AM-LINER II INSTALLATION PROCEDURE PATENTED

Similar documents
OSP Fiber Optic Cable


ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

Installation Instructions Table of Contents

Welker Jet Insert Model Control Valve

SECTION J CONTENTS OPTIONAL CONFIGURATIONS DESCRIPTION

IMS Robotics GmbH Am Bauhof 6 D Ottendorf-Okrilla Germany Phone: Sales +49 (0) Service +49 (0) Leasing +49 (0)

CABLE FEEDER, C CONECS CABLE FEEDER, D CABLE LUBRICATOR, AND LUBRICATION PUMP DESCRIPTION AND USE

Regular inspections are recommended to ensure that the system is functioning as designed.

CUES TV Systems. Full-circle solutions for the Water, Wastewater, & Stormwater Industries for over 40 years!

Small Kangaroo Cutter

ENGINE WINCHES from 300 to 5000 kg - TS and TD Series

INSTALLATION MANUAL 2000WCY

82-01 Chevy S-10/ GMC Sonoma Front Kit Part No B

Length 200 mm (knife included) 310 mm (knife included)

AGRICULTURAL SPRAYERS

Royal Care Series. Installation & Operations Manual

An innovative solution for water and sewer installation AXIS. Guided Boring System

jet features the patented

VENT SILENCER PRODUCT GUIDE

STRAIGHT CONVEYOR UNITS AND RIGHT-ANGLE TRANSFER

2010+ Camaro Triple-Threat Wet Nitrous System

INSTALLATION INSTRUCTIONS

LOAD/ANTI TWO-BLOCK INDICATOR INSTALLATION MANUAL

CHAPTER 12: OPERATIONS & MAINTENANCE

REAR MOUNT AERIAL LADDER USED AS A WATER TOWER

INSTALLATION INSTRUCTIONS

The Right Angle of the Latch to the Snare. Adjusting the Latch relative to the Snare

Towing and Road Service Guide For Lexus GS 300 and GS 430. Quality and Education Services AAA Automotive 1000 AAA Drive Heathrow, FL 32746

J e t t i n g n o z z l e s

POLYUREA SPRAY-IN BED LINER INSTALLATION GUIDELINE!

SERIES DESUPERHEATERS

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 13 Engine-Crankshaft, Cylinder block (Page GR-13)

Cable and Hose Reels / Balancer Program 0402

Towing and Road Service Guide For Lexus LS 600h L. Quality and Education Services AAA Automotive 1000 AAA Drive Heathrow, FL 32746

V200D VERIS Verabar (Double Rod) Installation and Maintenance Manual

AGRICULTURAL SPRAYERS

Trailer Sprayers. 750 Gallon Sprayer

Type N550 Emergency Shutoff Valves. Instruction Manual. Type N550 Emergency Shutoff Valves. Introduction. Specifications. Scope of Manual.

INSTALLATION INSTRUCTIONS

AMERICAN TH STREET, S.W. e GRAND RAPIDS, MICHIGAN 49508

SSMP ELEMENT 4 O & M Program APPENDIX 4.3. Sewer Pipe Cleaning Standard Operating Procedures (SOPs)

ITEM QTY CHECK PART NUMBER DESCRIPTION. NOTE: This package does not include any accessories for gauge installation

ITEM QTY CHECK PART NUMBER DESCRIPTION

15100 VALVES. E. Section Building Automation and Control System Guidelines

V400D VERIS Verabar (Double Rod) Installation and Maintenance Manual

Dear Dealer, (Available in Color and Black & White)

Completion Solutions Inc.

Spin Klin 12" Super Flow

ELECTRONIC OVERHEAD TRAVELLING CRANE DIMENSIONS & LOAD DATA

Colorado Division of Fire Prevention & Control Driver Operator Aerial JPRs (NFPA 1002, 2014 Edition)

Installation instructions, accessories

Services. Rental Equipment RENTAL DIVISION PRODUCT LINES. LOAD RESTRAINTS Load Binders (Lever & Ratchet) Truck Tie-down Assemblies Boomer Chains

Ford F-450 Pickup 2WD & 4WD 2WD & 4WD

Crane Systems GREER COMPANY. LALT 1151L System for Lattice Cranes. Installation and Calibration Manual. 1 of 39

TECHNICAL MANUAL UNIT, INTERMEDIATE DIRECT SUPPORT AND INTERMEDIATE GENERAL SUPPORT MAINTENANCE MANUAL

CLEARWATER FIRE & RESCUE TRAINING BUREAU

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

PRODUCT CATALOG PLUG-IT PRODUCTS. - A Different Kind of Plug Company -

G500REC Manual Covering System for Containers

Revised August BRIGGS IRRIGATION Spare Parts Manual for R18, R24, R30 Hosereel Mounted Boom Irrigators

