Islanding of 24-bus IEEE Reliability Test System

Similar documents
Islanding of 24-bus IEEE Reliability Test System

ECEN 667 Power System Stability Lecture 19: Load Models

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

Distributed Energy Resources

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

Grid Stability Analysis for High Penetration Solar Photovoltaics

Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

A Variable Speed Wind Generation System Based on Doubly Fed Induction Generator

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

TRANSMISSION LOSS MINIMIZATION USING ADVANCED UNIFIED POWER FLOW CONTROLLER (UPFC)

A SIMPLE CONTROL TECHNIQUE FOR UNIFIED POWER FLOW CONTROLLER (UPFC)

ECE 740. Optimal Power Flow

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1

Electrical Transmission System Analysis EE 456 project. Team Members Abdulaziz Almarzouqi Hamzah Abeer

Contingency Ranking and Analysis using Power System Analysis. Toolbox (PSAT)

Case No. 5 Sequential Motor Dynamic Acceleration Simulation ETAP TS V&V Case Number TCS-TS-181

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC

Power Technology Issue 104

Computer Aided Transient Stability Analysis

COMPARISON BETWEEN ISOLATED AND GRID CONNECTED DFIG WIND TURBINE

Transient Stability Analysis with PowerWorld Simulator

Power Flow Simulation of a 6-Bus Wind Connected System and Voltage Stability Analysis by Using STATCOM

COMPARISON OF DIFFERENT SOFTWARE PACKAGES IN POWER FLOW AND SHORT-CIRCUIT SIMULATION STUDIES. A Project

Fifteenth National Power Systems Conference (NPSC), IIT Bombay, December 2008

Journal of American Science 2015;11(11) Integration of wind Power Plant on Electrical grid based on PSS/E

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

DYNAMIC BEHAVIOUR OF SINGLE-PHASE INDUCTION GENERATORS DURING DISCONNECTION AND RECONNECTION TO THE GRID

Simulation of Security Constraint Optimal Power Flow Using Power World Simulator

SPIDER Modeling Sub-Group DER Modeling, CAISO Experience

IEEE Transactions on Applied Superconductivity, 2012, v. 22 n. 3, p :1-5

EE 456 Design Project

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

Use of STATCOM for Improving Dynamic Performance of Wind Farms Connected in Power Grid

Comparative Analysis of Integrating WECS with PMSG and DFIG Models connected to Power Grid Pertaining to Different Faults

Feasibility Study Report

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

Optimal Power Flow Formulation in Market of Retail Wheeling

Power System Economics and Market Modeling

STABILITY ANALYSIS OF DISTRIBUTED GENERATION IN MESH DISTRIBUTION NETWORK IN FREE AND OPEN SOURCE SOFTWARE

Stability Study for the Mt. Olive Hartburg 500 kv Line

Effect of crowbar resistance on fault ride through capability of doubly fed induction generator

POWERWORLD SIMULATOR. University of Texas at Austin By: Mohammad Majidi Feb 2014

T5S4P3 Synchronous Condensers Application. Mr. Marco Schenone Mr. Sandro Tuscano Mr. Alessandro Oldrati

POWER FLOW SIMULATION AND ANALYSIS

Computation of Sensitive Node for IEEE- 14 Bus system Subjected to Load Variation

Power Flow Control through Transmission Line with UPFC to Mitigate Contingency

PSO project EaseWind Enhanced ancillary services from Wind Power Plants. Anca D. Hansen DTU Wind Energy

Experiences with Wind Power Plants with Low SCR

Impact of Islanding and Resynchroniza?on on Distribu?on Systems

Virtual Synchronous Machines for Supporting Flexible Operation of Distribution Systems

Aggregation of plug-in electric vehicles in electric power systems for primary frequency control

STABILIZATION OF ISLANDING PEA MICRO GRID BY PEVS CHARGING CONTROL

Electric Power Research Institute, USA 2 ABB, USA

Introduction to PowerWorld Simulator: Interface and Common Tools

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS

Transient Stability Assessment and Enhancement in Power System

Power Quality Improvement Using Statcom in Ieee 30 Bus System

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

HVDC. TMT&D provides the best and most economical HVDC system.

