Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018

Similar documents
Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018

Williams Contractor Covered Task List Last updated 11/7/2017

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018

DCP Midstream Contractor Covered Task List Last updated 7/11/2018

TransCanada US Contractor Covered Task List Last updated 9/27/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017

Appendix A Kinder Morgan Operator Qualification Program List of Covered Tasks - Natural Gas - Part 192 Revised 12/13/2017

ASMECourseCatalog.

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS

Florida City Gas Contractor Covered Task List

Operator Qualification (OQ) Report

PIPELINE CORROSION CONTROL

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER

PHMSA Office of Pipeline Safety Dave Mulligan Western Region

New UST Installation Inspection Checklist

HDPE FUSIBLE VALVES EXPECT INNOVATION

CONTENTS. Foreword...iii. 1. Introduction...1

This article discusses a tank

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair

Monthly Checklist For Depot

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION

Monitoring Cathodic Protection of Natural Gas Pipelines

Cathodic Protection for AST s. Why is Cathodic Protection Important?

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

PEI/RP Recommended Practices for Installation of Bulk Storage Plants

INSTALLATION INSTRUCTIONS

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.:

An Introduction to Constructing and Maintaining Cathodic Protection Systems

ANNUAL UST SYSTEM INSPECTION CHECKLIST

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool

GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

No Infrared Refrigerant Leak Detector

PENNSYLVANIA ABOVE GROUND STORAGE TANKS

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc.

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

Oil & Gas Custody Transfer Data Sheet

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

Highway Crossings - Cased or Uncased

PIPELINE INSPECTION SURVEY QUESTIONNAIRE

SECTION FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS

Provides the perfect seal, protects flanges, valves and pipelines against corrosion whilst improving safety and reducing the risk of fire.

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607)

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES

PIPELINE. catalogue. Pipeline construc on and maintenance Products & Solu ons

Report of the Pipeline Safety Department. Home Explosion January 2, Whispering Hollow Drive Oklahoma City, Oklahoma

The Gradient Control Mat (GCM)

HOT TAPPING & PLUGGING SOLUTIONS

Broetje-Automation Company Standard Structural component specification for welded parts

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

NYSDEC CBS Compliance Requirements

GF Piping Systems. SurTap System Operation with VersaTap Fittings Manual

Biogas safety control equipment

Rosemount 402 and 402VP

Report No.: Name of Ship: Plans referred during Initial Survey:

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E.

Test Stations and Pipe-to-Soil Potential Measurements

Station 130 (Maple) Compressor Upgrade Project

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

Processing Plant Enters. the Pipeline World. A Case Study of a Chemically Welded Anomaly Repair. By Randy Vaughn. R&F Pipecon Resources

Water Connection Repair Method and Techniques

Official Journal of the European Union L 298/39

Sentinel Panametrics Custody Transfer Gas Ultrasonic Flowmeter

Ignition energy enough for igniting the mixture is available, such as sparkles generated by friction and impaction, electric arc or hot surfaces.

Sentinel. Panametrics Custody Transfer Gas Ultrasonic Flowmeter. GE Sensing. Applications. Features

Technical Offer. Antek Model 6200 Analyzer Determine Total Sulfur and Total Nitrogen in a single analyzer

AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA

RELIABLE AND EFFICIENT SYSTEMS

Lorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER AUTOMATIC INSERTION PROBE

MUELLER GAS. Shur StopTM Unit 812 PE Line Stopping. System 8" 12" SDR Reliable Connections. General Information 2

Have you previously been a supplier member? Yes No If yes, most recent year:

7. Protection System Testing

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY

FUNDAMENTALS OF INSERTION TURBINE METERS Les Bottoms Thermo Electron Corporation, Flow Systems

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com

GAS DISTRIBUTION PRODUCTS METER RISERS

Baumann Sanitary Diaphragm Angle and Inline Control Valve

COSASCO TWO-INCH SYSTEM

Transcription:

001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428 Oral 006 Inspection of Breakout Tanks 195.432 Oral 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 020 Pump Stations/Units - Startup, Operation and Shutdown 195.402(c)(7) 195.402(c)(8) 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 201 Abnormal Operating Conditions Related to Welding on Pipelines 195.452(h) 192.225 192.227 192.715 192.717 192.713 192.245 202 Monitoring of Welding Process 192.241(a) 192.241(c) 192.231 192.235 192.245 203 Visual Inspection of Welds not Non-Destructively Tested 192.241(b) 192.241(c) 204 Non-Destructive Testing (Dye Penetrant) 192.243 205 Non-Destructive Testing (Mag Particle) 192.243 206 Non-Destructive Testing (Ultrasonic) 192.243 207 Non-Destructive Testing (X-Ray) 192.243 208 Plastic Pipe Joining: Butt Fusion 192.281 209 Plastic Pipe Joining: Mechanical Joining 192.281 195.222 195.214 195.230 195.224 195.226 195.204 195.224 195.228 195.234 Oral Oral 195.204 Oral 195.234 195.234 195.234 195.234 Page 1 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 23

210 Plastic Pipe Joining: Electrofusion Joining 192.281 211 Perform Plastic Fusion Inspection Oral 213 Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections 214 Joining of Metal Pipe and Components by means other than Welding - Threaded Connections 215 Joining of Metal Pipe and Components by means other than Welding- Flanged Connections 216 Joining of Metal Pipe - Compression Couplings 217 Small Diameter Metal Tubing and Fitting Installation 401 of Buried Pipelines When Exposed 192.459 404 Protection of Coating When Backfilling and From Below Ground Supports 192.461(d) 192.614(c)(6) 192.461( c ) 192.319(b) 195.126 195.126 195.569 Oral 195.252 195.422 405 Protection of Coatings From Above Ground Structures 192.461(d) 406 Conduct Test to Determine Cathodic Protection Current Requirements 192.465(a) 192.457 407 Perform Cathodic Protection Survey 192.465(a) 192.465(e) 192.328(e) Oral 195.571 195.573(a) 408 Inspect Cathodic Protection Rectifier 192.465(b) 195.573( c ) 409 Inspect Interference Bonds 192.465(c) 195.573( c ) 410 Clear Shorted Casing 192.467(c) 195.401(b)(1) 195.575(a) 411 Inspect/Test to Assure Electrical Isolation is Adequate 192.467(d) Oral 195.575 412 Install CP Leads on Pipeline Using Exothermic Weld 192.471 195.567 413 Anode Installation on Submerged Pipeline or Facilities 192.471 Oral 414 Inspect for Internal Corrosion Whenever Pipe is Removed 192.475(b)(1) 195.579(c) Page 2 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 23

415 Monitoring for Internal Corrosion with Probes and Coupons 192.477 192.620(d)(5) 416 Monitoring for Internal Corrosion with Gas Samples 192.477 195.579(b) 417 Atmospheric Corrosion Monitoring 192.481 418 General and Localized Corrosion Measurement (Remedial Measures) 192.485(a)(b) 419 Cathodic Protection Potential Measurement 192.465(a) 192.620(d)(8) 195.585(b) 195.587 195.573(a) 420 Soil Resistivity 421 Measurement of Depth of Pitting with Pit Gage 192.485 195.569 195.585 423 Perform Direct Current Voltage Gradient (DCVG) Survey 192.490 192.620(d)(7) 424 Perform AC Current Attenuation (ACCA) Survey 192.490 192.328(e) 192.620(d)(7) 426 Inspect Pipe Coating with Holiday Detector 192.455(a) 192.457(a) 192.461 192.479 195.588 195.588 195.561 195.569 427 Inspection of Above or Below Ground Coatings Oral 480 Apply Approved Coating by Hand Application 192.461(a) 195.557 482 Apply Approved Coatings by Mechanical Spray and Hand Application Methods 192.461(a) 195.557 484 Apply Approved Coatings by Wrap Application 192.461(a) 195.557 501 Conduct a Pressure Test 192.505 192.507 192.513 192.328(d) 502 Conduct Pressure Test on Pipe that is to be Operated at a Pressure <100 psig 601 Start-up/Shut-down of Pipeline to Assure Operation Within MAOP / MOP 192.509 192.511 192.513(b) 192.605(b)(5) 602 Monitoring Pipeline Pressure 192.605(b)(5) 192.619 195.304 195.305 195.306 195.402 195.406 195.402( c )(9) 195.406 Oral Page 3 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 23

