TESTING REPORT Procedure used: 3A - STANDARD 3A - SMALL

Similar documents
COMFORT PRODUCT INC. Technical Report: (1215) Initial Report Date: August 03, 2015 Date Received: July 31, 2015 Page 1 of 22

ASTM D4169 Truck Profile Update Rationale Revision Date: September 22, 2016

SHOCK TEST REPORT. Report No. : ENVA S9 Model Number : S9

DILLARD S TEST PROTOCOL FOR DILR US PACKAGED PRODUCT TRANSIT TESTING ISTA (ELONGATED CONFIGURATION: 150 LBS OR LESS) (V8)

DILLARD S TEST PROTOCOL FOR DILR US PACKAGED PRODUCT TRANSIT TESTING ISTA (FLAT CONFIGURATION; 150 LBS. OR LESS) (V8)

PRODUCT RELIABILITY TESTING: Environmental, Mechanical and Packaging Case study: 19 Rackmount Switch

test with confidence HV Series TM Test Systems Hydraulic Vibration

THERMAL SHOCK TEST REPORT

TEST METHODS CONCERNING TRANSPORT EQUIPMENT

OFS Brands Test Facility Report No: OFSB Date: April 2, 2015 Page: 1 of 29. Test Report For: ANSI/BIFMA X Storage Units.

Result: The marking on front tires and rear tires were not conformed to the client s Spec. Please refer to below photos for details.

SGS TEST REPORT. Page: 1 of 8 Date: April 15,2010. itech Company LLC Christy Street, Fremont CA USA

Test Report No.: SDHL FT Date: May 15, 2017 Page 1 of 15

Lightweight Shock and Type I Vibration Test Report on UPS Model No. PS3200RM for Powerstar Inc. Gaithersburg, MD

No , Vers.1

The following information is provided in order help you evaluate whether your motor coach will accept the Cruiserlift System.

Amendment 69 FR (20 December 2004) Section 5 Hydraulic brake hose, brake hose assemblies, and brake hose end fittings ESN270529

DRIVER'S DAILY LOG (24 HOURS) Carrier: USDOT #: Time: Time Zone Offset from. Miles Today: 0 mi UTC: -05:00

GETWELL TECH.(H.K.) LTD.

OPERATING INSTRUCTIONS. Models SI-1400 through SI-1406

Report No 2370/ This Report consists of 40 pages. Authority & date Request by Client dated 25 November 2010

Die cutting and creasing machine with blanking and stripping device. model Brausse 1060ER

Jinhua Aceme Electric Co. Ltd.

*required field Section I - Personal Data First Name * Middle Initial. Last Name * Nickname

Power consumption In operation At rest For wire sizing. Torque Inhibiting torque. 150 s / C Sound power level Motor

There were no pallet numbers written on the pallets (need confirmation how to write it ) Product data measurement PASSED Tested products passed

NATIONAL TECHNICAL SYSTEMS

PHYS 2212L - Principles of Physics Laboratory II

COMPANY PROFILE IRE-TEX CORPORATION BERHAD A

EX-REPAIR AND MAINTENANCE RECEPTACLES

From system to component allocating EMC requirements Examples from different sectors

IEA SHC Task 27: Accelerated Aging of IG units: North American Test Methods

HT Dielectric Withstand Tester Volts AC Output 25mA Leakage Option

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM


VIBRATION AND MECHANICAL SHOCK TEST REPORT

Installation Instructions

Test Report Current (Gen 2) Pendant Armor and Gen 3 Pendant Armor Polymer A Hanger and Polymer B Hanger March 16, 2016 (Q022516U1R2) Testing Location

product manual H-2966B H-2966B Production, Cylinder End Grinder

GLASSCO LABORATORY EQUIPMENTS PVT. LTD.

Acrylic Chair- Clear 121-APC

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Modeling and Simulation of the drive system of elevator based on AMESIM

Lightweight Shock Test Report on Power Supply PS1503-H-MB and Adapter Plate for Powerstar Inc. Gaithersburg, MD

FILTRON 1-10 (DC/AC) BERMAD Irrigation

Cummins Turbo Engines: VpCI-126 bags vs. Competition

ENEC LICENCE. Licence No. ENEC Page 1/3 Date of Issue

PCT200 Powercast High-Function RFID Sensor Datalogger

APPLICANT: EMECO DATE: Mar 10, ELM AVE HANOVER, PA, USA

Sungrow-Samsung SDI ESS Solutions. April 12, 2017

French License Conversion

Vibration Energy Harvesting for Process Industry Applications

Test Report No. AJHL FB Date: JUN.21, 2016 Page 1 of 6

QSFP Copper Module Direct Attach Cable Assembly &Cage

Laboratory Report. U. S. Department of Justice

TEMPERATURE RISE TESTS

ADD: Room New Victory House, Wing Lok Street, Central, HONG KONG

Operation & Maintenance Manual. Sludge Vac. Visit our Website for more information on this product.

