Hornby 08 Diesel Shunter EM Finescale Conversion.

Similar documents
Hornby Railroad Crosti 9F EM Finescale Conversion.

Heljan EM Finescale Conversion.

Bachmann GWR Earl (Dukedog) EM Finescale Conversion

1. Invert the tender, and hold in a suitable device. We use a foam cradle the Peco loco service cradle being ideal.

Bachmann D11 EM/S4 Finescale Conversion

Hornby Railroad Hall EM Finescale Conversion.

Hornby GWR Star Class EM Finescale Conversion.

Bachmann 1F (Half Cab) EM Finescale Conversion

Heljan Class 16 EM Finescale Conversion

Keeper plate removed carefully. Marking the gear position on the axle.

Instructions for Assembling Driving Wheels, Axles and Crankpins

4mm scale 009 gauge Lodge Hill & Upnor railway Chattenden Drewry loco body kit.

SMITHS CAR CLOCK REPAIR KIT

Gearbox Assembly 101. Introduction. Before Beginning. By Mark Schutzer 4/13/06

Fitting new lock and replacing a door latch assembly

Improving the gearshift feel in an SW20.

Re-Energy.ca - Solar Electricity - Build Your Own Solar Car

Tri-Spark Ignition System Installation Triple Cylinder TRI-0001

Stephenson's Valve Gear: 7mm cast white-metal kit 19 th Century swing-link version - non-working, cosmetic only. Instructions

Mercedes Benz ABC Hydraulic Valve Block Solenoid Oil Seal Repair Fix Rebuild Kit Seals O-Rings Overhaul Install Instructions

$1.00 FOR THE TQIO/RCIO

The 2mm Scale Association etched replacement chassis for RTR loco bodies

REAR INTERIOR AMBIENT LED FITTING INSTRUCTIONS AUDI A4(B6) 2001 onwards

*Some speedometers have these additional electronic connections. If yours does, then remove the smaller slotted screws shown.

Fitting Radio Control to a Mamod Boulton

Fitting Instructions For The TDV6 EGR Blanking Kit To A 2006 Model Discovery 3 TDV6 GHSE

Installation instructions, accessories. Multimedia monitor with DVD, Dual screen. Multimedia monitor with DVD, Dual screen V1.

Trackstar Motorized Folding Shade Installation Instructions

Installation Manual TWM Performance Short Shifter Cobalt SS/SC, SS/TC, HHR SS, Ion Redline and Saab 9-3

WifiTrax WMR-10 in Atlas RS-3

DRIVE SHAFT LOCATION INDEX

DrVanos.com Stage II Installation Instructions. Tool rental is available with the purchase of a vanos kit *See website for more info*

Fitting the Bell Auto Services (B-A-S) TDV6 EGR Blanking Kit to a 2006 model Discovery 3 TDV6 HSE

INSTRUCTIONS & RECOMMENDATIONS

INSTALLATION INSTRUCTIONS JEEP 2011-UP JK SECURITY FULL CONSOLE #274

The HMC-Lite Construction Guide

This is a guide to assist you adjust the valve clearance on a 2l V6 MIVEC engine found in a Mitsubishi FTO GPX

Bruce s Science workbench

In area - A -, a proper seal must be made against the top of the window glass.

STAY ON TRACK WITH THIS LINE FOLLOW BUGGY WITH :MOVE LINE FOLLOW BOARD FOR BBC MICRO:BIT

J&M Mustang Adjustable Panhard Rod (05-09) - Installation Instructions

SMITHS CAR CLOCK REPAIR KIT

5 Removal and replacement

PLEASE READ THROUGH THE WHOLE WRITE UP BEFORE ACTUALLY USING IT!!!!

Work shop manual. Öhlins Steering damper Road & Track

The H-MAC Heavy Metal Articulating Chassis Construction Guide

TD5 BOOSTER INSTALLATION GUIDE

26 Hume Reserve Court, Nth. Geelong, 3215 Phone: (03) Fax: (03) DUAL RANGE HIGH SPEED INSTALLATION MANUAL. for

LAND ROVER DISCOVERY 3/ SPARE WHEEL CARRIER

TD5 BOOSTER INSTALLATION GUIDE

Repair Manual 11/99 PS-34. Page 1

Traditional method Oil Change Instructions For VW 1.9 TDI

Bag 1. Bag 1. Center Pivot. Center Pivot

Assembly Manual. 1/10th World GT car

J & D Machine / Hyperdrive / MSA 3711 Moon Bend Rd. Chapel Hill, TN 37034

iphone 5s Front Panel Replacement

Motorising Set for Corgi Feltham Tram BEC-KITS) Fitting instructions

Installation Instructions Console Megashifter

SERVICE MANUAL. Hollandia 300 Large

Upgrading Proto axle Geeps with Stewart Trucks. November 27, 2010 Mark Schutzer

BMW 528i E39 Sunroof Repair

Steeda S550 MT-82 Tri-Ax Race Short Throw Shifter Installation Instructions For Parts: ,