Electrical grid stability with high wind energy penetration

INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT

PES Cook Islands KEMA Grid Study Final Report

Tutorial. Running a Simulation If you opened one of the example files, you can be pretty sure it will run correctly out-of-the-box.

RECONFIGURATION OF RADIAL DISTRIBUTION SYSTEM ALONG WITH DG ALLOCATION

Variable frequency transformer for asynchronous power transfer

Performance Analysis of Transmission Line system under Unsymmetrical Faults with UPFC

HVDC Back-to-Back Interconnections Enabling reliable integration of power system

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations

COMPARISON OF DIFFERENT METHODS FOR EXCITATION OF SYNCHRONOUS MACHINES

EEEE 524/624: Fall 2017 Advances in Power Systems

Smart Integrated Adaptive Centralized Controller for Islanded Microgrids under Minimized Load Shedding

Study of DFIG based Wind Turbine for Reactive Power Generation Capability

Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line

/12/$ IEEE. M. Bashir M.Sc student, Student Member, IEEE Ferdowsi University of Mashhad Mashhad, Iran

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen)

Impact Analysis of Fast Charging to Voltage Profile in PEA Distribution System by Monte Carlo Simulation

ENHANCEMENT OF ROTOR ANGLE STABILITY OF POWER SYSTEM BY CONTROLLING RSC OF DFIG

Available Transfer Capacity with Renewable Energy

STATCOM Application to Address Grid Stability and Reliability: Part II. D.J. SHOUP, N.W. TENZA Mitsubishi Electric Power Products, Inc.

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

Dynamic Control of Grid Assets

Power Consump-on Management and Control for Peak Load Reduc-on in Smart Grids Using UPFC

A Case Study on Aggregate Load Modeling in Transient Stability Studies

Anupam *1, Prof. S.U Kulkarni 2 1 ABSTRACT I. INTRODUCTION II. MODELLING OF WIND SPEED

6545(Print), ISSN (Online) Volume 4, Issue 2, March April (2013), IAEME & TECHNOLOGY (IJEET)

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

CIGRE US National Committee 2013 Grid of the Future Symposium. Facilitating Bulk Wind Power Integration Using LCC HVDC

Possibilities of Distributed Generation Simulations Using by MATLAB

S o u t h w e s t P o w e r P o o l D i s t u r b a n c e P e r f o r m a n c e R e q u i r e m e n t s. Revision 3.0

Optimal Power Flow (DC-OPF and AC-OPF)

Wind Power Plants with VSC Based STATCOM in PSCAD/EMTDC Environment

Grid Stability Analysis for High Penetration Solar Photovoltaics

Transcription:

Islanding of 24-bus IEEE Reliability Test System Paul Trodden February 17, 211 List of Figures 1 24-bus IEEE RTS, with line (3,24) tripped and buses 3,24 and line (3,9) uncertain.................................... 3 2 Dynamic simulation results for islanding of buses 3 and 24........ 6 2 (continued) Dynamic simulation results for islanding of buses 3 and 24. 7 3 Generator swings as a consequence of breaking line (15, 24) and switching off the 182 MVA generator at bus 16..................... 8 4 Power swings on line (15,16) as a consequence of breaking line (15,24) and switching off the 182 MVA generator at bus 16............ 9 5 Comparison of total real power generation at buses 15 and 16 with generation from all other buses.......................... 9 6 Real power in the network: total generation, demand, and losses..... 1 7 Dynamic simulation results when mechanical power is ramped down rather than switched................................. 11 8 Generator swings as a consequence of breaking line (15,24) and ramping down the 182 MVA generator at bus 16................... 12 9 Power swings on line (15,16) as a consequence of breaking line (15,24) and ramping down the 182 MVA generator at bus 16........... 13 1 Dynamic simulation results for the electrical isolation from the network of switched-off generators........................... 15 1 (continued) Dynamic simulation results for the electrical isolation from the network of switched-off generators.................... 16 1 Introduction The IEEE RTS [1] comprises 24 buses and 38 lines. Of the buses, 17 have loads attached, and the total real power demand is 285 MW. Generation capacity is 345 MW from 32 synchronous generators; in addition, there is one synchronous condenser at bus 14. 1

