Easy Tool Retracting System SR2159

Similar documents
Retractable System Operation & Maintenance Manual

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool

High Pressure Access Systems

CHAMBER CUSTOMIZATION GUIDE TSE

PART# Tri-Valve Exhaust For SL 17 A/B, 17 K, KM 37 & KMB 18/28 Band Masks

Retrieval Tool. Operation and Maintenance Manual

Product Customization Guide TSE Brakes, Inc.

Dethatcher Kit Greensmaster 3000 Series

Technical Manual MSI Hydraulic Adjustable Choke

TWO-STAGE HYDRAULIC PUMP. RWP55-IBT-Air

Fisher 657 Diaphragm Actuator Sizes and 87

Your Global Flow Control Partner. Series 70 24V On/Off Electric Actuator Operation and Maintenance Manual

OPEN/CLOSE SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION

B21 Series BASOTROL Gas Valve

Techcon Systems TS5620 Series Diaphragm Valve. User Guide

ONYX VALVE CO MODEL DAO-PFC Installation & Maintenance

UNIFLO Control Valve

Operation and Maintenance Manual

Installation Instructions. Standard Gate Valves

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F-250/350 Single Wheel 2WD IMPORTANT NOTES

I-799/79V Coil Components

MS2001L LPR Corrosion Monitor

RECOMMENDET INSTALLATION PROCEDURE Timing Belt Tensioner for Aftermarket OPEL 2.0L SOHC, Fam. 2 (Revision date: 04/27/1999)

Table of Contents General Information Safety Message Classifi cation...2 Safety Notes...3 Terminology...4 Coupler Lifting Lug...

Circulation Kits for CP Pumps

Model DFR 070/156/220 Rotary Actuator

ONYX VALVE CO MODEL DAO-ADA Installation & Maintenance

Portable Two-Stage Under Axle Jack Max. Capacity: First Stage: 27.5 Tons Second Stage: 11 Tons. Safety Precautions

ONYX VALVE CO MODEL CER with JORDAN ACTUATOR Installation & Maintenance

Valtek Flow Boosters

INSTALLATION INSTRUCTIONS Air Spring Kit Dodge WD IMPORTANT NOTES

High Lift Transmission Jack

Series 70 24V On/Off Electric Actuator Operation and Maintenance Manual

Paint/Solvent/Dump Valve and Flow-Through Valve

Anderson Greenwood Single Active SSV Installation and Maintenance Instructions

Valveworks USA Operation and Maintenance Booklet Model FC

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

PV4 - Compact Shut Off Style Pig Valve IOM - Installation, Operation & Maintenance

Installation, Operation, and Maintenance Manual

MUELLER GAS. No-Blo Valve. Changers. Reliable Connections. General Information 2-3. Plugging Unit Assembly 4-5. Removing Old Valve 5-6

MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN

I & M Mark 96AA Series

Fisher 644 and 645 Differential Pressure Pump Governors

ONYX VALVE CO MODEL CAR, CAP-PFO Installation & Maintenance

CV Control Valves Installation and Operation Manual

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

Baumann Pneumatic Actuators

1" QickZone Modular Brass Manifold Installation Instructions Parts List

160S Rewind Option Kit Installation Instructions

Audi-Larm TM Audible Alarm: AirHawk II Air Mask

Kimray reserves the right to modify or improve the designs or specifications of such products at any time without prior notice Kimray Inc.

Part # Regulator Rebuild Kit for SuperFlow and SuperFlow 350 Regulators

0-800 psi Carbide Seat Fluid Pressure Regulator

IOM FOR DYNATORQUE D-LOCK LOCKING DEVICE (DL TYPE)

Portable Lighting Equipment Operating Instructions Table of Contents

PNEUMATICS CONTENTS HST-TAMPER

70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing

PNEUMATIC SLIDING VALVE

Valtek Auxiliary Handwheels and Limit Stops

I-VICFLEX.AB7 VicFlex Sprinkler Fittings for Ceiling Suspension Systems STYLE AB7

