Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Similar documents
Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Terminology. Glossary of Railway. Glossary of Railway Terminology

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Network Safeworking Rules and Procedures

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Module AC. AC electrified lines

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Preparation and movement of trains

Module DC. DC electrified lines

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB12 Iss 2 published on 01/09/2012

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Rule Book Index. Rule Book Index. covering all modules. Document Withdrawn as of December 2008 Uncontrolled When Printed. Rule Book Index.

Index (part 1) covering all modules except the train signalling modules. Withdrawn Document Uncontrolled When Printed. Rule Book Index.

GO/GN3637. Guidance on Defective On-Train Equipment. Rail Industry Guidance Note for GO/RT3437. Published by: RSSB

WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR)

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32

Risk Management of Rail Vehicle Axle Bearings

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK

Network Safeworking Rules and Procedures

TA20 ARTC Code of Practice for the Victorian Main Line Operations

Mechanical Trainstop Systems

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

Shunting and Marshalling

Equipotential Bonding of Rail Vehicles to Running Rail Potential

GORT3056 WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS

Port of Oulu Ltd. 8 Dec PERIOD OF VALIDITY AND INFORMING OF CHANGES RAIL NETWORK... 2

Control, Safe Use and Operation of Road-Rail Plant

Network Safeworking Rules and Procedures

Document Control Identification. Document History. Authorisation

Port of Oulu Ltd. 9 Dec 2016

Guidance for Low Voltage Electrical Installations

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

Compatibility Between Electric Trains and Electrification Systems

Working of Trains - Rules 1 to 45

Protecting Workers on the Track

Signal passed at danger near Ketton, Rutland 24 March 2016

Lineside Signal Spacing and Speed Signage

Standards Manager Web Standards List RSSB-Rail Safety and Standards Board

Interface between Rail Vehicle Weights and Underline Bridges

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013

Controlling the Speed of Tilting Trains Through Curves

VALIDITY AND INFORMING OF CHANGES...

Track Circuit Assister Configuration for Rail Vehicles

Network Safeworking Rules and Procedures

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Network Safeworking Rules and Procedures

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Branding of Wheels,Tyres and Axles

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Section C MARSHALLING, MOVEMENT AND LOADING. Contents

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016

Route Access Condition Notice

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS

Low Voltage Power Supplies in Electrified Areas

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

BRISTOL SOCIETY OF MODEL & EXPERIMENTAL ENGINEERS ASHTON COURT ESTATE MINIATURE RAILWAY

The West Lancashire Light Railway OPERATING RULE BOOK

Service and operate an electric main line locomotive

Contents. Port of Hanko Ltd. NETWORK STATEMENT for the timetable period of Change on section 7, agreement on the use of rail network

Operating Procedures Working of Trains - Procedures 1 to 23

Modernising the Great Western railway

Annex A. to Technical Specification "Operations and traffic management" adopted by

Centralised Traffic Control System - Rules 1 to 17

Morwell. (88 miles 75 chains 47 links, km)

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11

Structural Requirements For Drawgear And Buffers On Railway Vehicles

Rail Safety and Standards Board

ENGINEERS RESPONSIBILITY-WINDERS

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Runaway and derailment of a locomotive, Toton sidings, Nottinghamshire, 30 October 2016

Level crossing collision, near Dymchurch, 10 September 2016

Diesel Locomotive Train Driver. Lesson Plan and WorkBook

The Use of Electricity In Mines Regulations

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

Council of the European Union Brussels, 18 July 2014 (OR. en)

SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK

Advice and safety instructions. for Trafikverket track areas

Service and operate a diesel-electric main line locomotive

Ferrymead Railway Safety Case CSP-001

Maintenance. Education Program Basic Skills Series Module Eight

TOC Waiver. ARTC website

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

SYDNEY TRAMWAY MUSEUM

STAY SAFE NEAR ELECTRICITY

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

National technical rules for vehicles Related Control Command and Signalling Requirements

Avoidance of Danger from Electricity Overhead Lines and Underground Cables

Transcription:

GE/RT8000 - M4 Rule Book Module M4 Floods and snow Issue 1 June 2003 Comes into force 6 December 2003

Issue Date Comments Comes into force 1 June 2003 Initial issue 6 December 2003 Copyright 2003 Railway Safety

You will need this module if you are involved in the arrangements for: dealing with floods clearing snow operating miniature and independent snow ploughs. 1

