Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Similar documents
Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

Reliability Analysis Update

Generation Interconnection Feasibility Study Report. For. PJM Generation Interconnection Request Queue Position Y Linden 138 kv & 230 kv

Reliability Analysis Update

Transmission Expansion Advisory Committee

Interconnection System Impact Study Report Request # GI

CUSTOMER/ TWIN ARROWS PROJECT

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PREPARED DIRECT TESTIMONY

Sub-Regional RTEP Committee PJM South

Transmission Expansion Advisory Committee

ABB POWER SYSTEMS CONSULTING

Interconnection Feasibility Study Report GIP-226-FEAS-R3

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

PJM Regional Transmission Expansion Planning (RTEP) Process

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

Sub Regional RTEP Committee Western Region ATSI

Reliability Analysis Update

Reliability Analysis Update

MILLIGAN SOLAR PROJECT

Interconnection Feasibility Study Report GIP-222-FEAS-R3

New Jersey State Report

PUD ELECTRIC SYSTEM INTERCONNECTION

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Designated Entity Pre-Qualification Materials. Exelon Corporation

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

Substation Lightning Protection. Document Number: 1-11-FR-11

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Sub Regional RTEP Committee Mid-Atlantic

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

Dominion Energy Instructional Guide for Completing Virginia Form NMIN

Transmission Expansion Advisory Committee. Reliability Analysis Update

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

Interconnection Feasibility Study Report GIP-084-FEAS-R2

DFO STATEMENT OF NEED REPORT

HONOLULU AUTHORITY FOR RAPID TRANSPORTATION CITY AND COUNTY OF HONOLULU ADDENDUM NO. 1 TO THE REQUEST FOR INFORMATION FOR THE

100 MW Wind Generation Project

Merger of the generator interconnection processes of Valley Electric and the ISO;

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

Sub Regional RTEP Committee Mid-Atlantic

Supplemental Report on the NCTPC Collaborative Transmission Plan

Merchant Transmission Interconnection PJM Impact Study Report. PJM Merchant Transmission Request Queue Position X3-028.

Generator Interconnection System Impact Study For

Falcon-Midway 115 kv Line Uprate Project Report

Reliability Analysis Update

Consulting Agreement Study. Completed for Transmission Customer

Request for Proposal for Trolley Security Services

Feasibility Study Report

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT

Illinois State Report

Project #148. Generation Interconnection System Impact Study Report

Feasibility Study Report

Transmission Expansion Advisory Committee

Functional Specification Revision History

Sub Regional RTEP Committee Mid-Atlantic

Decision on Merced Irrigation District Transition Agreement

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee Mid-Atlantic

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Interconnection Feasibility Study Report GIP-369-FEAS-R1

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

Interconnection Feasibility Study Report Request # GI

City of Palo Alto (ID # 6416) City Council Staff Report

Interconnection Feasibility Study Report GIP-046-FEAS-R2

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

TRANSMISSION PLANNING CRITERIA

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

West Station-West Cañon 115 kv Transmission Project

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Interconnection Feasibility Study

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

XXXX. Kokish River Hydroelectric Project. Interconnection System Impact Study

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST

TERMS AND CONDITIONS

Transmission Expansion Advisory Committee

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

Sub Regional RTEP Committee Mid-Atlantic

Transcription:

New Transmission Line April 1, 2016 The enclosed information is proprietary to PSE&G and is provided solely for your use. It should not be copied, reproduced, or shared with others without PSE&G s prior written consent.