CVS Series H-900, H-1500 and H-2500 Design Valve Bodies

Installation, Operation, and Maintenance Manual

Hydraulic Wheel Dolly

70 Series 8700 End Mount Three Phase Brake Instructions IP43 (NEMA 2) Housing

Type 644 and 645 Differential Pressure Pump Governors

Operation and Maintenance Manual

EQUALIZER SYSTEMS County Road 3 Elkhart, IN Fax

0-500 PSI Soft Seat Fluid Pressure Regulator

Fig.01 Fig.02 Fig.03. Disassembly & Reassembly Instructions SBV-HP - Page 3

I-231.T2S1/CLAD. Victaulic Style 231 Non-Restrained, Flexible Expansion Coupling with Cladding on Expansion Side of Pipe WARNING IMPORTANT INFORMATION

Soft Seat Fluid Pressure Regulator

Troubleshooting flow chart for power unit M3593

Series Single seated top guided control valve. Preventive maintenance. Overhauling procedure. Wörth am Main SERVICE NOTE. Control Valve Division

w w w. h d o n l i n e s h o p. d e FLHT FRONT END LOWERING KIT GENERAL -J02546 REV Kit Number Models Additional Parts Required

YG101 SWING GATE OPENER OWNER S MANUAL

Series 900 Slitter Shaft

Cylinder and Valve: AirHawk II Air Mask

VSI INDUSTRIAL BALL VALVES SERIES 7100 SERIES 8100 SERIES 7200 SERIES 8300 SERIES 7400 SERIES 8400 SERIES 8000 SERIES 8500

Hard Seat Fluid Pressure Regulator

ADJUSTING THE GANG ANGLE

Installing the PAMCO CB750, CB550, CB500 Four, CB400F and CB350F Ignitions

Hose Reel Kit for Workman 200 Spray Systems. Installation Instructions. Form No Rev A. Model No Serial No.

Copyright 2011, MTS Medication Technologies. All rights reserved. MTS USA MTS UK MTS GERMANY

70 Series 8700 End Mount Three Phase Brake Instructions IP56 (NEMA 4) Housing

BOILER BLOWDOWN CONDUCTIVITY CONTROLLER (CONTINUOUS METHOD)

SERVICE MANUAL (INTERNATIONAL)

Fisher 585C Series Piston Actuators

Air-Assist Service Jack Max. Capacity: 10 Tons

JARVIS. Model 30CL-1 AND 30CL-3 Hock Cutter and Dehorner. 30CL-1 Hock Cutter

2001 SERIES CRYOGENIC BAR STOCK BODY VALVES

EXPANSION SEAL TECHNOLOGIES DC /01 REV 2 06/05 PAGE 1 OF 4

M-6642-MB Boss Oil Cooler INSTALLATION INSTRUCTIONS

Service Jacks. Operating Instructions & Parts Manual. Model Number. Capacity 4 Ton 4 Ton Air/ Manual 10 Ton 10 Ton Air/ Manual HW93657/ HW93660

McCannalok HIGH PERFORMANCE BUTTERFLY VALVE OPERATION AND MAINTENANCE MANUAL. The High Performance Company

Type N550 Snappy Joe Emergency Shutoff Valves

Temperature Sensor Series

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

HexPro Series Low Profile Wrenches

Service Jack. Form No Parts List & Operating Instructions 1510B. Max. Capacity: 5 and 10 Tons. 1 of 3. Sheet No. Issue Date: Rev.