Contents Uncontrolled When Printed Section 1 Floods 1.1 Conditions for train movement 1.2 Vehicles affected by floods or high-pressure water jets 2 Snow 2.1 Reporting procedure 2.2 Train running 2.3 Lines with conductor rails 2.4 Lines completely blocked by snow 3 Miniature snow ploughs 3.1 Movement in sidings 3.2 Removing the centre blade 4 Independent snow ploughs 4.1 Person in charge 4.2 Moving ploughs when not clearing snow 4.3 Ploughing instructions 4.4 Side flaps, spade plates and skids 4.5 Working of adjacent lines 4.6 Movements in sidings 4.7 Operating on electrified lines 4.8 Additional instructions for Beilhack PB 600 ploughs 2

1 Floods The people responsible: signaller, driver, operations controller, Network Rail area operations manager, person in charge, rolling stock technician 1.1 Conditions for train movement On lines which are flooded, trains may only be permitted to run as set out in diagram M4.1 on page 4. Although these conditions also apply to lines which have conductor rails, you must refer to company instructions for the movement of DC traction units. driver, signaller, operations controller 3

Floods and snow Uncontrolled When Printed Flood water is moving or might have dislodged ballast (irrespective of height of water), or More than 100 mm above top of rail Authority to allow trains to run must be given by the local manager 100 mm Top of rail Up to 100 mm above top of rail Maximum speed 5 mph - 50 mm Up to 50 mm below top of rail Normal working Diagram M4.1 Conditions for train movement signaller local manager You must get authority to allow trains to run from the Network Rail area operations manager in the situation described below. You must only give authority to allow trains to run after consulting the infrastructure manager and telling train operators when: flood water is moving or the ballast may have been dislodged (no matter what height the water is), or flood water is more than 100 mm above the top of the rail. 4

1.2 Vehicles affected by floods or high-pressure water jets You must arrange for the operations controller to be told if vehicles with roller bearings are stabled in, or pass through flood water above the bottom of the axle box. You must carry out this instruction if the vehicle axle boxes might have been affected by high-pressure water jets. You must tell the rolling stock technician so that the axle bearings can be specially examined. You must make this examination as soon as possible without causing delay or cancellation. driver, person in charge i operations controller rolling stock technician i This could be a person in charge of a location where the vehicles were affected by flooding or high pressure water jets. 5

Floods and snow Uncontrolled When Printed 2 Snow The people responsible: driver, signaller, operations controller 2.1 Reporting procedure driver signaller You must report any build-up of snow to the signaller, you must stop your train specially to do so if necessary. If special working arrangements need to be introduced, you must tell Operations Control. 2.2 Train running operations controller, signaller If you are told that snow is deeper than 200 mm above rail level, you must suspend the running of trains. However, you can allow trains which have miniature snow ploughs to continue to run normally if the snow is not deeper than 300 mm above rail level. If the snow is deeper than shown above, you must get authority from the Network Rail area operations manager to allow trains to run. 2.3 Lines with conductor rails operations controller, driver, signaller You must carry out the working instructions in GO/RT3091 DC Electrified lines instructions or other Network Rail DC lines booklets applying to lines which have conductor rails. 6

450 mm 300 mm 200 mm Independent snow ploughs. Beilhack PB600 ploughs can clear snow up to 1.8 metres. Trains fitted with miniature snow ploughs may run, if authorised by the local manager. Train running must be suspended. However, the local manager may authorise trains to run. Trains fitted with miniature snow ploughs may run normally. Normal working. Top of rail Diagram M4.2 Depth of snow 7

Floods and snow Uncontrolled When Printed 2.4 Lines completely blocked by snow signaller, operations controller awareness If any of line is completely blocked by snow, you must not permit trains to run until you have received the authority of the infrastructure contractor. You must arrange for the electrical traction system to be isolated if: conductor rails are covered by snow and it is to be removed by hand digging personnel need to stand on vehicles under or next to overhead line equipment to remove drifting snow. 8

3 Miniature snow ploughs The people responsible: driver, fleet engineer 3.1 Movement in sidings You must: not allow the miniature snow plough blades to come in to contact with the front stays of buffer stops avoid damaging wheel stops and derailers. driver 3.2 Removing the centre blade Between 1 April and 30 November you must make sure that the centre blade is not normally left in position. fleet engineer 9

Floods and snow Uncontrolled When Printed 4 Independent snow ploughs The people responsible: traction inspector, driver, rolling stock technician, person in charge of work on railway infrastructure, signaller, electrification engineer Reference to the term traction inspector in this includes any other person carrying out these duties. 4.1 Person in charge traction inspector You are responsible for taking charge when snow ploughing is taking place (see 4.3 of this module). 4.2 Moving ploughs when not clearing snow driver, traction inspector You must carry out the following instructions: The plough must not be propelled unless you need to do this to help with the progress of ploughing or when specially authorised for test runs or staff training. The speed of the train must not exceed 45 mph. Two ploughs may be coupled nose to nose by a draw bar when not ploughing, or for an authorised test run. Ploughs must not be marshalled with other types of vehicles unless specially authorised. No more than two ploughs may be hauled as a trailing load. 10

