Park & Ride Lot Investment Strategies

Similar documents
Statewide Park & Ride Inventory and Usage Study, March 13, 2013 Liz McAdory, VDOT, Transportation & Mobility Planning Division

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

HAMPTON ROADS TRANSPORTATION PROJECT PRIORITIES FOR THE 2034 LONG-RANGE TRANSPORTATION PLAN

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

DRAFT DRAFT. Agenda Item #8. Presented to the Hampton Roads Transportation Planning Organization Board March 19, 2015

Naval Station Norfolk Transit Extension Study. October 2014

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

TEXAS RURAL TRANSPORTATION PLAN 2035 (TRTP 2035)

Richmond Area MPO Regional Priority Transportation Projects

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Downtown Parking/Wayfinding Study. Review of Recommendations to City Council: January 16, 2018

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Waco Rapid Transit Corridor (RTC) Feasibility Study

Bus Stop Optimization Study

SUPPORTING TOD IN METRO CHICAGO

5. OPPORTUNITIES AND NEXT STEPS

Corridor Management Committee. March 7, 2012

FREQUENTLY ASKED QUESTIONS

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

Utility work, road construction substantially done on Fourth Street

Background Information about the Metrobus 29 Lines Study

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

The Eastern Connector Study November, 2007 planning for the future

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

East Link Extension. September 16, Bel-Red Conclusion to Final Design Open House Public Involvement Summary

Plattsburgh Downtown Parking Study

Action 6A: HRTAC FY2018 FY2023 Funding Plan

JOINT FACILITIES ADVISORY COMMISSION. ART and APS Bus Parking Informational Session July 27, :30 pm

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

The Engineering Department recommends Council receive this report for information.

West Broadway Reconstruction/LRT Design. March 19, 2015

Informal Business Discussion Minutes Tuesday, May 3, :00 PM 1. Transportation

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Richmond Area MPO Regional Priority Transportation Projects

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Stoughton Center Parking

Executive Summary October 2013

Proposed HRTAC FY2018 FY2023 Plan of Finance Update

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

Business Advisory Committee. November 3, 2015

Peninsula Corridor Electrification Project (PCEP)

Citizens Committee for Facilities

A Transit Plan for the Future. Draft Network Plan

Elizabeth River Crossings Study June 2008

4.0 TIER 2 ALTERNATIVES

Appendix C. Parking Strategies

CEDAR AVENUE TRANSITWAY Implementation Plan Update

PARKING OCCUPANCY IN WINDSOR CENTER

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

NEW YORK CITY CARSHARE PILOT

ARLINGTON COUNTY, VIRGINIA

SamTrans Business Plan Update May 2018

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

MPO Staff Report Technical Advisory Committee: July 12, 2017

TECHNICAL COORDINATING COMMITTEE (TCC) UPDATE PRESENTATION APRIL 26, 2017

CTA Blue Line Study Area

Leveraging Land Use Changes through Transportation Funding

Paratransit Overview O & O Presentation January 11, 2018

VDOT Unused Facilities

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

METRO Orange Line BRT American Boulevard Station Options

STH 60 Northern Reliever Route Feasibility Study Report

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

A Plan to Connect Baltimore

Parking Management Element

CREATING CONNECTIONS IN THE CITY OF WATERLOO

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT

L. A. Metro s Parking Management Program Principles Applied. October 17, 2011 Rail-Volution, Washington D.C.

Green Line LRT: Beltline Recommendation Frequently Asked Questions

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

Appendix 11-B 24-HOUR RAINFALL DEPTH DATA FOR VIRGINIA

Connected and Automated Vehicle Program Plan. Dean H. Gustafson, PE, PTOE VDOT Statewide Operations Engineer February 10, 2016

Regional Safety Action Plan and Safety Investigation Program

Mobility Corridor Updates. Transit & Active Transportation Projects

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

Harlem Avenue between 63 rd and 65 th

M E M O R A N D U M INTRODUCTION. POTENTIAL TDM STRATEGIES Marketing & Management. Residents & Employees. Exhibit 6