2 Scenario description In [2], a number of most-likely contingency scenarios are determined for the RTS, under a set of specified assumptions. The most probable collapse sequence is found to be the consecutive tripping of the transmission line between bus 15 and bus 24 and the line between bus 3 and bus 9. The authors show that load flow computations subsequently fail, since the system fails to supply the load at bus 3. In this section, we simulate this collapse sequence, and show that further failure may be prevented by a combination of islanding and load shedding. The simulation proceeds as follows. We assume that the line (15,24) has tripped, and study the network immediately after this first failure. Line (3, 9) is marked as uncertain (and assigned to set L ), as are bus 3 and bus 24, which are assigned to B. No buses are assigned to B 1. Figure We constrain the generators so that, for each, real power output may either be held at the current operating level or instantaneously decreased to zero. On the other hand, reactive power output may be set to any value between limits for the generator. The current (post-failure) operating point is obtained from solution of a DC OPF. Table 1 shows the generator outputs at nominal operation; the total cost of this generation is $61k per hour. 2

~ ~ ~ 18 21 22 17 ~ 16 19 ~ ~ ~ ~ 2 23 15 14 13? 24 11 12? 3? 9 1 8 4 5 6 1 2 7 ~ ~ ~ Figure 1: 24-bus IEEE RTS, with line (3,24) tripped and buses 3,24 and line (3,9) uncertain. g b P G g (MW) 1 1 16 2 1 16 3 1 76 4 1 76 5 2 16 6 2 16 7 2 76 8 2 76 9 7 57.1 1 7 57.1 11 7 57.1 12 13 76.3 13 13 76.3 14 13 76.3 15 14 (a) Buses 1 14 g b P G g (MW) 16 15 2.4 17 15 2.4 18 15 2.4 19 15 2.4 2 15 2.4 21 15 155 22 16 155 23 18 4 24 21 4 25 22 5 26 22 5 27 22 5 28 22 5 29 22 5 3 22 5 31 23 155 32 23 155 33 23 35 (b) Buses 15 24 Table 1: Generator outputs at nominal operation 3

3 Islanding solution The islanding solution depends on the value of β d. For β d =.5, d, the solution is described as follows. Lines (1,3) and (3,9) have been disconnected, islanding the uncertain buses 3 and 24 in Section. No generators are present in Section, so the load at bus 3 is fully shed. The following generators have been switched off One of the two 16 MW generators at bus 2. Four of the five 2.4 MW generators at bus 15. The 155 MW generator at that bus remains. The 155 MW generator at bus 16. Consequently, the only load shed in Section 1 at bus 9, where 174.4 MW is supplied against an original demand of 175 MW. 4 Dynamic simulation This section describes dynamic simulations of the network, from post-fault operation to the situation after islanding. Although the islanding formulation uses a DC model, the simulated network is AC, necessitating the determination of AC operating conditions both prior to and after islanding. Thus, the following sequence of operations is used to determine the parameters for time domain simulation. 1. Post-failure: Solve an AC optimal power flow (OPF) with the same penalties on real power generation as for the DC OPF. This provides the pre-islanding AC operating point, which differs from the DC solution in that generation is higher (to account for losses), voltages may be off nominal, and reactive power flows are non-zero. 2. Islanding: Disconnect lines as proposed by the (DC) islanding optimization. 3. Post-islanding: Solve an AC optimal load shedding optimization on the islanded network with the following equality constraints on real power output of generators If the DC islanding optimization switched off generator g, p G g =. Else generator g is constrained to operate at its pre-islanding operating point: p G g = P G,pre-islanding g. The reactive power is permitted to vary between limits. This determines the postislanding AC operating point, and includes among other things the correct proportion of loads to shed at each bus. 4

