Job Report. Moving Oil Rig Baronia at Ulsan, Korea. Facts Weight: t Moving distance: 120 m. Handling equipment Strand jack F-1000:

Similar documents
Job Report. New coastal highway route, Reunion Island, France. Facts Heaviest Modul: t Prefabricated pillars:

Job Report. Bosphorus Bridge, Turkey

KONGSBERG Maritime AGENDA 07/11/2012. Geir Håøy - President Kongsberg Maritime. Introduction to Kongsberg Maritime. Our markets.

Everett E Henderson Jr R.G. LeTourneau Scorpion Drilling Rig

KCC 6.8 HMD 3.9. National Pension 9.1. Hyundai Motors 2.9. HHI Holdings Asan Foundation 3.0. Treasury Stock 0.1. Others 46.5

Incremental Lifting System

Enerpac Integrated Solutions

Incremental Lifting System

DRILLING BARGE SS AMEQ CASPIAN SEA

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

The Pure Play Tender Drilling Contractor Simplified Overview

New Queensferry Crossing

- Shipbuilding Division - Offshore & Engineering and Industrial Plant Division - Engine & Machinery Division

CHAPTER 10 FLOATING WHARVES

- Shipbuilding Division - Offshore & Engineering and Industrial Plant Division - Engine & Machinery Division

CARGOTEC CORPORATION, PRESS RELEASE, 20 NOVEMBER 2014 AT AM EET. MacGregor s Hatlapa brand celebrates 95 years of engineering excellence

> THE A.P. MOLLER - MAERSK GROUP CONTAINER EQUIPMENT GUIDE

CONSULTMARINE SA cc CK # 2000/015744/23 CONSULTING MARINE ENGINEERS AND SHIP SURVEYORS

MBH series STONIMAGE MBH MOBILE BOAT HOIST MADE IN CHINA. Sailboat To serve the sailboat production and launch it to the lake and sea.

CONFIDENCE DYNA-MAC HOLDINGS LTD.

3. Steam Turbines and Boilers

SUYANTO RAWAT SUROTO PERSONEL PACTICULARS Last update June, 2014

Optimising overall functionality of your ships integrated anchor handling, towing, mooring and subsea load handling solutions

Evolving Global Oil Trade Flows. IEA-IEF-OPEC Joint Meeting Vienna, March 2018

L27/38 GenSets Ordered for TML Heavy Transport Vessels

03 MORDEC MORDEC MORDEC MORDEC MORDEC 15 MORDEC 16 MORDEC 17 MORDEC

Cascade and Chinook Journey History and Future

Hydraulic Cylinders for Offshore Applications

Global and China FPSO Industry Report, Dec. 2011

THE DESIGN OF ANCHOR ELEVATION PLATFORMS FOR CUTTER SUCTION DREDGE D ARTAGNAN

MARINE FENDERS ISO EDITION FLOATING FENDERS SYSTEM FENDERS FIXED FENDERS ROPES & RIGGING SERVICE. noreqfender.no

Appendix H: Construction Impacts H-3 Air Quality

Flexifloat Field Assembly Guide

March 22 nd, Southeast Asia were $3/MT lower on average... INSIDE THIS ISSUE. General Comments:

2019 elearning Platform

LIFTING LETTER THE BRIDGING THE GAP STORY ON PAGE 4 A PUBLICATION OF BARNHART CRANE & RIGGING COMPANY BARNHART CRANE & RIGGING COMPANY

Hybrid Riser Tower Tailored for Local Shallow Water Needs

Introduction of AVIC International

Author s Name Name of the Paper Session. PDynamic. Positioning Committee. Marine Technology Society

Self-propelled barges:

The Royal Institution of Naval Architects

Jan-Erik Räsänen, ABB Marine and Cranes/Tanker day Spore, ABB Marine Energy Efficiency Tanker day Singapore Oct 11th 2013

First published June 2007 Copyright China Trend Building Press Limited

DETAIL OF MAJOR EXPERIENCE ISO 9001:2008 Certificate No.: KLR

The oil & gas industry driven by David Brown.