Policy Advisory Committee Meeting November 13, 2013

Transit Access Study

Parking Management Strategies

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

ADM ASSIGNED POLICE VEHICLE PROGRAM

Major Widening/New Roadway

Geary Corridor Bus Rapid Transit

Appendix H: Tier 2 Evaluation Methodology and Results February 2017

WELCOME. Transit Options Amherst - Buffalo Public Workshops

Transportation Sustainability Program

Attachment 5 Eglinton West LRT Planning and Technical Update

Planning for Sustainability: Electric Vehicles

CREATING CONNECTIONS IN WATERLOO REGION

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Transcription:

Park & Ride Lot Investment Strategies Hampton Roads Transportation Technical Advisory Committee May 7, 2014 Carl E. Jackson, AICP Transportation Planning Specialist Hampton Roads District

VDOT Park & Ride Lot Inventory & Usage Study COMPLETED Project Team: VDOT SIR Kimley-Horn The Traffic Group Webbones SAG Timeline Began in fall of 2011 Completed early 2013 2

Goals / Objectives of P&R Study Conduct a statewide inventory of existing Park & Ride lots Identify recommendations for new, expanded or relocated/closed lots Update/reconstruct the VDOT Park & Ride website Enhance VDOT s statewide Park & Ride Program Develop formal PNR program Evaluate & establish VDOT policies & procedures Evaluate & clarify staff roles & responsibilities Increase coordination with Department of Rail and Public Transportation (DRPT) and other agencies Improve collaboration and coordination with multi-modal partners Increase public outreach and awareness Increase public access to information 3

Study Deliverables 1. Lot audit and inventory database a) Pictures b) Latitude and Longitude c) Number of spaces (incl. handicapped spaces) d) Amenities e) Special comments 2. Recommendations for new, expanded, relocated lots 1. Includes recommendations from comp. plans, MPO/PDC plans, statewide plans, etc. 2. Database and maps 3. Reconstructed website and embeddable widget 4. P&R Program Goals and Objectives / Best Practices 5. Public Outreach User Survey 4

Deliverable: Reconstruct VDOT Website 5

Deliverable: Lot Audit & Inventory Update Audited 16 lots in Hampton Roads District (3 lots in Gloucester) Chesapeake Greenbrier Mall Newport News Denbigh Fringe Parking Lot Lee Hall Commuter Parking Lot Portsmouth Park & Sail Commuter Parking Lot Suffolk Magnolia Commuter Parking Lot Route 58/460 Bypass Virginia Beach Silver Leaf Station Indian River Road Isle of Wight County/Smithfield Smithfield Commuter Parking Lot Bartlett James City County Croaker Road Jamestown Center Surry County Municipal Center Jamestown-Scotland Ferry Sussex County Stony Creek York County Lightfoot Gloucester County Guinea Road Commuter Lot Hayes Road Commuter Lot Rappahannock Parking Lot 6

Deliverable: Lot Audit & Inventory Update Additional Lots to be added to State Inventory Norfolk LRT Park & Ride Lots Harbor Park Station Ballentine/Broad Creek Station Military Highway Station Newtown Road Station Hampton Roads Transit Hampton Transportation Center Closed lots removed from State Inventory Great Neck Commuter Parking Lot (Virginia Beach) Patrick Henry Mall Commuter Lot (Newport News) Edgehill Commuter Parking Lot (Gloucester) Abingdon Rescue Park and Ride (Gloucester) 7

8

Deliverable: User Survey Findings Hampton Roads Average time of arrival to P&R Lot 6:02am 64% of P&R lot users in HR use lots five days / week 99% of all lot users use the lots to commute to work Of users surveyed, they chose the following mode once parked at the lot 9

Deliverable: User Survey Findings Hampton Roads Average distance traveled to get to P&R lot is 9 miles Average time spent traveling to P&R lot is 14 minutes Average distance and time traveled from P&R lot to destination is 26 miles and 41 minutes. Average total commute is 35 miles and 55 minutes. 10

Deliverable: P&R Lot Recommendations Maintenance at seven lots, including paving; resurfacing; enhance with lighting, bike racks, installing drainage, replacing signage, etc. Expand lot and connect bike and pedestrian facilities Establish formal agreement for existing and proposed lots Expand park & ride services A preliminary list of detailed recommendations was vetted with TRAFFIX Oversight Subcommittee in November 2013 11

