stainless 1 13 Belleville Washer 301SS Stainless 2 14 Stem Nut ASTM A194-8 Stainless 1 15 Stop-Lock-Cap 304SS Stainless 1 1/4 ~2 4 16 Bolt Washer 2-1/2 304SS Stainless 8 3 ~4 12 1/4 ~2 4 17 Bolt Nut 2-1/2 ASTM A194-8 Stainless 8 3 ~4 12 18 Body Bolt 1/4 ~3 4 ASTM A193-B8 Stainless 4 6 19 Handle Adapter 4 ASTM A351 Gr. CF8 Stainless 1 20 Pipe Handle 4 ASTM A53 Steel + Zinc Plating 1 21 Set Screw 4 ASTM A193-B8 Stainless 1 22 Triangle Stopper 4 420SS Stainless 1 23 Handle Sleeve 4 Vinyl Plastic 1 DOC: IOM_FNW310(1)AM_ ver_4-2011 Page 5 of 6

WARRANTY 1. LIMITED WARRANTY: Subject to the limitations expressed herein, Seller warrants that products manufactured by Seller shall be free from defects in design, material and workmanship under normal use for a period of one (1) year from installation but in no case shall the warranty period extend longer than eighteen months from the date of sale. This warranty is void for any damage caused by misuse, abuse, neglect, acts of God, or improper installation. For the purpose of this section, Normal Use means in strict accordance with the installation, operation and maintenance manual. The warranty for all other products is provided by the original equipment manufacturer. 2. REMEDIES: Seller shall repair or replace, at its option, any non-conforming or otherwise defective product, upon receipt of notice from Buyer during the Manufacturer s warranty period at no additional charge. SELLER HEREBY DISCLAIMS ALL OTHER EXPRESSED OR IMPLIED WARRANTIES, INCLUDING, WITHOUT LIMITATION, ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS OR FITNESS FOR A PARTICULAR PURPOSE. 3. LIMITATION OF LIABILITY: UNDER NO CIRCUMSTANCES SHALL EITHER PARTY BE LIABLE TO THE OTHER FOR INCIDENTAL, PUNITIVE, SPECIAL OR CONSEQUENTIAL DAMAGES OF ANY KIND. BUYER HEREBY ACKNOWLEDGES AND AGREES THAT UNDER NO CIRCUMSTANCES, AND IN NO EVENT, SHALL SELLER'S LIABILITY, IF ANY, EXCEED THE NET SALES PRICE OF THE DEFECTIVE PRODUCT(S) PURCHASED DURING THE PREVIOUS CONTRACT YEAR. 4. LABOR ALLOWANCE: Seller makes NO ADDITIONAL ALLOWANCE FOR THE LABOR OR EXPENSE OF REPAIRING OR REPLACING DEFECTIVE PRODUCTS OR WORKMANSHIP OR DAMAGE RESULTING FROM THE SAME. 5. RECOMMENDATIONS BY SELLER: Seller may assist Buyer in selection decisions by providing information regarding products that it manufacturers and those manufactured by others. However, Buyer acknowledges that Buyer ultimately chooses the product s suitability for its particular use, as normally signified by the signature of Buyer s technical representative. Any recommendations made by Seller concerning the use, design, application or operation of the products shall not be construed as representations or warranties, expressed or implied. Failure by Seller to make recommendations or give advice to Buyer shall not impose any liability upon Seller. 6. EXCUSED PERFORMANCE: Seller will make a good faith effort to complete delivery of the products as indicated by Seller in writing, but Seller assumes no responsibility or liability and will accept no back-charge for loss or damage due to delay or inability to deliver, caused by acts of God, war, labor difficulties, accidents, inability to obtain materials, delays of carriers, contractors or suppliers or any other causes of any kind whatever beyond the control of Seller. Under no circumstances shall Seller be liable for any special, consequential, incidental, or indirect damages, losses, or expense (whether or not based on negligence) arising directly or indirectly from delays or failure to give notice of delay. DOC: IOM_FNW310(1)AM_ ver_4-2011 Page 6 of 6