Generation IV Single- Trip Multizone FracPac System. Overview

Similar documents
SAND CONTROL. enhanced. Save time and cost while improving reservoir producibility HALLIBURTON. Solving challenges.

Completion Solutions Inc.

ISOLATION/UNIVERSAL TOOLS

Drilling & Down-hole Completion Tools

Set, seal, and retrieve with confidence. Packers Catalog

TMK QUANTUM Infinity. Unlimited Stage Fracturing System COMPLETIONS

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators.

SPE Workshop: European Formation Damage 7-8 June 2017 Sofitel Chain Bridge, Budapest, Hungary

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

GT GAS-TIGHT SERIES ELIMINATOR. Addressing your wellbore isolation and cement needs through an ISO V0-rated stage-cementing package

Deepwater Solutions. Tesco offers casing and tubular running services for both land and offshore applications

An Overview of Horizontal Multi-Stage. Kenneth Stevens, Jim Hill Halliburton

Subsurface Flow Controls

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Well Completions. Thursday, 4 July 13

Special Features. u By-pass below upper slips to wash. debris when valve is opened. u By-pass is opened before upper slips.

Express Series Multi Configuration Composite Body Bridge / Frac Plugs

Completion Tools Catalog

COMPREHENSIVE OVERVIEW

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

Minimizing risk with innovative design. Dual ESP Systems and Accessories

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Special Features. u Blanking plug seats in top of. u Bonded seal allows disconnects. and re-connects. u Right-hand or left-hand release

Composite Plugs. Index

Service Tools Catalog

SERVICE TOOLS. Magnus MDT Service Packer V-III Un-Loader Valve MANC Storm Valve

Casing Scraper. Service Equipment. Features

Downhole Tools Worldwide.

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

Dynamic MDT Service Packer V-III Un-Loader Valve ANC Storm Valve

Tryton. Tool Services. People. Products. Performance. Canadian Locations

Tryton. Tool Services. People. Products. Performance. Calgary - Sales/Marketing Office 1100, 250 2nd St. SW Calgary, AB T2P 0C1 Ph:

Intervention Barriers

WLTC Retrievable Bridge Plug

Permapak Seal Bore Packer

Product Overview Last date of Revision:

HYDRAULIC WORKOVER SERVICES

Coiled Tubing Solutions

Tryton. Tool Services. People. Products. Performance. Canadian Locations

TAM-J. Highest reliability multiple-set inflatable packer system available. Element sizes for 2-3/8 tubing through 30 casing

PRODUCT LINE. CPS Oil & Gas Equipments Private Limited. Liner Hanger System. Gas Lift Equipment. Cementing and Casing Accessories

Tryton People. Products. Performance.

Revised Completion Report. Bureau of Oil and Gas Planning and Program Management

MagnusSeal Retrievable Seal Bore Packer Product No.: MSP 7500

Technical Description and Specifications of the VibraEnforcer Systems for Freeing Stuck Pipe in Drilling Operations

PRODUCTION HYDRAULIC PACKER FIELD TEST

REDA Coil. Coiled tubing-deployed ESP system

MESQUITE OIL TOOLS, INC. PRODUCT CATALOG

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE

Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible

Plug & Abandonment Light Drilling Workover Well Intervention

EXAMINERS' REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

Short Fast Strong.

WELLCARE OIL TOOLS PVT LTD PACKER ACCESSORIES & TOOLS

Thru-Tubing. Motors and standard tools

Nut The standard bottom nut is a bullnose nut. Optional nut types, sub, mill, and side hill, are available.

Accelerating the Development of Expandable Liner Hanger Systems using Abaqus

The Benefits of Podded Propulsion in the Offshore Market

FAZEPRO Reversible invert-emulsion reservoir drill-in fluid system

DrillSafe Fluids Management and Bulk Mixer Inc.

Completion Systems & Mechanical Products

SPE Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation

RODEC "C" Low Profile Rotator / RODEC "C" Integral Rotator (3 in 1)

LEE NAK GUI TCP SERVICE COORDINATOR APPS

Technology Next Evolution of Unconventionals

Minerals Management Service

Stainless Steel Water Well Screens and Accessories

Fidmash. Coiled Tubing and Pressure Pumping Equipment

Wireline coring rods Technical Overview

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

DSI THRU-TUBING INC. Bear Claw Composite Bridge & Frac Plug Systems. Proof in Performance

TECHNICAL UNIT DAVIS-LYNCH INC. TYPE 778-MC & 777-HY STAGE COLLAR JCE 02/17/03. FILE: 778-MC TECH NEW.doc REV. 1 Page 1 of 6 DAVIS

2 1 /8 in Neyrfor TTT. Thru Tubing Turbodrill

#10 Setting Tool Assembly Product Family No (10)

Successful New Technology Introduction and Applications of Rotary Steerable System.

