RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST

Similar documents
East Allen County Schools Facilities History Calendar Years October 5, 2015

WINNER. Orange County Public Schools. 100% Design Community Meeting Hidden Oaks Elementary School February 21, 2017

Watauga County Schools Capital Improvement Plan 2015

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

City of Surrey PLANNING & DEVELOPMENT REPORT File:

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Operations Center FAQs

FACILITIES NEEDS ASSESSMENT - FACILITY MASTER PLAN CONSTRUCTION COST ESTIMATE FULLERTON JOINT UNION HIGH SCHOOL DISTRICT

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets.

Committee Approved Critical Repairs

$1.50 per hour. (includes custodial) custodial* (if necessary) $10.00 per hour plus $20.00 per hour plus $60.00 per hour plus

Parking and Loading. Page 1 of 7

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

LEED v4 Building Design and Construction Quiz #3 LT

Sketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018

District Technology Purchase and Replacement Plan for the 4-year Levy Cycle,

New Hanover County Schools Capital Outlay Summary &

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested

ERUSD 2025 Board Workshop #1

This letter summarizes our observations, anticipated traffic changes, and conclusions.

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A

Campus Summary. Page 1 of 6

Report Number: Date: June 12, 2012 INFORMATION FOR DECISION

Burlington Capital Improvement Plan: FY FY 2023

SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

ARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS

General Information. No right turn on Tulane. Student Drop-Off Area. Bike Parking

TOWN OF MARANA, ARIZONA LAND DEVELOPMENT CODE

Guideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement

AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS September 2010

NEW ELEMENTARY SCHOOL #1 Open BLPC Meeting January 9, 2013

WASTE AUDIT RESULTS AND WASTE REDUCTION WORKPLAN

OFF 7 6:30 & PICK UP:

STANDARD FOR OFF-STREET PARKING AND SERVICE FACILITIES

Article 10 Parking and Loading Standards

CASE STUDY APPLICATIONS OF THE DC300

Tot Lot. Up to 2nd Level. Visitor Parking. Leasing Office Entry Fitness Leasing Below Entry Gates

AMERICA S CENTER. America s. Center

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

THE CARMONY BUILDING ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED ELECTRICAL SYMBOLS AND ABBREVIATIONS

ARTICLE 501 OFF-STREET PARKING AND LOADING

The Educational Special Purpose Local Option Sales Tax (ESPLOST II) went into effect on January 1, 2012.

False Pass Final Report

Updated 10/16/2018. BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs

ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019

Carson City School District Completed School Bond

Welcome to the 2019 NESBA Winter Guard Championships! State time: 12 Noon Gates open to units and spectators at 10:45AM

Transportation and Facilities Report. Tuesday, January 23, 2017 Cynthia Kwiatkowski: Director of Transportation and Facilities

New Braunfels ISD Calendars

ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS

Empowering. An Overview of Solar Project Development, Deployment and Innovations. Photos courtesy of TUSD & Paul M. Ingram/TucsonSentinel.

GREAT NECK UNION FREE SCHOOL DISTRICT

±25,934 SF C-3 ZONED PAD

Village End Use Energy Efficiency Measures Program. AEA Grant # Administered by Alaska Building Science Network. Huslia Final Report

Demographic Report. Jarrell Independent School District. Spring Learn from Yesterday Understand Today Plan for Tomorrow

GSW Parking Policies I. GENERAL

Cold Spring School District 2243 Sycamore Canyon Road, Santa Barbara, CA (805)

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

Purpose of Capital Improvement Program

James N Thorp Elementary School

Site Technology Device Management and Theft Prevention Plan

1. Fowler Ave & Leroy Collins Blvd (map below) From Fowler, turn RIGHT on Leroy Collins, LEFT on USF Alumni, and RIGHT on USF MAGNOLIA DRIVE

-- CURRENT AND PROJECTED CAPACITY UTILIZATION -- SCHOOL YEARS

DISD NATHAN ADAMS ELEMENTARY SCHOOL

TRANSPORTATION TECHNICAL REPORT

CAPITAL IMPROVEMENT PLAN FISCAL YEARS

Project Summary. Evanston Water Treatment Plant Upgrade. Install new water filtration equipment

2016 JLPT Test Site Information Atlanta, GA

TANDEM AND OFF-STREET PARKING DISCUSSION PAPER 2013

Pace Bus Depot Location Analysis

The Millenia Town Center consists of a ±12.58 acre portion of the ±210 acre. The Millenia Town Center is currently planned to include two projects

2018 Training for Departmental Parking Representatives

Bus Congestion on the West Side of Manhattan. 6/6/14 Manha*an Community Baord 4 1

Mercer Island Center for the Arts Parking Management Plan

FOR REFERENCE ONLY LEGEND: GENERAL NOTES: UNDERGROUND GARAGE LEVEL FLOOR PLAN DR-10-0 SCALE : 1" = 30'-0"