CLUTCH CABLE REPLACEMENT GUIDE FOR THE FOLLOWING PRODUCTS 2004 ONWARDS

BMW E61 Hydraulic Pump replacement instructions

PRO RATCHET UNIVERSAL SHIFTER

NSWGR Z Tank Locomotive

Installation Instructions. QuickSilver Shifter. Fits: GM, Ford, Chrysler Transmissions See Application Guide for Specific Applications Part # 80683

Walthers/Life-Like USRA Steam Locomotive

Micro-Trains #1021/#1022 Low short profile coupler

Top Down Rollstar Shade Installation Instructions

Name: ACORN Inc. Address: 6450 Kingspointe Parkway, Unit 1, Orlando, Florida, IMPORTANT!

Shown with optional GFR-1017R Body Posts. J & D Machine / Hyperdrive / MSA 3711 Moon Bend Rd. Chapel Hill, TN

Maintenance Information

Automatic Roof Hatch Opener

MATCHLESS SPINNING WHEEL

Maintenance Information

2. With the rear door open remove pull-style clip from the passenger side just below the door latch.

Assembly Manual. 1/10th Formula 1 Car

OVERHAULING BRAKE CALIPERS GUIDE by Mr. Stefnwolf. This guide is for a 1982 GSX750ET but I expect most of the GS series to be similar if not the same.

Magnetic MTV Kit. User Guide. Components

Fuel Pump & Sending Unit Repair

Technical Support (707)

C15C C15C. Page 1 of 20

Written By: Sam Lionheart

Honda Super Cub Etc. Frame & Forks

AmTryke Adult Recumbent Model JT2000 #50-FC-2000

Chopper Couplings. Assembly. Fitting

S1 Sequential. T56 Magnum. Sequential shifter. Contents and assembly instructions

Clutch Kit Install Guide

Your G3 buggy is fitted with three switches on the front part of the body:

CHAPTER 11: FLYWHEEL, CLUTCH AND ALTERNATOR BACK ON

Installation Instructions COMPETITION/PLUS SHIFTER Ford Mustang MT82 6-Speed Manual Transmission Catalog#

1 Engine nacelle kit with outrigger for A 10 and similar models 7249 /52 1 Taper collet, 3.17 mm bore, 2 locking screws and cap nut 7249 /69

Installation Instructions

393: Multimedia system for the rear seat Multimedia system for the rear seat

Installation Instructions for the EVO3 Height-Adjustable Ultimate Short Shifter

Shock Tower Brace Installation Instructions Mazda Miata

NSWGR C LOCOMOTIVE AND TENDER KIT

3M Overhaul Service Kit

WARNING TAKE NOTE OF THE FOLLOWING: THIS PRODUCT MUST BE INSTALLED EXACTLY AS PER THESE INSTRUCTIONS USING ONLY THE HARDWARE SUPPLIED.

Transcription:

Hornby 08 Diesel Shunter EM Finescale Conversion. Before you start, it is a good idea to have some small containers or snap top poly bags to put screws and components in for safe keeping...much better than crawling about on the floor trying to find lost bits! 1. First, we need to remove the brake gear and axle box under keep moulding each side. This appears on later models to be glued into the chassis, whereas on earlier models they were simply a push fit. With care they can be levered out some force and a small screwdriver are required. If they break into sections, it is not the end of the world as they will clip back and appear as one when in position. Brakes being levered out. Brake moulding removed.

2. Next the coupling rods can be removed by undoing the crankpin screws with fine nose pliers. Take care, as these rods are quite delicate and can bend alarmingly if you are not careful. Rods removed. Store the rods safely until later. The crankpin screws can go into the spares box, as we have no further use for them. 3. Next, we must remove the body. Undo the four screws, one in each corner underneath the footplate, and the body lifts of easily. Body removed. 4. The next operations are aimed at loosening the wires from the motor to the pickups to allow them to easily to pull through the chassis from underneath later. 5. First, undo and remove the two motor mounting screws each side by the flywheel, and store safely. Remove the two screws, one each side by the flywheel.

6. Next undo the two screws holding the rear motor mounting plate, and lift the mounting plate away. Rear screws to be undone. Lift mounting plate away. 7. The motor can now be lifted clear carefully you may have to tease the red and black pickup leads from under the tape holding them to the motor. As you lift the motor, catch the small driveshaft that links the motor to the drive train. Motor lifted out - driveshaft below. 8. You can now see where the wires pass through the chassis, and at this point is a glob of what can only be described as tacky black yuk as shown below with the screwdriver stuck in it. Loosen this gunge, it usually comes away in one stringy lump, wrap in a tissue and put in the bin before it gets trodden into the workshop s best Axminster!

