TILT KIT - POWER RAIL P8 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev E SP3436 PCN

Similar documents
POWER RAIL P4 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev A PCN

MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN

MULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 15 Modules (TPM15) For Module Types E, F, & G ASSEMBLY INSTRUCTIONS

MULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

Top-of-Pole Mount for 1 Module (TPM1) For Module Type H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

POWER RAIL TM P8. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G When High Wind Version (HWV) or 6h x 2w, L

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 6 Modules (TPM6) For Module Type D

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G

Top-of-Pole Mount for 4 Modules (TPM4) For Module Types D, E, F, & G

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C

Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 2 Modules (TPM2) For Module Types C, D, E, F, G, & H

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

POWER XPRESS TM. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

MODEL 2604 WARNING <THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> Custom 5th Wheel Hitch Mounting Rail Installation Instructions

LOCKN LOAD MOUNTING KIT

One- Touch Installation Instructions

panelclaw.com Polar Bear III for 10 Degree

DOOR KIT P/N , APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

I-VIC300MS. Vic -300 MasterSeal Butterfly Valves WARNING SERIES 761

Tooling Assistance Center

Renogy MTS-TM100. Flat Roof Tilt Mount E Philadelphia St, Ontario, CA Version: 1.1

Please compare the parts in the box with the bill of materials provided to assure that you have all the parts necessary for this installation.

Installation Guide. Philips MP20/30/40/50 IntelliVue VHM Wall Mount Kit

INSTALLATION INSTRUCTIONS Horizontal Array Pole Clamp Models: KTA-220/225 and KTA-320/325

Installation Guide VHM Wall Mount Kit for Philips MX600/700/800 and MP60/70 IntelliVue

LOCKN LOAD FIRST TIME INSTALLATION

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Assembly & Installation Instructions

Installation for the Ford Mustang V-6 PN s , ,

Installation Instructions PowerBoard Automatic Retracting Running Board

Universal Pitch Adjustable Wall Mount For Flat Panel Display UPM-2401

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

Exhaust System Installation for Chevrolet Corvette C6 PN and

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Installation Manual TWM Performance Short Shifter Cobalt SS/SC, SS/TC, HHR SS, Ion Redline and Saab 9-3

WAVETRAX USER MANUAL

Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> Custom 5th Wheel Hitch Mounting Rail Installation Instructions

Exhaust System Installation for the Ford Mustang PN s , , , , , , , ,

I-VIC300MS. Series 761 Vic-300 MasterSeal Carbon Steel Butterfly Valve Series 461 Vic-300 MasterSeal Stainless Steel Butterfly Valve WARNING

INSTALLATION & OWNER S MANUAL

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

Installation and Set-Up Manual

INSTALLATION & OWNER S MANUAL

Correct Track. Correct Track Installation and Owner s Manual. Installation and Owner s Manual (For Aftermarket Applications)

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

POLY TIP-DOWN WINDSHIELD KIT

INSTALLATION. DRIVING LIGHTS for FLHT/FLHX/FLHR 5005

INSTALLATION MANUAL

P&G MANUFACTURING INC.

PRODUCT: JK Frame-Built Combo Bumper Base READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

LOCKN LOAD. MAX VEHICLE ROOF LOAD RATING: 100KG (2 Leg Pairs) 150KG (3 Leg Pairs) TOTAL LOAD EQUALS WEIGHT OF ROOF RACKS + ACCESSORIES + CARGO

Installation for Chevrolet Silverado/GMC Sierra PN s ,

Installation for Ford Explorer PN s , ,

MARCH COYOTE 9.5 x 19 (292 mm x 509 mm) Terminal Dome Closure Kits

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

Brake System H TX, H2.0TXS [B475]; H TX [B466] Safety Precautions Maintenance and Repair

Exhaust System Installation for the Ford Mustang PN s ,140584,140585,140589,140590,140591

Installation for Chevrolet Malibu 2.0L Turbo PN-11936

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

PW Cantilever Lift: Part Number: Instructions and Safety Tips 1200 Ibs Capacity

CANVAS DOOR KIT P/N , APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

SSV Series. Assembly and Service Instructions. Contents. Tool Requirements

TSS Tool Stand. Installation and Operation Manual. Document #:

PORTA-DOCK, INC. 100A 1200 LB. 84 WIDE ALUMINUM CANTILEVER BOAT LIFT 102A 1200 LB. 113 WIDE ALUMINUM CANTILEVER BOAT LIFT

Coupler Mounted Bracket

Installation for Honda Civic Type R PN

42A FLB WOOD BUNKS 43A FLB ALUMINUM BUNKS ALUMINUM CANTILEVER BOAT LIFT

Assist Step Kit Installation (Side Assist Step)

INFINITY-1 HALOGEN LIGHT BAR INSTALLATION MANUAL 7000 SERIES

CHAINGUARD REGAL ST COLOR

INFINITY-3 STROBE LED BAR INSTALLATION MANUAL 7700 SERIES

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

PORTA-DOCK, INC. 65A 1155 DOUBLE PERSONAL WATERCRAFT LIFT

Exhaust System Installation for Nissan GT-R PN 12658

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> BASE BOLT BAG (RVB3500) ITEM DESCRIPTION QTY. 1 2 " X 1 1 2" Hex Cap Screws 16

Exhaust System Installation for the Ford Mustang PN s , , , , , , , ,

Plasma Dual Swing-Out (PDS Series) Wall Mount

Commercial Pro Plow Combo, 50" ATV

CHAINGUARD REGAL ST COLOR

SUT-450-I ASSEMBLY REQUIREMENTS

Signal Mirror Installation Instructions

Exhaust System Installation for Chevrolet Corvette C7 Stingray PN 11855, 11856

Turning Point Pin Box. by Trailair OWNER'S MANUAL

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A

INSTALLATION & OWNER S MANUAL

Van Rack Installation Manual Dodge ProMaster

Installation Guide VHM Arm Kit for Philips Heartstart MRx and Heartstart XL+

Installation Manual TWM Performance Short Shifter 2008 Mitsubishi Lancer

Installation for Chevrolet Corvette C7 Stingray PNs 60547* 60548, and 60558

Installation for Honda Accord PN s 11840, 11853, 11949

Transcription:

TILT KIT - TM POWER RAIL P8 AEMBLY ITRUCTIO step-by-step assembly and installation Version 1, Rev E P3436 PC 021412-2

TM Tilt Kit Power Rail P8 WARIG: Follow the procedures and precautions in these instructions carefully. A Few words about these Assembly Instructions These instructions: Ÿ Do not include any information on the selection or installation of attaching hardware to be mounted to the roof substrate. For information on compatible attaching hardware, see our publication titled Power Rail Design Guidelines. Ÿ Begin after all roof mounted attaching hardware has been installed and secured to the roof substrate. Ÿ how the Power Rail Mounting ystem being installed on the Power Rail PV Flash roof attachment system. Ÿ Are intended to be used by individuals with sufficient technical skills for the task. Knowledge and use of hand tools, measuring devices and torque values is also required. Ÿ Include various precautions in the forms of otes, Cautions, and Warnings. These are to assist in the assembly process and/or to draw attention to the fact that certain assembly steps may be dangerous and could cause serious personal injury and/or damage to components. Following the step-by-step procedures and these precautions should minimize the risk of any personal injury or damage to components while making the installation an efficient process. For questions on a specific installation please call us or e-mail us at: Phone: 800-260-3792 Email: info@plpsolar.com Required Tools 1/2 inch wrench or socket for 5/16 inch module clamp hardware Torque wrench Ratchet wrench Ratchet extension bar Framing square Tape Measure 1 of 14

1 2 4 14 13 3 12 4 15 5 15 Tilt Kit Power Rail P8 Parts Identification 4 11 6 10 15 5 15 9 8 6 10 7 2 of 14

