MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Similar documents
NMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST

Pump Acceptance Test Data

of Fire Pump Assemblies

Inspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8

Fire Pumps Inspection, testing and maintenance of fire pumps

FIRE PUMPS F AI LISTED R LISTED N K S MOR S E P U IT Y S Y S T E M CE R T IF IE D

PRODUCT OF FIRE PUMPS SYSTEMS

FIREWATER PUMPS WEEKLY INSPECTION & TEST

Series 4600F. HSC Fire Pumps & Packaged Systems

FIRE PROTECTION PUMPS. Table of Contents

FIRE PUMPS & PACKAGED

AURORA COMPACT FIRE PUMP SYSTEMS

NFPA , Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems REVIEW SUMMARY

Fire Water Utility 2002 Training Manual Raw Water Storage Area

FIRE PUMP SYSTEMS. FIRE PUMP SINGAPORE PTE LTD No.8 Keng Chin Road #13-11 Cyan South Tower Singapore

Application & Reference Data Typical Specifications. Section 914 Vertical Turbine Fire Pump

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , ,

Diesel Engines for Fire Protection Applications

SINCE Double Suction Split Case Fire Pump. Series 4800 & (New Generation) 001-cat f

Start-Up and Installation Checklist

.2 Section Waste Management and Disposal..5 Section Thermometers and Pressure Gauges Piping Systems.

900 Series Split Case Fire Pump Systems

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS

Head - m. Flow - US gpm. Comments. Customer : Contact : Re Cotizacion Metro Linea 4 EDB Project : Quote No. :

SECTION DOMESTIC-WATER PACKAGED BOOSTER PUMPS

University of Houston Master Construction Specifications Insert Project Name

PRESSURE LIMITING DRIVERS

FAIRBANKS FIRE PUMPS JOCKEY PUMP SELECTIONS MODELS 933 & 934

SECTION (15444) - DOMESTIC WATER PACKAGED BOOSTER PUMPS

Appendix C. Interval Every 2 Year. Functional Test Weekly Monthly Quarterly. Semi. Every 3. Engineering Studies

Model 133 Models 134 & 135 AURORA 130 SERIES SINGLE STAGE TURBINE TYPE PUMPS

AS Electric Fire Pumpset Check List Please answer YES or No as appropriate. (if the answer is "NOT SURE" then answer "NO!

Hydrostatic Drive. 1. Main Pump. Hydrostatic Drive

DESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

Earthsafe Systems, Inc. Page 1

LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31

Flood Control Integrated System (FCIS)

.3 Section Concrete Forms and Accessories: Installation of Anchor Devices, Setting Templates

TYPE PC Propeller Condensate Pumps

Diesel generator set. QSB5 series engine Hz EPA Tier 3 emissions. Specification sheet. Description. Features

SUGGESTED SPECIFICATIONS

FLOOD PROTECTION SHUT DOWN VALVE (3 and smaller)

SECTION H3 TRAYMASTER SERIES DEAERATORS

Peerless Pump FIRE PUMPS. Horizontal Split-Case, Vertical Turbine, In-Line and End Suction. Sterling Fluid Systems (USA), Inc.

DIESEL GENERATOR SETS

September 22, 2016 To: All Contractors Re: Boiler Back-Up Fuel Tank System Renovation. Dear Sir:

Coolers. OK Series. Air Cooled Oil Coolers Hydraulic Symbol OK 1-11 OKF Cooling Systems Catalog. Applications

UNIVERSAL, INDEPENDENT DUAL SYSTEM HYDRAULIC TEST STAND

Operation and Maintenance. S100 Series Centrifugal Fire Pumps. Table of Contents. Visit us at F /22/02 6/21/18

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.