Black sticky gunge that needs removing. 9. Once the wires will move freely through the hole in the chassis, you can carefully replace the motor, making sure the driveshaft is fully engaged, and fasten the rear mounting plate and front mounting screws back. It is worth checking by revolving the flywheel that the driveshaft is correctly engaged and that the rear driven axle revolves...very easy to not have the driveshaft engaged correctly. 10. Replace the body it makes holding the loco in a cradle much easier for the next steps. 11. Invert the loco and hold in a suitable cradle, we use the foam Peco service cradle. 12. Undo the three screws and remove the keeper plate, which just lifts away. Keeper plate removed. 13. The front and rear wheelsets will now lift out. Front and rear wheelsets removed. 14. The centre wheels cannot be lifted out until the pickups are removed first. They are fastened, very lightly, to two plastic U shaped carriers which are in turn linked to each other by very thin clear plastic film. The copper strips fall off this film, and will lift away with great care so as not to bend or damage them.

If you successfully removed all the black gunge from under the motor, these pick up strips should lift away and the wires pull through without resistance. Pickups lifting away. Pickup carriers removed, allowing centre wheel removal. 15. We can now turn our attention to building up the wheelsets. 16. First, recover the brass bushes and drive gear from the Hornby wheels. Press the gear off the rear axle by pushing or tapping the axle through the gear. DO NOT TWIST the gear off the axle, as it is held on knurled splines which will damage the gear bore if twisted. 17. Mount one Gibson wheel onto the axle, and twist on until there is approx 5mm of plain axle protruding from the front face of the wheel. We simply do this with fingers and press down on a solid surface. 18. For the front and centre axles, place 2 x 1mm thick spacing washers onto the axle, then the two Hornby bushes (flanges facing each other towards the centre), a further 2 x 1mm thick spacing washers, followed by the second wheel, and set the back to back with a suitable gauge. There should be equal amounts of axle protruding each side. Front wheelset. Note spacing washers and Hornby bearings.

19. These two axles can now be placed in the chassis. 20. The pickups can now be eased carefully back into position. We used some insulting tape to help hold the copper strips in position until we can put the keeper plate back on. Front and centre wheelsets and pickups replaced. 21. We now place the rear driven axle into the chassis so that it is central, and mark the position of the gear with a felt pen. Marking the gear position on the axle. 22. Place the axle on something like a cutting mat, and using the edge of a four or six inch hand file, roll this with a deal of pressure backwards and forwards over the mat. You should produce a knurled effect on the axle which is quite sufficient to grip the gear on the axle with no glue required. You can of course use a drop of loctite or similar if you want. The plain face of the gear should be 13mm from the axle end. Knurled axle.

Axle with gear attached. 23. The axle can now have the wheels, 2 x 1mm spacing washers and Hornby bushes placed on each side, again setting the back to back. 24. This axle can be placed in the chassis make sure it engages with the drive train as it is possible to fit it the wrong way round. Don t ask how I know... Rear driven axle assembled. Rear axle in position. 25. Refit the keeper plate, and it should now look like this!

Wheels and axles all fitted. 26. It is worth placing on the track and applying power to make sure the pickups work and the driven axle revolves as it should. Outside Cranks and Rods. 1. Remove the cranks from the sprues, countersink the rear face crankpin holes and fit the crankpin screws as you would in a normal Gibson wheel. Because these are rather delicate, two spares should be found in the wheel pack. Put these somewhere safe in case you need them in the future. Outside cranks with crankpin pins fitted. 2. The cranks can now be gently pushed onto the plain axle ends. Try to push these on as square as you can, and all should be fine. Problems with the cranks splitting tend to happen if you push them on slightly lop sided. Cranks push fitted to axles. Note they are not fully pushed flush with the axle end yet.

3. We tend to push them half to three quarters onto the axle, so that quartering can be done easily. 4. Quartering is by eye I m afraid. It does not matter if the cranks are not at 90 degrees to each other, somewhere near is quite good enough. After all, who can see both sides at the same time, let alone measure the exact angle? 5. Once satisfied with the basic quartering, place a short crankpin bush over each pin. For a change, the rods need no bushing to bring the holes down to size, but need a small amount of opening up with a cutting broach. Check with a crankpin bush to get a good running fit, and carefully do all the rod holes. Again, caution. Hornby s rods seem quite soft and bend easily. 6. Place rods over the bushes, and retain with crankpin nuts. 7. It should be quite obvious at this point with the rods on if any further adjustment is needed to the quartering. Rods fitted. 8. A gentle track test will confirm if the quartering is as it should be. If not, adjust and test again. 9. The final operation is to chamfer the brake blocks on the brake mouldings. These need paring or filing back to 45 degrees quite severely. Aim to remove about half the block. Chamfer brake blocks. 10. Re fit the brake mouldings. 11. Again, track test gently to ensure nothing is catching...the sand pipes can catch you out when re fitting the brake mouldings.

The finished article. Do not forget to lubricate the new parts! Pete Hill August 2013 Other Parts Used in this Method 4M42B Crank pins 4M67/3 1/8 Spacing Washers