VDOT Park & Ride Lot Investment Strategies Study Step 1: Recommendations VDOT completed a P&R Lot Inventory and Usage Study from 2011-2013 http://www.virginiadot.org/projects/park_and_ride_lot_inventory_and_usage_study.asp Step 2: Priority Investment Areas (PIAs) VDOT staff compiled various data on each of the recommendations. A GIS Methodology was conducted with this data to identify Priority Investment Areas (PIAs): areas with a convergence of population density, high peak hourly traffic volumes and the proximity of the nearest existing P&R lot Major corridor that would be served by the potential P&R lot. The following data was used in this analysis: 1. 2010 Census Population Density 2. Volume per hour along routes 3. Location of existing lots 12

13

14

Hampton Roads District P & R Priority List Rank Locality Lot Name Description ADT Workers 3 mi radius Workers Travel Outside Percent Travel Outside 1 VIRGINIA BEACH Indian River Road Park & Ride Expand lot by 50-100 spaces 186939 46787 39999 85.49% 2 VIRGINIA BEACH Silverleaf Commuter Parking Lot Expand lot by 50 spaces 186939 62651 52406 83.65% 3 CHESAPEAKE New Proposed lot (Chesapeake Center) Lease agreement I-664 & Rte 337 112753 19567 18099 92.50% 4 NEWPORT NEWS Denbigh Fringe Commuter Lot Repave & enhance lot near Rte 60 133148 25500 22004 86.29% 5 CHESAPEAKE Greenbrier Mall Commuter Lot Expand lot by 150 spaces 77152 25515 21156 82.92% 6 CHESAPEAKE New Proposed lot (Hanbury Road) Construct New lot near Chesapeake Exp 59178 21559 18626 86.40% 7 NEWPORT NEWS Lee Hall Commuter Parking Lot Expand lot by 50 spaces near I-64 133148 4985 4759 95.47% 8 NEWPORT NEWS New Proposed lot (Huntington Park) Lease agreement to use lot near Rte 17 146303 27973 22191 79.33% 9 JAMES CITY COUNTY Croaker Road Commuter Parking Lot Pave & enhance lot near I-64 63380 3709 3445 92.88% 10 YORK COUNTY Lightfoot Commuter Parking Lot Pave & enhance lot near I-64 63380 4764 4209 88.35% 11 SURRY COUNTY Jamestown-Scotland Ferry Lot Pave & enhance lot near Rte 31 4278 256 253 98.83% 12 PORTSMOUTH New Proposed Lot (Greenwood) Construct New lot, I-264 & Greenwood Dr 77752 25701 21903 85.22% 13 PORTSMOUTH Park & Sail Commuter Parking Lot Repave & enhance lot at Court St & I-264 92065 36931 25108 67.99% 14 ISLE OF WIGHT COUNTY Bartlett Commuter Parking Lot Repave & enhance lot near Rte 17 28580 2886 2774 96.12% 15 ISLE OF WIGHT COUNTY Smithfield Commuter Parking Lot Expand lot at Rte 10 & Rte 258 28580 4516 3660 81.05% 15

VIRGINIA BEACH Indian River Road Commuter Lot Reon Drive and Route 407 Major Corridors Service: I-64 and Indian River Road Owner/Maintenance: VDOT Transit Service: HRT Spaces: 283 Avg. Occupancy: 56% Expand Lot by 50-100 Spaces Silverleaf Commuter Lot Silverleaf Drive and Route 225 Major Corridors Service: I-264 and Independence Blvd Owner/Maintenance: VDOT Transit Service: HRT Spaces: 260 Avg. Occupancy: 77% Expand Lot by 50 Spaces 16

CHESAPEAKE Greenbrier Mall Commuter Lot Mall Entrance and Greenbrier Pkwy Major Corridor Service: I-64 Owner/Maintenance: Private Transit Service: HRT Spaces: 50 (designated) Avg. Occupancy: 186% Expand Lot by 150 Spaces New Proposed Lot (Chesapeake Center) I-664 & Route 337/Portsmouth Blvd Major Corridor Service: I-664 Owner/Maintenance: Private Transit Service: HRT Spaces: N/A Occupancy: N/A Establish Lease Agreement New Proposed Lot (Hanbury Road) Chesapeake Exp/Hanbury Road Major Corridor Service: Rte 168 Owner/Maintenance: VDOT Transit Service: HRT Spaces: N/A Occupancy: N/A Construct New Lot 17