2019 Bond Program. Bond Advisory Committee Rankings. November 12, 2018

Table 1. Air Sampling Results (ng/m 3 ) for Building D (100 and 200, Mako Shark) at MHS Malibu High School Malibu, California

FACILITY NAME, SIZE, AND RENTAL RATES - Effective - July 2017

Vehicle Registration and Parking Policy

ECOKIDS BATTERY BUSTERS AUDIT

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS

Facilities Energy Report Fiscal Year 2016 Third Quarter

Informational Pre-Budget and CIP Council Workshop

Problem 14 Space for Parking E212 - Facilities Planning and Design

Introduction. School Overview TECHNICAL MEMORANDUM

OFF STREET PARKING AND LOADING

Requests Conditional Use Permit (Open Air Market) Staff Recommendation Approval. Staff Planner Kristine Gay

Schneider Electric Energy Solutions Savings Report. Florence City Schools

Carroll County Public Schools Transportation Services Department

WELCOME. Nanaimo Harbour and Gabriola Island Terminal Development Plans (TDPs)

CRDM Projects Approved

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

DIVISION 400 OFF-STREET PARKING AND LOADING

E. LAUREL HEIGHTS BACKGROUND

EDUCATIONAL PLANT FIVE YEAR SURVEY REPORT

DSO Program Management Project List

Transcription:

RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST 01. 2016

DESIGN SCHEME COMPARISONS SCHEME A: 2-Story building and parking garage, no code variance required. SCHEME B: 5-Story building(3 school levels built over 2 parking level, planned development(pd) code variance required. COMPARATIVE SUMMARY POINTS* POSITIVE NEGATIVE REMARKS GREEN SPACE/PLAY AREA SCHEME A 85,000 SF / 1.95 ACRES ± 10% SCHEME B 93,000 SF / 2.13 ACRES ± 10% + STUDENT CAPACITY SCHEME A 725 TO 750 STUDENTS SCHEME B 725 TO 750 STUDENTS ON-SITE PARKING SCHEME A 240 TO 260 CARS SCHEME B 240 TO 260 CARS QUEUE CAPACITY SCHEME A 230 TO 250 CARS SCHEME B 230 TO 250 CARS COST EFFICIENCY SCHEME A $30.8M SCHEME B $29.9M AUG 2018 OPENING ASSURANCE SCHEME A NO CODE VARIANCE REQUIRED, CITY STAFF REVIEW SCHEME B VARIANCE WITH DALLAS PZ COMMISSION VARIANCE WITH CITY COUNCIL ACTION + + + + + + + + - - - Net green space potentially become equivalent given the variance range that will be resolved in the final design. Either scheme will provide requested enrollment capacity. Both schemes will provide greatly expanded parking capacity to that found at a typical RISD elementary campus Both schemes maximize queuing capacity. Stacking 5 structural levels (Scheme B) gains some economies in foundation costs. Shortest timeline to building permit. Extend process required for issuance of building permit. * Diagrams in this presentation are conceptual in nature and not representative of final plans and dimensions. Illustrations are provided as representations of building elements and potential arrangements that can be incorporated into either final design scheme.

SCHEME A - CONCEPTUAL SITE PLAN NO CODE CHANGE REQUIRED 3 LANES GREEN SPACE TOTAL PLAY AREA = Approx. 85,000 SF Approx. 1.95 ACRE PARKING # LANE QUE STACK SPACE # = = 240 ~ 260 230 ~ 250 PLAY- GROUND PLAY- GROUND PLAY- GROUND BUS DROP OFF MAIN LOBBY OPEN PLAYFIELD BUS DROP OFF TURF ROOF SERVICE 3 LANES 0 50 100

SCHEME A - PARKING LV.1 FLOOR PLAN NO CODE CHANGE REQUIRED 536 ft 500 ft DROP OFF AREA ADMIN. DROP OFF AREA 500 ft 3 LANES 500 ft 0 50 100

SCHEME A - PARKING LV.2 FLOOR PLAN NO CODE CHANGE REQUIRED 512 ft DROP OFF AREA 512 ft DROP OFF AREA 3 LANES 0 50 100 512 ft

SCHEME A - SCHOOL LV.1 FLOOR PLAN NO CODE CHANGE REQUIRED COLLABO- RATION 2ND GR. UP KG PLAYGROUND PLAYGROUND PLAYGROUND CIRC. FROM PARKING GARAGE CANOPY ABOVE COLLABO- RATION MAIN ENTRANCE ADMIN. 526 ft PARKING GARAGE BELOW / OPEN PLAYFIELD CAFETERIA KITCHEN CLINIC SUPPORT KG / 1ST GR. 2ND GR. AND UP COLLABORATION GYMNASIUM SUPPORT/STORAGE LIBRARY FOOD SERVICE ADMINISTRATION CLINIC RESTROOM GYMNASIUM FIELD/PLAY AREA CIRC. 0 30 60