LIFT YOUR PRODUCTIVITY

The German Maritime Industry. Competence and Quality made in Germany. Canada, September 2017

ST. VINCENT AND THE GRENADINES

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Examples of the application of Permanent Means of Access to Tankers

MHD SPE - The self-propelled, electronically steered heavy load combination

Downstream & Chemicals

GEARBOXES CUSTOM PROPELLERS, SHAFTS AND RUDDERS TUNNEL THRUSTERS AZIMUTH THRUSTERS CONTROLLABLE PITCH PROPELLER SYSTEMS

Underwater Retrofit of Steerable Thrusters

specialized in modular PONTOON solutions for various purposes and applications

Monthly Economic Letter

COMPANY INTRODUCTION A SOLUTION PROVIDER

Integrated Solutions

Hywind Scotland status and plans

Shipbuilding Statistics APRIL, 2017

SUB SEA SYSTEMS INTERNATIONAL NIGERIA LIMITED CLOCKSPRING

Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection

Pacific Ports Conference on Clean Air Policies and Strategies

Air time! AMERICAN CRANES & TRANSPORT. Lift planning. Specialized Lifting. Crane inspections. Ranking North America s top tower crane-owning companies

Dynamic Positioning TCommittee

HC-278H II. HYLAB Series. Lattice Boom Truck Crane 300-ton (272 mt)

BOK SENG LOGISTICS TRENDS IN SINGAPORE AND SOUTH EAST ASIA S CRANE AND TRANSPORT SECTOR SPEAKER : VINCENT TEO & STEVEN TAN

SHORE POWER ALTERNATIVES AAPA ENVIRONMENT COMMITTEE SEPTEMBER 17, 2015 JOSEPH HOWER, PE, DEE

MCL Unitex Ltd Project References

BE FREE FROM MARINE FOULING. MARELCO Anode Types 03. MARELCO Typical Installs 04. MARELCO Anode Tape 05. MARELCO Safety Cap & Studs 06

Power Transmission Division Erlangen, April 29, Siemens Completes Installation of Second HVDC Converter Platform for TenneT

Shipbuilding Statistics SEPTEMBER, 2018

elearning PLATFORM 2018

OUTLINE OF SPECIFICATION FOR 400FT JACK UP RIG (CP400)

When you need to find a way

Submarine Power Cables

Vessel Portfolio. Your Partner in Offshore Services.

Deepwater Solutions. Tesco offers casing and tubular running services for both land and offshore applications

Golden Way Co. Company Profile

MULTI AXLE TRAILER, & LIFTING SERVICES HEAVY TRANSPORT HEAVY LIFTING (MOBILE CRANE & SKY LIFT) PRIME MOVER & HAULAGE JACKING & SKIDDING

Introduction Elastomeric Bearing Expansion Joints Construction Profiles Projects

Monthly Economic Letter

HISTORICAL DEVELOPMENT OF DYNAMIC POSITIONING

Hydraulic Floor Jack Repair Manual File Type

Welcome. to the. Salt Water Reverse Osmoses Water Making Presentation

Dropped Object Incidents on Chevron operated assets

CLASS 245 LIFTBOAT SEACOR EAGLE SEACOR EAGLE CLASS 245 LIFTBOAT. LEG CAPACITIES ELECTRONIC AIDS & COMMUNICATIONS HULL

Marine product guide. Engines and generator sets

INSTALLATION OF A SUBMERGED BUOY FOR SUPPORTING RISERS (BSR) SYSTEM IN CAMPOS BASIN SITE

Monthly Economic Letter

BUILT ON TRUST REVERSE CIRCULATION DRILLING RIG

Power From Shore: An introduction to HVDC Light Offshore

Marine product guide. Engines and generator sets

INDONESIA EXPORT AND IMPORT, APRIL 2017

sg..com PMC Praj Marine Consultants Pte Ltd Singapore

SPECIAL LEGISLATIVE COMMISSION TO STUDY POTENTIAL ECONOMIC OPPORTUNITIES IN THE DEVELOPMENT OF PORT FACILITIES IN THE STATE OF RHODE ISLAND

Rolling drums while California dreams

WORLD CLASS through people, technology and dedication. KONGSBERG September 20,

SNAME Luncheon 14 Sept Wind Turbine Installation Vessels

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal

Transcription:

Moving Oil Rig Baronia at Ulsan, Korea Weight: 17 000 t Moving distance: 120 m Strand jack F-1000: 4 pcs On May 2017 the 17 000 ton weighing oil rig was shifted to load on bord of a barge and eventually put into operation in the Gulf of Thailand. Hebetec Engineering Ltd was fully responsible for shifting works. For the loading the oil rig was moved with strand jacks and sliding shoes with teflon inlays.

