PREPARED DIRECT TESTIMONY

Similar documents
Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

2016 SDG&E Grid Assessment Results

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

Black Hills Project Summary

Appendix D Black Hills Project Summary

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

2020 & 2024 Draft LCR Study Results SDG&E Non-Bulk System. Frank Chen - Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019

2019 & 2023 Final LCR Study Results San Diego-Imperial Valley non-bulk sub-areas

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Interconnection System Impact Study Report Request # GI

APPENDIX F: 2012 Request Window Submittals

SDG&E Valley-Rainbow Project

CUSTOMER/ TWIN ARROWS PROJECT

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Valley - Rainbow Interconnection Project Feasibility Study Report

West Station-West Cañon 115 kv Transmission Project

for DRECP Alternatives

MILLIGAN SOLAR PROJECT

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

100 MW Wind Generation Project

Pacific Gas and Electric Company s Revised 2015 Annual Progress

City of Palo Alto (ID # 6416) City Council Staff Report

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Generation Interconnection Facilities Study For

Interconnection Feasibility Study Report GIP-226-FEAS-R3

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

Sub Regional RTEP Committee Western Region ATSI

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE

2013 ANNUAL PROGRESS REPORT

Four Corners Queue Transmission Interconnection Study

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Interconnection Feasibility Study Report Request # GI

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Full Network Model Scope for FNM DB61

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS

PUD ELECTRIC SYSTEM INTERCONNECTION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Richard A. Vail

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

GENERATOR INTERCONNECTION FACILITIES STUDY FOR DAN RIVER STEAM PLANT COMBINED CYCLE PROJECT With BIOMASS CONVERSION IN PLACE ROCKINGHAM COUNTY, NC

Electrical Handbook Fault Calculations Using The Mva Method

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

INTERCONNECTION FACILITIES STUDY REPORT

Western NY Public Policy Transmission Planning Report

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Merger of the generator interconnection processes of Valley Electric and the ISO;

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

SPP Notification to Construct

Designated Entity Pre-Qualification Materials. Exelon Corporation

Susan MacAdams Transit Consultant 269 S. Beverly Drive, Unit 1187 Beverly Hills, CA 90212

PG&E s 2012 Request Window Proposals

Q137 Generation Interconnection

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Generator Interconnection System Impact Study For

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Q0044 interconnection at

APPENDIX F: Project Need and Description

Cost Benefit Analysis of Faster Transmission System Protection Systems

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS

Consulting Agreement Study. Completed for Transmission Customer

MTEP13 SPM #2- Central Region. March 25, 2013

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

3.0 Radial Distribution Systems

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

1SPP Notification to Construct. RE: Notification to Construct Approved Reliability Network Upgrades

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources

Short Circuit Analysis with New Generation Proposed by XXXXXXXXXXXXXXXXXXXXXX Pursuant to a Transmission and Facilities Study

STATE OF NEW HAMPSHIRE Inter-Department Communication

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company

Rocky Mountain Power Docket No Witness: Gregory N. Duvall BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

Small Generator Interconnection Program Interconnection Technical Requirements

Pacific Gas and Electric Company s 2013 Annual Progress Report

March 31, 2014 VIA HAND DELIVERY & ELECTRONIC MAIL

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Sub Regional RTEP Committee Mid-Atlantic

SERTP rd Quarter Meeting

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

Transcription:

Application No.: A.0-04- Exhibit No.: SDG&E-4 Witness: William V. Torre In the Matter of San Diego Gas & Electric Company s Application for Authorization to (1) to Participate in the Steam Generator Replacement Project As A Co- Owner of San Onofre Nuclear Generating Station Unit Nos. & (SONGS & ) ; () Establish Ratemaking For Cost Recovery; and () Address Other Related Steam Generator Replacement Issues (U 0-E) Application No. 0-04- PREPARED DIRECT TESTIMONY OF WILLIAM V. TORRE BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA APRIL 14, 00

TABLE OF CONTENTS I. PURPOSE OF TESTIMONY... 1 II. DEVELOPMENT OF COST ESTIMATES FOR TRANSMISSION AND SUBSTATION COMPONENTS... III. DESCRIPTION OF COST ESTIMATES... 4 IV. QUALIFICATIONS OF WITNESS... i

PREPARED DIRECT TESTIMONY OF WILLIAM V. TORRE 4 11 1 1 14 1 1 1 1 1 0 1 I. PURPOSE OF TESTIMONY My testimony describes the cost estimates developed by San Diego Gas & Electric Company ( SDG&E or the Company ) for transmission and substation facilities for two potential sources of replacement generating capacity that could be used by SDG&E to replace its ownership share in the San Onofre Nuclear Generating Station ( SONGS ). I will refer to this SDG&E ownership share as SONGS-Share. The purpose of my testimony is to describe the cost estimates for transmission system reinforcements ( reinforcements ) that would need to be made if the Company were to replace its SONGS-Share with either of the two replacement generating sources analyzed. R.J. Rudden Associates, a unit of Black & Veatch Corporation ( B&V ) conducted transmission planning studies at the direction of SDG&E witness Mr. Richard Sheaffer. Based on these studies Mr. Richard Sheaffer determined the physical changes to the Company s transmission system that would be required to accommodate each of the SONGS-Share replacement alternatives considered by SDG&E witness Mr. Michael Schneider. Mr. Richard Sheaffer then provided descriptions of these system reinforcements to me for the purposes of estimating the costs of the modifications. I provided these cost estimates to Mr. Schneider for inclusion in his comparative generation economics analysis. WVT-1