The time domain simulation is executed between the two operating points. Dynamic data for the generators may be found in [3]; the synchronous machines are assumed be governed by second-order, lossless dynamics, with varying magnitudes of inertia depending on the rated output of each machine. Since a lossless, undamped machine is not realistic, we have assumed a damping coefficient D = 15 for each machine. The switching off of generators is simulated by reducing to zero their mechanical power inputs instantanously. Thus, the machines remain electrically connected to the network, and reactive power output changes are realized by changing the field voltages. Lines are disconnected by use of the breaker feature in PSAT, which trips a line at some user-specified time. Loads are shed instaneously upon request. Results for the solution corresponding to β =.5 the islanding of buses 3 and 24 are shown in Figures 2 6. Salient points are as follows: The islanding solution is transient stable, both in terms of frequency and voltage. Generator frequencies oscillate but all settle to 1 p.u. (6 Hz). The largest swings are associated with the generators at buses 15 and 16 and the line between, with fast ( 2 Hz) oscillations. The 182 MVA generator at bus 16 is switched off; the zeroing of mechanical input power leads to large swings in the electrical power output around zero. The 182 MVA generator at bus 15 maintains its mechanical input power at 155 MW; the electrical output swings about this value. The line (15,16) which carried 25 MW from 15 to 16 prior to islanding swings wildly before settling at a value close to 24 MW. Buses 18, 21 and 23 associated with the largest generators also see quite large swings, despite none of these generators being switched. Voltages temporarily violate upper limits, before settling. (Note that the two very low voltages at buses 3 and 24 are irrelevant, since no load or generation is present in this island. 5

5 2 4 3 2 1 1 q G g (MVAr) 15 1 5 2 (a) Real power generated 5 (b) Reactive power generated p L,fr l (MW) 3 2 1 1 2 3 4 5 (c) Line real power flows q L,fr l (MVAr) 1 5 5 1 15 (d) Line reactive power flows Figure 2: Dynamic simulation results for islanding of buses 3 and 24. 6

vb (p.u.) 1.6 1.4 1.2 1.98.96.94 (e) Bus voltages ω (p.u.) 1.1 1.8 1.6 1.4 1.2 1.998.996.994.992 δb δb1 (deg) 3 25 2 15 1 5 5 1.99 (g) Angular frequencies 15 (f) Bus relative phase angles Figure 2: (continued) Dynamic simulation results for islanding of buses 3 and 24. 7

2 15 1 5 5 1 182 MVA at bus 15 182 MVA at bus 16 15 (a) Real power outputs of generators at buses 15 and 16 44 42 4 38 471 MVA at bus 18 471 MVA at bus 21 412 MVA at bus 23 36 34 32 (b) Real power outputs of generators at buses 18, 21 and 23 Figure 3: Generator swings as a consequence of breaking line (15,24) and switching off the 182 MVA generator at bus 16. 8

28 27 26 p L,fr l (MW) 25 24 23 22 21 2 Figure 4: Power swings on line (15,16) as a consequence of breaking line (15,24) and switching off the 182 MVA generator at bus 16. X g b {15,16} 35 3 25 2 15 1 5 265 26 255 25 245 24 235 X g b/ {15,16} Figure 5: Comparison of total real power generation at buses 15 and 16 with generation from all other buses. 9

