S02. MAGNETIC PARTICLE TESTING

Similar documents
TAM International, Inc. QI Visible Magnetic Particle Inspection

Standard DS-1 Fourth Edition, Volume 4 - ADDENDUM 1 Applies to First Printing only

MAGNETIC-PARTICLE TESTING

WS-Series. Operating Instructions. Pulse DC End Area Coils. Drilco Style WS-Series Coils 1. E s t a b l i s h e d WS-14 WS-12 WS-10 WS-8

Standard Operating Practice S.O.P. No

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

SEAL-LOCK APEX ANCILLARY

Prevention vs. Reaction The Importance of Asset Integrity

Simplifying Inspection MAGNETIC PARTICLE TESTING ACCESSORIES

Simplifying Inspection MAGNETIC PARTICLE TESTING ACCESSORIES

Operating Instructions August 2013

SEAL-LOCK HT ANCILLARY SPECIFICATION

These instructions are applicable to the following models: ARI 1118 ARI 1148

These instructions are applicable to the following models: ARI 1108 ARI HP1108

WELD PLATE GAUGE TOOL INSTRUCTIONS

TKC CONVERTIBLE: 8 RD / NUE / EUE / BUTTRESS 4040 / 4040 HO / 4040 HO-B FS-150 ANCILLARY SPECIFICATION

Drill Pipe Connection Care and Handling

SEAL-LOCK HT-S (TIMED) ANCILLARY SPECIFICATION

First Quality Solutions

1. D-Lux Introduction ENGLISH Parts & Components Product Overview. 4. Precautions. 5. Hand-piece Components Installation

Established Operating Instructions. W-IC Series. Inspection Booth. Mobile. January, 2012 W-IC 1

Application of Magnetic Particle Inspection in the Field of the Automotive Industry

M-11 MARINE DIESEL ENGINE FUEL INJECTOR

Tooling Assistance Center

Detection and evaluation of rail defects with nondestructive

W-Series. Portable MPI Equipment Kits & Accesories. MPI Accessories continued... Distributed By. Yokes. Coils. Kits & Accessories

PRODUCT LISTING. Water Media

OPERATING & SERVICE PARTS MANUAL 700ES ENERGY SMART WRAPPER SERIES B

ULTRASONIC EXAMINATION

DEUTROFLUX UWE Universal Stationary Magnetic Particle Crack Detectors

RECOMMENDED PRACTICE SEAL-LOCK FLUSH/SEMI FLUSH CONNECTIONS

Application Techniques for Reflective Pressure-Sensitive Films

Report of Inspection

UNITED STATES COAST GUARD OCEAN ENGINEERING DIVISION WASHINGTON, D.C. JANUARY 2011 SPECIFICATION FOR THE MANUFACTURE

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: January 6, 2017

RECOMMENDED PRACTICE TKC FJ-150

Maintenance Adjustments

OPERATING INSTRUCTIONS. TempCheck Non-Contact Infrared Thermometer IRT200 F C + -

CGD8800X CGD8800X220 Combustible Gas Detector

Randy Recommends... If your bike has chain drive, here are some things you should know.

1. Specification For AC/HWDC Portable Magnetic Particle Testing Equipment With Demagnetisation Facility

E17H RAIL WHEEL INSPECTION

Q-Series Ultraviolet Lamps OPERATOR S MANUAL

OPERATING & SERVICE PARTS MANUAL SM20ES ENERGY SMART WRAPPER

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

Magwerks Corporation Newsletter

OT PEENING PROCESS AND ITS APPLICATIONS

ONYX VALVE CO MODEL DAC-PFO Installation & Maintenance

HCM25 Portable Sub-Sea MPI System Data Sheet

DYNAMIC PILE TESTING 10/26/ General.

Full View Flow Indicator

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: May 1, 2013

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

Instruction Sheet Crimping Die Assemblies , , and

ALBERTA TRANSPORTATION TECHNICAL STANDARDS BRANCH TPC SPECIFICATION FOR WHITE AND YELLOW TRAFFIC PAINT

AIR CORE SOLENOID ITEM # ENERGY - ELECTRICITY

ALBERTA INFRASTRUCTURE AND TRANSPORTATION TECHNICAL STANDARDS BRANCH TPC-05 SPECIFICATION FOR WHITE AND YELLOW TRAFFIC PAINT

Brake System H TX, H2.0TXS [B475]; H TX [B466] Safety Precautions Maintenance and Repair

Other brands currently owned and manufactured by Chemetall includes Oakite, Ardrox AV (formerly Dinitrol) & Naftoseal. Ardrox.