Moving Oil Rig Bergading at Ulsan, Korea Weight: 24 000 t Moving distance: 120 m Strand jack F-1000: 6 pcs On March 2017 the 24 000 ton weighing oil rig Bergading was shifted to load on bord of a barge and eventually put into operation in the Gulf of Thailand. Hebetec Engineering Ltd was fully responsible for shifting works. For the loading the oil rig was moved with strand jacks and sliding shoes with teflon inlays.

Moving of an Oil Rig at Bongkot, Thailand Weight: 23 600 t Moving distance: 90 m Strand jack H-600: 8 pcs On July 2011 the 23 600 ton weighing oil rig was shifted to load on bord of a barge and eventually put into operation in the Gulf of Thailand. Hebetec Engineering Ltd was fully responsible for shifting works. For the loading the oil rig was moved with strand jacks and sliding shoes with teflon inlays.

Moving of DSO Meren (GGCP) Topside & LSF, Korea Weight (LSF 600t): 7 750 t Moving distance: 90 m Strand jack H600: 4 pcs In 2014 the DSO Meren topside was moved for load out. Hebetec Engineering Ltd. provided the equipment for this load out action. The 4 strand jacks with a total pulling capacity of 2 400t were operated by a centralized control system. The topside has been moved onto a barge, operated by Cosco.

Installation of an Oil Platform in Malaysia conventional platform assembly and successfully utilized it in the China Sea. Maximum Weight: 3 600 t Weight of the platform: 2 200 t Weight of the legs: 100 t Lifting distance of the platform: 12 m Lowering distance of the legs: 20 m Stand jacks H-400: Stand jacks HA-140: Central computer control system 12 Stk 8 Stk The M.O.A.B. is a platform, which installs itself at the site of operation without additional auxiliary means like floating cranes. The platform is equipped with the there to required strandjacks on shore. The legs held by two HA-140 strand jacks are inserted after platform load out. Strand jacks installed upside-down at all platform corners are anchored to the heads of the legs. Following the transport to the site of operation, the platform is positioned exactly above the substructure on the ocean floor. The legs are lowered with lowering strand jacks HA-140, until they float. By flooding the legs are inserted into the substructure. As soon as all four of them are in position, the platform is lifted. After lifting, one strand connection after the other is disassembled and replaced by the definitive suspension (Superbolt). Overdick and partners together with Hebetec Engineering Ltd. developed a cost-effective alternative to

Moving of the Platform NR2, Korea Weight: 32 000 t Moving distance: 200 m APS-250: Push-Pull Unit PPU-160: 208 pcs 6 pcs In 2011 the offshore gas production within the largest gas filed in Australia s North West was expanded. For this purpose a platform, weighing 32'000 tons, was built in South Korea by Hyundai Heavy Industries company. High precision work was required to shift the platform over 200 meters distance. By applying 208 pieces of APS-250 modules with a total capacity of 52'000 tons Hebetec Engineering Ltd. mastered this assignment reliably and free of troubles. 6 Push-Pull units with a pushing capacity of 960 tons moved the colossus onto world largest barge.

Moving of 50 Oil Tanker by Air-Pad-Sliding System (Korea) Length, width, height: 244, 42, 32 m Weight: 22 000 t Moving distance: 91 m Total lifting capacity: 35'690 t Maximum friction: 0.5 % Air-Pad Sliding Module APS-250: Push-Pull unit: Hydraulic aggregate PA4-16: 140 pcs 4 pcs 4 pcs In 2004 in Korea as a world s first an oil tanker was built on shore without using dry-dock. By means of the newly developed APS (Air-Pad- Sliding System) Hebetec Engineering Ltd. Successfully moved the tanker onto a barge. In succession until 2008 a further 49 vessels were built and transported in the same manner using the APS system. HEBETEC Engineering AG info@hebetec.com T +41 (0)34 411 71 71

Load-Out of 22 Ships Tsuji, Korea Vessel length, -width, -height: 170, 28, 16 m Weight: 2 500-8 600 t Moving transverse: 30 m Moving longitudinal: 150-500 m Handling Equipment APS M-385: Push-Pull unit PPU-32: 32 pcs 8 pcs Instead of just constructing vessel segments Tsuji Heavy Ind. decided to build entire vessels. Hebetec Engineering Ltd. moved 22 vessels from production areas to load onto barges by using APS (Air Pad Sliding System). Transvers movement of 30m were followed by longitudinal sliding over up to 500m distance. The APS modules being installed in mobile cradles were applied at two production areas.