OTE: L-feet can be attached directly to the roof substrate with the proper hardware. ee Power Rail Design Guidelines for more information. CAUTIO: pan dimensions are a design specification. Consult the design manual to match these dimensions to site conditions. It's important to use the unique span dimension specific to the install. Failure to do so could lead to excessive deflection and/or premature system failure. tep 1: Install Attaching Hardware The selection of attaching hardware is dependent on the roof substrate and site design conditions. Please consult the design manual for specifics. Instructions for attaching anchoring hardware to the roof or structure are available on an individual product basis. Of critical importance in mounting the attaching hardware to the roof substrate is the - span between the attaching hardware. The - span must be set at 48- inches apart in order to use our precalculated tilt angle settings. These settings will set the array at a preferred tilt angle but are only effective when a 48- inch span has been used. A. Place the "L" Foot onto the PV Flash hanger bolt, aligning it to the slot of the compression block. B. ecure "L" Foot with flat washer and hex nut. Torque to 14-16 ft.-lbs. L Foot PV Flash Hanger Bolt PV Flash Hex ut Washer Compression Block Figure 1-1: Attaching L-foot to the PV Flash tep 2: Measure and Mark Attachment Points on trongback There are two important attachment points that must be carefully measured and marked on the trongbacks. One point indicates where the trongback attaches to the southern L Foot and the other indicates where the Leg attaches to the northern end of the trongback. A. Refer to Figure 2-1 for trongback, profile orientation. B. From the southern end of the trongback, measure and make a mark 1 from the end - this is where the trongback will attach to the southern L Foot. C. From the nothern end of the trongback, measure and make a mark 14 from the end - this is where the leg will attach to the trongback. (ee Figure 2-1) From outhern End 1 From orthern End 14 Mark here for L Foot Attachment Point Mark here for Leg Attachment Point trongback Figure 2-1: Measure and Mark Attachment Points on trongback 3 of 14

tep 3: Attach Leg to trongback These instructions cover two types of Legs, the Telescoping and the One-Piece. Both types are secured to the trongback using x 3/4 carriage bolts and flange nuts. Figure 3-1 shows the Telescoping and One-Piece legs. A. lide x 3/4 carriage bolt into the trongback, aligning bolt with the 14 mark previously made on the trongback. B. Align mounting hole of Leg to carriage bolt and secure with flange nut. Finger tighten for now. Align to Mark on trongback Align to Mark on trongback Flange ut Flange ut x 3/4 Carriage Bolt x 3/4 Carriage Bolt Telescoping Leg One-Piece Leg Figure 3-1: Attaching Leg to trongback tep 4: Attach trongbacks to outhern L Feet The trongbacks are secured to the L Feet using x 3/4 carriage bolts and flange nuts. Hardware may vary depending on design-specific requirements. (ee figure 4-1) A. lide one x 3/4 carriage bolt into the trongback. B. Line up your mark on the trongback with the center of the southern L Foot. C. ecure with flange nut. Finger tighten for now. Align to Mark on trongback ote Profile Orientation outhern L Foot x 3/4 Carriage Bolt Flange ut Figure 4-1: Attaching trongback to outhern L foot 4 of 14

WARIG: This is a two person activity. In addition to the difficulties associated with working on a sloped rooftop, the trongback and Leg assembly is awkward to handle. One person should hold and align the trongback while a second person secures the leg to the northern L Foot. Failure to do so could lead to serious personal injury and/or damaged components. tep 5: Attach Legs to orthern L Feet These instructions cover two types of Legs, the Telescoping and the One-Piece. Both types are secured to the Mounting Foot using a x 1 hex bolt and hardware. If using Telescoping Leg, it may be necessary to loosen the two telescoping lock bolts in order to extend or shorten the leg as needed to align the mounting hole of the leg with the slotted hole of the northern L Foot. A. Raise northern end of trongback and align mounting hole of Leg to slotted hole of northern L Foot. ecure with x 1 bolt, flat washers, lock washer and nut. B. Go back and check that the Leg and the L Foot position hasn't shifted from their marks on the trongback. Adjust to align as needed. C. Return to tighten and torque hardware as follows: - Flange uts securing trongback to L Foot Torque to 14-16 ft.-lbs. - Flange uts securing Leg to trongback Torque to 14-16 ft.-lbs. - Hardware securing Leg to L Foot Torque to 14-16 ft.-lbs. - Two Telescoping Leg lock bolts Torque to 14-16 ft.-lbs. trongback Leg (Telescoping hown) ee Views Below 48 x 1 Bolt Flat Washer Telescoping Lock Bolts Flat Washer Lock Washer x 1 Bolt Flat Washer Flat Washer Lock Washer orthern L Foot Telescoping Leg ut orthern L Foot One-Piece Leg ut Figure 5-1: Attaching Leg to orthern L Foot 5 of 14