LIMITADOR DE VELOCIDAD DYNATECH/ DYNATECH OVERSPEED GOVERNOR/ LIMITEUR DE VITESSE DYNATECH/ GESCHWINDIGKEITSBEGRENZER DYNATECH/ VEGA

CRD600 Automatic Fitting Inserter

Equipment For Non Destructive Testing

CRD610 Automatic Fitting Inserter

LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL

Overhead transmission lines Spacers

Risk Assessment Form

Section 10: Engraving Machine Cleaning

Pre-Installation. Surface Preparation TRAFFIC STRIPES, EPOXY RESIN

OPK-300N OPTIMAX Multi-Lite

OPERATING INSTRUCTIONS BULLETIN MODEL DA750 March MAGNETIC INSPECTION UNIT

OPERATIONAL INSTRUCTION OVERVIEW MAINTENANCE CHECKLIST

ONYX VALVE CO MODEL CAR, CAP-PFO Installation & Maintenance

Technical Manual. Inspection Record For: Hoist Model No.: Hoist Serial No.: Hoist Inspection and Maintenance Guide

Hydraulic Hand Crimping Tool, PN

TBE-700. Operation, Safety and Maintenance Manual. Stainless Steel Weld Cleaning System. Ensitech Pty Ltd

Tooling Assistance Center

XeVision XeRay XV-LX50 HID Searchlight

TO WRITE ON THIS LABEL USE AN INDELIBLE, PERMANENT INK MARKER, PEN OR PENCIL THAT WILL NOT FADE INDIRECT SUNLIGHT

ALITA LINEAR AIR PUMP OPERATION & MAINTENANCE MANUAL. AL- Model Number Date Code / Serial Number Date of Purchase

XCM12 Mini-Centrifuge

Using Electricity. Summary Notes. 1. From the Wall Socket Household appliances. Earth wire and safety.

PRODUCT SPECIFICATION

R. STAHL Schaltgeräte GmbH Geschäftsbereich Leuchten Nordstraße Weimar, Germany

Sarnafil TS E. Polymeric membrane for roof waterproofing. Product Description

Safety check e Safety and function test...to be kept in the cab

ONYX VALVE CO MODEL DAC-ADA Installation & Maintenance

READ AND SAVE THESE INSTRUCTIONS

MATERIAL SPECIFICATION FOR EMULSIFIED ASPHALT

PROCUREMENT SPECIFICATION FOR CNP19 CHERRY RIVETLESS NUT PLATE

U Blowout Preventer 13-5/8" 10,000 psi WP

MANN+HUMMEL ENTARON XD. Installation and Maintenance Manual. Version 0709

ARDROX NDT PRODUCTS & EQUIPMENT

RECOMMENDED PRACTICE SEAL-LOCK HT

INSTALLATION INSTRUCTIONS

STEERING COLUMN, LOWER STEERING SHAFT, AND STEERING GEAR BOX ALIGNMENT

Maintenance Manual. Hydrant Coupler. F250 Series

FULL AUTOMATIC ASPHALTENE ANALYZER APD-500A USER S GUIDE

USER MANUAL Edition

Revision Date Reviewed By Authorised By. V3 22/01/2018 D Newton P FitzPatrick. processes Task. Coupling and Uncoupling Coupling.

Broetje-Automation Company Standard Structural component specification for welded parts

Transcription:

S02.1 Scope This procedure is for the examination of ferromagnetic surface and near surface indications in stressed areas of welds, drilling or production equipment, or as a prove up technique. Both wet and dry particle techniques are discussed. Wet fluorescent magnetic particle inspection (MT) is also known as Blacklight inspection. The black light shall operate only in the UV-A part of the lightspectrum. S02.2 Relevant Standards and Documentation The latest editions of thefollowing: ASTM E 709 ASTM E 1444 API RP 7G API RP 5A5 API 8C NS-2 DS-1 Contract Review Form Inspection Report Form The Turnco Quality Manual API 6A S02.3 Equipment S02.3.1 General Requirements 2.3.1.1 AC Yoke: AC yokes are used for prove up with either dry or wet particles. The yoke shallbe capable of lifting a 10-lb. steel test mass and bear a re-calibration certificate (see Quality manual). 2.3.1.2 Coil: When a coil is to be used, it shall be supplied with DC, or rectified AC (Half-wave or full wave) from a source with a peak-reading ammeter (so that the ampere-turns can be calculated). The number of turns shall be securely attached to the coil. 2.3.1.3 : Inspection Area for coils: The inspection area shall be limited to half of the coil diameter up to 9" on each side of the DC coil. 2.3.1.4 Field Indicator: Type G castrol strips shall be used to test for the presence of magnetic field in the part. The strip shall be held on the part at least once per ten areas inspected. In use, a magnetic particle indication shall be visible on all 3 slots in the strip. The customer may require other forms of field indicator. 2.3.1.5 : Black and White Light Meter: An in-recalibration black (UVA)/white light meter shall be used to control (a) the minimum UVA light intensity at the inspection surface, and (b) the maximum white light in the inspection area. See below. 2.3.1.6 Cleaning materials: Cleaning of the part shall be performed using appropriate methods, depending upon the end use of the product. In the case of threads, only soft wheels may be used. The area to be inspected shall be free of grease and scale or other surface contaminant. All paint shall be removed from the area to be inspected. Page 1 of 5

02.2.1.7 Colored paints: Use to determine whether a part is acceptable or repairable or reject. If inspection is not to be performed to API standards where color coding had been defined, customer should supply his/her color coding requirement during Contractreview. S02.3.2 Dry Particle Inspection 2.3.2.1 Minimum Light Level: The minimum ambient white (daylight, or indoor facility) light intensity at the inspection surface shall be 500 lux (50 ft-candles). 2.3.2.2 Contrast: Dry Particles with high contrast from the surface to be inspected, and meeting the requirements of API RP 5A5 shall be used, and dispensed from an approved powderbulb. S02.3.3 Wet Fluorescent Particle Inspection 2.3.3.1 UVA Lamp: UVA (Black) light bulbs must be mercury vapor bulb of minimum wattage 100 W, with minimum intensity acceptable at a distance of 15 inches must be 2000 microwatts/ cm 2. Allow sufficient time (e.g. 10 minutes) for bulbs to warm up to provide full intensity. 2.3.3.2 Suspension fluid shall be a solvent with low sulfur content, Safety clean, Varsol, No 1 grade kerosene, and other comparable solutions may be used. Gasoline or diesel shall not be used. Water may be substituted on customer request. Surface tension reducers shall be added to water solutions. 2.3.3.3 Particle Concentration: Wet fluorescent particle strength shall range from a minimum of 0.1 to 0.4 ml/100 ml of solution, measured utilizing a centrifuge tube. Particle concentration shall be checked prior to the commencement of a job, and at least every 8 hours thereafter. The settling flask shall be maintained in an area free of magnetic fields. 2.3.3.4 Darkened Area: This can be a black light tent, or a cape + a matt black cloth on the floor. Capes where reflected sunlight (from the ground) should be discouraged. The latter is discouraged. The white light intensity in the viewing area shall not be more than 2 ft-candles (20 lux). The eye must be dark-adapted for several (at least 5) minutes before attempting to perform WFMT. S02.4 Procedures 2.4.1 Settling Test: Make up the solution. Fill the settling flask immediately prior to the start of the job. 2.4.2 Preparation: All surfaces to be inspected shall be thoroughly cleaned of any elements which could hinder a quality inspection. This may involve filing or grinding. In the case of the roots of threads in RSCs, use only soft wheels, to avoid the danger of removing metal, and covering the mouths of tight cracks. 04.4.3 Magnetization: The parts to be inspected shall be magnetized using a continuous longitudinal DC magnetic field. Page 2 of 5