II. DEVELOPMENT OF COST ESTIMATES FOR TRANSMISSION AND SUBSTATION COMPONENTS The cost estimates, for upgrades to existing facilities, developed for this study are 4 11 1 1 14 1 1 1 1 1 0 1 4 considered to be budget class cost estimates. Budget class cost estimates consider the cost of major construction activities including labor, materials, engineering, land procurement, and licensing activities, as well as all applicable overhead costs that could be incurred by SDG&E. To provide a budget class estimate for the transmission related work, SDG&E will typically first perform document research. This will include researching the pole/tower sizes, existing wire tensions, clearances, etc. to estimate the impact of completing the required work. Any tools available such as Geographic Information System ( GIS ) will be used to further assess the project impacts (provides pole locations, residential areas, types of environment, open spaces, etc). A field review of the line of known routes is performed providing information such as regarding access roads, obstructions installed on Right of Way ( ROW ), deteriorated pole replacements necessary, etc. To provide a budget class estimate for substation related work, SDG&E will perform document research and derive a detailed scope of engineering, procurement, and construction based on the basic project description. In addition to using an extensive up-to-date data base of work scope items, vendors and subject matter experts may be consulted to ensure that large cost items (major equipment and site development) are accurately estimated. Cost estimates include the latest overhead costs (administrative & general, local engineering), labor rates, material costs, land acquisition, and contingency costs. Contingency percentages and difficulty factors added are typically based on the designers/engineers judgment of potential unknowns that could surface to increase the project total costs. A contingency level of 0% was used for upgrades of both existing transmission and substation components for the WVT-

4 cost estimates provided in this study. A contingency level of 0% was used for new facilities associated with Scenario due to the higher level of uncertainty of project scope. Cost estimates were developed for two Replacement Scenarios (Replacement Scenario 1 and Replacement Scenario ). The two Replacement Scenarios are described below: 11 1 1 14 1 1 1 1 1 0 1 4 0 1 4 40 41 4 4 44 Replacement Scenario 1 models the Company s transmission plans under the assumption that its SONGS-Share is replaced by a 41 MW Combined Cycle Combustion Turbine ( CCCT ) power plant located at the present Encina site. Cost estimates were developed for the following components for this scenario: 1. Acceleration of the reconductoring of the Escondido to Felicita kv line to 01 (identified in the Reference Case as being otherwise needed by 0), an advancement of approximately seven years. The project would increase the rating of the kv line from. MVA to 1 MVA using a single kcmil aluminum conductor steel reinforced ( ACSR ) conductor.. Acceleration of the reconductoring of the Felicita to Ash Tap kv line to 01 (identified in the Reference Case as being otherwise needed by 0), an advancement of approximately seven years. The project would increase the rating of the kv line from. MVA to 1 MVA using a single kcmil ACSR conductor. Replacement Scenario models SDG&E s transmission plans under the assumption that the Company substitutes its SONGS-Share from a geothermal power plant that is interconnected to SDG&E s transmission system at the Imperial Valley Substation. Cost estimates were developed for the following components for this scenario: 1. Addition of a third 00 kv to 0 kv transformer (1 MVA) at the Imperial Valley Substation in 0.. Addition of a third 0 kv to kv transformer (4 MVA) at the Sycamore Canyon Substation in 01.. Acceleration of the reconductoring of the Felicita to Ash Tap kv line (. miles) to 01 (identified in the Reference Case as being otherwise needed by 0), an advancement of approximately seven years. The project would increase the rating of the kv line from. MVA to 1 MVA using a single kcmil ACSR conductor. Reconductoring of two kv lines, Sycamore to Pomerado kv double circuit line ( miles), and San Luis Rey to Melrose Tap kv line (4. miles) to increase the rating of each circuit to 04 MVA. WVT-