Additions, Revisions, or Updates

THE STS VEHICLE INSPECTION PROCESS

KOOCHICHING COUNTY HIGHWAY DEPT. HEAVY EQUIPMENT OPERATOR International Falls Maintenance Garage

PRODUCT SPECIFICATION

Vibration Test Systems

Our test laboratory - Apparatebau Kirchheim-Teck GmbH

EMPLOYMENT APPLICATION FORM TURK ENTERPRISES LTD.

Contents Getting Started with PrePass ELD...4 Starting a Trip...7 During a Trip Co-Driver Features... 14

PUMP PERFORMANCE TEST

K-03 CRUDE OIL TANK WASHING MACHINES

T~$t P~Cijpt1oll ', je~t# ' ~n~:2{211rtadje.sampje. PREPARED FOR: Comfor Tek Seating Street North Lethbridge, AB

VIA Platform Environmental Qualification Testing Standards

PRODUCT VTS C LOW TEMP. FREEZERS SPECIFICATIONS DIMENSIONS FEATURES LOADING QUANTITIES BIOMEDICAL SOLUTIONS

Precision Air Track P4-2710

Easy Weigh ADVANCED COUNTING SCALE MODEL: AC-100 OWNER S MANUAL VER 1.00

RP100 Series. 2.4GHZ Extended Range. 32-bit Microprocessor. Radio Receiver Model: RP100 / RP / 10 Digital Output

EAH153SY FITTING INSTRUCTIONS

STANDARD STEP IDENTIFICATION

Modern Applied Science

Power consumption In operation At rest For wire sizing. Actuating force Inhibiting force. Position accuracy ±5% Direction of stroke Motor

Safe-Stop TMA (Truck Mounted Attenuator) GENERAL SPECIFICATIONS

Report No: Test of: Reversible aluminium/timber window. Tested to: BS :2009 Performance of windows & doors Part 2: Operation & strength

Additions, Revisions, or Updates

Packaging Information IPS-CTS Coils

07-11 GM 4WD 1500 P/U 1 1/4 Body Lift

MODULE 6 Lower Anchors & Tethers for CHildren

Cobra-S. Catalog Cobra-S

TEST REPORT IEC Information technology equipment Safety Part 1: General requirements

Designing a UTV FIRE or RESCUE or FIRE RESCUE UNIT To Fit Your Departments Needs!

GENERAL PURPOSE INCUBATOR

CHIP & HOG TRUCK DRIVER EXAM

812 Valve Unit Instructions for Use / dö. CH-9101 Herisau/Schweiz Internet

White Paper: Ensure Accuracy and Maximize the Value of Your Cable Testing Equipment with Calibration from Fluke Networks

Rubber Band Car. Tommy Stewart Corey Marineau John Martinez

BS EN :2006. Windows and doors Product standard, performance characteristics. A Report To: Mila Hardware Ltd. Document Reference:

Lithium Battery UN38.3 Test Report

Installation, Operating & Maintenance Instructions. All-metal gate valve with compact or extended pneumatic actuator

ALPHA 70K TMA (Truck Mounted Attenuator) GENERAL SPECIFICATIONS

Faulted Circuit Interrupting Tests on Type CMU Power Fuses

2014 HBM ncode Products User Group Meeting

Technical Committee Motor Vehicles 15 September RDE 3 discussion

Ductless mobile fume hoods with modular filtration column

Transcription:

TESTING REPORT Procedure used: 3A - STANDARD 3A - SMALL > ISTA CERTIFIED LABORATORY 3A - FLAT 3A - LONG VERSION DATE: 2008 ( 2014 ) Laboratory : Address : Building B, Taineng Park, Xiyuan 6th Road ISTA Member ID : ST-1908 Email : pkg@hqts-qai.com City, State/Prov :Hangzhou, Zhejiang Phone: +86 571 88907007 ZIP/Postal Code, Country : 310030, CHINA Report Number HQ163031669 > PRODUCT MANUFACTURER / SHIPPER Test Requested by :XX Company : XX. ISTA Member ID (if applicable) : Address : XX ISTA Manufacturer s License Number (if applicable) : City, State/Prov :XX, XX ZIP/Postal Code, Country :/, XX > PRODUCT AND PACKAGE DESCRIPTIONS Date Tested: May 6, 2016 Date Received: April 28, 2016 SKU/Item No.: 0601396080/GWS900 Number of Samples tested 1 Product Description: Angle Grinder Gross Weight 4.96lbs/2.25kg PACKAGE Condition before testing: No damage External Dimensions (L x W x H) 14.2 x 4.7 x 4.9 The PACKAGING used during testing was: ORIGINAL as arrived in the lab for testing 360 mm x 120 mm x 125 mm NEW re-packaged with new materials before testing Did the lab OPEN the packaged-product before testing to determine product condition? YES NO PACKAGE Description: Components of the Angle Grinder were packed into plastic bag or fixed by corrugated board, and then packed into a master carton box. > TEST RESULTS PRODUCT Condition after testing (if inspected): Found rust mark on one component; no other obvious change and product operated well. PACKAGE Condition after testing: No obvious change. Pass Fail Actual Finding Comments or recommendations: > AUTHORIZED BY Neil Peng General Manager HQ-PTR01-038/12 Page 1 of 8