29 285 Real Power 28 275 27 P P g pg g d pd d 265 26 (a) Total real power generation and demand 65 6 Pl pl,fr l + p L,fr l (MW) 55 5 45 4 (b) Total real power line losses Figure 6: Real power in the network: total generation, demand, and losses. 1

5 1.6 4 3 2 1 1 vb (p.u.) 1.4 1.2 1.98.96 2 (a) Real power output generated.94 (b) Bus voltages ω (p.u.) 1.1 1.8 1.6 1.4 1.2 1.998.996.994.992.99 (c) Angular frequency p L,fr l (MW) 3 2 1 1 2 3 4 5 (d) Line real power flows Figure 7: Dynamic simulation results when mechanical power is ramped down rather than switched. 4.1 Ramp-down of generation Figures 7 9 show the results for when mechanical power input to the switched off generators is allowed to ramp down (over five seconds) rather than instantaneously change. Line cuts are still made instantaneously after one second. The gentler input change does not excite the large swings seen previously at buses 15 and 16, these generators showing only small oscillations. On the other hand, while reduced in amplitude, oscillations remain on the large generators at buses 18, 21 and 23. During the ramp down, the frequency rises by a small amount (.3%) as a consequence of the network being temporarily rich in generation. The oscillations on frequency, however, are greatly reduced. The voltage profile is almost exactly the same as before, since reactive powers are instantaenously changed as required. 11

2 15 1 5 5 1 182 MVA at bus 15 182 MVA at bus 16 15 (a) Real power outputs of generators at buses 15 and 16 44 42 4 38 471 MVA at bus 18 471 MVA at bus 21 412 MVA at bus 23 36 34 32 (b) Real power outputs of generators at buses 18, 21 and 23 Figure 8: Generator swings as a consequence of breaking line (15, 24) and ramping down the 182 MVA generator at bus 16. 12

26 25 24 p L,fr l (MW) 23 22 21 2 Figure 9: Power swings on line (15,16) as a consequence of breaking line (15,24) and ramping down the 182 MVA generator at bus 16. 13

4.2 Full disconnection of generators Now when a generator is switched off it is electrically isolated from the network, so provides no reactive power. Figure 1 shows the results. Disconnection is done instantaneously, at the same time as line cuts, and real power is not ramped down as in the previous sub-section. Key points: Real power swings are far less severe than for the case where the generators remain electrically connected. In general, more generators have to change their reactive power outputs to compensate for the loss of capability of the disconnected machines. Voltage oscillation is the most severe so far. Frequency oscillations are small. References [1] Reliability Test System Task Force of the Application of Probability Methods Subcommittee, IEEE reliability test system, IEEE Transactions on Power Apparatus and Systems, vol. PAS-98, no. 6, pp. 247 254, 1979. [2] J. Hazra and A. K. Sinha, Prognosis of catastrophic failures in electric power systems, in IEEE International Conference on Industrial Technology, December 26, pp. 1349 1354. [3] Reliability Test System Task Force of the Application of Probability Methods Subcommittee, IEEE reliability test system 1996, IEEE Transactions on Power Systems, vol. 14, no. 3, pp. 11 12, 1999. 14

5 2 4 3 2 1 1 q G g (MVAr) 15 1 5 2 (a) Real power generated 5 (b) Reactive power generated p L,fr l (MW) 3 2 1 1 2 3 4 5 (c) Line real power flows q L,fr l (MVAr) 1 5 5 1 15 (d) Line reactive power flows Figure 1: Dynamic simulation results for the electrical isolation from the network of switched-off generators. 15

vb (p.u.) 1.6 1.4 1.2 1.98.96.94 (e) Bus voltages ω (p.u.) 1.1 1.8 1.6 1.4 1.2 1.998.996.994.992 δb δb1 (deg) 3 25 2 15 1 5 5 1.99 (g) Angular frequencies 15 (f) Bus relative phase angles Figure 1: (continued) Dynamic simulation results for the electrical isolation from the network of switched-off generators. 16