SECTION H4 BOILERMATE DEAERATORS

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY

Track Drive Circuit - General System. Simplified Travel Circuit Diagrams: Neutral Controls Forward Travel Reverse Travel

Liebert CSU3000 DISCONTINUED PRODUCT. CSI Mainframe Cooling Systems. CT(Three Module) Model 20, 30 & 37 ton Mainframe Chiller

earth safe DEF Systems for Critical Power

Precision Air Drilling Services Equipment Information & Specifications

CHAPTER 7 PUMPING SYSTEM DESIGN

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

Pump Service Testing

SECTION PUMPS GENERAL PUMPS PART RELATED DOCUMENTS

60 Hz FEATURES. Exclusively from your Caterpillar dealer

TECHNICAL DATA. model f-1 2. LISTINGS AND APPROVALS 3. TECHNICAL DATA. Page 1 of 11

Spark-ignited generator set

DIESEL GENERATOR SET. 60 Hz FEATURES

D51 D61 D71 D91 Series

S200-P Series Centrifugal Fire Pumps Operation and Maintenance Instructions

Spark-ignited generator set

TECHNICAL DATA CAUTION

TECHNICAL DATA. Table 1: Model F1 Dry Valve Part Numbers and Specifications

CONTENTS 1. INTRODUCTION SAFTY INSTRUCTION CABLE CONNECTION SYSTEM DESCRIPTION INVERTER OPERATION...

Missing recessed or flush escutcheons, concealed cover plates with deflector and operating element in correct position

Operation and Maintenance. CG Series Centrifugal Fire Pumps. Illustrations

TotalPac 3 Firecyle III Wet pipe Remote controlled system

Rental Power QSL9 series engine

PROJ. NO SECTION HYDRONIC PUMPS

HYDRO 300C-6 Hydraulic Generator

Diesel generator set. 50 kw - 60 kw EPA emissions stationary Standby. Specification sheet. Description. Features

SAMPLE SPECIFICATIONS

D I E S E L G E N E R A T O R S E T S

TotalPac 3 Deluge, Electric release Remote controlled system

Diesel generator set. 20 kw EPA emissions stationary Standby. Specification sheet. Description. Features

Series CC Condensate Units

VSPS PACKAGE BOOSTER SYSTEM (END SUCTION PUMP DESIGN) FEATURES T Y P E

PRODUCING TRUST IN FIRE AND SAFETY FIRE PUMP SYSTEMS A PRODUCT OF COMPLIANT.


MICROPUMP MAG-DRIVE GEAR PUMPS

Series Base mounted pump. Installation and operating instructions

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

END SUCTION CENTRIFUGAL PUMPS

60 Hz FEATURES. Exclusively from your Caterpillar dealer

Users Manual. Cobra Plus Stand-By Emergency Lighting Inverter. Technical Manual # Revision B

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3

LEAD FREE * LFF113RFP Flood Protection Shut Down Valve

TECHNICAL PAPER 1002 FT. WORTH, TEXAS REPORT X ORDER

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Section 7.1. Wheel Drive Circuit - General System

OIL HANDLING SYSTEMS

Technical Information for PVX Series Pumps

The committee proposes the attached Public Input for further review at Second Draft.

Transcription:

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Acceptance Inspection Date of Review / / BLD20 - Project Address: Project Name: Numbers following worksheet comments represent an NFPA code section unless otherwise specified. Pass Fail NA General 1. Received fire pump system installation and test certification from installer. 2. Received fire pump manufacturer pump curve certification test form. 3. The pump suction pipe is flushed in accordance with NFPA Table 4. After the suction pipe is flushed, a 2-hour hydrostatic test is performed on suction and discharge piping, 200 PSI or 50 PSI above maximum static pressure, whichever is greater, 5. Pressure and flush test certification is provided before performing the field acceptance test, 6. The approved plan is on site. 7. Fire pump and controller, piping, gauges, jockey pump, and other component locations and design are the same as shown on the approved set of plans.

8. Fire pump has nameplate. 9. Wire installation to motor, control inner wiring, and jockey pump wiring is correct. 10. A pressure gauge not less than 3 ½ in. diameter is near the pump discharge casting, and the pressure range is at least twice the rated working pressure of the pump but not less than 200 PSI, 11. A compound pressure/vacuum gauge not less than 3 ½ in. diameter is connected to the suction pipe and the pressure range is twice the rated maximum suction pressure of the pump but not less than 100 PSI,. This does not apply to vertical shaft-turbine pumps taking a water supply from an open pit or well. 12. When provided, all valves (suction valve, discharge valve, bypass valves, backflow prevention device or assembly isolation valves) shall be supervised open by an off-site monitoring company, a local signal, locked open, or by seals, 13. Pump room has lighting, emergency lighting, heat, ventilation, and floor drain, 14. A circulation relief valve is provided on the pump of at least, ¾ in. for less than 2,500 GPM and 1 in. for 3,000 to 5,000 GPM, and it discharges to a drain, 5.11.1. This does not apply to pumps providing cooling water from its discharge to the engine driver. 15. Coupling guards are provided for driver to pump connecting flexible couplings or flexible connecting shafts,. 16. The operating angle of a flexible connecting shaft does not exceed the manufacturer listing requirements, 17. When installed, the eccentric taper reducer for suction has the taper on the bottom, 18. Suction screening is provided for open source water supplies, verify that its size matches what is detailed on the approved set of plans, 19. When a vortex plate is provided for taking suction from stored water supply, verify that it size and location matches what is detailed on the approved set of plans, 20. A check valve is installed in pump discharge assembly,.