TEST METHODS PROCEDURE 3A > ORIENTATION What position was the packaged-product in when the faces, edges and corners were identified: MOST STABLE SHIPPING Explain position if different than procedure recommendation: > ATMOSPHERIC CONDITIONING Start of Preconditioning(Ambient): Start of Conditioning(Controlled): Temperature ( ) 12 Temperature ( ) 38 Humidity (%) 54 Humidity (%) 85 End of Preconditioning: End of Conditioning: Temperature ( ) 13 Temperature ( ) 38 Humidity (%) 60 Humidity (%) 85 Duration: 24h Duration: 72h > SHOCK TEST FIRST DROP SEQUENCE (FOR SMALL: DO NOT TEST IN BAG) Shock Sequence Number Height of Shock (inches / mm) Orientation of packaged-product (ex: Face 6; Corner 2-3-5, Edge 3-5) Was packagedproduct CAUGHT to prevent tipping over? 1 18 / 460 EDGE Edge 3-4 Y N 2 18 / 460 EDGE Edge 3-6 Y N 3 18 / 460 EDGE Edge 4-6 Y N 4 18 / 460 CORNER Corner 3-4-6 Y N 5 18 / 460 CORNER Corner 2-3-5 Y N 6 18 / 460 EDGE Edge 2-3 Y N 7 18 / 460 EDGE Edge 1-2 Y N 8 36 / 910 FACE Face 3 Y N 9 18 / 460 FACE Face 3 Y N HQ-PTR01-038/12 Page 2 of 8

TEST METHODS PROCEDURE 3A > VIBRATION UNDER DYNAMIC LOAD OVER-THE-ROAD >> FOR STANDARD, FLAT, LONG: Formula, with values, used to Calculated Actual Top Load Total Test Face resting calculate Top Load Top Load Used Time on platform TL-H (108-H) x L x W x 0.0035 11.12 kg 12 kg / 25 lbs 60 mins Face 3 TL-W (108-W) x L x H x 0.0035 11.61 kg 12 kg / 25 lbs 30 mins Face 4 TL-L (108-L) x W x H x 0.0035 3.51 kg / 30 mins Face 6 >> FOR ALL: OVER THE ROAD (FOR SMALL: TEST IN BAG) Describe restraining devices used, if any: Steel Arms Use the spaces below to record frequency and PSD levels used: Frequency (Hz) PSD Level, g 2 / Hz 1 0.007 3 0.02 5 0.02 7 0.001 12 0.001 15 0.004 24 0.004 28 0.004 36 0.001 42 0.003 75 0.003 200 0.000004 Overall Grms: 0.53 >> FOR ALL: PICK-UP AND DELIVERY (FOR SMALL: DO NOT TEST IN BAG) Describe restraining devices used, if any: Steel Arms Face resting on platform: Face 3 Total test time: 30 min Use the spaces below to record frequency and PSD levels used: Frequency (Hz) PSD Level, g 2 / Hz 1 0.001 3 0.035 4 0.035 7 0.003 13 0.003 15 0.001 24 0.001 29 0.0001 50 0.0001 70 0.002 100 0.002 200 0.00005 Overall Grms: 0.46 > SHOCK TEST SECOND DROP SEQUENCE (FOR SMALL: TEST IN BAG) Shock Sequence Number Height of Shock (inches / mm) Orientation of packaged-product (ex: Face 6; Corner 2-3-5, Edge 3-5) Was packagedproduct CAUGHT to prevent tipping over? 10 18 / 460 EDGE Edge 3-4 Y N 11 18 / 460 EDGE Edge 3-6 Y N 12 18 / 460 EDGE Edge 1-5 Y N 13 18 / 460 CORNER Corner 3-4-6 Y N 14 18 / 460 CORNER Corner 1-2-6 Y N 15 18 / 460 CORNER Corner 1-4-5 Y N 16 36 / 910 FACE Face 5 Y N 17 (on hazard, as applicable) 18 / 460 FACE Face 3 Y N HQ-PTR01-038/12 Page 3 of 8

PHOTO ATTACHMENT Sample before test Drop test Vibration test Sample after test ********************************************************************************************************************************************************** TO BE CONTINUED HQ-PTR01-038/12 Page 4 of 8

PHOTO ATTACHMENT Box open Internal packaging 1) Internal packaging 2) Found rust mark ********************************************************************************************************************************************************** TO BE CONTINUED HQ-PTR01-038/12 Page 5 of 8

PHOTO ATTACHMENT Details of rust mark Unit product Top Load Apparatus Used ********************************************************************************************************************************************************** HQ-PTR01-038/12 Page 6 of 8

TO BE CONTINUED. P HOTO ATTACHMENT ISTA 3A - Over-the-Road Trailer Spectrum HQ-PTR01-038/12 Page 7 of 8

ISTA 3A - Pick-up and Delivery Vehicle Spectrum ********************************************************************************************************************************************************** END OF REPORT HQ-PTR01-038/12 Page 8 of 8