SCHEME A - SCHOOL LV.2 FLOOR PLAN NO CODE CHANGE REQUIRED COLLABO- RATION 2ND GR. UP LIBRARY KG ROOF ENTRANCE CANOPY LIBRARY OFFICE OPEN TO BELOW 540 ft OPEN TO BELOW ADMIN. ROOF KG / 1ST GR. LIBRARY RESTROOM OPEN TO BELOW 2ND GR. AND UP FOOD SERVICE CIRC. COLLABORATION ADMINISTRATION SUPPORT/STORAGE GYMNASIUM CLINIC FIELD/PLAY AREA 0 30 60

SCHEME A CONCEPT RENDERING NO CODE CHANGE REQUIRED

SCHEME A CONCEPT RENDERING NO CODE CHANGE REQUIRED

SCHEME A CONCEPT RENDERING NO CODE CHANGE REQUIRED

SCHEME B - CONCEPTUAL SITE PLAN CODE VARIANCE REQUIRED GREEN SPACE TOTAL PLAY AREA = Approx. 93,000 SF Approx. 2.13 ACRE PLAY- GROUND OPEN PLAYFIELD PARKING # LANE QUE STACK SPACE # = = 240~ 260 230 ~ 250 MAIN LOBBY BUS DROP OFF PARKING LV.1 EXIT OPEN PLAYFIELD VISITOR PARKING PARKING LV.1 ENTERANCE SERVICE PLAY- GROUND PLAY- GROUND 0 50 100

SCHEME B - PARKING LV.1 FLOOR PLAN CODE VARIANCE REQUIRED 500 ft DROP OFF AREA 500 ft 3 LANES 500 ft 0 50 100

SCHEME B - PARKING LV.2 FLOOR PLAN CODE VARIANCE REQUIRED 510 ft DROP OFF AREA 510 ft 3 LANES 510 ft 0 50 100

SCHEME B - SCHOOL LV.1 FLOOR PLAN CODE VARIANCE REQUIRED CIRC. OPEN PLAYFIELD PLAYGROUND KG GYMNASIUM 520 ft WALKWAY REST RM ADMIN TEACHER WORK RM OPEN PLAYFIELD 1ST GR STAGE CAFE KITCHEN KG / 1ST GR. LIBRARY RESTROOM CIRC. PLAYGROUND PLAYGROUND 2ND GR. AND UP FOOD SERVICE CIRC. COLLABORATION ADMINISTRATION SUPPORT/STORAGE GYMNASIUM CLINIC FIELD/PLAY AREA 0 30 60

SCHEME B - SCHOOL LV.2 FLOOR PLAN CODE VARIANCE REQUIRED CIRC. 2ND GR OPEN TO BELOW (GYM) CIRC. REST RM LIBRARY OFFICE TEACHER WORK RM 3RD GR LIBRARY 536 ft ALTERNATIVE LAYOUT TRADITIONAL LAYOUT OPEN TO BELOW (CAFE) KITCHEN ROOF CIRC. KG / 1ST GR. LIBRARY RESTROOM 2ND GR. AND UP FOOD SERVICE CIRC. COLLABORATION ADMINISTRATION SUPPORT/STORAGE GYMNASIUM CLINIC FIELD/PLAY AREA 0 30 60

SCHEME B - SCHOOL LV.3 FLOOR PLAN CODE VARIANCE REQUIRED CIRC. 4TH GR GYM ROOF CIRC. ADMIN REST RM TEACHER WORK RM 5TH GR COLLABO- RATION 6TH GR 550 ft TRADITIONAL LAYOUT ALTERNATIVE LAYOUT CAFE ROOF KITCHEN ROOF CIRC. KG / 1ST GR. LIBRARY RESTROOM 2ND GR. AND UP FOOD SERVICE CIRC. COLLABORATION ADMINISTRATION SUPPORT/STORAGE GYMNASIUM CLINIC FIELD/PLAY AREA 0 30 60

SCHEME A B ALTERNATIVE CLASSROOM LAYOUT FLOOR PLAN LAB CLASSROOM COLLABORATION CENTER PRESENTATION STAGE TECH CLASSROOM CLASSROOM

SCHEME A B ALTERNATIVE CLASSROOM LAYOUT AXONOMETRIC VIEW

SCHEME A B ALTERNATIVE CLASSROOM LAYOUT PERSPECTIVE VIEW

SCHEME B CONCEPT RENDERING CODE VARIANCE REQUIRED

SCHEME B CONCEPT RENDERING CODE VARIANCE REQUIRED