In response to the TIA the Director General of the Department of Planning and Infrastructure issued the following comment:

Similar documents
12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe,

Tomingley Gold Operations. Traffic Management Plan

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

ELANDSFONTEIN PHOSPHATE MINE

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION

Burrum Quarry Traffic Advice Stopping Distance Assessment

HIGH PRODUCTIVITY MOTOR VEHICLES NEW ZEALAND S APPROACH. John de Pont, TERNZ

TRAFFIC ENGINEERING SERVICES TRAFFIC IMPACT STATEMENT NATREF CLEAN FUELS II, SASOLBURG, FREE STATE. October 2013 Revised: 2.0

ACTION TRANSMITTAL No

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Traffic Impact Study Speedway Gas Station Redevelopment

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

FEASIBILITY LAND TRANSPORTATION VENTUS ENERGY. from. covering WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE. for.

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

Epping to Chatswood Railway Temporary Transport Plan

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

Clean Harbors Canada, Inc.

Placement of Bulk and Skip Waste Containers

Methods to Identify and Manage Runaway Heavy Vehicle Issues on Steep Descents

New West Partnership Deliverables July 2011/2012 Reporting

Cuadrilla. Roseacre Wood. Transport Consultation Report

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Blue Reflectors: An inexpensive and effective way of managing Fatigue of Drivers of Heavy Vehicles

Traffic Impact Assessment

Effect of Police Control on U-turn Saturation Flow at Different Median Widths

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

The remainder of this memorandum contains the details of our peer review findings.

Cornubia Retail and Business Park Development

Dar gues Reef Go ld Pr o ject

Liverpool Range Wind Farm. Traffic and Transport Report February 2017

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Appendix N Traffic and Transport Impact Assessment

DUNMORE QUARRY. Transport Management Plan. Boral Resources (NSW) Pty Ltd 4/04/2016. Prepared for:

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

FREQUENTLY ASKED QUESTIONS

SUBMISSION Barton Highway Duplication Planning and Safety Works 15 June 2010

Draft US Corridor Study Traffic Analysis Report

TRAFFIC IMPACT ANALYSIS

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Craigieburn Employment Precinct North and English Street

Ohio Department of Transportation. Special Hauling Permits Section West Broad St. Columbus, Ohio Third Floor Mailstop #5140

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

PROPOSED TRAFFIC RESOLUTION

24 July Fuel Quality Review Marsden Jacob. Dear Sir or Madam

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

PART TRANSPORT AND TRAFFIC. > Traffic Impact Assessment prepared by Cardno

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014

GLS CONSULTING ENGINEERING REPORT: DEVELOPMENT ERF 1692, FRANSCHHOEK: CAPACITY ANALYSIS OF THE BULK WATER & SEWER SERVICES

The Re:Queen and Sparks Traffic Brief - Addendum #2

BORAL CONCRETE GLENORIE

Chicago St. Louis High-Speed Rail. Braidwood Construction Public Meeting. August 7, 2014

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Electric Vehicle Infrastructure Location Tool and Visualization Map. July 17, 2018

HIGHWAY 28 FUNCTIONAL DESIGN

FREQUENTLY ASKED QUESTIONS

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

Application for Annual Move Permit

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RTID Travel Demand Modeling: Assumptions and Method of Analysis

STH 60 Northern Reliever Route Feasibility Study Report

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

The Engineering Department recommends Council receive this report for information.

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES

Please do not hesitate to contact me with any questions or concerns. I look forward to hearing from you.

The City of Toronto s Transportation Strategy July 2007

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

Proposed Readymix Regional Distribution Centre at Rooty Hill Traffic Impact Study

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

DESIGN BULLETIN #68/2010 (Supersedes Bulletin # 31) Roundabout Design Guidelines on Provincial Highways

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Additional $200 Speeding Fine Signs

Downtown One Way Street Conversion Technical Feasibility Report

Final Report. Cherrybrook Station Bus & Vehicular Access Review. Transport for NSW. MRCagney Pty Ltd. Prepared by:

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN

The Highway Safety Manual: Will you use your new safety powers for good or evil? April 4, 2011

Please Read Carefully

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.

This page is intentionally left blank.