Table of Contents 1. Executive Summary... 4 2. Company Evaluation... 5 2.1. Contact Information... 5 2.1.1. Primary Contact... 5 2.1.2. Secondary Contact... 5 2.1.3. Headquarters... 5 2.2. Pre-Qualification... 5 2.3. Company Information... 5 3. Constructability Information... 13 3.1. Scope of Project... 13 3.2. Cross-Border Issues... 13 3.3. Proposal Elements... 13 3.3.1. General Description... 13 3.3.2. Geographic Description... 13 3.3.3. Route Description... 13 3.3.4. Physical Characteristics... 16 3.3.5. Map and Supporting Diagram... 17 3.3.6. Interconnection Location... 18 3.3.7. Outage Requirements... 18 3.3.8. Cost... 18 3.3.9. Construction Responsibility... 19 4. Analytical Assessment... 19 4.1. Analysis... 19 4.2. Equipment Parameters and Assumptions... 19 4.3. PSS/E idev Files... 20 4.4. Supporting Information... 20 4.5. Proposal Template Spreadsheet... 20 4.6. Market Efficiency... 20 5. Cost... 21 5.1. Cost Estimate... 21 5.1.1. Total Cost... 21 5.1.2. Yearly Cash Flow... 21 5.1.3. Escalation Rates... 21 5.2. Detailed Breakdown of Cost... 21 PSE&G Restricted Page 2 of 28

5.2.1. Planned Return on Equity... 22 5.2.2. Estimated Monthly AFUDC... 22 5.2.3. Annual O&M Cost... 22 5.3. Cost Commitment... 22 6. Schedule... 23 7. Operations/Maintenance... 25 7.1. Overview... 25 7.1.1. Previous Experience... 25 7.1.2. Intentions for Control Center... 26 7.1.3. Maintenance Contracts... 26 8. Assumptions... 27 8.1. General... 27 8.2. Permitting... 27 8.3. Project Duration... 27 8.4. Cost... 27 Note: Supporting files (PSS/E idev, Case, and Contingency Files) were submitted electronically on March 17, 2016. PSE&G Restricted Page 3 of 28

1. Executive Summary The proposing entity is Public Service Electric & Gas (PSE&G). This proposal is submitted in response to PJM s 2016 Window 1. The violation was identified in the generation deliverability analysis. No additional violations are caused by the solution presented in this proposal. There are no nearby violations not addressed by this proposal. The proposed project is located within the Dominion zone. PSE&G is seeking Designated Entity Status to construct, own, operate, and maintain the proposed project. The following proposes a solution to the thermal overload violation including Flowgate 102. This project should be considered only as a whole. The proposed project cost is approximately base (without Risk & Contingency). The project duration is approximately 4.5 years. In addition to direct benefits above, the new transmission line provides an additional outlet for area generation. PSE&G Restricted Page 4 of 28

2. Company Evaluation 2.1. Contact Information 2.1.2. Secondary Contact 2.1.3. Headquarters 80 Park Plaza Newark, New Jersey 07102 (973) 430-7000 2.2. Pre-Qualification 2.3. Company Information PSE&G Restricted Page 5 of 28

PSE&G Restricted Page 6 of 28

PSE&G Restricted Page 7 of 28

PSE&G Restricted Page 8 of 28

Mickleton-Gloucester-Camden Project Susquehanna Roseland Project Burlington-Camden Project North Central Reliability Project PSE&G Restricted Page 9 of 28

PSE&G Restricted Page 10 of 28

PSE&G Restricted Page 11 of 28

PSE&G Restricted Page 12 of 28

3. Constructability Information 3.1. Scope of Project Build a new 230kV line from the planned 500kV Rogers Road station to the existing 230kV Clubhouse station. 3.2. Cross-Border Issues The following proposal is not a solution to Cross-Border issues. 3.3. Proposal Elements 3.3.1. General Description Build a new 230kV line from the planned 500kV Rogers Road station to the existing 230kV Clubhouse station. 3.3.2. Geographic Description 3.3.3. Route Description 3.3.3.1. Environmental Impacts All applicable environmental studies and permits will be filed and procured as part of this project. PSE&G Restricted Page 13 of 28

3.3.3.2. Right-of-way and Land Acquisition Plan and Approach Land acquisition is anticipated for this project. 3.3.3.3. Permitting Plan and Approach PSE&G Restricted Page 14 of 28

3.3.3.4. Potential Public Opposition PSE&G Restricted Page 15 of 28

3.3.4. Physical Characteristics Line and shield conductor type and size: Overhead or underground/submarine: Overhead Single or double circuit towers: Single Circuit PSE&G Restricted Page 16 of 28