CONTENTS: 5740AH - 40 Ton Air/Hydraulic Shop Press 5750AH - 50 Ton Air/Hydraulic Shop Press OWNER'S MANUAL

Transcription:

Easy Tool Retracting System SR2159 Metal Samples Company A Division of Alabama Specialty Products, Inc. 152 Metal Samples Rd., Munford, AL 36268 Phone: (256) 358-4202 Fax: (256) 358-4515 E-mail: msc@alspi.com Internet: www.metalsamples.com

Mounting the Easy Tool Refer to Figure 1. 1. Using the HANDLES move the SPINNER NUT assembly to the TOP most position. 2. Loosen the WING NUT and open the SWING ARM near the bottom of the Easy Tool. 3. Slide the Easy Tool onto the PROBE so that the PACKING BODY of the PROBE is held between the Easy Tool s MIDDLE PLATE and LOWER BASE. 4. Close the SWING ARM and tighten the WING NUT to secure the arm in place. 5. Move the INSERT SLIDE to the RETRACTED POSITION by pulling back on the KNOB. (See Figure 2.) 6. Turning the HANDLES on the SPINNER NUT, align the TOP LEG of the INSERT SLIDE to just above the SHOULDER OF THE CONNECTOR on the PROBE. 7. Push in the INSERT SLIDE to the ENGAGED POSITION, so that the TOP LEG rests on the SHOULDER OF THE CONNECTOR. (See Figure 3.) 1

TOP SPINNER NUT HANDLES KNOB INSERT SLIDE (ENGAGED POSITION) SHOULDER OF THE CONNECTOR INSERT BLOCK SPLIT SHAFT PROBE TOP BASE PACKING GLAND ASSEMBLY SUPPORT PILLAR MIDDLE PLATE LOCKING NUT RETAINER JAM NUT LOCKING SWING ARM WING NUT LOWER BASE PACKING BODY Figure 1. Easy Tool Retracting System 2

Figure 2. Insert Slide (Retracted Position) Top Leg Shoulder of the Connector Bottom Leg Figure 3. Insert Slide (Engaged Position) 3

Insertion 1. Check to see if the RETAINER NUT on the PACKING BODY is tight, and adjust it as necessary. (See Packing Gland Instructions.) 2. Open the valve. If leakage occurs through the PACKING GLAND, tighten the RETAINER NUT. If leakage continues, close the valve, remove the PACKING GLAND from the system, and consult the FACTORY. 3. Tighten the JAM NUT on the PACKING BODY. (See Packing Gland Instructions.) 4. Insert the PROBE by turning the HANDLES on the SPINNER NUT clockwise until the PROBE reaches the desired depth. Insertion depth can be measured by using the scale on the Easy Tool. 5. Tighten the LOCKING NUT on the PACKING BODY. (See Packing Gland Instructions.) 6. Raise the SPINNER NUT until the BOTTOM LEG of the INSERT SLIDE is just below the SHOULDER OF THE PROBE CONNECTOR. CAUTION: IF THE PROBE MOVES OUTWARD AS THE SPINNER NUT IS RAISED, THE LOCKING NUT REQUIRES FURTHER TIGHTENING. IF AFTER FURTHER TIGHTENING THE PROBE CONTINUES TO MOVE OUTWARD, RETRACT THE PROBE FROM THE SYSTEM. ONCE THE PROBE HAS CLEARED THE VALVE, SHUT THE VALVE AND CALL THE FACTORY. 7. Move the INSERT SLIDE to the RETRACTED POSITION. (See Figure 2.) Raise the SPINNER NUT until it clears the PROBE. Unlock the SWING ARM, and remove the Easy Tool from the PACKING BODY. 4

Retrieval 1. Re-install the Easy Tool (refer to Mounting the Easy Tool). 2. Move the INSERT SLIDE to the ENGAGED POSITION so that the SHOULDER of the PROBE CONNECTOR is held by the INSERT SLIDE. (See Figure 3.) CAUTION: CONFIRM THAT THE INSERT SLIDE IS PROPERLY MOUNTED ON THE PROBE. IMPROPER MOUNTING OF THE EASY TOOL ON TO THE PROBE COULD RESULT IN UNCONTROLLED RELEASE OF THE PROBE. 3. With the INSERT SLIDE properly mounted on the SHOULDER of the PROBE CONNECTOR, loosen the LOCKING NUT. 4. Retract the PROBE by turning the HANDLES on the SPINNER NUT counterclockwise until the PROBE has cleared the valve. 5. Once the PROBE has cleared the valve, close the valve. If the valve does not close, make sure the rod has been fully retracted. 6. If there is a bleed valve in place, open it to release pressure in the PACKING GLAND. 7. Move the INSERT SLIDE to the RETRACTED POSITION. (See Figure 2.) Raise the SPINNER NUT until it clears the PROBE. Unlock the SWING ARM and remove the Easy Tool. CAUTION: IF THE PROBE MOVES OUTWARD AS THE SPINNER NUT IS RAISED, MAKE SURE THE VALVE IS FULLY CLOSED AND THE PRESSURE IN THE NIPPLE HAS BEEN RELEASED. 8. Remove the PACKING GLAND from the system. NOTE: Apply lubricating oil or grease on threaded and moving parts to prevent seizure of these components. 5