NEWPORT NEWS Denbigh Fringe Commuter Lot Route 60 and Old Courthouse Road Major Corridors Service: I-64 and Route 60 Owner/Maintenance: VDOT Transit Service: HRT Spaces: 265 Avg. Occupancy: 10% Repave and Enhance Lot Lee Hall Commuter Parking Lot Route 238 and Route 143 Major Corridors Service: I-64 and Route 143 Owner/Maintenance: VDOT Transit Service: None Spaces: 32 Occupancy: 56% Expand Lot by 50 spaces New Proposed Lot (Huntington Park) Mercury Blvd & Hornet Circle Major Corridors Service: Route 17/James River Bridge Owner/Maintenance: City Transit Service: HRT Spaces: N/A Occupancy: N/A Establish Lease Agreement 18

WILLIAMSBURG/JAMES CITY/ YORK/SURRY Croaker Road Commuter Lot Route 30 and Route 607 Major Corridors Service: I-64 and Route 30 Owner/Maintenance: VDOT Transit Service: WATA Spaces: 70 Avg. Occupancy: 56% Pave and Enhance Lot Lightfoot Commuter Parking Lot Route 30 and Route 199 Major Corridors Service: I-64 and Route 199 Owner/Maintenance: VDOT Transit Service: WATA Spaces: 70 Avg. Occupancy: 26% Pave and Enhance Lot Jamestown-Scotland Ferry Lot Route 31 and Route 637 Major Corridors Service: Route 31 and Jamestown Ferry Owner/Maintenance: VDOT Transit Service: WATA Spaces: 20 Avg. Occupancy: 15% Pave and Enhance Lot 19

PORTSMOUTH Park & Sail Commuter Lot Court Street and Crawford Street Major Corridor Service: I-264 Owner/Maintenance: VDOT Transit Service: HRT Spaces: 119 Avg. Occupancy: 13% Repave and Enhance Lot New Proposed Lot (Greenwood) I-261 and Greenwood Drive Major Corridors Service: I-264 Owner/Maintenance: VDOT Transit Service: HRT Spaces: N/A Avg. Occupancy: N/A Construct New Lot 20

ISLE OF WIGHT Bartlett Commuter Parking Lot Route 669 and Route 17 Major Corridor Service: Route 17 and James River Bridge Owner/Maintenance: VDOT Transit Service: HRT Spaces: 10 Occupancy: 60% Repave and Enhance Lot Smithfield Commuter Parking Lot Route 258 and Route 10 Major Corridors Service: Route 258 and Route 10 Owner/Maintenance: VDOT Transit Service: HRT Spaces: 66 Occupancy: 42% Enhance Lot 21

NORFOLK LRT PARK AND RIDE LOTS Harbor Park Station 176 spaces Ballentine / Broad Creek Station 105 spaces Military Highway Station 232 spaces Newtown Road Station 266 spaces HAMPTON TRANSPORTATION CENTER Address: 2 West Pembroke Avenue, Hampton Major Corridor Service: I-64/Hampton Roads Bridge Tunnel Owner/Maintenance: HRT Transit Service: HRT 138 spaces 22

Major Milestones / Schedule Business Plan Milestones: October 18-21, 2013 Develop district P&R list of priorities October 31, 2013 Submit a DRAFT list of each district s P&R priorities Including at least some level of MPO coordination November 29, 2013 Completion of Richmond district pilot List of coordinated priorities Online map of priorities Cost estimates Existing and recommended lots One-pager (final deliverable for this milestone) April 1, 2014 Begin stakeholder input Online map will be used to solicit input 23

TPO Coordination to date October 7-10, 2013: Requested feedback from TRAFFIX Oversight Subcommittee (TOS) on recommendations from Park and Ride Inventory and Usage Study October 15, 2013: Received feedback from TPO based on citizen survey from Military Commuter Study October 21, 2013: District staff sent DRAFT preliminary recommendations to VDOT central office for review November 6, 2013: District staff presented recommendations to the TRAFFIX Oversight Subcommittee and received additional local feedback. April 1-30, 2014 : District staff requested feedback from TOS on Priority Investment Recommendations. May 7, 2014: Presentation to TPO Transportation Technical Committee on Priority Investment Recommendations 24

Questions / Comments / Discussion? Thank you! Carl E. Jackson III, AICP Transportation Planning Specialist Virginia Department of Transportation Hampton Roads District 757.925.2596 carl.jackson@vdot.virginia.gov 25