RENTAL TOOL SERVICES. Megaton Impact Tools

Capillary Deliquification Safety System

Powered Rotary Steerable System Technology

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM

NEW TECHNOLOGIES INCREASE DRILLING PERFORMANCE IN OMV PETROM. March 20, Bucharest

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

WELLBORE PRODUCTION STRING AND METHOD BACKGROUND

T BOP. prep. TC Cooper Cameron, Cameron Division

Six Years of Continuous Success With Progressing Cavity Pumps in Boscán Oil Field Keys For Success And Lessons Learned

Doing Business with ConocoPhillips

Innovative Landing String system for ultra-deep offshore

We Know Downhole. PRODUCT CATALOG

Model Tests for the DP System of a Drilling Semi-Submersible

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

AS-1 Retrievable Packer

Applied Technology and Best Practices in CEE. Conference. Budapest, 17 November Society of Petroleum Engineers

History. Wyoming CO2 Pipeline Network

St. Clair River Replacement Project Execution Plan. Appendix 1 Contractor s Drilling Execution Plan

3/25/15 University DC 1H Devonian Completion

Update on Tractor Conveyed Ballistics Including API RP-67 Revision

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

Transcription:

Generation IV Single- Trip Multizone FracPac System Overview Ricki Jannise Principal Product Champion Multizone Sand Control 281 988 2282 or 713 702 6716 Ricki.jannise@halliburton.com

What is it? Single-Trip Multizone FracPac Systems are downhole tool systems that allow the stimulation and gravel packing of multiple zones in a single trip of the work string into the wellbore. Treat and pack multiple zones in one trip Isolate zones from each other Access zones for treatment Open zones for production ESTMZ System 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2

Generation IV Features 10,000 psi pressure rating FracPac pump rates Large volume of high-strength proppant capable Intelligent completion capable Zonal isolation by system Zone length flexibility 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3

Why it Will Help A three-zone completion will save five round trips or 60 hours at 12 hours per trip A five-zone completion will save 11 round trips or 132 hours at 12 hours per trip Retrieving packer plugs have the highest risk of failure eliminating the packer plug will help reduce risk 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4

Time Savings Analysis 25,000-ft Well Depth Three Zones Multizone Installation 24-65 Rig Days 3 Work String Trips $39,000,000* Estimated Rig Costs Stacked Pack 46-144 Rig Days 8 Work String Trips $86,400,000* Estimated Rig Costs Gen. IV Multizone System can save millions of dollars *These are estimated figures only and costs may vary depending on many factors. 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5

Reducing Deepwater Completion Time and Costs ESTMZ System Saved Chevron an Average of 18 Days per Well in Deepwater GOM OPERATOR CHALLENGE: Save rig time in a multizone completion. SOLUTION: Halliburton s Enhanced Single-Trip Multizone (ESTMZ ) system was used to complete 4 zones in a deepwater well. RESULT: Successfully completed first cased hole ESTMZ system in the Gulf of Mexico by treating 4 stages in the Lower Tertiary. The fracs were pumped with DeepQuest fluid and high strength proppants with Halliburton s two frac vessels using offshore fluid transfers to increase the completion efficiency. VALUE ADDED: In Chevron s three wells, the ESTMZ system saved a total of 24 round trips to more than 25,000 feet. Chevron estimates it saved 18 days per well compared to conventional completions. The first well tested in excess of 13,000 BOPD. Treat and pack multiple zones in one trip Isolate zones from each other Access zones for treatment Open zones for production 2014 HALLIBURTON. ALL RIGHTS RESERVED. 6

Candidate Selection 9 5/8 47 53.5 ppf ID casing 7 26 32 ppf ID casing 8-1/2 open hole - consolidated Multiple zones two or more various lengths okay Similar pressure gradients Sand / hydrocarbon influx controlled Zone spacing: >4,000 max and 45 between zones 2014 HALLIBURTON. ALL RIGHTS RESERVED. 7

Past Jobs (29) As of October 2014 6 SITs - 9-5/8 CH (4), 7 CH (1), 8-1/2 OH (1) Carrollton, TX 2007-14 3 Field Trials - 9-5/8 CH (2 w/ 3 zones each) and 8-1/2 OH (1 w/ 4 zones) GoM operator 2008 and 2011 4 (3) 9-5/8 CH and (1) 8-1/2 OH Jobs GoM operator 4, 3, 6 and 5 zones respectively 2012 through 2013 6 9-5/8 Cased Hole Producer Asia Pacific operator 4, 3, 3, 4, 4 and 3 zone jobs 2010 through 2014 9 9-5/8 CH Jobs Asia Pacific operator 6, 5, 4, 3, 4, 4, 3, 4 and 3 zones respectively 2012 through 2014 1 9-5/8 CH Job Asia Pacific operator 3 zones 2013 2014 HALLIBURTON. ALL RIGHTS RESERVED. 8

ESTMZ System Components Frac Circulation Sleeve Next Zone Isolation packer Spacer pipe Gravel pack assembly Hydraulically activated shear sub Blank pipe Mid-Joint Production Sleeve (MJPS) Modular screen Frac Circulation Sleeve (FCS) Sump packer and seals 2014 HALLIBURTON. ALL RIGHTS RESERVED. 9

ESTMZ Enhanced Single-Trip Multizone FracPac System Running Procedure

ESTMZ System Installation Sump packer is set All zones are perforated Perforations have been de-burred and the hole clean Fluid loss and cross-flow are stopped Make-up, test and space-out ESTMZ system Run in the hole and sting into the sump packer Set the VCH (top) packer Set the isolation packers Perform work string pickle operation 2014 HALLIBURTON. ALL RIGHTS RESERVED. 11

FracPac Tool Assembly (Frac Sequence) Pressure test the service tool Perform treatment on the lower zone Reverse-out and test Perform treatment on the middle zone Reverse-out and test Perform treatment on the upper zone Reverse-out and test Pull out of the hole 2014 HALLIBURTON. ALL RIGHTS RESERVED. 12

Who to contact. Where to get more information. Ricki Jannise Principal Product Champion Multizone Sand Control ricki.jannise@halliburton.com Phone: 281-988-2282 Cell: 713-702-6716 www.halliburton.com/estmz 2014 HALLIBURTON. ALL RIGHTS RESERVED. 13