Perfect choice for marine and general purpose. Engineering tested by NATA accredited laboratory. Dacromet rust resistant finish to all winches

CS-900. Wheeled Cart - Electrostatic Spray System. Unpacking & Installation. Indoor Commercial Use Only

INSTALLATION INSTRUCTIONS

Operating Instructions Hang-Glider / Paraglider Towing Winches, Model: HGW Double-Drum

KE Series. Through Conduit, Double Expanding Gate Valves

Operating and Maintenance Manual

this equipment. Does Not

Advanced Outage Compression Methods for Steam Turbines. Nicholas Marsh 13 th February 2012

Section J Air Control Nozzles

INSTALLATION & OWNER S MANUAL

Optional Bullard Hook* with return latch, with or without return spring, for added safety.

COMBINED SEWER CLEANING AND WATER RECYCLING


INSTALLATION, OPERATION AND MAINTENANCE FOR SERIES 500 K-FLO BUTTERFLY VALVES

ENTIRE FUELING PROCESS IN & OUT IN 5 MINUTES*!

DR W

Maximum Flow: 600 GPM (3800 LPM) Portable Base 1250 GPM (4800 LPM) Direct Mount. Maximum Pressure: 200 PSI (1380 Kpa, 13.8 BARS)

West Metro Fire Protection District

STRINGING EQUIPMENT CATALOGUE

INSTALLATION INSTRUCTIONS

Tractor Mounted Tank Units

Description and Operation

2) Mark wall at 5 10 for center line of bottom bolt-hole in wall brackets on transition box side of floor.

C h e c k M a t e I n l i n e C h e c k V a l v e

Technical Data SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 1520 SERIES 2000 DIRECT & REVERSE ACTING

ASAP Jr. A Strap and Pole. Magic Christmas. Walter Monkhouse. Alexandria, La.

Redi Controls, Inc. Installation Operation & Maintenance Manual

PO Box 411 Berwick PA VALV

GM TRUCK BACKUP CAMERA INSTALLATION

SPECIFICATION OF TRAILOR MOUNTED SEWER JETTING MACHINE RAMJET 1500 Lts.

CDL Series Pre-Trip Inspection AT-TC3TS T1-JA01. Pre-Trip Inspection Checklist

Table of Contents WARN INDUSTRIES PAGE A1

AIR SUSPENSION KIT HP UNIVERSAL AIR SUSPENSION KIT

Developed by Engineer Bobby Bartlett February 2012

Main-to-House Sewer Lining System TRENCHLESS PIPE REHABILITATION WITH THE MTH METHOD

SEMPELL TURBINE BYPASS VALVE MODEL 115 CHP

Percussion milling cutters

Winch Operation Check

DVG/AF Variable Geometry Desuperheater

Transcription:

1 American Pipe & Plastics Inc. AM-LINER II INSTALLATION PROCEDURE PATENTED Arrive on Site Position reel trailer, power unit, and cable winch. Set up traffic control. Establish flow diversion. Begin heating the coil of flat AM-LINER II in the trailer until it is flexible enough to uncoil, pull into the manhole and pass through the shaping device. Note: Coordinate all activities at the upstream and downstream manholes using two way radios. Position television truck and prepare camera. Position high-pressure jet cleaning truck, and jet clean sewer line. Attach camera to high pressure cleaning head. 1 Pull camera back with the high pressure cleaning head. 2 Televise line, and mark cable to reference laterals. Remove the camera. Note: In some cases it may not be possible or desirable to use the shaping device. To use or not use the shaping device shall be at the discretion of the installer. Position the winch for pulling the liner into the sewer over the downstream manhole. Attach the cable from the TV camera to the cable on the liner pulling winch.