tep 6: Installing Rail-to-Rail Brackets Power Rails attach to the trongbacks via Rail-to Rail mounting brackets, x 3/4 turn bolts and flange nuts. The - span of the Rail-to-Rail brackets on the trongback is dependent on the type/size of module being used. If the module manufacturer has provided specific clamping locations, use their specifications; if none are specified by the manufacturer, use a factor of 20-percent of the module length to determine the - span of the Rail-to-Rail brackets. (ee Figure 6-1 below) Once the span is determined, measure and mark the positions of the Rail-to-Rail brackets on each of the trongbacks. 20% of Module length Module Length 60% of Module length 20% of Module length Module trongback Rail-to-Rail Bracket Position Rail-to-Rail Bracket Position Figure 6-1: Positioning the Rail-to-Rail Brackets on the trongback 6 of 14

OTE: Use care in aligning the Railto-Rail brackets from one trongback to the next. This will greatly assist in the installation of the Power Rails. OTE: Turn Bolts must be locked into the channel by rotating clockwise 90- degrees. Use the indicator slot on the threaded end to identify whether or not a Turn Bolt has been locked. Turn Bolt shown in channel of trongback Locked Indicator lot shown in Red Align and install the Rail-to-Rail brackets to the marks made on the trongback. A. Insert x 3/4 turn bolt into the trongback, twist and lock into place. B. Align Rail-to-Rail bracket to turn bolt and secure with flange nut. Torque to 14-16 ft.-lbs. Continue in this manner installing all Rail-to-Rail brackets on remaining trongbacks before moving on to install the Power Rails. Flange ut Rail-to-Rail Bracket x 3/4 Turn Bolt outhern L Foot trongback tep 7: plicing Power Rail with plice Plates Figure 6-2: outhern & orthern Rail-to-Rail Bracket Installation In some cases, the overall length of a rail set may require the use of a plice Plate to butt joint two lengths together. plice Plates get mounted on the sides of the Power Rail. The steps below describe how to install a plice Plate. A. Insert two x 3/4 turn bolts into the channel of each Power Rail section to be spliced. B. Hold the two ends of Power Rail together. C. Position the plice Plate on the Power Rail and four turn bolts. D. Align the plice Plate so that it's equally divided along the Power Rail butt-joint. E. ecure the plice Plate to Power Rails with four flange nuts. Torque to 14-16 ft.-lbs. Flange ut Rail-to-Rail Bracket x 3/4 Turn Bolt plice Plate Flange uts trongback Hold Butt-Joint Closed x 3/4 Turn Bolts Figure 7-1: plice Plate Installation 7 of 14

tep 8: Installing Power Rails Power Rails attach to the Rail-to-Rail brackets using x 3/4 turn bolts and flange nuts. While installing, pay close attention to the orientation between the Power Rail and the Rail-to-Rail brackets. Additionally, refer to the job specific plans for the E-W positioning of the Power Rail along the trongbacks. In most cases the run of the Power Rail is centered over the trongbacks. A. Position the southern Power Rail to the north side of the Rail-to-Rail brackets with the Power Rail profile in the same orientation shown in Figure 7-1. B. Referring to the Power Rail Design Guidelines, set the E-W position of the Power Rail in relation to the trongbacks by following the maximum allowable spans and cantilevers required for your site conditions. C. Insert one x 3/4 turn bolt into the Power Rail at each location of the Rail-to-Rail brackets along the Power Rail. D. Align each turn bolt to its respective Rail-to-Rail bracket and secure with flange nuts. Torque all at 14-16 ft.-lbs. Install the northern Power Rail in the same manner. (ee Figure 8-1) Power Rail Power Rail Rail-to-Rail Bracket Flange ut x 3/4 Turn Bolt ote Profile Orientation x 3/4 Turn Bolt Rail-to-Rail Bracket Flange ut Figure 8-1: Installing outhern and orthern Power Rails ote Profile Orientation 8 of 14