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Case Study STREAMS SMART MOTORWAYS

RURAL ROAD MAINTENANCE POLICY

Item No Transportation Standing Committee June 7, 2017

JUNE Livestock Transport

Transcription:

06 July 2012 P0961 Natural Gas Storage Facility Letter Ver2.doc CB&I Level 13, 197 St Georges Terrace Perth, Western Australia, 6000 Attention: Jim Rutherford Dear Jim, Re: Natural Gas Storage Facility Project, Tomago, NSW AGL Energy Limited (AGL) is proposing the construction and operation of the Newcastle Gas Storage Facility at Tomago, NSW. This site is north of the Tomago Aluminium Smelter on land currently owned by Tomago Aluminium Company (TAC). The Project consists of: a processing plant capable of processing up to 66,500 tonnes of liquefied natural gas (LNG) per year; a storage tank capable of containing up to 30,000 tonnes of LNG; a truck loading facility to allow the dispatch of up to 1,000 tankers of LNG per year; a new road to connect the gas plant site to the northern access road currently serving the Tomago Aluminium Smelter; and a natural gas pipeline which connects the gas plant site to a receiving station in Hexham, NSW. A Traffic Impact Assessment (TIA) for the proposed development, Natural Gas Storage Facility Project Traffic Study was completed by AECOM in 2011. In response to the TIA the Director General of the Department of Planning and Infrastructure issued the following comment: "B32 Prior to the commencement of construction of the project, the Proponent shall commission a suitably qualified road infrastructure specialist to assess the condition of all public roads proposed to be traversed by construction traffic associated with the project (including over-mass or over dimensional vehicles) in consultation with Council and the RMS, and to identify any upgrade requirements to accommodate project traffic for the duration of construction (including culvert, bridge and drainage design; intersection treatments; vehicle turning requirements; and site access), having regard to peak traffic volumes. The Pre- Construction Road Inspection Report shall be submitted to the Director-General prior to the commencement of construction works, clearly identifying recommendations made by the Council and the RMS and how these have been addressed. The Proponent shall ensure that

all upgrade measures identified in the report are implemented to meet the reasonable requirements of Council and the RMS, prior to the commencement of construction." Better Transport Futures has been commissioned by CB&I to assess the ability of the road network in immediate vicinity of the development subject site to accommodate the service vehicles that are expected to access the development during the construction phase of the project. A new access road is proposed to serve the development that will intersect the existing privately owned TAC northern access road at a T-junction. The TAC northern access road joins Old Punt Road approximately 200m from the intersection of Old Punt Road and the Pacific Highway. The location of the proposed development is displayed in Figure 1. Proposed Access Road Subject Site TAC Road Source: Google Maps Figure 1 Gas Storage Facility Subject Site The route of inbound and outbound construction vehicles to/from the proposed gas plant will be exclusively along the Pacific Highway, Old Punt Road and the TAC northern access road. The intersection of the Pacific Highway and Old Punt Road was upgraded from a priority controlled intersection to a signalised intersection in June 2007. At the same time, the intersection of the Pacific Highway and Tomago Road was upgraded, to allow for the dual right turn into Tomago Road off the Pacific Highway and the right turn out of Tomago Road was banned. Council have indicated that no additional road works or traffic management works are planned at or in proximity to these intersections. P0961 Natural Gas Storage Facility Letter Ver2.Doc Page 2

The RMS are planning an upgrade of the Pacific Highway between the F3 Freeway and Raymond Terrace, involving a 15 kilometer dual carriageway upgrade of the Pacific Highway bypassing Heatherbrae, to the north of the subject site. The RMS have approached Port Stephens and Newcastle Councils and formally reserved the highway corridor in the local environmental plans. Upon completion of the upgrades access to Tomago Road and the industrial area for northbound traffic would be via an off ramp, from the upgraded arterial road network. The RMS has indicated construction of the proposed road upgrade will commence once funding for the project becomes available with no timetable for this work currently available. An image of the proposed road network upgrade is displayed below in Figure 2. Old Punt Road Source: www.rta.nsw.gov.au Figure 2 Gas Storage Facility Subject Site It is noted that the Pacific Highway and Old Punt Road are designated by the Roads and Maritime Services (RMS) as being part of a restricted access vehicle route, capable of accommodating 26m B-double, articulated vehicles. The RMS defines the standard mass limit for 26m B-doubles as 62.5 tonnes. Discussion with the superintendent at the Tomago Aluminium Smelter has confirmed that the TAC northern access road has also been designed to accommodate a vehicle up to the size of a 26m B-double, which are the largest vehicles that currently access the smelter. Thus all the roads in proximity to the development have been designed to accommodate very large heavy goods vehicles. The AECOM TIA identifies the construction phases of the project as the following: Gas plant construction (three years); Pipeline construction (up to nine months); Access road and utility corridor construction (three months); and Hexham receiving station construction (up to nine months). The volumes of heavy goods vehicles expected per day for each construction phase is presented below in Table 1. P0961 Natural Gas Storage Facility Letter Ver2.Doc Page 3