Packing Gland Instructions COMPRESSION WASHER JAM NUT FERRULE PACKING BODY GRAFOIL OR V-RING PACKING RETAINER LOCKING NUT INSERTION ROD Figure 4. Packing Gland 1. If PACKING GLAND is not already installed, slide the PACKING GLAND over the INSERTION ROD or PROBE. The packing must be adjusted prior to mounting packing gland to process. The packing must be adjusted prior to mounting packing gland to process. 2. Loosen the LOCKING NUT. Slide LOCKING NUT and FERRULE away from the RETAINER. 3. Loosen the JAM NUT. Turn RETAINER clockwise to tighten the packing. The packing should be tightened until there is a resistance felt while sliding the INSERTION ROD in and out. The following table summarizes the recommended torque for ambient temperature against water: Pressure Rating 150 psi 500 psi 1,000 psi 1,500 psi P TE (Teflon ) Packing 240 in lb 20 ft lb 240 in lb 20 ft lb 300 in lb 25 ft lb 300 in lb 25 ft lb Grafoil Packing 180 in lb 15 ft lb 180 in lb 15 ft lb 240 in lb 20 ft lb 240 in lb 20 ft lb The packing must be adjusted prior to mounting packing gland to process. Do not over tighten packing. This will result in damage to the gland. 4. Tighten the JAM NUT, thereby locking the RETAINER in place. 5. Mount the PACKING GLAND on the NIPPLE or FLANGE and secure in place. The rod should be fully retracted at this time with the LOCKING NUT and FERRULE clear of the RETAINER. 6

The following steps may require a certified pipe fitter for complete installation. 6. Open the process valve and check for packing leaks. If packing is leaking, shut the process valve, remove the PACKING GLAND, and readjust the PACKING GLAND using steps 3-5. The packing must be adjusted prior to mounting packing gland to process. The packing may be tightened as long as the rod will slide in and out of the gland. 7. Insert to desired length. To lock the ROD in place, secure the LOCKING NUT and FERRULE. 8. Mount the safety plates or safety cap in place if applicable. Apply Anti-Seize Compound to prevent seizure of packing gland parts. Chevrons of Teflon packing should be in the direction of open to process. Packing Rings per Gland 3 /8" 1 /2" 5/8" P TE (Teflon ) Packing 5 6 9 Grafoil Packing 6 7 7 Safety Notices 1. A SAFETY NUT or SHIELD must be installed on retractable probe(s) after inserting the PROBE into the PACKING GLAND and prior to mounting the PACKING GLAND in the process. If the SAFETY NUT or SHIELD is subjected to a sudden impact event, the probe must be inspected by qualified personnel prior to reinstallation. 2. If the system is greater than 150 psi, Metal Samples requires the use of an Easy Tool Retracting System to install and remove any retractable PACKING GLAND system and the use of a Safety Clamp once the retractable PACKING GLAND system has been installed. 3. All retractable PACKING GLAND components, especially safety devices, must be evaluated periodically for proper installation. Special care must be taken when evaluating components which are subject to high corrosion environments for structural integrity. Failure to follow the above safety measures can result in physical injury to personnel and/or damage to plant equipment. If there are any questions concerning these safety notices, please contact our offices prior to attempting to use these products. Teflon is a registered trademark of DuPont. 7 Rev. 11-20-15