WARIG: This is a two person activity. In addition to the difficulties associated with working on a sloped rooftop PV Modules are heavy. One person should hold and align the modules while a second person secures modules with clamping hardware. Failure to do so could lead to serious personal injury and/or damaged components. tep 9: Installing PV Modules to Power Rails with Module Clamps PV Modules are secured to the Power Rail using Mid Clamps (tandard or RAD) and End Clamps (tandard, RAD or Universal), along with the appropriate attaching hardware. Attaching hardware includes Carriage Bolts or RAD Bolts for Mid Clamps and End Clamps, while the Universal End Clamp includes a preassembled Hex Bolt. The importance of correctly installing End and Mid Clamps: There is only one correct method of installing End Clamps and Mid Clamps. Failure to follow the correct method could lead to personal injury, structural failure, and/or damaged components. ee Figure 9-1 for proper method of installation for an End Clamp and Figure 9-2 for the Mid Clamp. Refer to these figures during the installation of the Modules to prevent any undue problems associated with an improper installation. CORRECT WROG End Clamp Correctly Installed End Clamp Installed Incorrectly Figure 9-1: Correct and Wrong methods of installing tandard End-Clamp (using Carriage or RAD Bolts) CORRECT Tabs WROG Mid Clamp is not square to Modules Installed with Modules butted against Mid Clamp Tabs Module Frames Visible Gaps between Mid Clamp Tabs and Modules Figure 9-2: Correct and Wrong methods of installing a Mid Clamp (using Carriage or RAD Bolts) 9 of 14

WARIG: Modules must be held in place until they are secured at all four points with clamping hardware. Failure to do so could lead to serious personal injury and/or damaged components. OTE: If using standard carriage bolts for Mid Clamps, they must be inserted into Power Rail before installing interior Modules. If using RAD hardware, they can be inserted anytime at any position along the Power Rail. Installing Modules using tandard End and Mid Clamps: tart with exterior Module and End Clamps. A. Place Module on two Power Rails, centering it lengthwise. Use a square to square-up the Module to the Power Rails. B. Insert one x 2, 2-1/4, 2-1/2 or 2-3/4 carriage bolt into the top slot of the Power Rail. Push the bolt against the side of the module frame. Install End Clamp onto bolt and secure with 5/16" flange nut. Torque to 14-16 ft.-lbs. (ee Figures 9-1 and 9-3) ow install the next in-line Module using Mid Clamps. C. Before placing the interior Module onto the Power Rails, first insert x 2, 2-1/4, 2-1/2, or 2-3/4 carriage bolts (bolt length is dependent on depth of Module frame) into the Module Rail, Figure 9-3: Installing Modules using tandard End-Clamp sliding the bolts inward next to the previously installed exterior Module. (ee Figure 9-4) ** lide 5/16 x Carriage Bolts into Module Rail ** tandard End Clamp x ** Carriage Bolt Flange ut P8 Power Rail 5/16 x 2, 2-1/4, 2-1/2, or 2-3/4 inch bolt. Length dependent on Module frame depth. ** 5/16 x 2, 2-1/4, 2-1/2, or 2-3/4 inch bolt. Length is dependent on Module frame depth. lide Carriage Bolts inward, adjacent to Exterior PV Module Exterior PV Module Figure 9-4: Inserting Mid Clamp Hardware into Power Rail 10 of 14

D. Install a Mid Clamp onto each carriage bolt making certain that the Mid Clamp tabs rest between the two modules. E. Push Modules against Mid Clamp tabs and secure Mid Clamp with flange nut. Torque to 14-16 ft.-lbs. (ee Figures 9-2 and 9-5) tandard Mid Clamp Tabs Flange ut Push Modules against Tabs of Mid Clamp Pre-loaded Carriage Bolt Figure 9-5: Installing Modules using tandard Mid Clamp Installing Modules using RAD End and Mid Clamps: tart with exterior Module and End Clamps. A. Place Module on two Power Rails, centering it lengthwise. Use a square to square-up the Module to the Power Rails. B. Insert one x 2, 2-1/4, 2-1/2 or 2-3/4 RAD bolt into the top slot of the Power Rail. Push the bolt against the side of the module frame and twist to lock in place. Install End Clamp onto bolt and secure with 5/16" flange nut. Torque to 14-16 ft.-lbs. (ee Figures 9-1 and 9-6) Install next in-line Module using Mid Clamps. C. Insert one x 2, 2-1/4, 2-1/2, or 2-3/4 RAD bolt (bolt length is dependent on depth of Module frame) into each Rail, next to the previously installed exterior Module. Twist RAD bolt to lock in place. (ee Figure 9-7) RAD End Clamp Rotate to Lock Flange ut x ** RAD Bolt P8 Power Rail 5/16 x 2, 2-1/4, 2-1/2, or 2-3/4 inch bolt. ** Length dependent on Module frame depth. Figure 9-6: Installing Modules using RAD End Clamp 11 of 14