Table 1 Project Construction Generated Traffic Component Task Source: New Gas Storage Facility Project Traffic Study (2011) prepared by AECOM Table 1 above indicates that the highest volumes of heavy goods vehicles of 40 50 per day are expected during the site preparation process of the construction phase. The TIA indicates that the TAC currently accommodates 400 450 heavy good vehicle movements per day. Thus the heavy goods vehicle construction activity is significantly less than the current heavy goods vehicle activity associated with the current operation of the aluminium smelter. The 2011 2013 SIDRA results from the AECOM TIA detailing the operation of the intersection of Pacific Highway and Old Punt Road with the background traffic and expected construction traffic (heavy and light) is presented below in Table 2. Table 2 Pacific Highway and Old Punt Road Horizon Year Operation with Construction Traffic Year Demand Flow (veh/hr) Level of Service Average Delay (secs) 2011 2,833 B 17.2 2012 2,816 B 15.4 2013 2,962 B 17.7 Source: New Gas Storage Facility Project Traffic Study (2011) prepared by AECOM HGV Deliveries per day Site Preparation 40-50 Bulk earth works 20 Gas Plant Structural works 1 (2month period) 20-30 Structural works 2 (remainder of period) 5 Commissioning 3 Rehabilitation and landscaping 4 Pipeline Construction 20 Access Road Construction 10 Hexham receiving station Construction 5 Traffic modeling undertaken in the TIA indicates that the construction vehicles generated by the proposed Gas Storage Facility will have a negligible impact upon the intersection of Old Punt Road and the Pacific Highway, which will continue to operate with acceptable delays and level of service in the horizon year of analysis. During the construction phase of the development a combination of rigid and articulated vehicles will be utilized. The largest rigid vehicle will be of 12.5m length and 2.5m width, which corresponds to an Australian Standard Heavy Rigid Vehicle. The largest semi-trailer will be of 19m length and 2.5m width which corresponds to an Australian Standard Articulated Vehicle. All construction vehicles accessing the site will have standard mass limits of less than 50 tonnes. Accordingly as the adjoining road network has been designed to accommodate vehicles up to the size of a 26m B-double, the geometric layout of the roads and intersections in the vicinity of the subject site can safely and efficiently accommodate the swept path movements of the typical construction vehicles. P0961 Natural Gas Storage Facility Letter Ver2.Doc Page 4

Some components of the proposed Gas Storage Facility will be prefabricated and delivered to the site. These components will have maximum load dimensions of 20m length, 5m width and 4m height. The delivery of these prefabricated components will occur a maximum of 6 times during the 3 year construction period of the proposed development. Whilst the length and height of these loads are considered acceptable, the RMS criteria specifies that a load carrying vehicles with a width of greater than 3.5m are requires a General Class 1 Oversize (Load Carrying Vehicle) Permit. Key criteria applicable to the movement of oversize vehicles in order to obtain the necessary permits include: The definition of an appropriate route for the over sized vehicle; The provision of Over Size warning signs, warning lights and warning flags on of the vehicle; The use of a pilot vehicle to provide advance warning to approaching traffic and to be positioned to give adequate warning to other road users.; and Travelling in accordance with designated curfews to minimise the impact on peak hour road network traffic. An oversize vehicle permit will be obtained prior to the delivery of each of the prefabricated components of the proposed development. Additionally in accordance with RMS requirements the permits will be carried with the oversize vehicle at all times on its route to and from the proposed Gas Storage Facility subject site. The overall conclusions from investigations is that the current road network in vicinity of the subject site can accommodate the volume and size of the vehicles associated with the construction phase of the Gas Storage Facility and no road upgrades are required. If you have any queries or require further information please contact our office. Sincerely, Mark Lucas Senior Transport Planner P0961 Natural Gas Storage Facility Letter Ver2.Doc Page 5