3.3.5. Map and Supporting Diagram PSE&G Restricted Page 17 of 28

3.3.6. Interconnection Location 3.3.7. Outage Requirements Outages will be required at the existing Rogers Road and Clubhouse stations. PSE&G will coordinate with the incumbent Transmission Owner to determine the length and timing of the outages. 3.3.8. Cost PSE&G Restricted Page 18 of 28

3.3.9. Construction Responsibility The new 230kV transmission line from the existing Rogers Road station to the existing Clubhouse station will be constructed by PSE&G. Modifications to the existing Rogers Road station and the existing Clubhouse station are assumed to be constructed by the incumbent Transmission Owner.. 4. Analytical Assessment 4.1. Analysis The output of the analysis showing the solution to identified issue was submitted on March 17, 2016 and is provided below in Table 4: Transmission Line Results. FG # Fr Bus Name To Bus Name CKT kvs 102 314940 8ROGERS RD FN AC % Cont Label 314902 8CARSON 1 500/500 102.91 'LN 511' Cont Type FN AC DC Conductor Rating (MVA) single AC Same as Case Rating 4.2. Equipment Parameters and Assumptions Nominal voltage rating: 500/230kV Line MVA normal and emergency rating: 550 MVA/550 MVA Grounding design for underground or submarine circuits: Not applicable PSE&G Restricted Page 19 of 28

Equipment ratings: 3000A Transformer MVA normal and emergency rating: 330/440/550 MVA Total mileage: Reactive Devices: Not applicable Synchronous Machines: Not applicable Line Impedances: Line Type R 1 (pu) X 1 (pu) B 1 (pu) Brunswick-Wake to Clubhouse 230kV line 0.000 0.006 0.010 500/230kV transformer 0.00022 0.01462 Table 5: Rogers Road to Clubhouse Impedances 4.3. PSS/E idev Files PSS/E idev files were submitted electronically on March 17, 2016. 4.4. Supporting Information A thermal overload in Dominion s territory was identified in the 2016 RTEP s Generation Deliverability study. The thermal overload on the Rogers Road to Carson 500kV line occurs with an outage of the nearby Rawlings to Carson 500kV line. To alleviate the overload and improve system reliability, a new 230kV line is proposed. The project will use the Rogers Road 500kV station to interconnect 500-230kV transformer. From the 230kV side of the transformer, there will be a new 230kV circuit to Clubhouse 230kV station. A new circuit breaker will be added to Clubhouse 230kV. PJM identified a thermal overload of 105% from a single contingency in the generation deliverability analysis. 4.5. Proposal Template Spreadsheet The final RTEP Proposal Template spreadsheet (in Excel format) is provided electronically as a separate file. 4.6. Market Efficiency Section is not applicable to this proposal. PSE&G Restricted Page 20 of 28

5. Cost 5.1. Cost Estimate 5.1.1. Total Cost 5.1.2. Yearly Cash Flow 5.1.3. Escalation Rates 5.2. Detailed Breakdown of Cost PSE&G Restricted Page 21 of 28

5.2.1. Planned Return on Equity 5.2.2. Estimated Monthly AFUDC 5.2.3. Annual O&M Cost 5.3. Cost Commitment PSE&G is providing a good faith, educated cost estimate for this project. Based on PSE&G s current assessment of the risks associated with constructing this project, PSE&G will not be submitting an accompanying cost containment mechanism. PSE&G Restricted Page 22 of 28

6. Schedule PSE&G Restricted Page 23 of 28

7. Operations/Maintenance PSE&G Restricted Page 25 of 28

7.1.2. Intentions for Control Center PSE&G may negotiate agreements to support Control Center operations. 7.1.3. Maintenance Contracts PSE&G may negotiate agreements to support maintenance. PSE&G Restricted Page 26 of 28

8. Assumptions PSE&G Restricted Page 27 of 28

PSE&G Restricted Page 28 of 28