WARIG: Be certain that all Flange uts on End and Mid Clamps are tightened and torqued to the stated values. Failure to do so could lead to serious personal injury and/or damaged components and property. D. Place next Module onto Rails. E. Install a Mid Clamp onto each RAD bolt making certain that the Mid Clamp tabs rest between the two modules. F. Push Modules against Mid Clamp tabs and secure Mid Clamp with flange nut. Torque to 14-16 ft.-lbs. (ee Figures 9-2 and 9-7) Installing Modules using Universal End Clamps: A. Place Module on two Power Rails, centering it lengthwise. Use a square to square-up the Module to the Power Rails. B. Position Universal Clamp underneath the module with notches facing the outside edge of the module, and rail centered RAD Mid Clamp Tabs Rotate to Lock Flange ut x ** RAD Bolt Push Modules against Tabs of Mid Clamp 5/16 x 2, 2-1/4, 2-1/2, or 2-3/4 inch bolt. ** Length dependent on Module frame depth. Figure 9-7: Installing Modules using RAD Mid Clamp between 'forks' of the clamp. lide clamp notches towards the module flange until the flange bottoms out in the notches. Tighten 5/16" bolt on bottom of universal end clamp. Torque to 14-16 ft.-lbs. Repeat for both end clamps. (ee Figure 9-8) PV Module otches lide Power Rail Universal End Clamp Installed Position (Views looking from underside) Bolt Figure 9-8: Installing PV Modules using Universal End Clamp 12 of 14

tep 10: Adjusting Tilt Angle with Telescoping Legs The Telescoping legs are designed to easily adjust the tilt angle of an array. It is recommended that this procedure be done by a minimum of two people. After loosening specific hardware, the full array pivots from the southern L Feet. B C WARIG: It s very important to support the weight of the array during this procedure. A minimum of two people should be used to hold and support the array while a third person loosens and re-tightens the hardware. Failure to do so could lead to serious personal injury and/or damaged components and property. A ote: Letters designate loosening sequence of hardware - matches step-by-step text on next page. Figure 10-1: Adjusting Tilt Angle Use caution when loosening hardware to avoid disengaging from their locations. Loosen just enough to allow components to rotate freely (ee Figure 10-1). A. Begin by loosening the hardware attaching the trongbacks to the L Feet. B. As two people hold and support the array from the backside, the third person loosens the hardware at both ends of the Telescoping legs. C. ow loosen the Telescoping leg lock bolts. D. Lift/push the array to the desired tilt angle and hold in place. E. Re-tighten and torque hardware as follows (ee Figure 10-2): 1. Two Telescoping Leg lock bolts: Torque to 14-16 ft.-lbs. 2. Flange uts securing Legs to trongback: Torque to 14-16 ft.-lbs. 3. Hardware securing Legs to L Feet: Torque to 14-16 ft.-lbs. 4. Flange uts securing trongbacks to L Feet: Torque to 14-16 ft.-lbs. B 13 of 14

WARIG: Be certain that all hardware has been re-tightened and torqued to the stated values. Failure to do so could lead to serious personal injury and/or damaged components and property. 2 1 4 3 ote: umbers match step-by-step torque values in steps above. Figure 10-2: Re-tighten and Torque Hardware 14 of 14

Albuquerque Office 1700 Louisiana Blvd., uite 130 Albuquerque, M 87110 Corporate Headquarters 660 Beta Drive Mayfield Village, OH 44143 Telephone: 800.260.3792 Fax: 505.889.3548 www.preformed.com E-mail: info@plpsolar.com 2017 Preformed Line Products PC 021412-2 Version 1, Rev E P3436