21. An indicating gate or butterfly valve is installed on fire protection system side of the check valve, 22. For a centrifugal pump and when provided a pressure relief valve is located between the pump and pump discharge check valve, verify that its location matches what is on the approved set of plans, 23. The test header and the number of hose valves are provided, in accordance with Table 5. and their location matches the approved set of plans, 24. The construction of the fire pump room (1- or 2-hour fire-resistive) matches the approved set of plans, 25. The pressure maintenance (jockey) pump has a check valve in its discharge piping and the isolation valves (indicating butterfly or gate) location match the approved set of plans,. Operational Tests Are Performed by the Contractor or Manufacturer 26. Flow tests for positive displacement pumps are performed and recorded in accordance with Sections 14 and A.14, using a flow meter in a test loop that discharges the flow back to the supply. 27. For the load start test, the engine-driven fire pump, without interruption, will be brought to rated speed providing a discharge equal to peak load, Controller 28. The fire pump controller is tested in accordance with the manufacturer s requirements and Section 14. 29. A minimum 6 manual starts and 6 automatic starts are performed, split the tests between each set of engine batteries and emergency power (only if emergency power is required for operating the pump) and simulate loss of the primary power source to verify the transfer to secondary power source, 30. Each start is no less than a 5 minute run time, and total pump operation shall not be less than 1 hour, 31. Simulate primary power loss and allow automatic transfer to secondary power supply (only if emergency power is required for operating the pump) while pump is operating at peak load,

32. Engines with electronic fuel management control systems will test both primary and alternate control systems, 33. Pump packing drips. 34. No overheating. 35. No excessive vibration. 36. Pump starts on water flow. 37. Pump starts on pressure drop. 38. Casing relief valve operates. 39. Pressure relief valve operates. 40. Jockey pump stop point pressure is recorded. 41. Jockey pump start point pressure is recorded. 42. Fire pump start point pressure is recorded (usually 5 PSI above jockey stop PSI). 43. Pump flow tests are conducted at churn (no flow), rated (100 percent of rated capacity), and peak (150 percent of rated capacity) loads,. Additional test points can be taken. Electric Driven Pump 44. Supervised alarms operate when motor stops running, loss of phase, electric phase reversal and controller trouble. 45. Simulated test for phase reversal is conducted. 46. Switching from normal power to emergency and back to normal at peak load does not trip the breaker. (NOTE: This test is only required when the electric driver is connected to a emergency or standby source of power). 47. Pump started once from manual emergency handle operation. 48. Pump start up on emergency power occurs automatically.

Diesel Driven Pump 49. Audible alarms operate when overspeed (120 percent) causes shutdown, low oil PSI, high temp, battery failure, charger failure, low air or hydraulic PSI, and failure to automatically start. 50. Audible or visual alarms provided at constantly attended location when engine stops running, controller main switch is turned off, or there is trouble on the controller or engine. 51. Instrumentation panel includes tachometer, oil PSI gauge, and temperature gauge. 52. Battery chargers and ampmeters function. 53. The battery charger is listed for fire protection service; the battery rack is adequately secured and elevated at least 12 in. above the floor level. 54. Timer set for 30 minute each week run time cycle. 55. For automatic shutdown after an automatic start, the shutdown occurs in accordance with Section 12. Well Test and Inspection for Vertical Turbine Pumps 56. The well s production capability is verified by a continuous 8 hour test at 150 percent of the pump rated capacity. Test readings are taken every 15 minutes and the test data provides the static and pumping water levels at 100 and 150 percent of the pump s rated capacity, Address: Inspection Date: Fire Code Administration Staff Captain