4 11 1 1 14 1 1 1 1 1 0 1 4 4. A double-circuit 0 kv overhead transmission line, 0 miles long, from the step-up substation at the hypothetical geothermal plant to the Imperial Valley 0 kv Substation. Both circuits will use at bundled kcmil ACSR conductor per phase.. At the step-up substation located at the geothermal power plant site, four breaker-and-a-half bays are to be provided for four leads from the 0 kv side of four 1./0 kv step-up transformers, and to terminate two 0 kv lines from Imperial Valley, and two spare positions for future connections. A total of ten 0 kv circuit breaker, plus associated buswork and controls are included. Generator circuit breakers and step-up transformers are not included.. At Imperial Valley, an extension of the 0 kv main bus, installation of two 0 kv bays to include two line positions and circuit breakers which will accommodate terminating two 0 kv lines from the hypothetical geothermal plant. This will also include two tie positions with breakers, two transformer bank positions without circuit breakers and associated controls. In both of the two Replacement Scenarios, Mr. Michael Schneider specified the general location of the replacement generation. Mr. Richard Sheaffer through his planning studies provided the determination of the transmission reinforcements required to reliably support the replacement generation on the transmission system. III. DESCRIPTION OF COST ESTIMATES The cost estimates for each of these scenarios are summarized in the tables shown below. 0 All costs were estimated in 00 dollars for use by Mr. Schneider in his economic analysis and escalated by him to the appropriate year. The following Table 1, summarizes cost estimates for Scenario 1 transmission and substation components. WVT-4

Table 1 Project Name: Scenario 1 Estimate: COST SHOWN IN 00 DOLLARS X 1,000 Year Prior 00 00 00 00 0 Total Years Transmission 0,14 0 0 0 0,14 Substation 0 0 0 0 0 Total w/o AFUDC 0,0 0 0 0 0,0 AFUDC 0 0 0 0 0 Total w/ AFUDC 0,1 0 0 0 0 $,1 4 T The following Table provides a summary of the cost estimates for Scenario, for the transmission and substation components. Table Project Name: Scenario Estimate: COST SHOWN IN 00 DOLLARS X 1,000 Year Prior 00 00 00 00 0 Total Years Transmission 0, 0 0 0 0, Substation 0, 0 0 0 0, Total w/o AFUDC 0 144,4 0 0 0 0 144,4 AFUDC 0 1,4 0 0 0 0 1,4 Total w/ AFUDC 0 1,4 0 0 0 0 $1,4 A breakdown of the costs of each transmission component is provided in Exhibit 1. WVT-

IV. QUALIFICATIONS OF WITNESS My name is William V. Torre. My business address is San Diego Gas & Electric 4 11 1 1 14 1 1 1 1 1 0 1 4 Company, 1 Century Park Court, CPA, San Diego, CA 1. I am presently employed by San Diego Gas & Electric Company ( SDG&E ) as Manager of the Electric Transmission Engineering and Design Section. I have been the manager of Transmission Engineering and Design for approximately years. I graduated with a Bachelor of Science degree in Electrical Engineering ( BSEE ) from The University of Missouri - Rolla in 1. I later received a Master of Science degree in Electrical Engineering ( MSEE ) from the California Polytechnic State University San Luis Obispo in 1. I am also a registered Professional Engineer (in the Electrical Branch) in the State of California (No. ). With respect to my professional experience, I worked for Pacific Gas and Electric Company ( PG&E ) during the period from 1 to 1. I have worked for SDG&E for approximately years. I have held a number of positions throughout my career involving electric utilities, the majority of which have involved electric transmission planning, construction and engineering. Such positions have involved modeling of the transmission grid for both California and the interconnected system of the Western Systems Coordinating Council ( WSCC ). I have also served as a representative on the WSCC Technical Studies Subcommittee, Pacific and Southwest Transfer Subcommittee, and Rating Methods Task Force. WSCC is now known as the Western Electricity Coordinating Council ( WECC ). I also have written several technical papers for the IEEE and served on several working groups. I have previously testified before this Commission. This concludes my prepared direct testimony. WVT-

Exhibit 1 Transmission and Substation Cost Estimate Breakdown

EXHIBIT 1 SDG&E Cost Estimates* *Estimates are in 00 dollars and include AFUDC. Project Description Tie Line Number ISD Unescalated Estimate ($ 000) Transmission Reinforcements Associated w/ Scenario 1: Escondido-Felicita Reconductor to 1 MVA TL 01 $ 4,0 Felicita-Ash Tap Reconductor to 1 MVA TL 1 01 $, Total Unescalated Cost of Scenario 1 Transmission Reinforcements: $,1 Transmission Reinforcements Associated w/ Scenario : Imperial Valley Sub. rd 00/0kV Bank - 0 $,41 Sycamore Canyon Sub. rd 0/kV Bank - 01 $ 11, Felicita-Ash Tap Reconductor to 1 MVA TL 1 01 $, San Luis Rey-Melrose Tap Reconductor to 04 MVA TL 0 0 $,4 Sycamore Canyon-Pomerado Reconductor to 04 MVA TL 1 and 4 01 $ 4,1 New Dbl. Ckt. 0 kv Transmission Line Geothermal to IV 0 $,4 New 0 kv Substation at Geothermal 0 $, I V Upgrade to Interconnect Geothermal 0 kv Lines 0 $, Total Unescalated Cost of Scenario Transmission Reinforcements: $ 1,4