2 Install the shaping device at the bottom of the manhole against the entrance to the host pipe. Alternatively the shaping device may be located on the back of the heating trailer or outside of the manhole 3 Install rollers in the manhole to guide the pulling cable in such a way that the cable does not cut into the crown of the host pipe. Connect the high-pressure water hose from the cleaning truck to the water spray nozzle assembly on the shaping device. Pull the cable from the downstream power winch through the host pipe to the upstream manhole using the TV winch. Thread the cable from the downstream winch through the shaping device such that it will pull the liner through the shaping device and into the host pipe when the downstream winch is operated. Shut off the steam to the coil of AM-LINER II. Pull the free end of the flat liner from the reel. Prepare the nosepiece by folding approximately three feet of liner in half along the longitudinal axis. Tape the folded liner. Drill holes through the folded liner, then thread a cable or chain through the holes in such a way that it may be quickly attached to the cable from the pulling winch. Attach the cable from the pulling winch to the cable or chain of the nosepiece. Begin pulling the liner to the downstream manhole using the power winch. The operation must be coordinated with the people at the upstream manhole using two-way radio. Guide the flat AM-LINER II from the trailer

3 through the manhole and into the shaping device. Position the liner so that the nosepiece is properly oriented in the lower unit of the shaping device. Start the flow of water to the spray nozzles, then lock the lower shaping disc into contact with the liner and close the upper guide rollers. Care must be taken not to kink or snag the liner as it is guided from the trailer through the manhole and into the shaping device or through the shaping device and into the manhole. Note: If the shaping device is not used guide the nosepiece through the manhole and directly into the host pipe. A piece of carpet attached to a rope and soaked with a lubricant should be placed between the liner and the crown of the host pipe at the point of entry. The rope from the lubricate carpet must be secured to the manhole so that the carpet will not be pulled into the pipe. Additionally it is advisable to pour or spray a lubricant such as vegetable oil or oil soap onto the liner as it is pulled through the host pipe. Cut the liner at street level leaving several feet of extra liner to allow for stress relief. Remove the shaping device. Continue the pulling operation until the liner arrives at the downstream manhole and the end is pulled around the downstream roller and brought to street level. Release tension on the downstream winch. Cut and remove the tape around the liner so that it does not obstruct the holes in the nosepiece. Apply steam to the free end of the liner, to make it pliable. Lock the reel of the winch.

4 Insert an inflatable steam rated flow through plug into the end of the liner. Inflate the plug until it causes the liner to bulge. Connect the plug to the steam source. Apply steam to the liner through the upstream inflatable plug assembly. This starts the stress relief process. Observe the movement of the liner in the manhole. Continue steaming until no movement of the liner is observed. Shut off steam flow. Cut off the excess liner, leaving approximately one foot of liner extending from the host pipe. Release the reel of the winch and allow slack in the liner. Remove the roller in the manhole. Install the inflatable plug and flow through steam assembly inside of the liner. Insert the end of the plug so that when it is expanded it will press the liner tightly against the inside of the host pipe. Inflate the plug and connect the steam hose. Block the plug against both horizontal and vertical movement. Observe the movement of the liner in the manhole. Continue steaming until no movement of the liner is observed. This completes the stress removal procedure.

5 Shut off the steam. Cut off the liner in the manhole. Leave sufficient liner extending into the manhole to install the inflatable plug into the liner without having it extend into the host pipe. Inflate the plug until it fits tightly in the liner. Block the inflatable plug against the manhole to prevent movement once the liner is pressurized. Connect the steam hose from the downstream control manifold assembly to the connection on the inflatable plug assembly in the manhole. Apply steam to the liner. Increase steam flow until the downstream operator reports that the gauge at his station indicates the target pressure.. Begin timing the process when the temperature at the downstream station reaches 200ºF. Maintain steam pressure at the target pressure for the predetermined length of time. Begin the cooling process. Switch from steam to compressed air. When the change is complete, the operator will immediately communicate with the downstream operator using the words all air. The valve controlling the steam exhaust must be in the fully open position. Monitor steam pressure and temperature on the control manifold. Report times and temperatures to the upstream operator. Maintain the target pressure by telling the upstream operator to either increase or decrease steam flow. When the operator hears the words all air he will take control of the cooling process, and maintain the targeted cooling pressure from his control station. Monitor the air temperature at the downstream station until the gauge indicates a temperature of 80º F. Continue to cool the liner for approximately 30 minutes after reaching that temperature.

6 Open the downstream valve to release the pressure in the liner. Shut off the compressed air. Depressurize the expandable plug from street level before going into the manhole to remove the blocking and the plug Depressurize the expandable plug from street level before going into the manhole to remove the blocking and the plug. Inspect the liner using closed circuit television. Reinstate the service connections using a robotic cutter. Trim the ends of the liner. Note: The above procedures may vary according to conditions and equipment. 1 Self-propelled cameras would also be acceptable to accomplish this task. 2 The methods shown herein to bring the pulling cable from the downstream manhole to the upstream manhole are provided for informational purposes only. Any method which accomplishes this purpose efficiently without damage to the host pipe should also be considered acceptable. 3 The recommended shaping device is manufactured by Express Industries of Plain City, OH. 10/05