4.3 Ploughing instructions The ploughs normally work in pairs, coupled one each end of two locomotives working in multiple or tandem between the ploughs. a) General instructions driver, traction inspector You must carry out the following instructions: You can use any type of locomotive (except a shunting locomotive). The train must not exceed 45 mph. A guard does not need to be provided. b) Traction inspector s duties You must: make sure the ploughs are worked properly keep in touch with the signaller about the priorities of clearing lines find out information about any electrified lines keep a good lookout when the plough is travelling. traction inspector During ploughing you may authorise the driver of locomotives working in multiple to drive from the leading cab of the second locomotive. c) Driver s duties You must make sure that: the automatic brake is working on the ploughs on the front of the leading plough two white lights are displayed (which you may remove during ploughing if they are likely to become displaced or damaged). driver 11

Floods and snow Uncontrolled When Printed 4.4 Side flaps, spade plates and skids rolling stock technician person in charge of work on railway infrastructure rolling stock technician You must make sure that this equipment is locked in the retracted position when proceeding to or from the site of ploughing. You must lower the retractable skids only when authorised by the person in charge of work on the railway infrastructure. You must: authorise the spade plates or retractable flaps (or both) to be lowered or brought into the operative position accompany the ploughs to identify any places where this equipment must be retracted. You must: be competent in the operation of independent snow ploughs set and retract side flaps, spade plates and skids, and be present when these are being used. 4.5 Working of adjacent lines signaller You must make sure that adjacent lines are clear throughout when ploughing is in progress. You do not need to carry out this instruction when ploughs are set to push snow to the cess side only, as long as the person in charge has made sure that: there is no danger to trains on the other line, and you have been told about this arrangement. traction inspector When in charge of a plough which is set to push snow to the cess side, trains can continue to pass on the adjacent line as long as you: make sure there is no danger to trains on the other line, and have told the signaller about the arrangements. 12

4.6 Movements in sidings You must make sure that ploughs do not make contact with the front stays of buffer stops. You must avoid damage to wheel stops, derailers and other similar equipment. driver, traction inspector 4.7 Operating on electrified lines a) Before ploughing starts Before ploughing starts on an electrified line, you must: tell the electrical control operator obtain an isolation on a line which has a conductor rail. signaller b) Line electrified by the overhead system If the depth of snow is 900 mm or less, you do not need to get an isolation. If the depth of snow is more than 900 mm, you must tell the electrification engineer that ploughing is to take place and not allow ploughing to start unless authorised by the electrification engineer. If you are told that the depth of snow is more than 900 mm, you must arrange for: an isolation, or a competent electrification person to accompany the plough, in which case there is no need to obtain an isolation unless that person considers it necessary. electrification engineer You do not have to earth the equipment unless personnel need to approach the overhead line equipment. 13

Floods and snow Uncontrolled When Printed electrification engineer If personnel do need to approach the overhead line equipment, you must arrange for the issue of RT3116 Overhead Line Permit to work as shown in module AC2 AC electrified lines: Working on or near to the OLE. 4.8 Additional instructions for Beilhack PB600 ploughs a) General instructions traction inspector, driver You must not: couple ploughs together nose to nose haul ploughs unless authorised in special instructions. b) Working instructions You can operate this plough to clear snow up to 1.8 metres above rail level. c) Setting the blades rolling stock technician Before ploughing starts, you must: on a double line, set the blades to push snow to the left-hand side of the line in the direction of travel on a single line, set the blades to the normal v arrangement. 14

Glossary of terms and abbreviations The term Conductor rail Electrified line Operations Control Overhead line equipment Rolling stock technician Siding Single line Traction unit Includes or means: A rail through which electricity is supplied to electric-powered trains. A line that is electrified either by 25,000 volts AC overhead lines or by 750 volts DC conductor rails. Local instructions are issued for certain s of route electrified by 1500 volts DC overhead lines. The general term used for Network Rail Operations Control offices. Wires, suspended over the railway line for supplying electricity to electric trains. This includes associated: fittings insulators feeders switches jumpers return conductors. A person who is authorised and has the necessary technical competence to examine or repair specified items of equipment forming part of a train or vehicle. A line on which vehicles are marshalled, stabled, loaded, unloaded or serviced clear of a running line. One line is available for movements in both directions. Locomotive, multiple unit, self-propelled rail vehicle or road/rail vehicle operating in rail mode. 15

Glossary of terms and abbreviations The term Train Train operator Includes or means: Light locomotive, self-propelled rail vehicle or road-rail vehicle in rail mode. The company responsible for operating a train. 16