2.4.4 Presence of Sufficient Field: A Castrol strip shall be used to verify the presence of an acceptable surface field magnetic strength and direction. Where many parts of the same dimensions are required to be inspected, use of the Castrol strip may be restricted to one in 5components. 2.4.5 Particle application: Generously apply the magnetic solution to areas to be inspected while the coil is active. Allow several seconds for the particles to be drawn to any the MFL fields of any imperfections and defects. 2.4.6 Visual Inspection: Carefully examine the area in a darkened state (either a black light tent, or under a cape, with the inspector looking at about 45 degrees to the horizontal). Particular attention should be paid to the area of the last engaged threads because this is the area where the majority of the stress is concentrated. 2.4.7 Mirrors: All areas where accumulation of particles occur shall be rolled at least twice, and inspected. A magnifying glass shall be used on pin ends, and a dentist s mirror shall be used onbox end threads. 2.4.8 Any indications which cannot be lightly buffed and proved up shall be rejected and marked for repair. Grinding out cracks is not permitted. 2.4.9 All RSC connections shall be inspected over the entire surface of the connection over the box threads and the ID of the pin. S02.5 Visible Magnetic Ink Inspection 2.5.1 Magnetic ink inspection shall be performed with the use of an AC yoke to create a variable surface field strength; A dry white flat background contrast shall be provided using a very thin layer of contrast aerosol paint. The particle suspension shall be prepared according to recommendation or pre-mixed aerosol cans. 2.5.2 Any indication shall be proved up with a buffing wheel, and reapplication of the test. Any cracks are cause for rejection. 2.5.3 API or customer specification shall apply for acceptance and rejectioncriteria. S02.6 Dry Particle Inspection 2.6.1 Contrast: Dry Particles with high contrast from the surface to be inspected, and meeting the requirements of API RP 5A5 shall be used. 2.6.2 Inspection Area: When a yoke is used, the inspection of the area is a ring in the central region between the legs of the yoke. 2.6.3 Inspection: All inspection areas shall be inspected (a) with the legs of the yoke in contact with the Page 3 of 5

article under inspection, and (b) at least two angles, roughly 90 degapart. Note: When attempting dry particle inspection in an active coil field, particles will fur out along emergent lines of MFL, and could obscureindications. S02.7 Wet Fluorescent Particle Inspection(WFMT). S02.7.1 Activation of MFL: When using a coil, the largest MFL from tight imperfections occurs whenthe coil field is ON. Inspection can also be performed in the resulting residual induction, but the indication from very tight cracks at the roots of threads may be more difficult tosee. S02.7.2 Use of Field Indicator: Once the magnetization level has been determined from the customer s magnetization requirement(s) [These may be different from API or other written standards, since there are very many requirements in existence], the ability of that field strength to produce an indication on a field indicator must be verified. S02.7.3 Concentration: Record the solution concentration on the inspection form. S02.7.4 Solution/Ink: Solution must be sprayed slowly and indications given time to form. Allow the solution to run slowly over the inspection area so that the MFL from imperfections/defects can attract and hold particles out of thesolution. S02.7.5 Thread Roots: UVA shall be directed downwards into thread roots, either directly or using a mirror. As part of the set-up procedure, check the intensity at the inspected surface using a UVA meter, and note the distance of the UVA lamp from the work surface. While cracks can appear anywhere on RSCs, pay particular attention to the last engaged thread area, especially on connections showing thread stretch. S02.7.6 Rejection Criteria: Any indication that can not be lightly buffed out or otherwise proved up shall be marked for repair. (Some such indications may arise from small metal burrs at thread roots.) However, if cracks are found, they shall not be ground. All cracks in thread roots indicate that the metal has completely fatigued and is to be rejected. S02.7.7 Marking of Rejects: Follow the appropriate colorcoding S02.8 Records 2.8.1 Inspection records: A record of the inspection(s) shall be completely filled in, reviewed by an appropriate person, and provided to the client. As a minimum this report shall contain at least the following information. A. Customer name and P.O. number, H. Summary of inspection results: B. Date of inspection, 1. Inspection Unit numbers and inspector s C. Description of parts signature. Initials not acceptable. D. Inspection tolerances used, ifany, 2 Inspector s certification level in MT E. Service performed, 3. Findings Page 4 of 5

F. SOP(s) used. 4. Quality requirements on form below. G. Location of Inspection. 2.8.1.1 Inspector shall take pictures of all cracks and rejectable damages per DS1 latest edition, or customer criteria, for all downhole equipment. All other images will be required per customer criteria, or inspectors discretion. All pictures shall be reviewed before uploading to insure that the picture is clear of the damage it is showing. 2.8.2 : Record Keeping: Records of this inspection shall be retained for a period of 5 years (see Quality Manual). Records may be either in paper form or digital. Page 5 of 5