603 Compressor Units: Startup, Operation, Shutdown and Purging Before Returning to Service 604 Locate, Mark, and Remediate Exposed Pipelines in the Gulf of Mexico 192.605(b)(7) 192.605(b)(6) 192.612(b) 195.413 605 Locate Line/Install Temporary Marking of Buried Pipeline 192.614(c)(5) 195.442(c)(5) 606 Locate and Mark Submerged Pipelines 192.614(c)(5) Oral 607 Damage Prevention: Observation of Excavating and Backfilling 192.614(c)(6) 192.319(b) 195.252 195.442(c)(6) 608 Damage Prevention for Blasting Near a Pipeline 192.614(c)(6) 195.442(c)(6) Oral 609 Inspect and Maintain Odorization Equipment 192.625(e) 610 Monitor Odorant Concentration 192.625(f) 611 Hot Tap (Steel Pipe) 192.627 612 Hot Tap (Plastic Pipe) 192.627 613 Purge Pipeline Facilities With Gas 192.629(a) 614 Purge Pipeline Facilities With Air or Inert Gas 192.629(b) 195.422 195.402(c)(10) Oral 616 Atmospheric Monitoring during Hot Work Operations 195.402( c )(11) 619 Damage Prevention during Vacuum Excavation and Backfilling Activities 661 Launching and/or Receiving Internal Devices (Pigs) 192.937(c) 192.476 192.620(d)(5)(iv ) 192.620(d)(9) 701 Patrolling Pipeline and Leakage Survey without Instrument 192.705 192.613 192.706 192.620(d)(4) 192.721 192.614(c)(6) 195.442(c)(6) Oral 195.426 Yes 1:2 3 195.412(a) Oral 702 Leakage Survey with Leak Detection Device 192.706 703 Placing/Maintaining Line Markers 192.707 195.410(a) 195.410(c) 704 Permanent Field Repair by Grinding 192.713 195.226 195.230 705 Permanent Field Repair Using Composite Materials (Clockspring) Oral Page 4 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 23

706 Permanent Field Repair Using Composite Materials (Armor Plate) 707 Permanent Field Repair Using Bolt-On Clamp/Sleeve 192.717 195.422(a) 708 Permanent Field Repair Using Full Encirclement Weld Sleeve 709 Inspection and Testing of Relief Devices (Compressor Stations, Meter Stations, Regulating Stations) 710 Inspect/Test Compressor Station Remote Shutdown Devices (ESD/EBD) 192.717 195.422(a) 192.731(a) 192.731(b) 192.743 195.428 192.731(c) 711 Inspect, Test, and Maintain Systems 192.731(c) 195.408(b)(1) 195.408(b)(1) 712 Programmable Logic lers 192.731(c) 195.408(b)(1) 195.428(a) 713 Test/Maintain Gas Detection and Alarm Systems 192.736(c) 714 Inspect and Maintain Pressure ing and Regulating Devices 715 Test and Maintain Pressure Switches and Transmitters in Pressure ing and Regulating Service 192.743(a) 192.619(b) 192.743(a) 192.619(b) 716 Inspect, Maintain, and Operate Valves 192.745 192.747 717 Maintaining Vaults With Pressure Regulating and Pressure ing Equipment 718 Monitoring for Internal Corrosion with Liquid Samples 192.477 192.620 719 Permanent Field Repair Using Composite Materials (Wrapmaster) 722 Permanent Field Repair Using Composite Materials (Aqua Wrap) 724 Permanent Field Repair Using Composite Materials (PipeWrap A+ / Atlas CFP) 195.428 195.428 195.420(a) 195.420(b) 192.749 192.713 195.422( a ) 195.579 725 Aerial Leakage Survey: Transmission 192.706 Yes 1:2 3 904 Inspection of Material 192. 328(a)(1) Oral 910 Inspection of Construction Activities 192.305 192.620(c)(6) CPG 745 Operate Air Mover During Cutting, Grinding and Welding Operations 192.629(b) Oral 195.402(c)(10) Page 5 Copyright 2018. Veriforce, LLC. All rights reserved. Rev. 23